Loading...
49 Washington Square North - CofNA - painting and repairs v��OONDITg9Oi < 0 0 ���CtMINE Dfl�Pr Salem Historical Commission 98 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970(978)619-5685 CERTIFICATE OF NON-APPLICABILITY HCNA-22-87 It is hereby certified that the Salem Historical Commission has determined that the proposed: Type of Work: Painting in-kind as described below will be appropriate to the preservation of said Historic District,as per the requirements set forth in the Historic District's Act(M.G.L.Ch.VC)and the Salem Historic Districts Ordinance. District: Washington Square Address of Property:49 WASHINGTON SQUARE NO, U2, SALEM, MA 01970 Name of Owner at time of Submission: FINN JAMES DANIEL;HOULE MAXWELL ALLAN Applicant's Description of Work: Scrape and Paint the right side of the building with the existing colors.Replace two deckboards with the same material. Statement of Conditions:in-kind painting and repairs Scrape the right side of the building and repaint with existing color Replace 2 deckboards with same material All work to replicate existing materials, dimensions, design, location, color and outward appearance. *NOTE: Historic materials and details must be retained and repaired except where material is not salvageable and must be replaced. If replacement is necessary, new elements must replicate existing details, dimensions and materials. Should any changes to materials, design or outward appearance be determined necessary,. Applicant must submit a new application for review. Non-applicable due to being in-kind painting and repairs. Upon completion of above work,please notify Historical Commission staff through permitting system as final sign-of'is required to document compliance with this Certificate and approved plans. Dated:November 8,2022 SALEM HISTORICAL COMMISSION By: This certificate will expire:November 8,2o23, The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings(or any other necessary permits or approvals) prior to commencing work. 49 49 - I