64-433 - 7 LAURIER ROAD - CONSERVATION COMMISSION Luw�,z.r k'oo-�, DEP (oN— H33
Now
Massachusetts Department of Environmental Protection Provided by DER
Bureau of Resource Protection - Wetlands DEP File Number
WPA Form 3 - Notice of intent
Document Transaction.Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
city/rows
Important:
Whenfilling out
A. General Information
When
forms on the
computer,use 1. Project Location (Note: electronic filers will click on button for GIS locator):
only the tab key
to move your 1
cursor-do not
use the return a.Street Address Ci
b. ty/rows c.Zip Code
key. Latitude and Longitude: N yZ e :it:7c Z l rf to 11 it
d. Latitude e.Lon etude
MAP �, .�i 3 L c .0 0-EI�E®
f.Assessors Map/Plat Number g. Parcel/Lot Number
FA2. Applicant: SEP 2 1 2006
ARV, ra c-A413 LA DEPT.OF PLANNING&
a.First Name b. Last Name
i c.company COMMUNITY DEVELOPMENT
Note: - 1`y L&glI�1t�-1r kD
Before d.Mailing Address
completing this form consult 115' N h G �F N A P q 70 N a�1 lC
your local e.City/rown I.State - g.Zip Code
Conservation G'7E 'bL.61360
Commission h. Phone Number i.Fax Number I.Email address
regarding any
municipal bylaw or ordinance. 3. Property owner (if different from applicant): ❑ Check if more than one owner
a.First Name b.Last Name c.Company
d.Mailing Address
e.City/Town I.State g.Zip Code
h.Phone Number L Fax Number j.Email address
4. Representative (if any):
a. Finn
b.Contact Person First Name C.Contact Person last Name
d.Mailing Address
e.City/Town I.State g.Zip Code
h.Phone Number i. Fax Number j.Email address
5. Total WPA Fee Paid (from NO[Wetland Fee Transmittal Form):
a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid
6. General
Project Description:
4-rNST-+CL- ]7b , �2 �CC -PRIG.
wpaform3.doc•rev.3/29/05 Page 1 of 7
Massachusetts Department of Environmental Protection Provided by DEP:
Bureau of Resource Protection - Wetlands DEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number.
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
City/Town
A. General Information (continued)
7. Project Type Checklist:
a. ® Single Family Home b. ❑ Residential Subdivision
c. ❑ Limited Project Driveway Crossing d. ❑ Commercial/Industrial
e. ❑ Dock/Pier f. ❑ Utilities
g. ❑ Coastal Engineering Structure h. ❑ Agriculture—cranberries,forestry
i. ❑ Transportation j. ❑ Other
8. Property recorded at the Registry of Deeds for:
.S X Cl
a,qu/ ty�} b. Page Number
Y "1 J
c.Book d.Certificate#(if registered land)
9. Has work been performed on the property under an Order of Resource Area Delineation involving
Simplified Review within 3 years of the date of this application?
a. [-Yes b. ❑ No
10. Buffer Zone Only- Is the project located only in the Buffer Zone of a bordering vegetated wetland,
inland bank, or coastal resource area?
a. ❑ Yes-answer 11 below, then skip to Section C.
b. ❑ No -skip to Section B.
If yes, no Notice of Intent or Request for Determination of Applicability may be filed for work within the
50-foot-wide area in the Buffer Zone along the resource area during the three-year term of an Order
of Resource Area Delineation, or any Extended Order, or until the applicant receives a Certificate of
Compliance, whichever is later.
11. Buffer Zone Setback—For projects that involve work only in the buffer zone, select the applicable
adjacent resource area(check one):
a. ❑ BVW b. ❑ inland bank c. ❑coastal resource area
The distance between the closest project disturbance and the associated resource area is:
d.linear feet
wpaform3.doc•rev.3/29/05 Page 2 of 7
l
Massachusetts Department of Environmental Protection Provided by DEP:'_
Bureau of Resource Protection - Wetlands DEP File Number
WPA Form 3 — Notice of Intent
'.- Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
City/Town
B. Resource Area Effects
1. Inland Resource Areas
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:Include your Resource Area Size of Proposed Alteration Proposed Replacement (if any)
document
transaction a. ❑ Bank 1.linear feet 2.linear feet
number b. (! Bordering Vegetated /3S0
(provided on Wetland 1.square feet 2.square feet
your receipt
page) with all c. ❑ Land Under 1.square feet 2.square feet
supplementary Waterbodies and
information you Waterways
3.cubic yards dredged
submit to the d. El Bordering Land
Department. Subject to Flooding 1.square feet 2.square feet
3.cubic feet of flood storage lost 4.cubic feet of flood storage replaced
e. ❑ Isolated Land Subject
to Flooding 1.square feet
2.cubic feet of flood storage lost 3.cubic feet of flood storage replaced
I. ❑ Riverfront area 1.Name of Waterway(if available)
1.Width of Riverfront Area (check one):
❑ 25 ft. - Designated Densely Developed Areas only
❑ 100 ft. - New agricultural projects only
❑ 200 ft. -All other projects
2. Total area of Riverfront Area on the site of the proposed project: Square Feet
3. Proposed alteration of the Riverfront Area:
a.Total Square Feet b.Square Feet within 100 ft. c.Square Feet between 100 ft.and 200 ft.
4. Has an alternatives analysis been done and is it attached to this NOP ❑ Yes❑ No
5.Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No
wpaform3.doc•rev.3/29/05 Page 3 of 7
Massachusetts Department of Environmental Protection Provided byDEP:
Bureau of Resource Protection - Wetlands DEP File Number
WPA Form 3 — Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Cityrrown
B. Resource Area Effects
2. Coastal Resource Areas:
Check all that apply below. Attach narrative and supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
number
(provided on b. ❑ Land Under the Ocean 1.Square feet
your receipt
page) with all 2.Cubic yards dredged
supplementary Indicate size under Coastal Beaches and/or Coastal Dunes
information you c. ❑ Barrier Beach below
submit to the
Department. d. ❑ Coastal Beaches 1.square feet 2.Cubic yards beach nourishment
e. ❑ Coastal Dunes 1.Square feet 2.Cubic yards dune nourishment
f. ❑ Coastal Banks 1.Linear feet
g. ❑ Rocky Intertidal Shores 1.Square feet
h.❑ Salt Marshes 1.Square feet 2.Sq tt restoration,rehab.,or creation
i. ❑ Land Under Salt Ponds 1.Square feet
2.Cubic yards dredged
j. ❑ Land Containing
Shellfish 1.Square feet 2.Square feet restoration,rehab.
k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1.Cubic yards dredged
i. ❑ Land Subject to Coastal
Storm Flowage 1.Square feet
3. Limited Project:
Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR
10.24 or 310 CMR 10.53?
a. ❑ Yes ❑ No If yes, describe which limited project applies to this project:
b.Limited Project
wpaform3.doc•rev.3/29/05 Page 4 of 7
Massachusetts Department of Environmental Protection Provided by DEP:
Bureau of Resource Protection -Wetlands DEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
ILI Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Citylrown
C. Bordering Vegetated Wetland Delineation Methodology
Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary:
Online Users: 1. ❑ Final Order of Resource Area Delineation issued by Conservation Commission or DEP
Include your (attached)
document transaction 2. DEP BVW Field Data Form (attached)
number
(provided on 3. ❑ Final Determination of Applicability issued by Conservation Commission or DEP (attached)
your receipt
page) with all 4. ❑ Other Methods for Determining the BVW Boundary(attach documentation):
supplementary
information you a. ❑ 50%or more wetland indicator plants
submit to the
Department. b. ❑ Saturated/inundated conditions exist
c. ❑ Groundwater indicators
d. ❑ Direct observation
For all projects
affecting other e. ❑ Hydric soil indicators
Resource
Areas, please f ❑ Credible evidence of conditions prior to disturbance
attach a
narrative 5. Other resource areas delineated:
explaining how D. Other Applicable Standards and Requirements
the resource
area was
delineated. 1. Is any portion of the proposed project located in estimated habitat as indicated on the most recent
Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and
Endangered Species Program?
a. ❑ Yes No If yes, include proof of mailing or hand delivery of NO[to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
ToL Zuy�j Route 135, North Drive
b.Date o`ff Map Westborough, MA 01581
2. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a. ❑ Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to:
Massachusetts Division of Marine Fisheries
251 Causeway Street, Suite 400
Boston, MA 02114
b. ® Not applicable—project is in inland resource area only
3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a. ❑ Yes [9 No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP
Website for ACEC locations). Note: electronic filers click on Website.
b.ACEC
Massachusetts Department of Environmental Protection Provided by DEP:
Bureau of Resource Protection - Wetlands DEP Pile Number
WPA Form 3 - Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
cityrrown
D. Other Applicable Standards and Requirements
Online Users: 4. is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Include your Restriction Act(M.G.L.c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)?
document
transaction a. ❑ Yes JS No
number
(provided on
your receipt 5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the
page) with all wetlands regulations, 310 CMR 10.00.
supplementary
information you a. ❑ Yes R No If yes, describe which exemption applies to this project:
submit to the
Department.
b.Exemption
6. Is this project subject to the DEP Stormwater Policy? a. ❑ Yes 0 No
If yes, stormwater management measures are required. Applicants should complete the Stormwater
Management Form and submit it with this form.
b. If no, explain why the project is exempt:
i Al T�is wcr�., �S CyNC f lf� 'Xt S'f i-/'i J �G r
E. Additional Information
Applicants must include the following with this Notice of Intent(NO[). See instructions for details.
Online Users: Attach the document transaction number(provided on your receipt page) for any of
the following information you submit to the Department.
1. [ USGS or other map of the area (along with a narrative description, if necessary) containing
sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. '❑ij, Plans identifying the location of proposed activities (including activities proposed to serve as
a Bordering Vegetated Wetland [BVWj replication area or other mitigating measure) relative
to the boundaries of each affected resource area.
3. ( Other material identifying and explaining the determination of resource area boundaries
shown on plans (e.g., a DEP BVW Field Data Form).
4. (~? List the titles and dates for all plans and other materials submitted with this NOI.
5. ❑ If there is more than one property owner, please attach a list of these property owners not
listed on this form.
6.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
6. ❑ Attach NOI Wetland Fee Transmittal Form
9. Attach Stormwater Management
S e Form if needed.
❑ ,
wpaform3.doc•rev.3/29/05 Page 6 of 7
Massachusetts Department of Environmental Protection Provided by DEP:'
Bureau of Resource Protection - Wetlands DEP File Number
WPA Form 3 - Notice of Intent `
--Document Transaction Number
L11 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
City/Town
F. Fees
The fees for work proposed under each Notice of Intent must be calculated and submitted to the
Conservation Commission and the Department (see Instructions and NOI Wetland Fee Transmittal
Form).
No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth,
federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts
Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland
Fee Transmittal Form) to confirm fee payment:
1gIq C1jz.c /VI,
1.Municipal Check Number 2.Check date
A r (4 13 RLZ0�afv
3.State Check Number 4.Check date
N A P2 y TX Lr�( f3 fr y
5.Payor name on check:First Name 6.Payor name on check:Last Name
G. Signatures and Submittal Requirements
I hereby certify under the.penalties of perjury that the foregoing Notice of Intent and accompanying
plans, documents, and supporting data are true and complete to the best of my knowledge. I understand
that the Conservation Commission will place notification of this Notice in a local newspaper at the
expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the
requirements of M.G.L. c. 131, §40. Notice must be made in writing by hand delivery or certified mail
e o(return re e' t re est II abu r within 100 feet of the property line of the pr 'ect to ation.
Signature of Applicant j Date
Signature of Property Owner(if different) Date
Signature of Representative(if any) Date
For Conservation Commission:
Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents; two copies
of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and the city/town fee payment must be sent to the
Conservation Commission by certified mail or hand delivery.
For DEP:
One copy of the completed Notice of Intent(Form 3), including supporting plans and documents;one copy of
pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and a copy of the state fee payment must be sent to
the DEP Regional Office (see Instructions) by certified mail or hand delivery. (E-filers may submit these
electronically.)
Other:
If the applicant has checked the"yes"box in any part of Section D, Item 3, above, refer to that section and the
Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely
manner may result in dismissal of the Notice of Intent.
Pace 7 Of 7
L
COT"f
� ` g ' CITY OF SALEM -,«. ...
CONSERVATION COMMISSION
August 14, 2009
Mark Tremblay
7 Laurier Road
Salem, MA 01970
Re: Certificate of Compliance—DEP #64-360 and%3'—7 Laurier Road,Salem,
MA
Dear Mr.Tremblay:
Enclosed, please find the Certificate of Compliance for the above referenced projects. These
documents must be recorded at the Essex County Registry of Deeds, Shetland Park 45 Congress
Street, Suite 4100 Salem, Massachusetts. Please fill out and return the Recording Information on
page 4 of the Certificate of Compliance for each project, which will indicate to the Salem
Conservation Commission that the document has been recorded.
If you have any further questions please feel free to contact me at(978) 619-5685.
Sincerel
Carey Du es
Conservation Agen Staff Planner
Enclosures
CC: DEP Northeast Regional Office
I -
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands "" "' DEP File Number:
WPA Form 86 — Certificate of Compliance 64-433
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the Mark Tremblay
computer, use Name
only the tab
key to move 7 Laurier Road
your cursor- Mailing Address
do not use the Salem MA 01970
return key. Cityrrown State Zip Code
2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to:
Mark Tremblay
Name
64-433
Dated DEP File Number
3. The project site is located at:
7 Laurier Road Salem
Street Address Cityrrown
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different)
Essex
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent, on:
August 12, 2009
Date
B. Certification
Check all that apply:
try Complete Certification: It is hereby certified that the work regulated by the above-referenced
` Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the
above-referenced Order of Conditions have been satisfactorily completed. The project areas or work
subject to this partial certification that have been completed and are released from this Order are:
wpaform Mom•rev.7113/04 Page 1 of 4
r Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands — DEP File Number:
WPA Form 813 — Certificate of Compliance 64-433
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification (cont.)
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced
Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no
longer valid. No future work subject to regulation under the Wetlands Protection Act may
commence without filing a new Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions: The following conditions of the Order shall continue: (Include any
conditions contained in the Final Order, such as maintenance or monitoring, that should continue
for a longer period).
Condition Numbers:
C. Authorization
Issued by:
Salem c6 iy
Cons anon Commiss n Datt of Issuance
This Certi ate mu be signed by a majority of the Conservation Commission and a copy sent to the
applicant a app priate DEP Regional Office (See Attachment).
Signatur
C — —
w afcrm Bb.doc•rev.7113/04
Page 2 of 4
' Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands "' DEF File Number:
WPA Form 813 — Certificate of Compliance 64-433
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
C. Authorization (cont.)
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
On this 13 Of August 2009
Day Month Year
before me, the undersigned Notary Public, personally appeared
K. Cornacchio, D. Pabich, M. Blier, K. Glidden A. Hamilton B. Christie and C. McCauley
Name of Document Signer
proved to me through satisfactory evidence of identification, which was/were
personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged
to me that he/she signed it voluntarily for its stated purpose.
As member of Salem Conservation Commission
City/Town
CAREY R.OUQUE8
� tr�MOMNens
MY CarndMkrr�fEn"
Signature f Notary Public
Carey . Duques
Printed Name of Notary Public
August 16 2013
My Commission Expires(Date)
Place notary seal and/or any stamp above Signature of Notary Public
wpaform 8b.doc•rev.7/13104 Page 3 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number,
WPA Form 8B — Certificate of Compliance 64-433
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of
Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:
Salem
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
7 Laurier Road 64-433
Protect Location DEP File Number
Has been recorded at the Registry of Deeds of:
County
for:
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpaform 9E.4oc•rev.7/13104
Page 4 or 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection Wetlands
DEP Regional Addresses
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Mail transmittal forms and DEP payments,payable to:
Commonwealth of Massachusetts
Department of Environmental Protection
Box 4062
Boston, MA 02211
DEP Western Region Adams Comin Hambden Monroe Pittsfield Tyringham
436 Dwight Street Agawam Conway Hancock Montague Plainfield Wales
9 Alford Cummngton HaHield Monterey Richmond Were
Suite 402 Amherst Dalton Hawley Montgomery Rowe Warwick
Springfield,MA 01103 Ashfeld Deerfield Heath Monson Russell Washington
Phone:413-784-1100 Becket Easthampton Hinsdale Mount Washington Sandisfield Wendell
Belchertown East Longmeadow Holland New Ashford Savoy Westfield
Fax:413-784-1149 Bemardslon Egremont Holyoke New Marlborough Sheffield Westhampton
Blandford Erving Huntington New Salem Shelburne West Springfield
Brimfield Flonda Lanesborough Noah Adams Shueesbury West Stockbridge
Buckland Gill Lee Northampton Southampton Whalely
Chademont Goshen Lenox Northfield South Hadley WilbrahamCheshire Granby Leverett Orange Southwick Williamsburg
Chester Granville Leyden Otis Springfield Williamstown
Chesterfield Great Barrington Longmeadow Palmer Stockbridge Windsor
Chiopee Greenfield Ludlow Pelham Sunderland Worthington
Clarksburg Hadley Middlefield Peru Tolland
DEP Central Region Acton Charlton Hopkinton Millbury Rutland Uxbridge
627 Main Street Ashbumham Clinton Hubbardslon Millmlle Shirley Warren
Ashby Douglas Hudson New Braintree Shrewsbury Webster
Worcester,MA 01608 Athol - Dudley Holliston Northbamugh Southborough Westborough
Phone:508-792-7650 Auburn Dunstable Lancaster Northbridge Southbridge West Boylston
Fax:508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield
Bane Fitchburg Leominster Oakham Sterling Wesdord
TDD: 508-767-2788 Bellingham Gardner Littleton Oxford Stow Westmnster
Berlin Grafton Lunenburg Paxton Sturbridge Winchendon
Blackstone Groton Marlborough Pepperell Sultan Worcester
Bolton Harvard Maynard Petersham Templeton
Boxborough Hardwick Medway Phillipston Townsend
Boylston Holden Mendon Princeton Tyngsborough
Brookfield Hopedale Milford Royalston Upton
DEP Southeast Region Abington Dartmouth Freetown Mattapoisett Provincetown Tsbury
20 Riverside Drive Acushnet Dennis Gay Head Middleborough Raynham Truro
Attleboro Dighton Gcsnold Nantucket Rehoboth Wareham
Lakeville,MA 02347 Avon Duxbury Halifax New Bedford Rochester WellAeet
Phone:508-946-2700 Barnstable Easmam Hanover NoahAtgeborough Rockland West Bridgewater
Fax:508-947-6557 Beri East Bridgewater Hanson Norton - Sandwich Westport
Bourne Easton Harwich Norwell Scituate West Tisbury
TDD:508-946-2795 Brewster Edgartown Kingston Oak Bluffs Seekonk Whitman
Bridgewater Fairhaven Lakeville Orleans Sharon Wrentham
Brockton Fait River Mansfield Pembroke Somerset Yarmouth
Carver Falmouth Manor, Plainville Stoughton
Chatham Foxborough Marshfield Plymouth Swansea
Chikrark Franklin Mashpee Plympton Taunton
DEP Northeast Region Amesbury Chelmsford Hingham Memimac Quincy Wakefield
1 Winter Street Andover Chelsea Holbrook Methuen Randolph Walpole
Abington Cohasset Hull Middleton Reading Waltham
Boston,MA 02108 Ashland Concord Ipswich Millis Revere Watertown
Phone:617-654-6500 Bedford Danvers Lawrence Milton Rockport Wayland
Fax: 617-556.1049 Belmont Dedham Lexington Nahant Rowley Wellesley
Beverly Dover Lincoln Natick Salem Wenham
TDD:617-574-6868 Billerica Dracut Lowell Needham Salisbury West Newbury
Boston Essex Lynn Newbury Saugus Weston
Boxford Everett Lynnfield Newburypmt Sherbom Westwood
Braintree Framingham Malden Newton Somerville Weymouth
Brookline Georgetown Manchester-By-The-Sea Norfolk Stoneham Wilmington
Burlington Gloucester Marblehead Noah Andover Sudbury Winchester
Cambridge Groveland Medfield North Reading Swampscott Winthrop
Canton Hamilton Medtord Norwood Tewksbury Woburn
Carlisle Haverhill Melrose Peabody Topsfield
wpaformeb.doc-DEP Addresses•rev.9A3/09 Page 1 of 1
HANCOCK
# 13255 ASSOCIATES
16 July 2009
Salem Conservation Commission
Carey Duques
120 Washington Street
Salem, MA 01970
Re: Tremblay property
7 Laurier Road
DEP files 64-0360 and 64-0433
Dear Commission Members;
This letter is written to report upon mitigation plantings and grading on the subject
property.
I have reference to an annotated print of a plan by Griffin Engineering(original date
11/16/05)marked '64-433 additional items'. These items include a stone patio, side deck
and front deck; a wood fence and an above-ground pool. The decks and fence are in
place as shown on the plan, and their locations and dimensions were verified by my direct
measurements on 12 June 2009. The front deck was to have been 4' x 8% it was built 4'
x 5'. The above-ground pool will not be built. The mitigation area and low field stone
wall are located as shown on the annotated plan.
As shown in the attached photographs,the proposed work is complete and the site is
entirely stable. There is at present no evidence of invasive species within the replication
area. The conditioned two seasons of inspection, monitoring and reporting have been
completed.
On behalf of my client, Mark Tremblay, I hereby request a Certificate of Compliance for
both referenced Orders of Conditions.
Respectfully,
John Dick PLS
Senior Wetland Sci t
DANVERS,MA MARLBOROUGH, MA LAKEVILLE, MA CHELMSFORD, MA SALEM, NH
185 Centre Street 315 Elm Street 4 Freetown Street 313 Littleton Road, Unit 18 P.O. Box 205
Danvers,MA 01923 Marlborough, MA 01752 Lakeville, MA 02347 Chelmsford, MA 01824 Salem, NH 03079
Phone: 1978)777-3050 Phone: (508] 460-1111 Phone: (S08) 923-1002 Phone: �978) 244-0110 Phone: (603) 898-3491
Fax: 1978)774-7816 Fax: (508) 460-1121 Fax: (508) 923-0022 Fax: (9781224-1133 Fax: [603)898-6263
www.hancockassociates.com
J Ne
sa a w.. � wc. ♦ $ f r ;T v r � ,r. �� i� m 1 � t / r !C{
c�b rii ar S 1 {
lk^
- -..�`}it'�" ,�-1>♦'�ysy � J (�' , ,,,-.:-¢t L y ) .y, a!F y f k � -1 fk',
OF!
" 1 Jl Ye qT
S
11s"�----
Av
cps
\w y
.'��..��_,'•,e'w {Tcr� a;�fi �` \ �• � 1 5 y ;t_ } a�fl �(�Or z r
5� ✓ k+ � ti
I f i3'
r
� x
N
P ,�izr ,wx
'i }ram< y Fi,Yej i yr} ,w. ♦w 'A.
Y w�9y.s� ' FyF, "�Yk P�^�k" +'Yr �A' Y" �5 �Yy � � !X f:
tv > � t� `q • 4. 3}s+ fr-�`a£xik4 '�r'�''a j �; Yt � y y ,p .
1 at ,fitll.P3y<; YIry j , . , -: Sftl'h'�i-ar.f
1 Pam• k j ,�",� r�`.} :y 1 { -a�'� }.`�z..�.,.y ��-a v rt5,� fP.��k;r' 4�14er�~ ����_
Sp lv l
d�"
fi #w t � kta s' rt t 1lift,
MI ). .
4� t t �..^.,�f it �' s� � �LC � l ♦t �,- ��r� r � "'-{
.Jar-A� -.A� i i� '!� iX ► !' � �. tf.°'� j�"�- „�e.�'
i
qs� �wa
r:
f
r
oY �+
v '
Y��i 3' . Y•Y �� � �t� M��Y'i4
44� � � � �r M"P'k ca k'y ! .wait ♦ y k
T.m� l #�✓ r �ro �f ���yv� .''fiR ,ice. 8 � ,,
4 PF k gpn 2dly £' y='!' k vYY
�m P
041,
S
yli o 'P Ft
fk �;Mp elUt yf�z ¢pIIs }
8tvL
_ d
� rr
A
b,.✓-� gyp„ � ',(ry. '"1 ry y
k
\p 4 t�ry�}jyY'�' e >e4l 4••,�`";�j c `3, /,N 4.+ ,:
`H ^'i
5
Mot 20
-Al a
4
mot,
:-,rs
�rrvaA
a
I
v �
i
a
r
n #�
#r
_ I
2 m
I m
iA
I v
Page 4 of 8
?sari{�i ,�.� ♦ �-' � • 1"l� E
Jr
G
.fad r S.Y�• « 3 ),� i
Ni
, kt
'!�Y sq• �7� �:���'ir�> .r i.,� p�fir" �� A..
LJO
Rv
r
s
�p407TA
CITY OF SALEM
CONSERVATION COMMISSION
SITE VISIT FORM
PROJECT LOCATION: �t�(Q/ DATE OF SITE VISIT: $ It o
PROJECT PROPONENT: :&nu DEP FILE NUMBER:64-%C 6V-433
PROPOSED WORK: nS�LLJW\� a 0.bwig � wee a (�4e 1 g.'r
Y►YV ATTENpYAuN G '� J
r
i
E ry
.. ,� =. .. _
Commission Members/Agent: Abutters:
Applicant/Property Owner/Representative:
_.,.
SITE VISIT:PURPOSE � � _.,�,� ,� UuIu ����`� .i.�.-;� {.:-t�,t, .... �*: m-i "'"� ;�•t' a
Request for Determination Abbreviated Notice of Resource Area Delineation Notice of Intent
Nz7Certificate of Compliance El Enforcement/Violation ❑Emergency ❑ Informal
INLAND RESOURCE AREAS COASTAL RESOURCE AREAS
LLSBank ❑ Land Subject to Coastal Land Under the Ocean
Storm Flowage
ordering Vegetated Wetland
❑ Designated Port Area ❑Coastal Beach
9'Land Subject to Flooding
j El Coastal Dune 0 Barrier Beach
ElLand Under Water Bodies or Waterway
Name: ❑ Coastal Bank D Rocky Intertidal Shore
0 Riverfront Area ( 7 Salt Marsh ❑ Land Under Salt Pond
El i
Vernal Pools € 0 Land Containing ❑Anadromous/Cata-
j Shellfish dromous Fish Run
I
E� 0 Bordering Vegetated Wetland in Coastal Area
BUFFE ZONES (h n,l00;feet u
Water Body Bordering Vegetated Wetland ,Bank 0 Coastal Beach ❑Coastal Dune
INTERESTS PROTECTED. ..a
Protection of Water Supply protection of Groundwater Supply JnFlood Control
torm 5
Damage Prevention 1'revention of g � Pollution rotection of Fisheries
Protection of Wildlife Habitat 0 Protection of Land Containing Shellfish
Is this an exempt project:If so,why?
Are resource area boundaries delineated correctly? If not,explain.
SITE VISIT,-DOCUMENTATION'
_.._ , :u:a, -mow.
Photos ❑ Site Map ❑Other:
O/BSERVdTIONS
Take into account relevant aspects or featiues such as: natural or piped drainage or obvious pollution;
topography; existing vegetation; possible alternative sites; signs of wildlife, possible vernal pools, rare species
habitat; landmarks; recent or historical disturbances; proximity to other water bodies or drainage areas;
adjacent land uses.
�tuw` W1 �0.ntL �^O-ire_ tr�b- 1 2
IV& 105
RECOMMENDATIO m NS
(o�:a� ettaa+a�. c�II 1�.0 hnitn f, ��5jji��1� -� u-� ���t -Eo ��«•.� CaC
�1Wnfr^tA czve ciGfilZlCv7
CITY OF SALEM
CONSERVATION COMMISSION
January 27, 2009
Mark Tremblay
7 Laurier Road
Salem, Massachusetts 01970
Re: Order of Conditions—DEP#64-360 and#64-433
7 Laurier Road Salem, Massachusetts
Dear Mr. Tremblay:
Per our phone conversation this afternoon, I wanted to follow-up on the next steps in regards to
your two outstanding Orders of Conditions #64-360 and #64-433.
Project #64-360 was for the restoration of approximately 550 square feet of wetlands at the
above referenced property. Tom Keough, from Hancock Associates, was hired to oversee the
planting of high bush blueberry and chokeberry bushes as described in the Order of Conditions.
The Conservation Commission received two monitoring reports (dated July 16, 2007 and July
15, 2008) describing the condition of the wetland replication. Based on the reports the wetland
replication appears to have successfully survived two growing seasons. In order to confirm that
they are established the Salem Conservation Commission requires a written certification from the
Wetlands Specialist certifying that both the wetland alteration and replication work has been
performed in compliance with the Order of Conditions and an "as-built" plan of both the
alteration and replication areas signed and stamped by a Registered Professional Engineer or
Registered Professional land Surveyor (See Order of Conditions Special Condition #56 for
additional details). In order to receive a full Certificate of Compliance please review all
Conditions and confirm that they have been met.
As we discussed this Order of Conditions was extended until March 11, 2009. If you are not
able to request a Certificate of Compliance by March 11, 2009 due to weather conditions that
make surveying difficult or for other reasons please contact me.
A second project that you have an open Order of Conditions for at 7 Laurier Road is #64-433.
This project permitted the after-the-fact installation of a 14'X 22' stone patio, a 4'X 12' side
deck and a 4'X 8' front deck. The order also permitted the installation of a wooden picket fence
with posts that were hand dug and located along the northeastern comer of the property abutting
_'9 Willson Street as well as the installation of an above ground pool (see the Order for more
details). This Order expires on October 19, 2009. As stated above prior to requesting a
Certificate of Compliance please review all conditions and ensure they have been met. In order
to receive a full Certificate of Compliance all conditions will have to be fulfilled.
If you have any further questions, please feel free to contact me at 978.619.5685.
Sincerely,
L4
Carey Du ues, AICP
Conservation Agent/Planner
CC: Thomas Keough, Hancock Associates
f
. o
CITY OF SALEM
CONSERVATION COMMISSION
October 19, 2006
Mark Tremblay
7 Laurier Road
Salem, Massachusetts 01970
Re: Order of Conditions—DEP#64-433
7 Laurier Road Salem,Massachusetts
Dear Mr. Tremblay:
Enclosed, please find the Order of Conditions for the above referenced project.
Following the 10-day appeal period (November 2, 2006), this document and the attached
Special Conditions must be recorded at the Essex County Registry of Deeds (36 Federal
Street, Salem, MA). Once recorded, please return a copy of Page 9 of the Order, which
will indicate to the Commission that the document has been recorded.
As indicated in the Order, prior to any work commencing, this Order must be recorded, a
sign shall be displayed showing DEP File # 64-433 within public view, and contact me at
least 48 hours prior to any activity to schedule a pre-construction meeting to review the
Order with your hired contractor.
If you have any further questions, please feel free to contact me at 978.745.9595.
Sincerely,
jm� )b%
tL.—__/
Carey Duques
Conservation Agent/Planner
Enclosures
120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 • TEL: 978.745.9595 FAx: 978.740,0404 0 WWW.SALEM.COM
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-433
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
Important: Salem
When filling From: 1.Conservation Commission
out forms on
the computer, 2.This issuance is for (check one): a. 0 Order of Conditions b. ❑ Amended Order of Conditions
use only the
tab key to 3.To: Applicant:
move your
cursor-do not Mark Tremblay
use the return a.First Name b.Last Name c.Company
key. 7 Laurier Road
d.Mailing Address
v° Salem MA 01970
e.City/Town f.State g.Zip Code
4. Property Owner (if different from applicant):
a. First Name b.Last Name c.Company
d.Mailing Address
e.City/Town I.State g.Zip Code
5. Project Location:
7 Laurier Road Salem
a.Street Address b.City/town
Map 23 Lot 0050
c.Assessors Map/Plat Number d. ParceVLot Number
Latitude and Longitude, if known (note: N 42 30.21 7054.15
electronic filers will click for GIS locator): e.Latitude f. Longitude
5. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel):
Essex
a.County b.Certificate(if registered land)
14968 92
c.Book d. Page
�. Dates: September 21, 2006 October 12, 2006 October 19, 2006
a.Date Notice of Intent Filed b. Date Public Hearing Closed c.Date of Issuance
S. Final Approved Plans and Other Documents (attach additional plan or document references as
needed):
Record Plan for Certificate of Compliance (Plan contains"Additional Items: #1 Stone patio; #2 Side
Deck; #3 Front Deck; 44 Fence (wood); #5 Above Ground Pool"
M. Tremblay's additions to R. Griffen's plan Robert H. G riff en
b.Prepared By c.Signed and Stamped by
September 2006 1"-20'
d. Final Revision Date e.Scale
f.Additional Plan or Document Title g.Date
wpaforrr5.doc• rev.3/1/05 Page 1 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-433
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
t. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution
d. ® Private Water Supply e. ® Fisheries f. ® Protection of Wildlife
Habitat
g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance standards set
forth in the wetlands regulations.This Commission orders that all work shall be performed in
accordance with the Notice of Intent referenced above, the following General Conditions, and any
other special conditions attached to this Order.To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these
conditions shall control.
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the
wetland regulations.Therefore, work on this project may not go forward unless and until a new Notice
of Intent is submitted which provides measures which are adequate to protect these interests, and a
final Order of Conditions is issued. A description of the performance standards which the
proposed work cannot meet is attached to this Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the
effect of the work on the interests identified in the Wetlands Protection Act.Therefore, work on this
project may not go forward unless and until a revised Notice of Intent is submitted which provides
sufficient information and includes measures which are adequate to protect the Act's interests, and a
final Order of Conditions is issued. A description of the specific information which is lacking and
why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
3. ® Buffer Zone Impacts: Shortest distance between limit of project disturbance and
wetland boundary(if available) a.linear feet
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. ❑ Bank a.linearfeet b.linear(feet c.linear(feet d.linear feet
5. ❑ Bordering Vegetated
Wetland a.square feet b.square feet c.square feet d.square feet
6. ❑ Land Under Waterbodies a.square feet b.square feet c.square feet d.square feet
and Waterways
e.cu.yd dredged f.cu.yd dredged
wpatorm5.da • rev.311/05 Page 2 of 9
Massachusetts Department of Environmental Protection
DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions 64-433
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
7. ❑ Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet
a. ❑ Isolated Land Subject
to Flooding a.square feet b.square feet
Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
9. ❑ Riverfront area a.total sq.feet b.total sq.feet
Sq It within 100 It c.square feet d.square feet e.square feet f.square feet
Sq It between 100-200 ft
g.square feet h.square feet 7-square feet j.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
to. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
it. ❑ Land Under the Ocean a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13. ❑ Coastal Beaches a.square feet b.square feet c.dy nourishmt. d.dy nourishmt.
14. El Coastal Dunes a.square feet b.square feet c.dy nourishmt. d.c/y nourishmt
15. ❑ Coastal Banks a.linear feet b.linear feet
16. ❑ Rocky Intertidal Shores a.square feet b.square feet
n. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet
18. ❑ Land Under Salt Ponds a.square teat b.square feet
c.cu.yd dredged d.cu.yd dredged
19. ❑ Land Containing
Shellfish a.square feet b.square feet c square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a.cu.yd dredged b.cu.yd dredged
21. ❑ Land Subject to Coastal
Storm Flowage a.square feet b.square feet
w aform5.dm• rev.3r1/05 Page 3 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-433
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years,from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe,tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land,the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection"for, "MA DEP"]
"File Number 64-433 "
wpafor 5AE • rev.8r110S Page 4 of 9
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-433
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before DEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A)to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition #12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the
property subject to this Order and to any contractor or other person performing work conditioned by
this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy
Standards.
Special Conditions:
If you need more
spacefor
additional
conditions,
select box to
attach a text
document
wpaform5.dm• rev.3/1105 Page 5 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-433
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ❑ Yes ® No
2. The hereby finds (check one that applies):
Conservation Commission
3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
a.Municipal Ordinance or Bylaw b.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final Order of
Conditions is issued.
4. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
a. Municipal Ordinance or Bylaw b.Citation
The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the
conditions shall control.
If you need more c. The special conditions relating to municipal ordinance or law are as follows:
space for P 9 P Y
additional
conditions,
select box to
attach a text
document ❑
wpalorm5.dw• rev.3/1/05 Page 6 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-433
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special Qc'�nw 19 f 26W
condition pursuant to General Conditions #4,from the date of issuance. 1.Date of Issuance
Please indicate the number of members who will sign this form:
This Order must be signed by a majority of the Conservation Commission. 2.Number of s gne, s
The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Signatures:
k�
Y " V
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
On this 12 of October 2006
Day Month Year
Before me, the undersigned Notary Public, K. Cornacchio, J. Funari, K. Glidden, D. Pabich,
personally appeared M. Blier, A. Hamilton, & D. Summer
proved to me through satisfactory evidence of identification, which was/were
personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of Salem
Cityrrown Conservation. Commission
Cd1REV p.WltauEB
cararrKww OF raMauUm
Uf tiN CammYalan Exphea "uques
,
August 16,2013
Printed Name of Notary Public
Place notary seal and/or any stamp above August 16, 2013
My Commission Expires(Date)
This Order is issued to the applicant as follows:
❑ by hand delivery on by certified mail, return receipt requested,on
OA6.r 11 aye
Date Date
wpaform5.eoc• rev.3/1/05 Page 7 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-433
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions.
The request must be made by certified mail or hand delivery to the Department, with the appropriate filing
fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR
10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at
the same time be sent by certified mail or hand delivery to the Conservation Commission and to the
applicant, if he/she is not the appellant.Any appellants seeking to appeal the Department's Superseding
Order associated with this appeal will be required to demonstrate prior participation in the review of this project.
Previous participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or
Determination, or providing written information to the Department prior to issuance of a Superseding Order
or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act, (M.G.L. c. 131, §40) and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
wpatorm5.doc• rev.3/1105 Page 8 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-433
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land,the
Final Order shall also be noted in the Registry s Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information
on Page 7 of this form shall be submitted to the Conservation Commission listed below.
Salem
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
-----------
To:
Salem
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
7 Laurier Road 64-433
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
t r fApplicant
S gna u e o
w aforrr5.dm m.31V05 Page 9 of 9
Attachment to Order of Conditions # 64-433II
Page lof 5
SALEM CONSERVATION COMMISSION
DEP FILE #64-433
7 Laurier Road
City of Salem, Massachusetts
ADDITIONAL FINDINGS
Based on the Estimated Habitats or Rare Wildlife and Certified Vernal Pools Map (June 1, 2003) from Natural
Heritage & Endangered Species Program(NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any
vernal pools.
This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L. Chapter 131,Section 40 and the City
of Salem Wetlands Protection Ordinance, Salem Code Chapter 34,Section 34-1 —34-13.
This Order permits the after-the-fact installation of a 14' X 22' stone patio, 4' X 12' side deck, and 4' X 8' front
deck. The Order permits the installation of a wooden picket fence with posts that are hand dug that shall be located
along the northeastern comer of the property abutting the property at 29 Wilson Street(Map 23 Lot 42). This Order
also permits the installation of an above ground pool to the west of the driveway as indicated on the approved plans.
The Commission stated that the pool is not to be drained into the wetlands,brook, or catch basins as they drain into
the brook. The Commission added a perpetual condition stating that nothing is to be discharged, cleaned, or
disposed of into the storm drains. This Order does not permit the restoration or replication of bordering vegetated
wetlands as the applicant proposed in the NOI. The restoration of filled wetlands will be addressed under an
Amendment to an existing Order of Conditions DEP file#64-360.
GENERAL CONDITIONS
1. This Order of Conditions must be recorded in its entirety(all 5 pages)at the Essex County Registry of
Deeds or the Land Court for the district in which the land is located,after the expiration of the 10-day
appeal period and within 30 days of the issuance. A copy of the recording information must be
submitted to the Salem Conservation Commission before any work approved in this Order
commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands
Protection Ordinance,Salem Code Chapter 34, Section 34-1 —34-13.
3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones, other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
4. Prior to any work commencing, a sign shall be displayed showing DEP File#64-433, and not placed on
a living tree.
5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
yak Attachment to Order of Conditions#64-433
Page 2of 5
6. With respect to this Order,the Commission designates the Conservation Agent as its agent with powers
to act on its behalf in administering and enforcing this Order.
7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at
any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131,
Section 40, the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
8. The term"Applicant"as used in this Order of Conditions shall refer to the owner,any successor in
interest or successor in control of the property referenced in the Notice of intent,supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act (P.L. 92-500, 86 stat. 816), U.S. Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G. L. Ch. 21A ss7
and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the
septic system within 100 feet of wetlands shall be submitted to the Commission prior to
construction initiation.
(4) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR
744.).
10. If there are conflicting conditions within this Order, the stricter condition(s) shall rule.
it. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods
and boundary during construction if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
14. The work shall conform to the following attached plans and special conditions:
Final Approved Plans
Mark Tremblay 7 Laurier Road Salem MA: Record Plan for Certificate of Compliance (Plan
contains "Additional Items: #1 Stone patio;#2 Side Deck; #3 Front Deck; #4 Fence (wood); #5
Above Ground Pool'
(Title)
November 16, 2005
(Dated)
Robert H. Griffin
40 Attachment to Order of Conditions # 64-433
Page 3of 5
(Signed and Stamped by)
City of Salem Conservation Commission
(On file with)
15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved
plan(s) shall require the applicant to file a Notice of Proiect Change with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the
change(s)is substantial enough to require filing a new Notice of Intent or a request to correct or amend
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued,the applicant or current landowner shall submit to the Commission a statement signed by the
buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
PRIOR TO CONSTRUCTION
17. Prior to the commencement of any activity on this site other than activities listed above,there
shall be a Pre-Construction Meeting between the project supervisor, the contractor responsible for the
work, and a member of the Conservation Commission or its Administrator to ensure that the
requirements of the Order of Conditions are understood. The staked erosion control line shall be
adjusted,if necessary,during the pre-construction meeting. Please contact the Conservation Commission
Agent at(978)745-9595 ext 311 at least forty-eight(48) hours prior to any activity to arrange for the
pre-construction meeting.
18. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Administrator shall inspect and approve such installation at the pre-construction
meeting.
19. No clearing of vegetation,including trees,or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
EROSION CONTROL
20. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in the wetland areas and buffer zones. The erosion control
specifications provided in the Notice of Intent and the erosion control provision in the Order will be the
minimum standards for this project;the Commission may require additional measures.
21. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland
resource areas to prevent sediment from entering wetland resource areas.
22. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
23. The area of construction shall remain in a stable condition at the close of each construction day.
Attachment to Order of Conditions # 64-433
Page 4of 5
24. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through hay bale sediment traps,silt filter bags or other means approved by the Commission or its
Administrator.
25. Within thirty(30) days of completion of construction on any given portion of the project, all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas.
26. If soils are to be disturbed for longer that two(2) months,a temporary cover of rye or other grass should
be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,
exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored, to
prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
27. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
28. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
29. All waste products,grubbed stumps, slash;construction materials,etc. shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
30. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
31. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil
prior to seeding and final stabilization.
32. Immediately following drainage structure installation all inlets shall be protected by silt fence,haybale
barriers and/or silt bags to filter silt from stormwater before it enters the drainage system.
33. There shall be no pumping of water from wetland resource areas.
34. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
35. During construction,all drainage structures shall be inspected regularly and cleaned as necessary.
36. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including,but not limited to,civil administrative
penalties under M.G.L Chapter 21A, section 16.
AFTER CONSTRUCTION
37. Upon completion of construction and final soil stabilization, the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance (COC):
(1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
A_ c
Attachment to Order of Conditions # 64-433
Page 5of 5
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
(3) An"As-Built"plan signed and stamped by a Registered Professional Engineer or Land Surveyor
showing post-construction conditions within all areas under the jurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at a minimum:
(a) All wetland resource area boundaries with associated buffer zones and regulatory setback
areas taken from the plan(s)approved in this Order of Conditions;
(b) Locations and elevations of all stormwater management conveyances,structures and best
management designs,including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
(c) Distances from any structures constructed under this Order to wetland resource areas-
"structures"include,but are not limited to,all buildings, septic system components,wells,
utility lines,fences,retaining walls,and roads/driveways;
(d) A line delineating the limit of work-"work"includes any filling,excavating and/or
disturbance of soils or vegetation approved under this Order;
38. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds
and a copy of the recording submitted to the Salem Conservation Commission.
39. If the completed work differs from that in the original plans and conditions, the report must specify how
the work differs; at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission, may the applicant request in writing a Certificate of
Compliance as described above.
40. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Administrator has
authorized their removal.
ADDITIONAL CONDITIONS
41. This Order permits the installation of an above ground pool and is contingent on the project meeting
City codes and obtaining necessary permits.
42. The holes dug for the installation of the fence posts shall be hand dug and all spoils from digging shall
be removed from the site and properly disposed.
PERPETUAL CONDITIONS
43. The applicant,current landowner, and future property owners shall not dump,clean, discharge anything
into the storm drains.
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
ONE WINTER STREET, BOSTON, MA 02108 617-292-5500
MITT ROMNEY ��S��` ,��® STEPHEN R.PRITCHARD
Governor RECEIVED
Secretary
KERRY HEALEY 2 r3 2006 ROBERT W.GOLLEDGE,Jr.
Lieutenant Governor (]r T Commissioner
DEPT.Of PLANNING&
COMMUNITY DEVELOPMENT
DEP File# 064-0433
RE: NOTIFICATION OF WETLANDS PROTECTION ACT FILE NUMBER SALEM
DATE: 10/19/2006 5:51 PM (city/town)
The Department of Environmental Protection has received a Notice of Intent filed in accordance with the
Wetlands Protection Act(M.G.L. c. 131, §40):
Applicant: Mark Tremblay Owner:
Address: 7 Laurier Road Address:
SALEM,MA 01970
LOCUS: Laurier Road
IF CHECKED,THE FOLLOWING ITEM(S)APPLY TO THIS NOTICE OF INTENT:
A.-(X)-This project has been assigned the following file# : 064-0433
Although a file#is being issued, please note the following:
Wetland alteration of 1350 is not explained in NOI.
C.()Other Regulatory Jurisdiction
1. () Application has been forwarded to Waterways Regulatory Program to determine if a
Chapter 91 License is required.
2. () Applicant is advised to forward a copy of the Notice of Intent to the Corps of Engineers
for review(call 1-800-362-4367 for information).
D. Q 401 Water Quality Certification
The project described in your Notice of Intent requires a 401 Water Quality Certification
from the Department of Environmental Protection and may require submittal of a 401 application
form. See below for further details:
1. ()Based upon the information submitted in and with your Notice of Intent a separate 401
Water Quality Certification application form is not required. The Department has reviewed
the plans submitted by the applicant and finds that there is reasonable assurance that the project or
activity will be conducted in a manner that will not violate the Massachusetts Surface Water
Quality Standards,provided that:
a) the applicant receives and complies with a Final Order of Conditions from the local
conservation commission or the Department;
This information is available in alternate format.Call Donald M.Games,ADA Coordinator at 617-556-1057.TDD Service-1-800-298-2207.
DEP on the World Wide Web: http:/hw .mass.gov/dep
0 Printed on Recycled Paper
b) The Order of Conditions does not cause the loss of more than 5,000sq.ft. of bordering
vegetated wetlands and land under water and/or the dredging of more than 100 cubic yards of
land under water;
c) any loss of vegetated wetlands has been mitigated with a minimum replication of 1:1; and is
not part of a subdivision; does not cause the loss of any Wetlands designated as
d) The project is not exempt from the M.G.L. c. 131, §40-the Wetlands Protection Act;
Outstanding Resource Waters; and does not cause the loss of any salt marsh.
Therefore,provided that the above conditions are satisfied,the Final Order of Conditions will serve as the
Water Quality Certification for this project. This does not relieve the applicant of the duty to comply with
any other statutes or regulations.
2. Q Before the activity described in the Notice of Intent can commence,you must obtain a Water
Quality Certification form from this Regional Office. Please complete the enclosed 401 Water
Quality Certification application form and file it with this Regional Office for review.
3. ()Your project involves dredging of greater than 100 cubic yards of material or requires a
permit from the Federal Energy Regulatory Commission for work in"waters of the
Commonwealth." Therefore, your proposed project is subject to 314 CMR 9.00 and requires a
Water Quality Certification. Please complete the enclosed 401 Water Quality Certification
application form and file it with the Department of Environmental Protection,Waterways
Program,and One Winter Street,Boston,MA 02108. Contact the Division of Waterways
program at 617-292-5655 if you have and questions.
For more information please contact: Ms. RACHEL FREED @(978) 694-3258 or at 978 694-
2224.
Cc:
Conservation Commission: Salem Conservation Commission, City Hall 1 Salem Green