Loading...
116-118 LEACH ST - BUILDING INSPECTION IMMMONTeEfILs "Ag APPROVED BY 774E 01 JdSPECMB PWR TD A PIERWT 11N:ING GRAND CITY OF_SALEM N40\ ^ s (( N 0 r. �.-- WWd zer"oftm �/ l Is Propeny ft Fnelodo DWdcIT„ YN No lal]dioa of l &, I i�tc� 51 Is PmPft Locftd In ft Co nsma a mm? Yw_L No BUILDING PERMIT APPLICATION FOR:- Permit to: (Circle whichever apply) Roof- ^ f sEalI Sid Ste, POOL Repair place. �iir v., PLEASE FILL OUT LEGIBLY i COMPLETELY TO AVOID DELAYS N PROCESSM4G TO THE INSPECTOR OF LDINGS: ' The urtders Iss r a permit to build aocordGig.to the.followkq speclticationa: Owner's Name Address a Phone Architects Name Address a Phone �i/�r/P!� eti r So✓1 Mechanics Name - (� 0 G d Address & Phone �4n What is ft psposs of i m"m CI wow n■dwW4, hCW noisy ftMm? We to*kq Colton..to low? 2/P 5 MbsAos9 A 9c� ^ ca Elam d Cost" _( je f ly Um"r 902 rAm LIar1w ) q0 2 3 I� rac sor Stnature Applicant S I1N1 R THE PEN LTY'do OF PERJURY DESCRIPTION OF TO BE DONE ad os (4 c Lwl P C ►�/ /�l� / ��/ e CrSFrnS /(� �ear4 . . lazc�6�cf'- Y k41 MAIL PERMIT TO: rcld c1� air SJN fne d0 LiOMUSN1 9� z O4 031NVUD LV*ed NOLLVOOI OLiAmad mm NotLyonddvION .� �1 GUY Dj. �Qll'tJt, `1VL�I.SSCLCttZlSett,S \ Ytre Department 48 Lafayette Street 29 Fort Av; Robert 4y Turner Saknm,Massachusetts 01970-3695 Chief Tef 978-744-1235 Y're Prevention 978-744-6990 Bureau FaX 97&745-4646 97&745-7777 FIRE DEPARTMENT CERTIFICATE OF APPROVAL FOR A BUILDING PERMIT IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND' THE 'SALEM FIRE CODE, APPLICATION IS HEREBY.MADE FOR THE APPROVAL OF'PLANS AND-THE ISSUANCE OF A CERTIFICATE OF APPROVAL FOR A BUILDING PERMIT BY ME SALEM FIRE DEPARTMENT; . ( Ref. Section 113.,3 of ,the Mass. Bldg. .Code) • . JOB LOCATION: BOWNER/OCCUPANT: a ' . ELECTRICAL.CONTRACTOR:; FIRE SUPPRESSION CONTRACTOR v - fi PHONE a APPLICANT L /73 7(1� J Y .. :ADDRESS OF APPLICANT: �wt, Zd A CITY OT -TOWN: • e a _ „ s '.APPAOVAL DATE d x • ' .. r b 44 in -i?a. #` - a _ r `Cartificate•of "approval is herebq�granted,-'on approved ,plane or submittal of °. dataila,oVy' the SALEM FIRE DEPARTMENT. All plans are approved solely r ��, 'forsidentification of type and,,locatioeo,f fire protection devices and eq t¢uipmen " : I Allyplaoa ate"subject to approval of any.other ,authority having jurisdiction # f Upon completion, the applicant:orainstaller(s) ,shall request ao inspection -� test of:,thedire protection devices.and`e'quipmentI (ADDITTIONAL REQUIREMENTS, '=:`(kil€ o, SEE REVERSE SIDE'***). O , NEW CONSTRUCTION. ? .(� {y` /d i PROPERTY LOCATION HAS NO COMPLIANCE HITH`,THE^PROVISIONS OF y. t CHAPTER 148,-SECTI09 26 C/E, M G.L. ,;RELATIVE TO THEaINSTAT.A-' TION_OF APPROVED FIRE ALARM'DEVICES: THE OWNER OF THIS'PRO PERTY IS ,REQUIR.ED .TO OBTAIN COMPLIANCE AS A CONDITION OF -OBTAINING A BUILDING PERMIT. PROPERTY LOCATION !IS' IN i:0MPLIACNE WI'rH ,17tC PROVISION OF CHAPTE:P 148, SECTION 2G E. PIRATION Dii_ $30.00 $50. 00 CHEC kI,i In compliance with the provision of Section 113. 5 of the Massachusetts State Building Code, and under guidelines agreed upon by the Salem Bldg. Inspector and the Salem Fire Chief, the applicant for a building permit shall obtain the Certificate of Approval (see reverse side) and stamped plan approval from the Salem Fire Prevention Bureau. J (. Said application and approval is required before a building permit may be issued. The Massachusetts State Building Code requires compliance approval of the Salem Fire Department, with reference to provisions of Articles d and 12 of the Building Code, the Salem Fire Code, Massachusetts General Laws, and 527 Code of Massachusetts Regulations. r r The applicant shall submit this application with three (3) 'sets of plans', drawn In sufficientclarity, to obtain stamped approval of the Salem Fire Department. This applies for all new construction, substantial alterations, change of use and/or occupancy, and any other approvals g required by the Massachusetts General Laws, and the Salem Fire Code. }., .,.. . Ex eption: . .'Plans will not be` required for structural work when the y Y •: Y proposed work to be performed'under the building permit will not,, in the opinion of tW Building Inspector, require a plan to show the nature and character of the work to be j performed i a �Sotice: Plans are normally required .for`fire su, y re q ppression systems, ; fire alarm systems, tank Installations, and. Fire Code requirements. Under the provisions of Article 22 of the Massachusetts State Building 'Code, certain proposed projects may',not' require submission of plans or complete compliance with new construction requilrements. In these ancases' ` provistons of Article 22, appendix T, and Tables applicable shall apply. This section' shall not,;however, supersede the , provisions ;outlined' In the Salem Fire Prevention..Regulations, Chapter _ " 118, ,XGL, or 527 Code of Massachusetts Regulations. All permits for fire code use'and/or occupancyr'shall"appiy'for the entire structure; fire 'alarm and/or smoke detector 'installation shall -apply to the entire structure based upon current requirements as per Laws .and/or i'. Codes, but the existing structure may comply with regulations ! applicable for existing structures. Is Votive: Sub-contractors may also be required to file Individual applications for a Fire Department Certificate of approval for the area of their work. Such sub-contractoes shall file 'an :application to Install with" the Fire prevention 9ure3u . .prior to commencing any work ,for those areas applicable: PUBLIC PROPERTY DEPARTMENT 120 WASHINGTON &MUT,31110 FLOOR "La;M.MA Oi 070 TaL-(070)741-2495 CRT.300 FAX (076) 740-96A STANLEYJ.. IC YLWOV & JIL MA DWOM OF DEBRIS AFFIDAVIT m aoosrdanoe with tba provisku OfMM c 40,W4 1 aclmowiedgs that as a con"oa Of Bm'l ft Pemfd/ .aH ddm multmg from&a o mamticd=aodM govaned by d&Bmlftg Pa®it abali be disposed Of is a peopally Hcamaad soH&wm)a disposd facility.as dalbed by MC$,c BL S130A. The74le be disposed otat I J . Loeatiaa of Facr'Hw . ofPa®itAppHea� Dap lane Howiog in£oImatiom ofP®it AppHcaat ef �rr 1L Firm Name;if any fG 9c4, (e— C 0 Addraae.City& The above staWte requires that debris fiom the demohU m.renovation,rehab or other altmidon of bmlft or sbucdue be diapered m a properly-h rased solid-wasft disposal facility as de:Smed by MGL cM Sl5K and the building parmib or Hemises m to iadreate the locatim of dw facility. Salem Conservation Commission AMENDED SPECIAL CONDITIONS—DEP FILE # 64-342 City of Salem, 116 Leach Street 1. The Conservation Agent will be notified 48 hours prior to commencement of construction activities(978-745- 9595 ext. 311). Members and agents of the Salem Conservation Commission(Commission) shall have the right to enter and inspect the premises to evaluate and ensure compliance with the conditions and performance standards stated in this Order,the Notice of Intent,the referenced plans,the Act, and 310 CMR 10.00,and may require any information, measurements,photographs,observation and/or materials or may require the submittal of any data or information deemed necessary by the Commission,agent, or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the Commission is satisfied that the work will comply, and has so notified the applicant in writing. 2. Approval of this application does not constitute compliance with any law or regulation other than MGL Chapter 131, Section 40, and Wetlands Regulations 310 CMR 10.00. This Order shall apply to any successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans. These obligations shall be expressed in covenants in all deeds to succeeding owners or portions of the property. 4. The form provided at the end of this Order shall be completed and stamped at the Registry of Deeds after the expiration of the 10-day appeal period and within 30 days of the issuance if no request for appeal has been filed with the Department of Environmental Protection. This form shall be returned to the Commission within 21 days of recording accordance and prior to commencement of any activities subject to the Order of Conditions. 5. Prior to any work commencing, a sign shall be displayed showing DEP file 64-342 and not placed on a living tree. 6. The term"Applicant"as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 7. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the _ following: (1) Section 404 of the Federal Water Pollution Control Act(P.L.92-500, 86 stat. 816),U.S.Army Corp of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified (3) Flood Plain (4) Grading Ordinance 8. If there are conflicting conditions within this Order,the stricter condition(s)shall rule. 9. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 10. The Commission and its Administrator shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 11. All work shall be performed in accordance with this Order of Conditions and approved site plans(s). No alteration of wetland resource areas or associated buffer zone, other than that approved in this Order,shall occur on this property without In approval from the Commission. 12. If any changes are made in the above-described plan(s) which may or will alter an area subject to protection under the Wetlands Protection Act, or any changes in activity subject to regulations under G.L.Ch. 131, Section 40, the applicant shall inquire from this Commission in writing,prior to their implementation in the field, whether the change(s) is significant enough to require the filing of a new Notice of Intent. Any error in the plans or information submitted by the applicant shall be considered changes and the above procedures shall be followed. A copy of such request shall at the same time be sent to the Department of Environmental Protection. 13. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued, the applicant or current landowner shall submit to the Commission a signed statement by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 14. Conditions number_NA as indicated shall continue in force beyond the Certificate of Compliance, in perpetuity,and shall be referred to in all future deeds to this property. PRIOR TO CONSTRUCTION 15. Prior to commencement of any activity on this site,there shall be a PR-ECONSTRUCT10N MEETING between the project supervision; the contractor responsible for the work or its administrator to and phone numbers of all responsible parties shall be registered with the Commission at the pre-construction meeting. 16. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commssion and/or its Administrator shall inspect and approve such installation at the pre-construction meeting. 17. Prior to the commencement of any activity on this site,the applicant or current landowner shall submit to the Commission in writing a construction schedule/sequence of work to complete this project. 18. Prior to any work on site, the proposed limits of work shall be clearly marked with stakes or flags and shall be confirmed by the Connnission or its Administrator. Such markers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers shall be informed that no use of machinery, storage of machinery or materials, stockpiling of soil or construction activity is to occur beyond this line at anytime. 19. Prior to commencement of construction on site,the limits of wetland resource areas closest to construction activity shall be flagged with surveyor's tape and shall remain in place during construction. The limits of areas to be impacted and the limits of work in the replication area(s) shall be clearly flagged. 20. There shall be_NA_hay bales and wooden staked stored under cover on the site to be used only for emergency erosion control. EROSION CONTROL 21. Appropriate erosion control devices shall be in place prior to the beginning of any phases of construction,and shall be maintained during construction in the wetland areas and buffer zones. The erosion control specification provided in the Notice of Intent and the erosion control provision in the Order will be the minimum standards for this project; additional measures may be required by the Commission. 22. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment from entering wetland resource areas. 23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 24. The areas of construction shall remain in a stable condition at the close of each construction day. 25. Any de-watering of trenches or other excavations required during construction shall be conducted so as to prevent siltation of wetland ICSOarec areas. All discharges from de-watering activities shall be filtered through haybale sediment traps. silt filter bags or other means approved by the Commission or its Administrator. 26. Within thirty days of completion of construction on any given portion of the project,all disturbed areas in the . completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover,using sufficient top soil to assure long-tenn stabilization of disturbed areas. 27. If soils are to be disturbed lot longer than two months,a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,exposed surfaces shall be stabilized by other appropriate erosion control measures,firmly anchored,to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 28. A copy of the Order of Conditions, construction plans,and copies of the documents and reports cited in Condition# 11,shall be on the site upon commencement and during any site work for contractors to view and adhere to. 29. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 30. Only clean fill, free of masonry, stumps, asphalt,and any other kind of waste material shall be used on the site. 31. All waste products,grubbed stumps,slash;construction materials,etc.shall be deposited at least 100 feet from wetland resource areas and 200 feet from rivers. - 32. All filling or removal of waste material from the site shall be done in accordance with the regulations of the City of Salem Health Department. 33. Cement trucks shall not be washed out in any wetland resource or buffer zone area. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be removed by hand. 34. No fuel,oil,or other pollutants shall be stored in any resource area or the buffer zone thereto,unless specified in this Order of Conditions. 35. There shall be no pumping of water from wetland resource areas. 36. During construction, all drainage structures shall be inspected regularly and cleaned as necessary. 37. Immediately following drainage structure installation, all inlets shall be protected by silt fence, hayblae barriers and/or silt bags to filter silt from stonnwater before it enters the drainage system. 38. The project shall not cause an increase in run-off onto adjacent properties,either during construction or when completed. 39. The applicant is hereby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including,but not limited to, civil administrative penalties under M.G.L. Chapter 21A,section 16. POST CONSTRUCTION 40. All disturbed areas, slopes and proposed landscape areas shall be loamed and seeded or stabilized through the use of erosion control blankets or other approved means. All disturbed areas will be graded, learned, and seeded prior to November I of each year, if possible. No disturbed areas or stockpiled material will be left unprotected or without erosion controls during the winter. 41. Upon completion of c0nstnictinn, the applicant or current landowner shall submit the to]lowing to the ' Conmrission to request a Certificate of Compliance: (1) A letter requesting a Certificate including the following information: a. Name and address ofcurrent landowner; b. Name and address of the individuaI/trust or other entity to whom the Certificate is to be issued: c. Street address and lot number for the project;and d. DEP file number (2) A letter from a Registered Professional Engineering or Land Surveyor certifying compliance of the property with this Order of Conditions (3) An"As-Built"plan signed and stamped by a Registered Professional Engineer showing post-construction conditions and: a. As-built elevations of all drainage ways constructed within 100 feet of any wetland resource area; b. As-built elevations and grades of all filled or altered wetland resource areas,buffer zones and replicated areas;and c. Distances to all structures within 100 feet of any wetland resource area. 42. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds. 43. If the completed work differs from that in the original plans and conditions,the report must specify how the work differs; at which time the applicant shall first request a modification to the Order. Only upon review and approval by the Commission, may the applicant request in writing a Certificate of Compliance as described above. 44. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Commission and/or its Administrator has authorized their removal. 45. .The following condition(s) shall extend beyond the Certificate of Compliance, in perpetuity,and shall be recorded as such on the Certificate of Compliance and in all future deeds to this property: PERPETUAL CONDITIONS 46. There shall be no dumping of leaves,grass clippings,trash or any kind of refuse in the resource area. 47. Herbicides shall not be applied within 100 feet of the wetland. 48. No sodium-based products shall be used for control of ice or snow within 100 feet or the wetland. ADDITIONAL CONDITIONS 49. Before work can commence,the Applicant shall obtain all the necessary Federal, State and Local permits and or approvals needed to construct this project. Jt � Salem Conservation Commission SPECIAL CONDITIONS — DEP FILE # 64-345 City of Salem, 116 Leach Street 1. The Conservation Agent will be notified 48 hours prior to commencement of construction activities(978-745- 9595 ext. 311). Members and agents of the Salem Conservation Commission(Commission)shall have the right to enter and inspect the premises to evaluate and ensure compliance with the conditions and performance standards stated in this Order,the Notice of Intent, the referenced plans,the Act, and 310 CMR 10.00, and may require any information, measurements,photographs,observation and/or materials or may require the submittal of any data or information deemed necessary by the Commission,agent,or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the Commission is satisfied that the work will comply, and has so notified the applicant in writing. 2. Approval of this application does not constitute compliance with any law or regulation other than MGL Chapter 131, Section 40,and Wetlands Regulations 310 CMR 10.00. 3. This Order shall apply to any successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans. These obligations shall be expressed in covenants in all deeds to succeeding owners or portions of the property. 4. The form provided at the end of this Order shall be completed and stamped at the Registry of Deeds after the expiration of the 10-day appeal period and within 30 days of the issuance if no request for appeal has been filed with the Department of Environmental Protection. This form shall be returned to the Commission within 21 days of recording accordance and prior to commencement of any activities subject to the Order of Conditions. 5. Prior to any work commencing,a sign shall be displayed showing DEP frl 64-345 and not placed on a living tree. 6. The term"Applicant'as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of Intent,supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 7. It is the responsibility of the applicant to procure all other applicable federal,state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L.92-500,86 star. 816),U.S.Army Corp of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified (3) Flood Plain (4) Grading Ordinance 8. If there are conflicting conditions within this Order,the stricter condition(s)shall rule. 9. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 10. The Commission and its Administrator shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 11. All work shall be performed in accordance with this Order of Conditions and approved site plans(s). No alteration of wetland resource areas or associated buffer zone,other than that approved in this Order,shall occur on this property without prior approval from the Commission. 12. If any changes ate made in the above-described plan(s)which may or will alter an area subject to protection under the Wetlands Protection Act,or any changes in activity subject to regulations under G.L. Ch. 131, Section 40, the applicant shall inquire from this Commission in writing,prior to their implementation in the field, whether the change(s) is significant enough to require the filing of a new Notice of Intent. Any error in[he plans or information submitted by the applicant shall be considered changes and the above procedures shall be followed. A copy of such request shall at the same time be sent to the Department of Environmental Protection, 13. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued,the applicant or current landowner shall submit to the Commission a signed statement by the buyer that ,he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 14. Conditions number 49 as indicated shall continue in force beyond the Certificate of Compliance, in perpetuity, and shall be referred to in all future deeds to this property. PRIOR TO CONSTRUCTION 15. Prior to commencement of any activity on this site,there shall be a PRECONSTRUCTION MEETING between the project supervision; the contractor responsible for the work or its administrator to and phone numbers of all responsible parties shall be registered with the Commission at the pre-construction meeting. 16. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commission and/or its Administrator shall inspect and approve such installation at the pre-construction meeting. 11 17. Prior to the commencement of any activity on this site,the applicant or current landowner shall submit to the Commission in writing a construction schedule/sequence of work to complete this project. 18. Prior to any work on site,the proposed limits of work shall be clearly marked with stakes or flags and shall be confirmed by the Commission or its Administrator. Such markers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers shall be informed that no use of machinery, storage of machinery or materials,stockpiling of soil or construction activity is to occur beyond this line at anytime. 19. Prior to commencement of construction on site,the limits of wetland resource areas closest to construction activity shall be flagged with surveyor's tape and shall remain in place during construction. The limits of areas to be impacted and the limits of work in the replication area(s)shall be clearly flagged. 20. There shall be 20 hay bales and wooden staked stored under cover on the site to be used only for emergency erosion control. EROSION CONTROL 21. Appropriate erosion control devices shall be in place prior to the beginning of any phases of construction,and shall be maintained during construction in the wetland areas and buffer zones. The erosion control specification provided in the Notice of Intent and the erosion control provision in the Order will be the minimum standards for this project; additional measures may be required by the Commission. 22. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment fi om entering wetland resource areas. 23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 24. The areas of construction shall remain in a stable condition at the close of each construction day. 25. Any de-watering of uenchcs or other excavations required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharges from de-watering activities shall be filtered through haybale sediment traps, silt filter bags or other means approved by the Commission or its Administrator. 26. Within thirty days of completion of construction on any given portion of the project, all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover,using sufficient top soil to assure long-term stabilization of disturbed areas. 27. If soils are to be disturbed for longer than two months, a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,exposed surfaces shall be stabilized by other appropriate erosion control measures, firmly anchored,to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 28. A copy of the Order of Conditions, construction plans, and copies of the documents and reports cited in Condition# 11, shall be on the site upon commencement and during any site work for contractors to view and adhere to. 29. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 30. Only clean fill,free of masonry,stumps, asphalt, and any other kind of waste material shall be used on the site. 31. All waste products,grubbed stumps, slash; construction materials,etc. shall be deposited at least 100 feet from wetland resource areas and 200 feet from rivers. 32. All filling or removal of waste material from the site shall be done in accordance with the regulations of the City of Salem Health Department. 33. Cement trucks shall not be washed out in any wetland resource or buffer zone area. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be removed by hand. 34. No fuel,oil,or other pollutants shall be stored in any resource area or the buffer zone thereto,unless specified in this Order of Conditions. 35. There shall be no pumping of water from wetland resource areas. 36. During construction,all drainage structures shall be inspected regularly and cleaned as necessary. 37. Immediately following drainage structure installation,all inlets shall be protected by silt fence,hayblae barriers and/or silt bags to filter silt from stormwater before it enters the drainage system. 38. The project shall not cause an increase in run-off onto adjacent properties,either during construction or when completed. 39. The applicant is hereby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including,but not limited to,civil administrative penalties under M.G.L. Chapter 21A, section 16. POST CONSTRUCTION 40. All disturbed areas, slopes and proposed landscape areas shall be learned and seeded or stabilized through the use of erosion control blankets or other approved means. All disturbed areas will be graded, learned,and seeded prior to November f of each year, if possible. No disturbed areas or stockpiled material will be left unprotected or without erosion controls during the winter. 41. Upon completion of construction, the applicant or current landowner shall submit the following to the Commission to request a Certificate of Compliance: (1) A letter requesting a Certificate including the following information: a. Name and address of current landowner, b. Name and address of the individual/trust or other entity to whom the Certificate is to be issued: c. Street address and lot number for the project;and d. DEP file number (2) A letter from a Registered Professional Engineering or Land Surveyor certifying compliance of the property with this Order of Conditions (3) An"As-Built"plan signed and stamped by a Registered Professional Engineer showing post-construction conditions and: a. As-built elevations of all drainage ways constructed within 100 feet of any wetland resource area; b. As-built elevations and grades of all filled or altered wetland resource areas,buffer zones and replicated areas; and c. Distances to all structures within 100 feet of any wetland resource area. 42. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds. 43. If the completed work differs from that in the original plans and conditions,the report must specify how the work differs;at which time the applicant shall fast request a modification to the Order. Only upon review and approval by the Commission,may the applicant request in writing a Certificate of Compliance as described above. 44. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final venetative cover and the Commission and/or its Administrator has authorized their removal. 45. The following condition(s)shall extend beyond the Certificate of Compliance,in perpetuity, and shall be recorded as such on the Certificate of Compliance and in all future deeds to this property: PERPETUAL CONDITIONS 46. There shall be no dumping of leaves,grass clippings,trash or any kind of refuse in the resource area. 47. Herbicides shall not be applied within 100 feet of the wetland. - 48. No sodium-based products shall be used for control of ice or snow within 100 feet or the wetland ADDITIONAL CONDITIONS 49. The applicant and/or his successor in perpetuity shall install and maintain a crusted stone driveway as proposed and depicted in the Notice of Intent. 50. Staked haybales shall be installed along the edge of the coastal bank prior to the commencement of any work. 51. French drains or dry wells shall be constructed to a depth of 4 feet and be located adjacent to the four comers of the new addition to collect roof runoff. 52. Filter fabric shall be install under the catch basin cover(located in for of the existing residence)to prevent sediments from entering the stoma drain system.The applicant shall maintain and clean out as needed. Once the project is completed, the fabric shall be removed carefully as not to allow any caught sediment or debris from entering into the drianage system. r NORTH LICENSE NO, Gi-ENDQ kA W) Approved by Department of Environmental Protection SALEM der <M� Date: �o- 4ow� ,- Me LO' Sh tlan Derby Wharf ' 2DI PCY Vo s �N h PILES (lOX) 20' LONG ,�. 12' DIA, AT SOP `� . .�� �SALEM 6' WIDE DECK ^"^ SOUTH Fore HARBOR SALEM r Par ' tip H x SSc SO' 16'-3' R- � r CMN�) n High date MARBLEHEAD Me a mow' Existing Seawall LOCUS MAP s & Fill Licence •i See Note O 25' S'x15' 1 31' Cabana Note; `w' iY3347 Existing Seawatt & O8'x15' 14PREP13S ADDITION Fitt Permit M,G,L c,91 Tcol Shed Licence No, 7129 ew Recorded 5/5/98 Reg. of Deeds LOT #0546 Ile Bk14786 Pg129-133 MAP #33 s`r9 �Gm CS DEP file #64-268 �ey\de > 0 Approved 3/20/98 A DEP Application No, C W 7-87 Q 9 38 a idewa � 50' ---..� LEACH STREET PLAN VIEW (Scales 1'=30') PURPOSE: SIMPLIFIED LICENSING 0 7.515 30 60 ADJACENT PROPERTY OWNERS: 1. 106 Leach Street: PLAN ACCOMPANYING Proposed 300 Sq. Ft. Pier Karen Shepard - Unit I PETITION OF: IN Salem Harbor Mary Ungaro - Unit 2 AT Salem Randy M. Reid - Unit 3 Charles & Kathy O'Connell _ COUNTY OF, Essex ETATEi MA 2. Roger E. MarcoreRe 116 Leach Street APPLICATION BY: Charles 171 Jersey St. Marblehead Salem, MA 01970 3, John R, Gillespie Jr, and Kathy O'Connell 120 Leach Street SHEET 1 OF 2 DATE: 1 Dec 2003 L TOTAL AREA = 9,000 S.F. 100% REFERENCES EXISTING BUILDING = 1,084 S.F. 12% SOUTH ESSEX DISTRICT -i EXISTING DECK = 337 S.F. 3.7% REGISTRY OF DEEDS: ..(,,`:IMP'`:• EXISTING COVERAGE = 1,421 S.F. 15.8% DEED BOOK 1375, PAGE 1 PROPOSED ADDITIONS = 1.655 S.F. 18.4% DEED BOOK 10813, PAGE 115 PROP. COVERAGE = 2,739 S.F. 30.4% PROP, OPEN SPACE = 6,261 S.F. 69.67 ASSESSOR' SETBACKS: MAP 33 FRONT YARD 15' LOT 0546 SIDE YARD 10' ZONING: R-2 REAR YARD 30' FLOOD ZONE A-4 ELEVATION FLOOD CONTOUR 11' COMMUNITY PANEL 250102 0005E DATE 8-15-85 cN NOTE. IN PROP ALE oWOT WATERFRONT HARBOR HAYBALES TO BE MAINTAINED DURING CONSTRUCTION TIMBER RET. WALL j FLATS AS PER SHED DEED BOOK 10813 TO BE PAGE 115 REMOVED H 50.00' `I 50.00, PARCEL I I PARCEL II BULKHEAD LOT 8 N LOT 9 TO BE REMOVED 5000 S.F. 4000 S.F. sREn I HAYBALES 70 BE REMOVED I I.... _ .._ -- iii:28.0'iiii.._ His�u:c q ::....PROP L 14.5' D:4N ciiii}::•.iv: mL::.ADO: LOT 10 �. ....:......?:'::v:ii.:ii....:....:.i::.:ii. —14.5• — o o icKiC_ /I 4 m --- I I � -+POkCM �I of .4' ! _ H I I I I 50.00, LEACH STREET ?3 JAAIES P LA N OF LAND BDDotaixAb I N v No.om SALEM , MA. u �yoQ NO. 116-118 LEACH STREET JAMES W. BOUGIOUKAS P.E., R.LS. DATE Asiwm�` CHARLES R. O'CONNELL R2 FOR PERMIT MAH R BRADFO—RD L ENGINEERING NGINEERINGN Cu O. tBY 3 WASHINGTON SQ. 11REIS2ONS3/19/ 00HAVERHILL MA. 01 830 RG JWB CTOS ° (978) 373-2396 Eu (978) 373-801 AHO .i