Loading...
36 MARCH ST - BUILDING INSPECTION (2) --- s�. 7 fhc C'onunonsvcahh ul Massachuuats Board of Building Regulations and Standards ('I'1')'OF Y sr Nlassachusct(S State Building Code. 780 C'NIR SALLM 'tip.,.' Hrri.ecJlhu _'lll/ Building Permit Application To C'onslntct, Repair. Renovate Or Demolish a One-or rnw-Fantih Dn ellii,if f This Section For 011ieia se 0111 Building Permit Number. _— Date, pplicd: Budding Uliiciul(Print N;une) Signature Bute SECTION I:SITE INFORMATION 1.1 Pyoperty� M �T 1,2 Assessors flap& P�urc�Nrumben L�Ia�Is this an acce led street?yes r/ no Nfap Number Parcel Numhcr 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed(Jse Lot Area Isq It) Frontage(11) 1.5 Building Setbacks(it) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Wateerr Supply:IM.G.I.c.40.§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public fd Private❑ Zone: _ Outside Flood Zen-? Chock ifc site disposal system ❑ SECTION3: PROPERTY OWNERSHIP 2.1 Owner'of Record: �Ml rIAA\/� �7 �iF F l7%L Ern AN �l9`7U N;une 1 Prmt) C tly.stale,LIP �,r,r�s� S r 9- X( No.:md Slrecr�Y) � TeiS80e D Email Address SECTION J: DESCRIPTION OF PROPOSED WORKS(check all that apply) New Construction ❑ Existing Building Owner-Occupied Repairs(s) ❑ Alteration(s) Addition ❑ Demolition Accessory Bldg.Cl Number of Units Other ❑ Specify: Brief Description of Proposed Work=:_ 4y—'&A 640M N 200 f76 it STAr/7-j SECTION 4: ESTIMATED CONSTRUCTION COSTS 11em Estimated Costs: (Labor and \laterialsl Official Use Only I. Building S SOO �% I. Building Permit Fee: f Indicate how fee is determined: 2. Electrical S ❑Standard CiryiToon Application Fee ❑Total Project Cost'(Item 6)s multiplier _ —_x !, 1'lunihing S 2. 01her Fees: f _ ._--- 4. .Vxhanic.11 iil\'.1('1 S List: 3 \Icelmnical iFirc — --- -- - - -- Supliressioni S Total .\II Fees: I,, Total Project Cost: S _ -- ('heck No. ('heck Amount: Cosh \m1nml: ` � _. .. . �� ❑Paid in Full ❑OulsnmJing_Il_al;.utce Due: SECTIONS: CONS'I-RUC'r1ON SFRVH'ES 5.1 Construction Supervisor License Si.)(C' 5 66 7�L. J`l��6 /TO/�j I icenx Number Py\irlunn Uaiie ......... ....---- Name ol'('SI. I It,Ider ll I isl CS I. I)Pe Vee halo\\1 �. Sly °=�-- ---__----- ------- .1\pe Dcxriptiun No. and Strcel (19 Unrestricted IIIuiIJin o uO to 15,0110 al. Il.l It RnlricWd IX2 I.unil Doellin Ol\il'oen.Slane.LIP SI Mason RC Roolin Coverin H%'S Window and Siding SF Solid Fuel Ruming Appliances I Insulation .� D Demolition Isle hunt IfmailaJJmsr / 5.2 Registered Ilume Improvement Contractor(HIC) /Sr7,7TR l9 /zQ IIIC Registration Number Fi,piratiun Dale IIC'Cam any Name ur I IIC Registrant Name i9 �� - NU.wtJ Steel L•'muil address Ci /Town,State,ZIP tale hon� SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L,c. 152.1 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed AfTtdavit Attached? Yes ..........0 No...........❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, as Owner of the subject property,hereby authorize &&& llyC to act on my behalf,in all matters relative to work nut rizeddbby tthis building permit application. r�rz , �nn/� Sr E.rw `��4 — z a 2 Prier Uwnar's Nwme(Electronic Signature) Date SECTION 7b:OWNEW OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Print 0%%nerb or Authorind Agcol's Namc(f.lcctronlc Signature) Date NOTES: r.\nr who obtains a building permit to do his her own work,or an owner who hires an unregistered contractor tered in the Hume Improvement Cuntrnctur(HICI Program),will no have access to thearbitration ur guaranty fund under\I.G.L.c. la_'A.Other important information on the HIC Program can be found at . n ,v.t Information on the Construction Supervisor License can be round at \ \. ni.l.: !;o\ III, stantial\vork is planned,pro\ide the information below; a(sy. R.I . __—_-._I including garage, finished basemenCattics,Jaks or porch I Gross li\ingareal sq. fl.l flabitableroumcount I \unlheruFlircplaas ... _ _ \unlherufhednnnns .. \umher ut'hathroums \'umber of half hudis I\pe of heating sf slcm Number ol'Jecks, porches 1 I\pe of arohng s\stent - I'nclascJ Open i {. I'mal Project Square Footage nlal\ he:uhstitoted li,r"fatal Project('list" I Hamel Contracting Inc. Lisc.#CS66734 Reg. #156338 19 Sutton Ave DATE: 12114111 Salem MA. 01970 Estimate# 273 (978)745-3659 FOR: Deck Estimate for: Terry Anne St. Pierre 36 March St. Salem Me. 01970 Description Amount Rebuild deckffire escape Tear out existing landing/rails/stairs/lower landing Pour 4 10"x48" cement footings in driveway for support posts Frame in new deck wf 2x8 PT frame with 6x6 PT posts anchored into new footings Frame lower landing as above Frame 2 new sets of 202 PT stair stringers Install 514"x6" cedar decking surface on all new work Install4x4 cedar posts wf 2x4 cedar rails and 2" ballusters at 40"above deck Install 4x4 cedar postsfrails and ballusters at new stairwayflanding New framing to be anchored to house wallfflashed and waterproofed Repair siding at house connections as needed Contractor to remove all construction debris into roll off container This estimate does not include any paint or finishes Materials 2,500.00 Labor 4,000.00 Any extra siding repairs will be inpected and quoted as an additional cost. Total Estimate $ 6,500.00 This Estimate Valid for 30 Days CITY OF SeUZNf, LYWs kcj1LS 1 l J ©l,'tLDLVG DEP.1A'1TtF.VT 120 W.1 SNLNGTON STRFgpr }1O Roc it Tit. (978) 745-9595 KIJ G3EJU.t3Y DUXOLL FAX(978) 740.9946 .MAYOR Tkows ST.FtEiu DfitE(TOR OP PCeLIC PROPERTY/at:MnCfG CO-WUSSIONER Construction Debris Disposal Affidavit (required for all demolition and renovation work) In accordance with the sixth edition Debris, and the of the State Building Code, 780 CMR section I I I.S provisions of MGL c 400 S 34; Building permit M is issued with the condition that the dcbris resulting from this work shall be disposed of in a proper 11 I, S I JOA. ly licensed waste disposal facility as defined by NIGL c The debris will be transported by: �Enrro,-, I�IfPbflA! S (name ut hauler) 7Srs y s rho debris will be disposed of in �Ennvl/cEr J�rSPoS.Fi S y5 (name of faadily) --------- eat/yILI 1�ddRtr or•r,,d �y) � ynarure ofpermu�pphunt Z/ZoI /Z rr. 1k I 0 ry wr CITY OF SALEM9 MASSACHUSETTS t*/ �S BOARD OF APPEAL 120 WASHINDTON STREET, 3RD FLOOR IIIIIIIIII IIIIIIIIIIIIIIIII�II�IIIIII�IIIII�II f � SALEM, MASSACHUSETTS 01 970 II TELEPHONE: 978-745-9595 1011091600441 Bk:3066Y Pg:583 FAX: 978-740-9846 09/16/2011 03:26 VAR Pg 112 KIMBERLEY DRISCOLL MAYOR qa 03 August 23, 2011 Decision City of Salem Zoning Board of Appeals Petition of TERRYANNE ST. PIERRE requesting Variances from side and front yard setbacks in order to replace an existing deck with a larger, 8'x10' deck on the property on 36 MARCH STREET(R-2). A public hearing on the above Petition was opened on August 17, 2011, pursuant to Mass General Law Ch. 40A, § 11. The hearing was closed on that date with the following Zoning Board of Appeals members present: Rebecca Curran (Chair), Annie Harris,Jamie Metsch,Jimmy Tsitsinos (alternate) and Bonnie Belair (alternate). Petitioner seeks Variances under Sections 4.1 of the City of Salem Zoning Ordinances. Statements of fact: 1. George Fallon presented the petition on behalf of his wife, Terryanne St. Pierre. 2. In a petition date-stamped August 3, 2011, petitioner requested relief from front and side yard setbacks in order to remove an existing deck and replace it with a larger one. 3. No member of the public opposed or supported the petition at the August 17, 2011 meeting. The Board of Appeal, after careful consideration of the evidence presented at the public hearing, and after thorough review of the plans and petition submitted, makes the following findings: 1. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent or purpose of the zoning ordinance. 2. In permitting such change,the Board of Appeals requires certain appropriate conditions and safeguards as noted below. i 2 On the basis of the above findings of fact and all evidence presented at the public hearing Including,but not limited to,the Plans,Documents and testimony,the Zoning Board of Appeals concludes: 1. Dimensional Variances under Sec.4.1 are granted to construct the proposed deck. In consideration of the above,the Salem Board of Appeals voted;five(5)in favor (Curran, Metsch,Harris,Tsitsinos and Belair)and none(0)opposed,to grant petitioner's request for Variances subject to the following terms,conditions,and safeguards: 1.. Petitioner shall comply with all city and state statutes,ordinances,codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissioner. 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction, 5. A Certificate of Inspection is to be obtained. 6. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including,but not limited to,the Planning Board. Rebecca Curran,Chair Salem Board of Appeals A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision,if any,shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A,and shall be filed within 20 days of filing of this decision in the office of the City Clerk.Pursuant to the Massachusetts General Laws Chapter 40A,Section 11,the Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk has been filed with the Essex South Registry of Deeds. Date SEP 1 3 2011 1 hereby certify that 20 days have expired from the date this Instrument was received, and that NO APPEAL has been file d/In�this ttice. A True Copy a_ ATTEST: CI LERK, Salem, Mass. $.�r�a� M!➢, 0l970 '7X y [,Eo�f r?�itg i 'MT k �x2 CEAAR, X 6 TT, pT, SAY X6 gTiilrs6ER5 6x6 P'r. �esr5 /�. lJ �--� ,�••~' • � dx6 fir. yjq ffoAR �fi ' - -� ?osu a �--- (� v a P, f, 57'�N was — ( ®o y8`r eim6N r i � Ar��Irlrh 7, rWAY 4NMe sr r' e4eoV 30 �I�rtcM �r, S�e�M dw4 0/170 i zyeeF r, 3rrI446EtTf ZXg ?_r /S oe v I - � y