Loading...
297-305 BRIDGE STREET PSS + AUL 11-29-18 Commonwealth of Massachusetts Executive Office of Energy & Environmental Affairs LlDepartment of Environmental Protection Northeast Regional Office • 205B Lowell Street, Wilmington MA o1887 . 978-694-3200 Charles D. Baker Matthew A. Beaton Governor Secretary Karyn E. Polito NOV 2 9 2018 Martin Suuberg Lieutenant Governor Commissioner CERTIFIED MAIL 70141820 00013560 9005 City of Salem Re: SALEM — 3- 11726 Planning & Community Development 297 to 305 Bridge Street 98 Washington Street, 2nd Floor Permanent Solution Statement Salem, MA 01970 Activity & Use Limitation ENF #: 00006101 Attn: Tom Devine Senior Planner NOTICE OF AUDIT FINDINGS INTERIM DEADLINE AUL AUDIT INSPECTION COMPLIANCE SCREENING AUDIT Dear Mr. Devine: The Massachusetts Department of Environmental Protection (MassDEP or the Department) has conducted an audit of a Permanent Solution Statement (PSS) and Notice of Activity & Use Limitation (AUL) submitted for the above-referenced site on January 9, 2015 , MassDEP' s audit of this site consisted of an inspection (Level 2 Audit) of the area subject to the AUL and technical screens (Level 1 Audits) of the PSS and AUL. Level 1 Audits are performed using standard MassDEP checklists. Examples of MassDEP ' s checklists are available on the Internet at http://www.mass. gov/eea/agencies/massdep/cleanup/sites/technical-screenin -ag udit- forns-checklists.html. This Notice informs you (as used in this notice, "you" refers to the City of Salem) of the results of MassDEP' s audits. AUL AUDIT INSPECTION On October 2, 2018, MassDEP conducted an AUL Audit Inspection at the site to observe conditions related to the area subject to a Notice of AUL. In particular, the inspection focused on whether activities and uses were consistent with the terns and conditions of the AUL and whether obligations and conditions required to maintain a condition of No Significant Risk were This information is available in alternate format. Contact Michelle Waters-Ekanem, Director of Diversity/Civil Rights at 617-292-5751, TTY# MassRelay Service 1.800-439-2370 MassDEP Website: www.mass.gov/dep Printed on Recycled Paper Salem, 341726 2 being met. The AUL area is a public parking lot located in a mixed residential and commercial section of Salem. During the October 2, 2018 inspection, MassDEP observed a pay station kiosk on a concrete pad located near the entrance of the parking lot. Following the inspection, MassDEP contacted Alan Sullaway, Assistant Director of the Traffic and Parking Department for the City of Salem, to determine if the pad was installed in accordance with the requirements of the AUL, if applicable. The AUL was filed on December 17, 2014 with the Southern Essex District Registry of Deeds. The AUL allows for construction activities provided that the excavation, movement, and handling of soils below the geotextile liner at depths greater than 1 .5 feet are conducted in accordance with a Soil Management Plan and a Health and Safety Plan, and requires that the asphalt pavement be maintained such that the physical integrity is not compromised. Mr. Sullaway was not sure of the exact date of the installation of the pad, however, he believed it was installed around the time the MBTA began construction of their new garage in Salem. According to information available online, garage construction began around August 2013 and the garage opened in October 2014. So it is likely that the pad was installed at the parking lot prior to the filing of the AUL. Further, even if the pad had been installed after the filing of the AUL, it was only 4 inches in depth, based upon information obtained from Mr. Sullaway, and, therefore, would not have triggered the need for a Soil Management Plan or Health and Safety Plan. In addition, given that the asphalt pavement that was excavated for the pad installation was replaced with concrete, the requirement to maintain the pavement would have been met. Therefore, based upon this information, MassDEP did not identify any violations applicable to the AUL. A copy of MassDEP ' s AUL Field Screening Form is attached. PERMANENT SOLUTION STATEMENT (PSS) TECHNICAL SCREENING AUDIT A technical screening audit of the PSS was performed using a standard MassDEP checklist. The technical screening audit is conducted to identify conditions that pose or could pose Imminent Hazards, identify conditions that require Immediate Response Actions, or recommend the site for a targeted comprehensive audit. Based on the technical screening audit of the PSS, MassDEP is not directing you to undertake further response actions at this time with regard to the PSS . ACTIVITY & USE LIMITATION (AUL) COMPLIANCE SCREENING AUDIT A compliance screening audit of the AUL instrument was performed to ensure that the instrument has been prepared in conformance with and meets the requirements of the Massachusetts Contingency Plan (MCP; 310 CMR 40.0000). As a result of the compliance screening audit, MassDEP has identified the following violation which requires correction: • Violation of 310 CMR 40. 1074(2)(a)(5) Pursuant to 310 CMR 40. 1074(2)(a)5, an 8 1/2" sketch plan shall be attached as an exhibit to the Notice of AUL, showing the location of the Notice of AUL in relation to the boundaries of the disposal site. Exhibit B of the Notice of AUL contains two survey plans, one for Parcels I and II, and one for Parcel III. A sketch plan of the property, however, was not attached to the AUL Salem, 341726 3 identifying the AUL boundaries, disposal site boundaries, and the location of the surfaces to be maintained, specifically the asphalt pavement, concrete blocks, sidewalks, and landscaped areas. ACTIONS TO BE TAKEN AND THE DEADLINES FOR TAKING SUCH ACTIONS : In order to return the site to compliance, by July 1, 2019, submit through MassDEP ' s online filing system (eDEP) a certified registry copy of the following: 1 ) A Confirmatory AUL, pursuant to 310 CMR 40. 1085 , with an attached sketch plan that clearly identifies the AUL boundaries, property boundaries, disposal site boundaries, and barriers to be maintained. In addition, upon completion of the above, a Post-Audit Completion Statement, in accordance with 310 CMR 40. 1170, must be submitted to MassDEP through eDEP . Copies of the forms and instructions are available online at https://www.mass. gov/lists/waste-site-cleanup-forms. Please note that this is an enforceable Interim Deadline issued pursuant to M.G.L. c. 21E, 310 CMR 40. 0167, and 310 CMR 40 . 1140. If you do not meet this deadline, you maybe subject to enforcement action by MassDEP. Please be reminded that the AUL shall be incorporated either in full or by reference into all future deeds, casements, mortgages, leases, licenses, occupancy agreements or any other instrument of transfer. Within 30 days of such incorporating, a copy of the recorded or registered instrument of transfer shall be submitted to MassDEP. LICENSED SITE PROFESSIONAL s A copy of this letter has been sent to Prasanta K. Bhunia, LSP #2999, the LSP-of-Record for the Disposal Site. Please note that you, not the LSP, are responsible for responding to this Notice and correcting the violations identified therein. LIMITATIONS & RESERVATION OF RIGHTS Please note that the screening of the PSS and AUL conducted by MassDEP were not comprehensive audits. It is possible that a future comprehensive audit, if one occurs, may identify violations of applicable laws and regulations for which MassDEP may require you to undertake further response actions at the site or MassDEP may invalidate the PSS and require termination of the AUL. The review of these documents is for use by MassDEP and may not be relied upon for any other purpose. The review does not include a comprehensive list of requirements, which are fully set forth in M.G.L. c. 21E and 310 CMR 40. 0000, and does not constitute a final agency decision, nor create any legal rights or relieve any party of obligations that exist pursuant to applicable laws. MassDEP ' s findings were based upon the accuracy and certainty of the information reviewed during the audit. These findings do not: (1 ) preclude future audits of past, current, or future actions Salem, 341726 4 at the site; (2) apply to actions or other aspects of the site that were not reviewed in the audit; (3) in any way constitute a release from any liability, obligation, action or penalty under M.G.L. c. 21E, 310 CMR 40.0000, or any other laws, regulations, or requirements. MassDEP retains authority to take or arrange, or to require, any Responsible Party or Potentially Responsible Parry to perform any response action authorized by M.G.L. c. 21E, which MassDEP deems necessary to protect health, safety, public welfare, or the environment. If you have any questions regarding this letter, please contact Debra Hawks at (978) 694-3380. Please reference Release Tracking Number 341726 and Enforcement Tracking Number ENF #: 00006101 in any future correspondence to MassDEP regarding the site. erely tal Analyst a avid LI;usata Chief, Audit Section Bureau of Waste Site Cleanup Attachment: AUL Field Screening Form cc : City of Salem, Mayor's Office (mayor salem.com) City of Salem, Board of Health (healthy salem.corn City of Salem, Planning and Community Development (tdaniel@salem.co City of Salem, hrspectional Services is ierre e.salem.com) Prasanta K. Bhunia, LSP-of-Record (bhunigp@wseinc.com) NERO/Data Entry: AUDCOM/INTLET AUL/SNAUDI AUL/TSAUD (10/11/18) MASSACUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION RELEASE TRACKING NUMBER II " 11726 Northeast Regional OfficeBureau of Waste Site Cleanup AUL FIELD SCREENING FORM TowN: SA`EM Site Name: Fmr, Universal Steel (Parking lot) Contact Person: Thomas Devine, Sr. Planner Address: 297-305 Bridge Street I Phone: (978) 619-5682 AUL INFORMATION 6illed out by Screenin ice Stafp SITE INSPECTION gilled out by Field Staffi Date AUL filed: Boundaries of AUL area(s) identifiable? Unclear BK 33745 PG 313 Complete access to all AUL area(s)? See notes below* 12/17/2014 Evidence of recent excavation/disturbance? See notes below * AUL on entire property Evidence of recent construction? See notes below * Remediation Waste present? See notes below * Indication of potentially serious site conditions? No BARRIERS =pavement, orange gemextile liner and soils beneath liner at 1.5' or more bgs *Limited access due to multiple parked vehicles PERMITTED ACTIVITIES AND USES 1 OBSERVED ACTIVITIES AND USES X IndustriaUCommercial X Parking lot X Landscaping* X Underground utility and/or construction * * AUL area is a paid parking lot operated by the City of Salem. A *..provided BARRIERS not disturbed portion of this property, Parcel H1, is located on the other side **. . .provided activities are done as per SAM, HASP and as of the chain linkfence on the back end of the AUL perAUL "Obligations", including waste management -Other activities & uses approved by an LSP VIOLATION OBSERVED: No INCONSISTENT/RESTRICTED ACTIVITIES AND USES ' OBSERVED ACTIVITIES AND USES X Residential X Agricultural X Institutional* X RemovaUdisturban ce** *. . .private orpublic schools; day cares *. . .Activities or uses likely to involve the removal and/or disturbance of soils beneath BARRIERS except for underground utility and/or construction work (noted above) or in accordance with an LSP Opinion -Activities or uses likely to involve direct contact to soils beneath BARRIERS VIOLATION OBSERVED: No OBLIGATIONS AND CONDITIONS' OBSERVED CONDITIONS X Soil Mgmt Plan (SMP) X Health and Safety Plan (IIA SP) MassDEP observed a pay station kiosk and street light that may X Barriers and landscaped areas * X Inspections ** have been installed after the AUL implementation. X Relocation *** According to Mr. Devine: (a) inspections are performed 2x/yr *Maintain barriers (pavement, concrete blocks, sidewalks, and and recorded in a dedicated AUL binder, and (b) no excavation landscaped areas was performed far the street light post since this post was placed * *. . ..annual inspection ofpavement, concrete blocks, between large concrete blocks, secured with an adhesive, and sidewalks, and landscaped areas placed on top of the parking lot surface. ** * Soils beneath geoteedle liner must remain at depth and cannot be relocated unless evaluated and approved by an LSP MassDEP contacted Alan Su/laway, Asst. Parking Director at the City of Salem regarding the pay station kiosk. Seethe November 2018 Notice of Audit Findings leaer for further discussion. AUL Sketch Attached to this form? No VIOLATION OBSERVED: No AdditionalComments/Notes on Reverse Side: No Additional Comments/Notesn e Side: No Completed by: Debra Hawks Date: 1012118 t The following is only a brief summary of most of the ALL conditions, consult the actual Activities and Use Limitation Notice for specific descriptions