Loading...
105 LEACH ST - BUILDING INSPECTION - PUBLIC PROPERTY DEPARTMENT 91%air L SCOLL 12O WASHINGTON STPX"•SALEK W.AISACHLSLI-M 01970 TEL-978-7S5-9S9S 0 Fix:97&7i0.9&% APPLICATION FOR THE REPAIR, RENOVATION, CONSTRUCTION. DEMOLITION. OR CHANGE OF USE OR OCCUPANCY, FOR ANY EXISTING STRUCTURE OR BUILDING 1.0 SITE INFORMATION _ Location Name: Building: (;.ArAge Property Address: lO S L CAGtf Sr' SRC.CM I IVA 01970 Property is located in a; Conservation Area Y/N_ V Historic District YIN 2.0 OWNERSHIP INFORMATION 2.1 Owner of Land Name: t c o.e A. Cook Address: 105 LGAcN ST _ SALcm MA 019 70 Telephone: 978 740 9188 3.0 COMPLETE THIS SECTION FOR WORK IN EXISTING BUILDINGS ONLY Addition Existing 1 Renovation Number of Stories Renovated Change in Use New Demolition XExisting 2-16 Approximate year of I (t 2O Area per floor (sf) Renovated construction or renovation of existing building New Brief Description of Proposed Work: 1\e.MOJ2 Gard.c�� b ��S . Cpn S���cT A 20 ' xZ4 'L)eeP &cmse- as (per Z ,6 :4. AoI2Tv`�l Mail Permit to: What is the current use of the Building? rag e Material of Building? B(o rk lwoo<4 If dwelling, how many units? Will the Building Conform to Law? AYES Asbestos? N o Name John Vj-X.';IhOe — Sr`✓c�-.,eS No�7Y1 lrcL .Aa3 Address and Phone WQ sh ern ST ��ewr ( ) 68/7 Mechanic's Name Address and Phone Construction Supervisors License# HIC Registration# Estimated Cost of Project$ 2?,00o Permit Fee Calculation Permit Fee$ — Estimated Cost X$7/$1000 Residential Estimated Cost X$111$1000 Commercial An Additional $5.00 is added as an Administrative charge. Make sure that all fields are properly and legibly written to avoid delays in processing. The undersigned does hereby apply for a Building Permit to build to the above stated specifications. Signed under penalty of perjury X %it 4;'-e Date l0 23 0� H 1q O.L. it m CITY OF SALEM PUBLIC PROPERTY DEPARTMENT Ki MBERLEY DRISCOLL MAYOR 120 WASHINGTON$rREET• SALEM,MASSACHOSETIS 01970 TEL 978-745-9595 • FAx:978-740-9846 HOMEOWNER LICENSE EXEMPTION Please Print Date 81i 410 6 Job Location /0 S LcACN ST' � 5ALEA1 , AIA Home Owner Address — SAInd — Home Owner Telephone 97$ 740 `I/88 Present Mailing Address — SAwte. — The current exemption of"Homeowners"was extended to include owner-occupied dwellings of two Units or less and to allow such homeowners to engage an individual for hire who.does not possess a license, provided that the owner acts as supervisor. DEFINITION OF HOMEOWNER Person(s) who owns a parcel of land on which he/she resides or intends to reside, on which there is, or is intended to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two year period shall not be considered a homeowner. Such "homeowner" shall submit to the Building Official, on a form acceptable to the Building Official, that he/she be responsible for all such work performed under the Building Permit. The undersigned "homeowner" assumes responsibility for compliance with the State Building Code and other applicable by-laws and regulations. The undersigned "homeowner" certifies that he/she understands the City of Salem Building Department minimum inspection procedures and requirements and that he/she will comply with said procedures and requirements. HOMEOWNERS SIGNATURE AiwL _ APPROVAL OF BUILDING INSPECTOR See other side for state code Homeowner's Exemption The Code states that: "Any Homeowner performing work for which a Building Permit is required shall be exempt from the provisions of this section (Section 109.1 —Licensing of Construction Supervisors);provided that a Homeowner engages a person(s) for hire to do such work, and the Homeowner shall act as Supervisor." Many Homeowners who use this exemption are unaware that they are assuming the responsibilities of a Supervisor(see Appendix Q, Rules and Regulations for Licensing of Construction Supervisors, Section 2.15). This lack of awareness often results in serious problems, particularly when the Homeowner hires unlicensed persons. In this case your Board cannot proceed against the unlicensed person as it would with a licensed Supervisor. The Homeowner acting as Supervisor is ultimately responsible. To ensure that the Homeowner is fully aware of his/her responsibilities, many communities require, as part of the Permit Application, that the Homeowner certify that he/she understands the Responsibilities of a Supervisor. On the last page of this issue is a form currently used by several towns. You may care to amend and adopt such a form/certification for use in your community. CITY OF SALEM, MASSACHUSETTS PUBLIC PROPERTY DEPARTMENT 120 WASHINGTON STREET, 3RD FLOOR SALEM, MASSACHUSETTS 01970 TELEPHONE: 978-745-9595 EXT. 380 FAX: 978-740-9846 Thomas J. St.Pierre Director of Public Property Zoning Enforcement Officer Section 116.0 Demolition of Structures Structures over fifty (50) tears old must have approval of the Salem Historical Society UTILITY DISCONNECTIONS REQUIRED Authorized Agent Date of Disconnection Water: (see attached requirements) Electrical: Fire: ��h Sewer: �� 2 Salem Historical Commission: Dig Safe Number: 2OOA 330 1 r� Pest Control: `DOCUMENTATION OF ALL THE ABOVE MUST BE ATTACHED BEFORE PERMIT CAN BE ISSUED*** Fee for Demolition: $5.00 for application plus$2.00 per 100 square ft.gross area,minimum$15.00 I ' ,3 ; 1!>T.T 122 �3a- i2 .T. �i c*.��uL�?123PII5 i-s �r^�*?=tzn2 ii:a�{ua:2:rs ?•nie[ SFPR ;29C In accordance with provisions of General Laws of the Commonwealth of Massachusetts and the Salem Fire Code, the following regulation governing the demolition of structures within the City of Salem shall be followed. This regulation is made in the interest of fire prevention, to prevent conditions which are or may become dangerous as a fire hazard, or are otherwise in violation of law. 1. Before a structure can be demolished, the Salem Fire Department Shall conduct a preliminary demolition inspection , to ascertain any conditions which may require a fire watch or other preventive measures, to be taken before , during and/or after said demolition process. 2. A permit to demolish or remove a building or structure shall not be issued until said inspection has . been conducted, and a report of requirements necessary for prevention of fire and life safety hazards shall be obtained by the applicant for the permit. 3. The requirements outlined in the report shall become a part of the restrictions portion of the demolition permit issued by the Building inspector, for compliance with the Code. 4 . The inspection report shall include, but not necessarily be restricted to the following: A. Welding and cutting permit required. B. Fire watch to be maintained by a professional off-duty firefighter, with such equipment as determined by the head of the Fire Department. Per Order: A Approved by : Lieut. David J. ggi Salem Fire Mar al �• �Crs6:¢ '� � /)cam•,....G� James F. Brennan, Chief Salem Fire Department (8/76) ■ - r. c T. -\> .t-t - 4AY ;.,is.ro > Tx t. �----::�:- ..t��::�`i.� 'a' TRrJ.`�„". . t:"""' '��r y; ..a..r+-u i t � ..iM r. Ate. .i♦ -sue...^i.,{yy...�.wyv.. .a•1ir.+c�'s�'a ' ✓ <i� :/ .�. > 't •1 vr.hr'-..cr.ar-g.s Gros i^ as•-� / •s D .,'G�.,R v'Ic`T^.a.7�ica+"T�;Y�'10T X, ..�.a vS-.-.+1 •r 7 .���c •f-;.rG x'_t)� n -Tr-" stir y+T �, i4' u, rN, r ■ .. :,y.,y r � Y :s s._.,.rum{ r�e-t�.� ' � ..Y) _ j A1�9 e�G.>taLlr� I• �. Y1.•"- rrl P,RY _ �t�ti ...yam.) 1 •ZIA��M ii �•'i". .�..✓, �� III t Y-�l•�S9.)1` II 760 CMR: STATE BUILDING CODE COMMISSION i Lei SECTION 115.0 CONDITIONS OF PERMIT J,i _ = F� 115.1Proce dCoath awe wwith ork. code: shallhnot be construed as authority s i to violate, cancel or set aside any of tmodPtficauon or legallvisions of y ' code, except as specifically stipulated by 4 7-1';;..5 granted variation in accordance with Section 126.0. i permit, All work, shall conform to the -_> ante with Pwhich the permit 115.Z ComPl] I I i stamped or endorsed application aan roved amendments thereto• has been issued and any PP 115.3 Change in site plan: A lot or site shall not be changed, .• increased or duninished in area from that shown on the official , ' a•. `':• >- affidavit of r+.4 site plan, as specified in Section 113.6, unless a revised plan showing such changes accompanied by the necessary ry d. I I +v owner or applicant shall have been filed and approved. �s I ; I ',• A revised site plan will not be required u the 1?I`s ..nlr Exception: reason of an official street openin4. E� change is caused by public improvement. ' I street widening or other t , a,ti SECTION 116.0 DEMOLITION OF STRUCTURES 116.1 Service connections: Before a building e or structure can j tify rG.. be demolished or removed, the owner or agent shall crtrtteell 1 Utilities having service cennectiotts�thsewein r and other connec' turn, such as: water. electric. 9 or strueturs ions. A permit to demolish or remove a'buildin9 the utilities. r •....• shall not be issued se P dveeseervice connectionse is obtained s and appurten- + ht stating such as: meters and regulators have been re- 1G• ant equipment. ed in a safe manner. .� " moved or sealed and plugg i When a building or structure has been "ram" 116.2 Lot regulation: operation has not been I. : u demolished or rem, dd the va�tcllotashall be fillormity ed ajnOn- d l„ ktrite•:F projected or approve in organic fill. graded and maintalnedd fret fromthe accumulation grades. The lot shall be maintained o us conditlem which of rubbish and all other unsafe o hazardous endanger the life or health of the PttbYe: Pro`na made to prevent the accumulation of water o 1 dugs d thi foundations on the necessary retauning premises and fencesashallin ba epreepteed in accord- I 1 ante with the provisions of Article 13. ! SECTION 117.0 MOVED STRUCTURES ICI 117.1 General: Buildings andwith the rprovi ionses moved iofothis code.within the jurisdiction shall comply '•K - 19 III 9/1/80 II J' $ o CITY OF SALEM9 MASSACHUSETTS s. DEPARTMENT OF PUBLIC SERVICES 3 8 120 WASHINGTON STREET, 4TH FLOOR ,y SALEM, MASSACHUSETTS 01970 `��11N8 BRUCE D. THIBODEAU, P.E. DIRECTOR OF PUBLIC SERVICES/CITY ENGINEER TEL: 978-745-9595 EXT. 321 FAX: 978-745-0349 WATER & SEWER In accordance with provisions of General Laws of the Commonwealth of Massachusetts and the Salem Water and Sewer Department,the following regulations governing the demolition of structures within the City of Salem shall be followed. This regulation is made in the interest of protecting the water and sewer infrastructure at each domestic & commercial hookup location within the City of Salem as well as to prevent conditions, which may cause danger to public safety, cause water to be lost or loss of city or personal property due to water or sewer loss. 1. Prior to demolition of property, a licensed plumber shall ascertain where all water and sewer lines are located on said property. The plumber shall make a determination of use of such water and sewer lines, not limited to, domestic use, irrigation, fire suppression, or septic systems. After all water and sewer lines have been located,the plumber shall make a written report with diagrams of utility locations found to the Director of Public Services. A request to the Department of Public Services shall be made to terminate water services at the street after such notice of locations have been made but not before item#2 is completed. 2. Prior to demolition a licensed drain-layer, licensed by the City of Salem, shall cut and cap the water and sewer lines at the city main. In the event that water or sewer will immediately be used after demolition for construction purposes, a set of certified plans and drawings by a registered professional engineer must be provided to the Dir. Of Public Services/City Engineer reviewed and approved prior to the obtaining a demolition permit. 3. A demolition permit shall not be issued until items 1 & 2 have been completed and the Department of Public Services has conducted an inspection and signed off on the water and sewer portion of the Building Department prerequisite Utility Disconnections Required form. Approved by: Bruce hi ea Dir. Of Public Services/City Engineer 11105 0 Salem Historical Commission 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978)745-9595 EXT. 311 FAX(978)740-0404 WAIVER OF THE DEMOLITION DELAY ORDINANCE It is hereby certified that the Salem Historical Commission has waived the Demolition Delay Ordinance for the proposed demolition as described below, as per the requirements set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. Address of Property: 105 Teach Street garage Name of Record Owner: Michael A. Cook Description of Demolition Work Proposed: Demolition ofgarage. Waiver is conditional that applicant submit elevation drawings detailing all four sides, along with photograph documentation of all four sides of building and close-up detail of masonry block before demolition PP I permit is approved. I P Dated: 9/7/06 SALEM HISTORICAL COMMISSION By: 22:4\�JvvZ_7 r THIS IS NOT A DEMOLITION PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. Construction Plans Salem Building Department Design, Materials and Construction Details for A Boathouse at 105 Leach Street Submitted by Owner: Michael A. Cook 105 Leach Street Salem,MA 01970 October 20, 2006 I 21'-4' 20'-4' GAS, WATER AND ELECTRIC UTILITIES ENTER HERE THROUGH PVC PIPE SET 36' BELOW TOP OF FOUNDATION, #5 REBAR HORIZONTAL CONTINUOUS (2 TOP, 2 BOTTOM, & 2 FOOTING) ENGINEER TO REVIEW SUBSURFACE FIELD CONDITIONS UPON EXCAVATION. 23'-10" NOTES. 1, CONCRETE 3000PSI MINIMUM STRENGTH, 23'-4- 2, VOLUME OF FOOTING = 130 CU. FT. 3. VOLUME OF WALLS = 325 CU, FT. 4, VOLUME OF 6' THK FLOOR = 214 CU. FT. 5. QTY OF 30' #5 REBAR = 8 PIECES 6, QTY OF 8' #5 REBAR = 51 PIECES #5 x 30' REBAR @ 16' O.C. DAVIT BASE DRILLED AND ADHESIVE-SET 3'X3'X6' DEEP _ _ 8' INT❑ EXISTING FOUNDATION WALL ---- II <- EXISTING SEAWALL -> 1'-4' --------L----- ----------------------------- ---�{-- ------------------------------------------ 20'-4' CAP WALL TO NEW HEIGHT- 3' FROM DAVIT BASE TO BLOCK WALL 1'-0°--} 1'-0" THIS SURFACE TO 1' ABOVE DAVIT BASE I 7 •;• T 4' TO 6'-0° Michael A.Cook 105 LEACH STREET,SALEM,MAW970 1'-0" FOOTING AND FOUNDATION MATERIAL:POURED CONCRETE 2'-01-F- 2'-0' DATE: 10-20-2006 SCALE:1/64 20'-0' _ ILI. R S -SO L POCKETS POCKETS 2'-8' DOOR 'J' BOLTS FOR BEAM 8'-0' FOR BEAM SEE NOTES 8' _ FILL CORES SOLI 24'-0` 4' DIA. LALLY COLUMN 7'-11j, POCKETS 2'-8' ON CONCRETE PAD FOR BEAM _ ILL CORES SOLID 2'-8' 4° POCKETS - FILL CORES SOLI 4 -D, FOR BEAM 2'-0' 3'-4° 8" DEEP TYP 4'-0' NOTES: 2 -8, 1)ADD TRUSS TYPE REINFORCING WIRE ON EVERY OTHER COURSE(HORIZ). ' I I 2)ADD#4 REBAR(11T DIA)VERTICALLY WHERE CORES ARE FILLED SOLID. 3)ADD 12"LONG"J"BOLTS(1l2"DIA)IN CEMENT PROTRUTING 2"FROM TOP COURSE EVERY 32"FOR SILL PLATE ATTACHMENT. I 12 COURSES I I I OF 8" BLOCK Michael A.Cook 105 LEACH STREET, SALEM,MA 01970 4'-0' 1 I I I I I CEMENT BLOCK WALLS MATERIAL:8X8X16 SPLITFACE HOLLOW BLOCK DATE: 10-20-2006 SCALE:1164 A �-I BEAM SPAN 16' W8 X 18 X 19-1/2' 1STEEL BEAM --------------------------- ------------------- es¶ve ee�e�rme _------- vet------ �a�aer_e a 7j' 2X8 1 11 II II p 11 II II I 11 11 II II II p 51' r-- 1 11 II 11 II 11 11 11 I II II II II II p 1X6 SPACER 1 n n p u u u n 1 u u u n n p l u u u u n n n l n u u n u e I 11 11 II 11 II II n 1 11 11 11 II 11 p 1 u n u n n n n l n n n n n e u n u n n u n 1 u n n n n p W8X18 BEAM 7'-5 1 u u u n n n n n n u n u p 5�4' I u n u u u u n 1 n n u n u e n u n n 21k8 i12 lib ,C n n ii p n I n n u n 11 itIt 1 11 It it itn 1/2 BOLTS It u u u n u n u n I n n n p u 32' APART & u n n u n 1 n u u 9 u 24'-0" I II X 10 9 19-1X2'I ST,EE� IFAM 11 _aLL_-L__ LL__L__JL_=LL__L__ 17'-6 A 5j' STAGGARED =_= -13a= ass .=asses=�sa=ae ROOM R__T-_�._-R__.p_- __�__¶__ 11 II II 11 II 11 It 11 1 11 II II II II 11 11 11 11 II II 11 1 11 II ,1 II u 11 e u 11 n n u 1 n n 1 u ABOVE DETAIL A n u It n u n u n l u u u u n u n n u n u n I n u n 1 n u u n n n u u i n n n I SCALE 1:8 n u n n n n u u I II n n 7'-5j' II n n n n n u n I n n n II u u n S�rX�i @ii16'1O, 11 n 1 u BEAM SPAN 18' 1 u u n n n u u 1 n It 11 u 1 n n u u u ➢ n 1 n p n 1 1 u n u n n u n 1 n u u________1 1 n u n p n u u 1 11 n nr--lr—n1 =11 X 4;D X 19-1 2'1 STEEL-WA lN--III 2'-4j' 1' - - --- -- - --- --- - -- - ANDING ----_---„--T�=----„-gym=- ---_=--,r—�=�.__-- I It II II it 11 I II I; lilt II 11 II 5'-56' <9 il L C) 72' ' H 6'-6' (OPEN DECK) OVER PITCHED ROOF 1 1 (5) 2X8 HEADER 20'-0', SECTION A-A HEADER SPAN 8'6' A �-� 3/4' PLYWOOD SUBFLOOR --2X8 SILL (TOP IS FLUSH W/ TOP OF JOIST) 2X8 JOISTS 16' O.C. Michael A.Cook 105 LEACH STREET, SALEM,MA 01970 FLOOR JOISTS MATERIAL:SPRUCE/PINE/FIR(S.P.F.j 2X8 DATE: 10-20-2006 SCALE:1164 " PLYWOOD SHEATHING 5ja I II I I II II II 1 II II 11 1 1 1 II I L —J — l —J JL JL —J 2X6 @ 16' O.C. typ 1'-2�" 1/4' THICK CLEAR POLYCARBONATE WINDOW (HINGED AT BOTTOM) 7'-56' ►{ WITH SCREEN (2 PLACES) 2'-61q' 7'— (3) 2X10 Y Y U U ¢ ¢ I1 (2) 2X6 (2) 2X6 11 / ii I ----- Y 6'-6�" Y ----- n 7 _6a --if----- \ \ lr-----Tr-----. I 11 4 11 11 II R❑. 1 11 II I II II 1 1 II II Y Y I II II 1 , 11 \11N '-7�q' � II 1 1 II II 1 U U5'_0�, a � I 11 II I - ,I -9x XNNI ,`----''L-----JJ•---- -----J L-----J L----JL----- L-----�L---- JL - NorthEast Wall Elevation-2nd Floor Michael A.Cook WALL CONSTRUCTIONI 105 LEACH STREET, SALEM,MA 01970 1) 2X6 SOLE & TOP PLATE TYPICAL. 2) 2X STUDS 16. O.C. TYPICAL WALL CONSTRUCTION DETAIL 3) R21 FIBERGLASS INSULATION BTW STUDS 4) DESIGNED FOR 'STAND-UP' CONSTRUCTION. MATERIAL:AS NOTED 5) USE 3/4' THK PLYWOOD SHEATHING AND FASTEN WITH 50% GALV. NAILS AND 50% SCREWS 6) ADD TYVEK & CLABBORD SIDING OUTSIDE DATE: 10-20-2006 7) ADD 1/2' SHEETROCK INSIDE. SCALE:1132 7'-56" 2' 2'-61q' = (3) 2XIB .i -i LD 2'-6 L = Z Z 7'-61q" 3'-4' m I 5'-0j" 5 _7 " ( L I T _3�L x('Ju LILI i _J _ _______________________________________________________________________________________ _ __________________________________________________________________________________________________ 19'-10 " 45° 10' SOFFIT South West Wall Elevation-2nd Floor WALL CONSTRUCTION, 1) 2X6 SOLE & TOP PLATE TYPICAL. 2) 2X6 STUDS 16' O.C. Michael A.Cook 3) R21 FIBERGLASS INSULATION BTW STUDS 106 LEACH STREET, SALEM,MA 01870 4) DESIGNED FOR 'STAND-UP' CONSTRUCTION. 5) USE 3/4' THK PLYWOOD SHEATHING AND TYPICAL WALL CONSTRUCTION DETAIL FASTEN WITH 50% GALV. NAILS AND 50% SCREWS 6) ADD TYVEK & CLABBORD SIDING OUTSIDE. MATERIAL:AS NOTED 7) ADD 1/2' SHEETROCK INSIDE. DATE: 10-20-2006 SCALE:1132 1'-4' PITCH 2'-10' 1356 �\ PLYWOOD GUSSETT BRACE — USE ON BOTH p SIDE OF RAFTERS AT HIP MY 26) m EV Plan View 7'-7' 3'-3j' o 7 , 2)M RAFTERS W or. 17N 3)FIBERGLASS DSU ATIRN BTW RAFTERS. 4�' f)ADD VENTDIRDS I)THUND INSULATION IN RA ER RHERE D)INSTALL CSNTI OUS ROOM & SOFFIT VENTS. RE CUT BIN WALL TX WTa 1N RAFTERS WHERE RESTING RII va L 7)6143W SLOES f PER FU - SIDES. ES!®PEI. D)INSTAL• En S 24•PER FORT - S1DE5. D)INSTALL CMIM TIES FOR r I0.SIENIN V[M 3/4• TiG PLYWN, U.ADD 100%COVERAGE ICE L WATER SHIELD. Re ADD Rt�I1G FELT ASJWAXT SHDVcS. 9'-1 "18,135- Michael A. Cook ' t" )ostEAcr+srREEr,SAlF1A,)M01970 ROOF CONSTRUCTION DETAIL MATERIAL:AS NOTED NorthEast Wall Elevation I DATE: 10-20-2006SCALE:1/50 2s-0o 1'-4' PITCH 2'-10° 4'-5J� 135° i/ PLYWOOD g p w GUSSETT BRACE - USE ON BOTH m SIDE OF RAFTERS AT HIP to <QTY 26) u 17'-5�" t] eo 11 N N 2 Cl) 1 Plan View 7'-7"� 2X6 COLLAR TIE - USE ON ONE 7�' SIDE OF RAFTERS FOR A 7' CEILING. 3'-3j" 8'-0" I (QTY 14) �47' 6° V7418.4350 6'-7j° (4:12 PITCH) T%RMIAMichael A.Cook RAFTERS ar 105 LEACH STREET, SALEM,MA GIM 63.435° FIBERGLASS WRIATIM BTW RAFTERS u AN VENTS tWER DWATIRI BTW RAFTERS.(24;12 PITCH) 6)a;!MROSHMM�"a IN RAF ms� ROOF CONSTRUCTION DETAIL " n 1&4W S ON�tS e PER FELT -Tar GANBM- MATERIAL:AS NOTED &6a455' RIPE IS BY PER F®T - SIDES. I %INSTALL 2M CG.LAR TIES FOR 7' CER.M IL SHEATH ADDADDD =CCWERAGE T�i WATER SHEELM DATE: 10-20-2006 NorthEast Wall Elevation 'a AM ROWING FELT 6 "S"""`LT SHBx1ei SCALE:1/50 ' THK RISER TYP �2 7" NOSING H TREAD TYP �1° 2nd FLOOR - 7j° 7z 8" RISE t �10' TREAD 8'-Y ----- 7'-8" -- L__� � 9" TYP 7 TYP --� 6j° FLO R SLAB 8'-111q" Michael A. Cook 105 LEACH STREET, SALEM,MA 01WO STAIR STRINGERS MATERIAL:SPRUCE/PINE/FIR(S.P.F.)2X72 DATE: 10-20-2006 SCALE:1/64 1� IIIII - _ _ - 11 I■ 1� IIIII NMI IIIII ---------� NMI IM ri NMI IIIII r 1� IIS 1 � NMI IIII� rJ�/ 1� I IIII ■I ��I1'� Il,! NMI .,-; 111►�11 III 11 - NMI � Al :EM �� �o o� COST/ SCHEDULE OF GARAGE AT 105 LEACH ST. DESCRIPTION WEEK OF CITY TIME PRICE EA CITY PRICE DEMO LABOR 23-Oct 1 DAY 25/HR $ 200.00 20 YARD DUMPSTER RENTAL (CONCRETE) 1 WEEK $ 400.00 JACKHAMMER RENTAL 1 DAY $ 50.00 DUMP LUMBER @ N.S. CARTING $ 100.00 EXCAVATOR RENTAL, GAS, DELIVERY 30-Oct 2 DAYS $ 400.00 WOOD FOR FORMS 1 DAY 1 $ 200.00 #5(5/8) REBAR X 20' LONG 21 17 $ 357.00 #5 REBAR x 30" LONG 8 0.125 $ 17.00 POUR FOOTING 4000PSI 4.82 YD 1 DAY 115+ $ 674.00 BUILD FORMS 2 DAYS POUR WALLS 4000PS1 12.04 YD 1 DAY 115+ $ 1,618.00 POUR FLOOR 4000PSI 7.92 YD 1 DAY 115+ $ 1,078.00 8X8X16 CORNER SPLITFACE C.M.U. 6-Nov 48 4 $ 192.00 8X8X16 STREACHER SPLITFACE C.M.U. 441 3 $ 1,323.00 LABOR (MASONRY) 6 DAYS $ 2,400.00 TRUSS TYPE REINFORCING WIRE 1 O' LONG 36 2.25 $ 81.00 3/8 DIA REBAR 12" LONG MORTAR MIX 80 LBS "CON-PROC 3" 5.55 12" LONG 1/2" DIA"J" BOLTS 16 2 $ 32.00 W8X1 5X1 9.5' STEEL BEAMS-GALVANISED 13-Nov 4 1 DAY 337.5 $ 1,350.00 4" DIA LALLY COLUMNS 1 42 $ 42.00 LALLY COL BRKTS (TOP) SIMPSON LCC4.5-4 1 42 $ 42.00 PLYWOOD CDX 1/2"THK 4X8 SHEET(BEAMS) 3 13 $ 39.00 2X8X8 SPF (RIM JOIST IN BEAMS) 20 1 DAY 5.86 $ 117.20 1/2" DIA X 5" CARRIGE BOLT&WASHER/NUT 16 1.9 $ 30.40 HEAVY DUTY JOIST HANGERS 2X8 84 1 DAY 1.1 $ 92.40 1.5" LONG JOIST HANGER NAILS 800 2X8X8 SPF (FLOOR JOIST) 42 1 DAY 5.86 $ 246.12 2X8X8 PT SYP (TRIPPLE SILL PLATE) 24 8 $ 192.00 PLYWOOD 3/4 THK FLOOR (T&G PINE) 15 1 DAY 20 $ 300.00 PLYWOOD 3/4"THK GUSSETTS 20-Nov 8 1 DAY 20 $ 160.00 2X6X8' SPF RAFTERS 56 1 DAY 3.75 $ 210.00 2X12X10' (TRIPPLE RIDGE BEAM) 6 14 $ 84.00 RAFTER HANGERS 28 1 DAY 5/8 PLYWOOD 4X8 ROOF SHEATHING 20 1 DAY 19 $ 380.00 2X6X8' SPF SOLE PLATE 8 3.75 $ 30.00 2X4X8' SPF STUDS 40 1 DAY 2.13 $ 85.20 2X6X8' SPF STUDS 13 3.75 $ 48.75 2X6X8' SPF TOP PLATE 8 3.75 $ 30.00 ICE &WATER SHIELD 3X75=225S.F. ROLL 3 100 $ 300.00 TAR (FELT) PAPER 432 S.F./ROLL 20-Nov 2 16 $ 32.00 ROOF SHINGLES-ARCHITECTURAL 7 2 DAY 63 $ 441.00 TYVEK HOUSE WRAP X WIDE ROLL 495SF Thanksgiving 1 69 $ 69.00 CLABBORD 1DAY FIBER BOARD UNDERLAY 4X8 SHEET 5 11 $ 55.00 ADHESIVE RUBBER ROOF 10'X 25' ROLL(NEED 130 S.F.) 1 1 DAY 160 $ 160.00 DRIP EDGE COVER TAPE ROLL 1 170 $ 170.00 SLEEPERS (2X4X8) @ 16 O.C. 15 2.13 $ 31.95 6"WIDE DECKING (CHOICEDECK 130 S.F. CABLE RAILING 33 L.F. GARAGE DOOR 16X7 ELEC LOW HDROOM 27-Nov 1 2000 $ 2,000.00 32X80 WOOD DOOR W/WINDOW 1 180 $ 180.00 32X48 WINDOW 2 180 $ 360.00 24"X 48"X 3/8"THK LEXAN PANEL 1 1 DAY 97 $ 97.00 8'8"X 7'6" CUSTOM BARN DOOR 1 1 DAY 50 $ 50.00 2X12X10 STAIR CUSTOM STRINGER 4-Dec 3 1 DAY 14 $ 42.00 WINDOW DH 3 1 DAY 160 $ 480.00 DOOR 36"X 79" CUSTOM W/WINDOW 1 180 $ 180,00 LOCKSET DOORKNOB 2 25 $ 50.00 WIRE OUTLETS, LIGHTS, SUBPANEL 1 250 $ 250.00 INSULATION R13 88 S.F. ROLL 12 33 $ 396.00 DRYWALL 20 PAINT 1 30 $ 30.00 CARPET 19X17=323 S.F. 323 2 $ 646.00 GAS FIREPLACE 11-Dec $ 1,500.00 HOT TUB $ 4,895.00 TOTAL 1 $25,016.02 Construction Plans Salem Building Department Design, Materials and Construction Details for A Boathouse at 105 Leach Street Submitted by Owner: Michael A. Cook 105 Leach Street Salem,MA OI970 October 20,2006 C=K y 20'-4' GAS, WATER AND ELECTRIC UTILITIES 7ENTER HERE THROUGH PVC PIPE SET 36' BELOW TOP OF FOUNDATION. ##5 REBAR HORIZONTAL CONTINUOUS C2 TOP, 2 BOTTOM, & 2 FOOTING) ENGINEER TO REVIEW SUBSURFACE FIELD CONDITIONS UPON EXCAVATION. 23'-10° NOTES: 1. CONCRETE 3000PSI MINIMUM STRENGTH. 23'-4' 2. VOLUME OF FOOTING = 130 CU. FT. 3. VOLUME OF WALLS = 325 CU, FT, 4. VOLUME OF 6' THK FLOOR = 214 CU. FT. 5. QTY OF 30' #5 REBAR = 8 PIECES 6, QTY OF 8' #5 REBAR = 51 PIECES #5 x 30' REBAR @ 16' O.C. DAVIT BASE DRILLED AND ADHESIVE-SET 3'X3'X6' DEEP - 8' INT❑ EXISTING FOUNDATION WALL ---------------.--------__--___—__ i) _ <- EXISTING SEAWALL -> 1'-4' - --- --- - NE_ ------- ---- -- ----------- - - - ------- ------- - WUCTI L 3' FROM DAVIT BASE TO BLOCK WAL - ------ 20'-4° -CAP-----WALL-----T❑--NEW HE-I-GHT--- ";a 1'-0°--} THIS SURFACE TO 1` ABOVE DAVIT BASE :•:. r 4' TO 6'-0' Michael A. Cook io6LEACHSTREET,SALEM,MACIWO L, FOOTING AND FOUNDATION 1 MATERIAL:POURED CONCRETE 2'-0'—h—� DATE: 10-20-2006 SCALE:1/64 20'-0" 2'-0, �6° 6'-8° I FILL CORES SOLI POCKETSJ7 POCKETS — 2'-8' DOOR 'J' BOLTS FOR BEAM 8'-0" FOR BEAM SEE NOTES 8" - _ FILL CORES SOLI 24'-0' 4' DIA. LALLY COLUMN 7'-11 " POCKETS 2'-8' ON CONCRETE PAD FOR BEAM ILL CORES SOLI 6'-04" 2'-8° 10'-8" 4° 8° 1'-0' POCKETS —_ FILL CORE SOLI 4'-O" FOR BEAM 3'-4" �g' DEEP TYP 2'-8" 4'-0" . NOTES: 1)ADD TRUSS TYPE REINFORCING WIRE ON EVERY OTHER COURSE(HORIZ). ' ( I 11 2)ADD#4 REBAR(12"DIA)VERTICALLY WHERE CORES ARE FILLED SOLID. I I I 3)ADD 12"LONG"J"BOLTS(12"DIA)IN CEMENT PROTRUTING 2"FROM TOP I COURSE EVERY 32"FOR SILL PLATE ATTACHMENT. ——- -� cs�nn a .�� nti.�a cou I I 1 12 COURSES Michael A.Cook Cc'1= 'I L = h��€ , I I I OF 8" €1Elfi*44 ,IA1s4° 106 LEACH STREET,SALEM,MA 01,970 4'-0' 1 1 ,t CEMENT BLOCK WALLS: I I I STRA N M. MATERIAL:8X8X16 SPLITFACE HOLLOW BLOCK �Na34420 % DATE: 10-20-2006 �., �.� /3.y •� � SCALE:1/64 A BEAM SPAN 16' W8 X 18 X 19-1/2' ISTEEL BEAM -=vTe= s_�var_� vv�ver--1 ���==raa =_R'" —7�" 2X8 1 II u x it II II 11 1 II it it II II M I 11 II 11 H II II II 1 II 11 II it II e n n x n n u u It n u n u e 5a` 1X6 SPACER 1 11 11 II II 11 11 I 11 II II II II 1 II II It II II II 1 II II 11 II u 10 I II II II 11 It II 11 II it 11 II 11 11 I n n n 11 1111 u 1 n n H n n e BEAM 7'-5 " 1 x x n u n 11 n I u n x u n e 54 W8X18 I n n n n n n u n . x n n n e I u n u u n H I1 1 n n n n n e 1 n x n n 11(2-� ,I n n n u n 1 II II 11 11 2A8 III—°' L6 I �O�II 11 11 II H 1/2' BOLTS 1 11 11 a II 11 II 11 11 u It 11 If 32' APART & II II 11 II 11 II 11 1 11 11 It It II WS 1 1°�-1X2'I SIEEA�1 ;; 24'-0' S , STAGGARED STIEEWA1L__L__ 17'-6" A m3'm5��83maHmzcx3 11 it =—It 11-- --If--n-- ROOM 8� rri.1111111.1; II II 11 It a 11 H 11 II II H n n n n u x I x 11 11 u ABOVEn n H u x n n 1 u n n u DETAIL A Hn n n u u n 1 n unISCALE 1:8 u i ii ii ii 6'-0' 7'-56' II 11 1{ n " ° II BEAM SPAN 18' II 11 11 11 �IIp {yn It ii 1 11 H I u 1 u u x ?X`-II @u1611 O, n u 1 u 1 u n n n u u H 1 n n n I 1 n n n n u n u 1 n u 1 1 n n n u u u n 1 n n u_—___-- I n u n x x n u I u n ur--lr--w 2,_4 , u WI ---4�---___--- 211 ST EC__BEANhm,_"w'__m � 1 ----- ANDING ----_---- ------------- ------- ---- I 11 n 11 11 It Iii — t 11--n n—ii--u 5'-56' (9 1 L C X @ 16 O. 72' 6'-6' (OPEN DECK) OVER PITCHED ROOF , (5) 2X8 HEADER 20'-O', SECTION A-A HEADER SPAN 8'6" 1 A --1+-j 3/4' PLYWOOD SUBFLOOR �_--2X8 SILL (TOP IS FLUSH W/ TOP OF JOIST) 2X8 JOISTS 16' O.C. StfuctUres North entmiling If-ItuMeers, Inc. Michael A. Cook r g 10 LEACH STREET,$iLEM,MA 01970 Q' 8T^ i No.3 y 4=2o FLOOR JOISTS MATERIAL:SPRUCE I PINE/FIR(S.P.F.)2X8 DATE: 10-20-2006 SCALE:1164 qD" PLYWOOD SHEATHING S�" 1 Ir 1 I I 11 11 r, 1 i 11 II II 1 1 I 11 1 L _JL _ L J IL Jl J 2X6 @ 16' O.C. typ 1' 22 " 1/4' THICK CLEAR POLYCARBONATE WINDOW (HINGED AT BOTTOM) 7,_5�' " WITH SCREEN (2 PLACES) 2,-6 j' 7'-9 (3) 2X10 Y U U Jii \ L3 i it\\ \ (2) 2X6 zz. 3 z (2) 2X6 7`-6q' ----- I -----it-----ir----- `1 6'-64° Y -----it----- 1 11 I I 11 11 1 / u I R.D.RI n \ Y Y 1 7 II , 1 II II I U U i 11 11 11 it � 5'-0�" / 1, , r 11 II 1 ¢ / „ , 1 11 11 r (1 II 1 1, /N 11 I I 11 11 i II II 1 , II 11\ J a / II 11 , 1 11 II I I ,I 11 1 , it il \ 3 -9 / II II 1 1 II 11 I II II , „ II \ 1 II II I X X I 11 II I 1 II \ / II 11 1 1 11 11 1 N N 1 11 11 1 � it 11 ` / ii ii i 1 n n I 1 n II 1 , rl it ` / 1 II II 1 1 it 11 I , II 11 � II It 1 1 11 II 1 I it 11 1 � i II 11 I 1 11 II \ / II II 1 11 II 1 I 11 11 1 1 It 11 \ J L--___JL_-_-_J I L_-___J L_____J L_____ __-_JL_----J L____J _8'-4j° —� - 3'—2' 19'-10j" NorthEast Wall Elevation-2nd Floor r (+ 5p�p[I gq¢ q IS I' b et"ares 0�'{orth M/' �i nP3� l9ie �D`Ee9 Michael A.Cook WALL CONSTRUCTION, 10LEACHSTREET, SALEW.M 01970 1) 2X6 SOLE & TOP PLATE TYPICAL. I'°J`'`7, 2) 2X6 STUDS 16. O.0 TYPICAL WALL CONSTRUCTION DETAIL 3) R21 FIBERGLASS INSULATION BTW STUDS �ri- - 4) DESIGNED FOR 'STAND-UP' CONSTRUCTION, MATERIAL:AS NOTED 5) USE 3/4' THK PLYWOOD SHEATHING AND FASTEN WITH 50% GALV. NAILS AND 507 SCREWS - DATE: 10-20-2006 6) ADD TYVEK & CLABBOR➢ SIDING OUTSIDE 7) ADD 1/2' SHEETROCK INSIDE. SCALE:1132 7 56 2' 2'-61q° 7'-96 ao- -i i (3) 2X8 -i -i L') 2'-6 0 z z 7 " Y 3'-4' '-6 Y i 5'-'* 5 7 " a ¢ x x Cu[ju D N i ' L 19'-10�q' 450 _— --�,- -------- 10' SOFFIT Southwest Wall Elevation-2nd Floor Struciures North WALL CONSTRUCTIONS ' '"s;3 t ti+;;)fi 'e"grgnesPid r" 1) 2X6 SOLE & TOP PLATE TYPICAL «' .)O�tN P, 4 Michael A.Cook 2) 2X6 STUDS 16' O.C. 3) R21 FIBERGLASS INSULATION BTW STUDS 106 LEACH STREET,SALEM.MA 01970 4) DESIGNED FOR 'STAND-UP' CONSTRUCTION. L to.3, 96 5) USE 13/4' THK PLYWOOD SHEATHING AND "1 ; TYPICAL WALL CONSTRUCTION DETAIL FASTEN.WITH 50% GALV, NAILS AND 50% SCREWS * ' •" 6) ADD :TYVEK & CLABBORD SIDING OUTSIDE. c:;;�`-'' '� MATERIAL:AS NOTED 7) ADD '1/2- S14EETR13CK INSIDE. DATE: 10-20-2006 SCALE:1132 114'ITCH 135° y \ �--�'' �" PLYWOOD GUSSETT BRACE - USE ON BOTH SIDE OF RAFTERS AT HIP (QTY 26) 17'-5j' io fV Plan Frew S4 uc+u es North Conomiaing Engineers, Inc. 7'-7' 7 n aw RAFTERS Ls• T 8'-0" 4)FIBERGLASS UNDER SR RTv RAFTERS ° o CVT 3SD)VENTS UNDER I CH IN 8 A STUN RAiiERS 9 04TALL CMTMNS RNFB• SVFTT Vmm R T HON WALL MTCH a!RAFTERS VNERE RESTMS[M VALL n 18A3S SLOPE A 2 PER FOOT - T� SPMBFi£L 4 R)D6&437WAL SLOPE iS M PER FOR - ED- A VIFAH 2X6 3/4' LIES W T' cER.ING WL IL AMI CO 3AG TIC PLYAM 6' 1& ADD RDWM T�i�ASP WATT "CUS. 18.435° Michael A.Cook 6'-71q` 1M LEACH STREET,SALEM.MA 01970 63.435° ROOF CONSTRUCTION DETAIL MATEMAL:AS NOTED DATE: 10-20.2006 NorthEast Wall Elevation I SCALE: �2 0 1'-4° PITCH 2 _ip" 135° y \ PLYWOOD g um GUSSETT BRACE - USE ON BOTH m SIDE OF RAFTERS AT HIP tO Lu 17'-5 ' CQTY 26) 0 m � O N N 1'-4h" 4'-2 Plan View --��j 7,-7' -{ 2X6 COLLAR TIE - USE ON ONE 7� SIDE OF RAFTERS FOR A 7' CEILING, (QTY 14) tv A S rR V 4i2" 6" STRUC LhRAL w ' No w d SEi u�Ctures North 9' 7'-4 ' 18,435° &�Itu D Engineers Inca 6'-7 ° <4'I PITCH) 4 b Michael A.Cook 2 TRLPPI.ET Rmff SEAM' 105 LEACH STREET:SALEM,MA 01970 2)FIBERGLASS IB RKTESS I6. TM 63.435° 4)FIiiR EXTS ANDER N TI RK7ERs u ran vI C TINOU 1NSlR. % S RT I RAFTERS C24;12 PITCH) 9 CUT BIR CONTII WS CHI x sosS VENTS ROOF CONSTRUCTION DETAIL w art maRsmllnL NmcN w RAFTERS WERE ��ON WAIL MATERIAL:AS NOTED 1'-4° 7) NL435' SLOPE IS 4' PER FOOT-TOP GAMBREL e)63.435•SLOPE IS 24'PER{TUT - SIDEC %INSTALL 2%6 COLIAR TIES FOR 7' CEU34 IL ADOEA I=COVERAGETICE i VATER SNIELB DATE: 10-20-2006 NorthEast Wall Elevation IZ.AOO ROOFING FELT 6 ASPNA LT RUULM SCALE:1/50 " THK RISER TYP �2 -7"�� TREAD TYP1" NOSING 2nd FLOOR ------- 7J" 8" RISE I I 10" TREAD i L _1 7 -8" I I ----- ----- �- 9" TYP 1 if 7j" TYP FLOOR SLAB 98"—_4 V-21" 22 11�" 8'-114" ers� e North ' ne ' Michael A.Cook STrrJCT PAL _> 105 LEACH STREET,.SALEM,MA 01970 1, Z`� ' STAIR STRINGERS >� MATERIAL:SPRUCE!PINE!FIR(S.P.F.)2X72 DATE: 10-20-2006 SCALE:1!64 NMI i:il��li'iiiiii�i�il1111�111�i''■■■■■■■■■■■ ■ IOI III■I- 11 I■ 1�1 IIIII NMI IIIII ---------� NMI IIIII ! ri NMI I III r NMI 6�■� NMI Illii' rJ�-/ NMINMI IIIIII! 11 �I►i Ilia, 1�1_ IIIII ���/CI.��� ►.� NMI 11130,N ILMI , _ ;ii.�i III►�III�11 I I fir � �� � 0 o� COST/SCHEDULE OF GARAGE AT 105 LEACH ST. DESCRIPTION WEEK OF QTY TIME PRICE EA QTY PRICE DEMO LABOR 23-Oct 1 DAY 25/HR $ 200.00 20 YARD DUMPSTER RENTAL (CONCRETE) 1 WEEK $ 400.00 JACKHAMMER RENTAL 1 DAY $ 50.00 DUMP LUMBER Q N.S. CARTING $ 100.00 EXCAVATOR RENTAL, GAS, DELIVERY 30-Oct 2 DAYS $ 400.00 WOOD FOR FORMS 1 DAY $ 200.00 #5 (5/8) REBAR X 20' LONG 21 17 $ 357.00 #5 REBAR x 30"LONG 8 0.125 $ 17,00 POUR FOOTING 4000PS1 4.82 YD 1 DAY 115+ $ 674.00 BUILD FORMS 2 DAYS POUR WALLS 4000PSI 12.04 YD 1 DAY 115+ $ 1,618.00 POUR FLOOR 4000PSI 7.92 YD 1 DAY 115+ $ 1,078.00 8X8X16 CORNER SPLITFACE C.M.U. 6-Nov 48 4 $ 192.00 8X8X16 STREACHER SPLITFACE C.M.U. 441 3 $ 1,323.00 LABOR(MASONRY) _ 6 DAYS $ 2,400.00 TRUSS TYPE REINFORCING WIRE 10' LONG 36 2.25 $ 81.00 3/8 DIA REBAR 12" LONG MORTAR MIX 80 LBS"CON-PROCO" 5.55 12" LONG 1/2" DIA"J" BOLTS 16 2 $ 32.00 WBX15X19.5'STEEL BEAMS -GALVANISED 13-Nov 4 1 DAY 337.5 $ 1,350.00 4"DIA LALLY COLUMNS 1 42 $ 42.00 LALLY COL BRKTS (TOP) SIMPSON LCC4.54 1 42 $ 42.00 PLYWOOD CDX 1/2"THK 4X8 SHEET(BEAMS) 3 13 $ 39.00 2X8X8 SPF RIM JOIST IN BEAMS) 20 1 DAY 5.86 $ 117.20 1/2" DIA X 5" CARRIGE BOLT&WASHER/NUT 16 1.9 $ 30.40 HEAVY DUTY JOIST HANGERS 2X8 84 1 DAY 1.1 $ 92.40 1.5" LONG JOIST HANGER NAILS 800 2X8X8 SPF(FLOOR JOIST) 42 1 DAY 5.86 $ 246.12 2X8X8 PT SYP (TRIPPLE SILL PLATE) 24 8 $ 192.00 PLYWOOD 3/4 THK FLOOR (T&G PINE) 15 1 DAY 20 $ 300.00 PLYWOOD 3/4"THK GUSSETTS 20-Nov 8 1 DAYF3.76 $ 160.00 2X6X8'SPF RAFTERS 56 1 DAY $ 210.00 2X12X10'(TRIPPLE RIDGE BEAM) 6 $ 84.00 RAFTER HANGERS 28 1 DAY 5/8 PLYWOOD 4X8 ROOF SHEATHING 20 1 DAY $ 380.00 2X6X8' SPF SOLE PLATE 8 $ 30.00 2X4X8' SPF STUDS 40 1 DAY $ 85.20 2X6X8' SPF STUDS 13 $ 48.75 2X6X8' SPF TOP PLATE 8 3.75 $ 30.00 ICE &WATER SHIELD 3X75=225S.F. ROLL 3 100 $ 300.00 TAR (FELT)PAPER 432 S.F./ROLL 20-Nov 2 16 $ 32.00 ROOF SHINGLES-ARCHITECTURAL 7 2 DAY 63 $ 441.00 TYVEK HOUSE WRAP Y WIDE ROLL 495SF Thanksgiving 1 69 $ 69.00 I CLABBORD 1DAY FIBER BOARD UNDERLAY 4X8 SHEET 5 11 $ 55,00 ADHESIVE RUBBER ROOF 10'X 25' ROLL(NEED 1$0 S.F.) 1 1 DAY 160 $ 160.00 DRIP EDGE COVER TAPE ROLL 1 170 $ 170.00 SLEEPERS(2X4X8) @ 16 O.C. 15 2.13 $ 31.95 6"WIDE DECKING (CHOICEDECK) 130 S.F. CABLE RAILING 33 L.F. GARAGE DOOR 16X7 ELEC LOW HDROOM 27-Nov 1 2000 $ 2,000.00 32X80 WOOD DOOR W/WINDOW 1 180 $ 180.00 32X48 WINDOW 2 180 $ 360.00 24"X 48"X 3/8"THK LEXAN PANEL 1 1 DAY 97 $ 97.00 8'8"X 7'6"CUSTOM BARN DOOR 1 1 DAY 50 $ 50.00 2X12X10 STAIR CUSTOM STRINGER 4-Dec 3 1 DAY 14 $ 42,00 WINDOW DH 3 1 DAY 160 $ 480.00 DOOR 36"X 79"CUSTOM W/WINDOW 1 180 $ 180.00 LOCKSET DOORKNOB 2 25 $ 50.00 WIRE OUTLETS, LIGHTS, SUBPANEL 1 250 $ 250.00 INSULATION R13 88 S.F. ROLL 12 33 $ 396.00 DRYWALL 20 PAINT 1 30 $ 30.00 CARPET 19X17=323 S.F. 323 2 $ 646.00 GAS FIREPLACE 11-Dec $ 1,500,00 HOT TUB $ 4,895.00 TOTAL $25,016.02 Construction Plans Salem Building Department Design,Materials and Construction Details for A Boathouse at 105 Leach Street Submitted by Owner: Michael A. Cook 105 Leach Street Salem,MA 01970 October 20, 2006 9� 21'-4• 20'-4' GAS, WATER AND ELECTRIC UTILITIES ENTER HERE THROUGH PVC PIPE SET 36' BELOW TOP OF FOUNDATION. #5 REBAR HORIZONTAL CONTINUOUS (2 TOP, 2 BOTTOM, & 2 FOOTING) ENGINEER TO REVIEW SUBSURFACE FIELD CONDITIONS UPON EXCAVATION. 23'-10' NOTESi 1. CONCRETE 3000PSI MINIMUM STRENGTH, 23'-4' 2. VOLUME OF FOOTING = 130 CU. FT, 3. VOLUME OF WALLS = 325 CU, FT. 4. VOLUME OF 6' THK FLOOR = 214 CU. FT, 5. QTY OF 30' #5 REBAR = 8 PIECES 6, QTY OF 8' #5 REBAR = 51 PIECES #5 x 30' REBAR @ 16' O.C. DAVIT BASE DRILLED AND ADHESIVE—SET 3'X3'X6' DEEP __ 8' INT❑ EXISTING FOUNDATION WALL r---- 1 q C ------------ .. L C— EXISTING SEAWALL —) 1'-4' ;' ------- --20'-4' CAP WALL T❑ NEW HEIGHT--- -- ------ ----- -- -- ---------------------- R�� l 3' FROM DAVIT BASE TO BLOCK WALL a `^ 1'-0' �{ THIS SURFACE TO 1' ABOVE DAVIT BASE 4' TO 6'-0' s` Michael A. Cook 106 LEACH STREET,SALEK MA0'1 WO FOOTING AND FOUNDATION MATERIAL POURED CONCRETE DATE: 10-20-2006 SCALE:1/64 20'-0° 6, 6 8' I 2i_Oa FILL —1 S SOLI POCKETS POCKETS //f2'-8' DOUR 'J' BOLTS FOR BEAM 8'-0° FOR BEAM SEE NOTES 8' - _ FILL CORES SOLI 24'-0' 4' DIA, LALLY COLUMN 7'-Ii ° POCKETS 2'-8' ON CONCRETE PAD FOR BEAM ILL CORES SOLE 6'-0j' 2'_8' 4° POCKETS FILL CORES SOLID FOR BEAMCEI 1— —2'-0'3'-4' 8' DEEP TYP 2'-8'L 4 -0° NOTES: 1)ADD TRUSS TYPE REINFORCING WIRE ON EVERY OTHER COURSE(HORIZ). 2)ADD#4 REBAR(1/2'DIA)VERTICALLY WHERE CORES ARE FILLED SOLID. I I I 3)ADD 12-LONG'J'BOLTS(VT DIA)IN CEMENT PROTRUTING 2"FROM TOP I COURSE EVERY 32'FOR SILL PLATE ATTACHMENT - cw.u� � uSN5 EAll I 12 COURSES Li:r E'1gtno' �nC. I I I OF 8' €ER"ut° Michael A.Cook zw M i t 105LEACHSTREET, SAfEM.MA M 4'-0' I I I I I HN M. CEMENT BLOCK WALLS: I I I rAFW STR MATERIAL:8X8X16 SPLITFACE HOLLOW BLOCK �9'-4' 8'-8' R0.--- 1 ,1 �Na3an2D i DATE: 10-20-2006 e. . •��..�+Z.:/.,.;!;x SCALE:1164 A --� BEAM SPAN 16' W8 X 18 X 19-1/2'ISTEEL BEAM --------------------------------------------- 1 N u u N n u u �n u u n u n 07 2X8 I n n u u n u u l u n u n u a I n u n a n n n l u u u n u a 54 u n u u n a n n 11 u u a q 4 1X6 SPACER 1 II II N II II II II 1 II 11 II II N ■ I 11 It II N II II 11 1 II 11 II II II q 1 n n n n q n n i n 11 a N n a 1 II 11 11 II ,I 11 1 11 N a Sln W8X18 BEAM II II 11 II If II II 11 II II II II 9 9 1 11 11 it 11 111I� II J11 I 11 II II II II e 1 II N N II 2k8 IP ll6 .0�1 q 11 11 II I n n u n n u N I n n n n n 112' BOLTS I it II n ,1 11 11 II II it If 11 11 32' APART & 11 11 N 11 11 11 N I 1, It II 11 11 1 24'-0' 11 I8 �( 1 1�-1X2'; SEE $EA1 ;; 5 , STAGGARED 17'-6' A i� ROOM 8 c_vv v — 11 11 II 11 II Il It 11 N II M6 - 1 a n ABOVEn I n n DETAIL A SCALE 1:S n u 7'-5 ° 11 11 II 11 11 11 II II I It 11 BEAM SPAN 18' 11 11 11 II 11 p I' 11 I II 11 1 x n n @u16uQ, a N I q 1 N 11 11 11 II 11 If I II 11 11 11 I n n u u q n a I 11 i I 1 u n n u ❑ 11 N I n q n u u n 11 __--V,8 X== 1�:12'! STEEL' BEAM==H' = ---- ---- -- -T-®--_- --- -_� =_--- LANDING I II II II II 11 I II III „ „ n II II 5'-5j' (9 1 L C. X @ 16 O, 72' 6'-6" (OPEN DECK) ❑VER PITCHED ROOF 1 (5) 2X8 HEADER 20'-0°�— --�I SECTION A-A HEADER SPAN 8'6' 1 A -�+J 3/4' PLYWOOD SUBFLOQR /_— 2X8 SILL (TOP IS FLUSH W/ TOP OF JOIST) ii —2X8 JOISTS 16' O;C. S1gruc1ures North e ?p Michael A.Cook 10 LEACH STREET,9ALEM,MAQ7a70 4l.h "F' IE - 81 .E FLOOR JOISTS MATERIAL:SPRUCE/PINE 1 FIR(S.P.F.)2X8 DATE: 10-20-2006 SCALE:1/64 " PLYWOOD SHEATHING �5j" I II 1 I it rl II 1 , II II II r l I II 1 L _JL L J _JL Jl J L _JL -JL _ 2X6 @ 16' ❑,C. typ 1 22 ° 1/4' THICK CLEAR POLYCARBONATE WINDOW (HINGED AT BOTTOM) 7' Sj' WITH SCREEN (2 PLACES) 7`)k (3) 2X10 ` Y Y U U I Q Q LD (2) 2X6 Z„ (2) 2X6 7'-6)q' iT-----,r-----,r----- Y 6'-6j' YT-----,r-----it----- � I{ + II 1 1 11 II I R.O. I It 11 I 1 II Y 1 II II 1 1 II � I II I 1 II Ir I I 11 I. /N II I I 11 11 I I II 11 1 i II 11\ '3+-9 1 ii II 1 1 ,I tl , i3 + I I I I 11 I I I X X / n 11 I i ii ii i N N i ii ii i r 11 II I I it 11 I , ,I II ` 11 II I I II 11 1 I II If I I II II ------Jt__—_ -----JL—__—_JL-----J L-----JL-----JL----- __--JL_____JL_—__a I- 19'-10j' NorthEast Wall Elevation-2nd Floor Sluuctu-ss North C1➢ fmc It61-m En.C.4 Michael A.Cook WALL CONSTRUCTIONr 105 LEACH STREET,SALEM,MA 01970 1) 2X6 SOLE & TOP PLATE TYPICAL. 4 r"�`"^`` 2) 2X6 STUDS 16. O.C. TYPICAL WALL CONSTRUCTION DETAIL 3) R21 FIBERGLASS INSULATION BTW STUDS s 4) DESIGNE➢ FOR 'STAND-UP' CONSTRUCTION. `'.. -' .' - . MATERIAL:AS NOTED 5) USE 3/4' THK PLYWOOD SHEATHING AND FASTEN WITH 50% GALV. NAILS AND 507 SCREWS DATE: 10-20-2006 6) ADD TYVEK & CLABB13RD SIDING OUTSIDE 7) ADD 1/2' SHEETROCK INSIDE. SCALE:1132 7'-56' 2' as (3) 2X8 =a 2'-6 L7 z_ z 7'-6 " Y 3'-4" Y a a Y Y 5'-7j' U U i Cu -3 N i _J -------------- --------------- ------------ - 19'-10' 45° 10' SOFFIT SouthWest Wall Elevation-2nd Floor Structures North 'a^ j9 i a e.es 0i WALL CONSTRUCTIOW 1) 2X6 SOLE & TOP PLATE TYPICAL JOyN P.^. `� MIChe@I A.Cook 2) 2X6 STUDS 16' O.C. 3) R21 FIBERGLASS INSULATION BTW STUDS ' 105 LEACH STREET, $4LEA1,MA OtWO 4) DESIGNED FOR 'STAND-UP' CONSTRUCTION. FJ�13 ' 5) USE 1 ..3/4' TW PLYWOOD SHEATHING AND i ht, 2C „ TYPICAL WALL CONSTRUCTION DETAIL FASTEN;WITH 507 GALV. NAILS AND 507 SCREWS , ` MATERIAL:AS NOTED 6) ADDITYVEK & CLABBORD SIDING OUTSIDE. 7) ADD d/2- SHEETROCK INSIDE. DATE: 10-20-2006 SCALE:V 32 2'-0' _L 1'-4' PITCH 2'-10' 135° y �----" �° PLYWOOD GUSSETT BRACE - USE ON BOTH SIDE OF RAFTERS AT HIP (QTY 26) 17'-5�' IO CV •�:: JOF � v.,, Plan View StrucNurss North Con,cling Engineers, Inc. 7'-7' 3'-3j' gp�rmisTRutTm�,�,R �Fn U TRIDPLE T RIDGE DEAN. 7 3)FO RAFTERS Ib•AT 8'-0° 3)AN VCWS KMRMI DTV RATTERS. . 0 ADD YEMS UNDER TCH N RA r RATTERS. 9 DWALL CQITRUUS SUM ►-SOTTR VENTS i CUT BDt05MDUTN NDTCN W RATTERS WERE 7)16,4G ON WALL A-E T)1&43S SLDPE is t' PER TWT - FOP EANBRE4 IDEL 4 D) UWAL s n ISM PER TOD7 - ERI W SWAIN .L RX6 C/4' TRS V r CELLMG. IL ADD VRM 3/V Tte.PL)MIi& 6' IP.ADD R TTELT4 FL L ASWiNATT S= 7'-4�' 18.435° Michael A.Cook 6'-7 j° 105 LEACH STREET,SALEM.MA 019M 63.435° ROOF CONSTRUCTION DETAIL MATERIAL:AS NOTED DATE: 10 NorthEast Wall Elevation Ii I 0 2006 1'-4' PITCH 2'_10° 4 -5�\ 135° y \ PLYWOOD g GUSSETT BRACE - USE ON BOTH pp SIDE OF RAFTERS AT HIP tO w 17'-5 ' (QTY 26) N X rl " N 1j .M. 1'-4b' 4'-2"--1 Plan View 7,-7' 2X6 COLLAR TIE - USE ON ONE 7h' SIDE OF RAFTERS FOR A 7' CEILING. _ (QTY 14) 4j' 9�tt µ ryry North g, 61 9TRUC l'OAL 3 c Bl Q-ictures North R� w 7'-4�' C'C�nsufting Engineers, Inc. 9'-1j' 18,435' 1 (4112 PITCH) 1 = Michael A. Cook 6'-7a° ll RWLE lEAR 0 an RAFTERS 16' 105 LEACH STREET, SALEAI,MA01970 m ERS T 63,435' 33 TiRELRaAas ReTAATmn aATT u am vDn 1R®Tx WAATOR RTW RATTERS. (24112 PITCH) 9 DWALL CMffV 6 RIDGE L SOFFIT VERTS ROOF CONSTRUCTION DETAIL 6)arr ER9SHMn MM04 IN RATTERS WHERE RESTIRO a WALL MATERIAL:AS NOTED 7) Laws• SLOPE IS 4•FER FWT -TOP OAIDNEL. R>634W SUPS LS 24'PER FOOT - SIDM w MTAu V6 CQA AR Tar FOR 7•CEO.OIG. IL ADDADDiWX CaMAGE VX a WATER SFML DATE: 10-20-2008 Nort6East Wall Elevation La.ADD ROWM FELT 6 ASPHAU_T SIRNaES SCALE:1/50 ' THK RISER TYP �2 -7'�� TREAD TYP1' NOSING 2nd FLOOR ------ 7j< 8" RISE L 1 I I L__ -- 10" TREAD ----- ----- I L l 8'-5" � I ----- ----- 7'-8' 9" TYP 7. 11/-91q" L__1 7j' TYP (j' FLOOR SLAB 9j" I r &RAC Ivves North H . $i1"JCT ani Michael A. Cook IW5 CHSTREET, SAIEM,M 01070 '"A• 5�'�� STAIR STRINGERS y 6,,•,aa�g a'`` MATERIAL:SPRUCE/PINE/FIR(S.P.F.)2X12 DATE: 10-20-2006 SCALE:l/64 1�1 IIIII' - _ _ - 11 I■ NMI IIIII NMI IIIII ---------� NMI III ri imioil IIIII r NMI NMI IIII'�' rJ�/ NMI IIIIII! 111►i Il� 1�_ IIIII ����CI.��� ►.� NMI LI�IIloss— No �� 1� lid■II'� �' 10=1- --- ��.'i _�..iiii IIh111 ICI I�D1 ,�_, ■� I\�II ICI ,► iii�i i.= ��i i -■fit: ili�i �ri-� i ��■rl iso— ii11 fll �- - - � , _ � � __ _ �� � � - _� � � � �� �5 � �\ \ � -- �� COST/SCHEDULE OF GARAGE AT 105 LEACH ST. DESCRIPTION WEEK OF CITY TIME PRICE EA CITY PRICE DEMO LABOR 23-Oct 1 DAY 25/HR $ 200.00 20 YARD DUMPSTER RENTAL (CONCRETE) 1 WEEK $ 400.00 JACKHAMMER RENTAL 1 DAY $ 50,00 DUMP LUMBER 9 N.S. CARTING $ 100.00 EXCAVATOR RENTAL, GAS, DELIVERY 30-Oct 2 DAYS $ 400.00 WOOD FOR FORMS 1 DAY $ 200.00 #5(5/8) REBAR X 20' LONG 21 17 $ 357.00 #5 REBAR x 30" LONG 8 0.125 $ 17.00 POUR FOOTING 4000PSI 4.82 YD 1 DAY 115+ $ 674.00 BUILD FORMS 2 DAYS POUR WALLS 4000PSI 12.04 YD 1 DAY 115+ $ 1,618.00 POUR FLOOR 4000PSI 7.92 YD 1 DAY 115+ $ 1,078.00 8X8X16 CORNER SPLITFACE C.M.U. 6-Nov 48 4 $ 192.00 8X8X16 STREACHER SPLITFACE C.M.U. 441 3 $ 1,323.00 LABOR (MASONRY) 6 DAYS $ 2,400.00 TRUSS TYPE REINFORCING WIRE 10' LONG 36 2.25 $ 81.00 3/8 DIA REBAR 12" LONG MORTAR MIX 80 LBS "CON-PROCO" 5.55 12" LONG 1/2" DIA"J"BOLTS 16 2 $ 32.00 W8X15X19.5' STEEL BEAMS -GALVANISED 13-Nov 4 1 DAY 337.5 $ 1,350.00 4"DIA LALLY COLUMNS 1 42 $ 42.00 LALLY COL BRKTS (TOP) SIMPSON LCC4.5-4 1 42 $ 42.00 PLYWOOD CDX 1/2"THK 4X8 SHEET(BEAMS) 3 13 $ 39.00 2X8X8 SPF (RIM JOIST IN BEAMS) 20 1 DAY 5.86 $ 117.20 1/2" DIA X 5"CARRIGE BOLT&WASHER/NUT 16 1.9 $ 30.40 HEAVY DUTY JOIST HANGERS 2X8 84 1 DAY 1.1 $ 92.40 1.5"LONG JOIST HANGER NAILS 800 2X8X8 SPF FLOOR JOIST 42 1 DAY 5.86 $ 246.12 2X8X8 PT SYP (TRIPPLE SILL PLATE) 24 8 $ 192.00 PLYWOOD 3/4 THK FLOOR (T&G PINE) 15 1 DAY 20 $ 300.00 PLYWOOD 3/4"THK GUSSETTS 20-Nov 8 1 DAY 20 $ 160.00 2X6X8' SPF RAFTERS 56 1 DAY 3.75 $ 210.00 2X12X10' (TRIPPLE RIDGE BEAM) 6 14 $ 84.00 RAFTER HANGERS 28 1 DAY 618 PLYWOOD 4X8 ROOF SHEATHING 20 1 DAY 19 $ 380.00 2X6X8'SPF SOLE PLATE 8 3.75 $ 30.00 2X4X8' SPF STUDS 40 1 DAY 2.13 $ 85.20 2X6X8' SPF STUDS 13 1 3.75 $ 48.75 2X6X8'SPF TOP PLATE 8 3.75 $ 30.00 ICE&WATER SHIELD 3X75=225S.F. ROLL 3 100 $ 300.00 TAR (FELT) PAPER 432 S.F./ROLL 20-Nov 2 16 $ 32.00 ROOF SHINGLES-ARCHITECTURAL 7 2 DAY 63 $ 441.00 TYVEK HOUSE WRAP T WIDE ROLL 495SF Thanksgiving 1 69 $ 69.00 CLABBORD 1 DAY FIBER BOARD UNDERLAY 4X8 SHEET 5 11 $ 55.00 ADHESIVE RUBBER ROOF 10'X 25' ROLL(NEED 130 S.F.) 1 1 DAY 160 $ 160.00 DRIP EDGE COVER TAPE ROLL 1 170 $ 170.00 SLEEPERS(2X4X8) @ 16 O.C. 15 2.13 $ 31.95 6"WIDE DECKING CHOICEDECK 130 S.F. CABLE RAILING 33 L.F. GARAGE DOOR 16X7 ELEC LOW HDROOM 27-Nov 1 2000 $ 2,000.00 32X80 WOOD DOOR W/WINDOW 1 180 $ 180.00 32X48 WINDOW 2 180 $ 360.00 24"X 48"X 3/8'THK LEXAN PANEL 1 1 DAY 97 $ 97.00 8'8"X 7'6"CUSTOM BARN DOOR 1 1 DAY 50 $ 50.00 2X12X10 STAIR CUSTOM STRINGER 4-Dec 3 1 DAY 14 $ 42,00 WINDOW DH 3 1 DAY 160 $ 480.00 DOOR 36"X 79"CUSTOM W/WINDOW 1 180 $ 180.00 LOCKSET DOORKNOB 2 25 $ 50.00 WIRE OUTLETS, LIGHTS, SUBPANEL 1 250 $ 250.00 INSULATION R13 88 S.F. ROLL 12 33 $ 396.00 DRYWALL 2=j $25,.0 . PAINT 30.00 CARPET 19X17=323 S.F. 3 $ 646.00 GAS FIREPLACE 11-Dec $ 1,500,00 HOTTUB $ 4,895.00 TOTAL02 Pest Control Service Agreement 2974 DENNIS THE NIENNIS PEST CONTROL CO., INC. TERMITE &CARPENTER ANT SPECIALISTS 1-800-649-3028 WOBURN LOWELL BOSTON LYNN PEABODY NEWTON LAWRENCE 935-DEAD 459-2950 576-1038 592-0023 532-3443 332-5853 689-0697 CUSTOMER SERVICE LOCATION IS%M 9ke C. STREET �\ 11 • CITY,STATE.nd ZIP - - - PERSON TO BE CONTACTED - SERVICE PHONE PHONE - TYPE OF PP;?�51OEESEF CEED - DATE SERV E BE S EXPIRATION DATE I. _-l. ` RENEWAL SERVICE TO BE PERFORMED Q a)3 ❑ ❑ MONTHLY ❑ QUARTERLY ❑ OTHER PESTS TC7 BE CONTROLLED ---------------- �p SPECIAL INSTRUCTIONS r1 f TERMS AND CONDITIONS: SERVICE GUARANTEE:We agree to apply chemicals to control above-named pests in accordance with terms and conditions of this Service Agreement. All labor and materials will be furnished to provide the most efficient pest control and maximum safety required by federal,state and city regulations. ANNUAL AGREEMENTCHARGE $ - pp 6Y \n1�3 �lP�c DATE INITIAL SERVICE CHARGE $ W COMPANY (AUTRORIZE SIGNATUR I � J� � t MONTHWOUARTERLY PAYMENTS $ FOR Lk L-4*— (3M6 CUSTOMER DATE (AUTHORIZED SIGNANREI $