Loading...
125 Derby Street - CofNA - painting ��oon�nrT,�go UL E Salem Historical Commission 98 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970(978)619-5685 CERTIFICATE OF NON-APPLICABILITY HCNA-22-8i It is hereby certified that the Salem Historical Commission has determined that the proposed: Type of Work: Ordinary Maintenance,Repair,or Replacement as described below will be appropriate to the preservation of said Historic District,as per the requirements set forth in the Historic District's Act(M.G.L.Ch.4oC)and the Salem Historic Districts Ordinance. District: Derby Street Address of Property: 125 DERBY STREET, SALEM, MA o19'70 Name of Owner at time of Submission: Christian Haselgrove Applicant's Description of Work:This work will replace the boards at the base of the northeast face of the building. In the attached image,the boards in question are the yellow horizontal boards just above the foundation. The boards will be replaced and painted to match the existing construction. Statement of Conditions: Replace the boards at the base of the northeast face of the building with same materials. In the attached image, the boards in question are the yellow horizontal boards just above the foundation. Boards will be replaced and painted to match existing construction and colors. Paint northwest and northeast faces of the building. This will include side and trim. Colors to match existing colors Body: Alexandria Beige (HC-77) Trim:Montgomery White(HC-33) Shutters/Door: Black Upon completion of above work,please notify Historical Commission staff through permitting system as final sign-ofis required to document compliance with this Certificate and approved plans. Dated: October 31,2022 SALEM HISTORICAL COMMISSION By: This certificate will expire: October 31,2o23. The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings(or any other necessary permits or approvals) prior to commencing work.