102 LAFAYETTE ST - BUILDING INSPECTION (4) ayU Stu '4"Oa,
CK 1 —O(P — I3
The Commonwealth of Massachusetts
Department of Public Safety
Ulf Massachusetts State Building Code(780 CMR)
Building Permit Application for any Building other than a One-or Two-Family Dwelling
(Phis Section For Official Use Only) .i
Building Permit Number: Date Applied: Building cial:
4.
SECTION 1:LOCA ON(Please indicate Block#and Lot#for locations for w a s is not available)
/oa- �oral ill if o/77o
No.and Street City/Town Zip Code Name of Building(if applicable)
SECTION 2-PROPOSED WORK
Edition of MA State Code used_ If New Construction check here❑or check all that apply in the two rows below
Existing Building,) Repair❑ 1 Alteration ,d I Addition❑ Demolition ❑ (Please fill out and submit Appendix 1)
Change of Use ❑ Change of Occupancy ❑ 1 Other ❑ Specify_
Are building plans and/or construction documents being supplied as part of this permit application? Yes ❑ No
Is an Independent Structural Engineering Peer Review required? Yes ❑ No'�(
Brief Desorption of Proposed Work:
1n l f Vta✓ t, i .� i [ .
SECTION 3:,COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR
CHANGE IN USE OR OCCUPANCY
Check here if an Existing Building Investigation and Evaluation is enclosed(See 780 CMR 34) ❑
Existing Use Group(s): I Proposed Use Group(s):
SECTION 4:BUILDING HEIGHT AND AREA
Existing Proposed
No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.)
Total Area(sq.ft.)and Total Height(h.)
SECTION 5:USE GROUP(Check as a livable
A: Assembly A-1❑ A-2❑ Nightclub ❑ A-3 ❑ A 3 ClA-5❑ B: Bueinees E: Educational ❑
F: Fact F-1❑ F2❑ H: HI Hazard H-1❑ H-2❑ H-3 ❑ H-4❑ H-5❑
I: Institutional 1-1❑ 1-2❑ 1-3❑ I-4❑ M: Mercantile❑ IL Residential R-10 R-2❑ R-3❑ R4❑
S: Storage S-1 Cl S-2❑ U: Utility 13 Special Use❑and please describe below:
Special Use:
SECTION 6:CONSTRUCTION TYPE(Check as a livable)
IA ❑ IB ❑ IIA ❑ JIB HU ❑ IIIB ❑ IN VA ❑ VB ❑
SECTION 7.SITE INFORMATION(refer to 780 CMR 111.0 for details on each item)
Water Supply: Flood Zone Information: Sewage Disposal: Trench Permit Debris Removal:
Public❑ Check if outside Flood Zone❑ Indicate municipal Cl A trench will not be Licensed Disposal Site❑
Private❑ or indentify Zone: or on site system❑ required❑or trench or specify:permit is enclosed❑
Railroad right-of-way: Hazards to Air Navigation MA Historic Commission Review Process;
Not Applicable❑ Is Structure within airport approach area? Is their review completed?
or Consent to Build enclosed❑ - Yes❑ or No❑ 1 Yes❑ No ❑
SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY
Edition of Code: Use Group(s): Type of Construction: Occupant Load per Floor:
Does the building contain an Sprinkler System?: Special Stipulations:
SECTION 9: PROPERTY OWNER AUTHORIZATION
Name and Address of Property Owner
NSQC 1oZ L a eke
Name(Print) No.and Streek J City/Town Zip
Property Owner Contact Information:
l k VdGd - - SDdf _ I dENE@NOkrNSlla�ECDG, a�G
TitleU Telephone No.(business) Telephone No. (cell) e-mail address
If applicable the property owner hereby authorizes
Name Street Address City/Town State Zip
to act on the property owners behalf,in all matters relative to work authorized by this building permit application.
SECTION 10.CONSTRUCTION CONTROL(Please fill out Appendix 2)
building is less than 35,000 cu.it.of enclosed space and or not under Construction Control then check here 0 and skip Section 10.1
10.1 Registered Professional Responsible for Construction Control
Name(Registrant) Telephone No. e-mail address Registration Number
Street Address City/Town State .Zip Discipline Expiration Date
101 General Contractor
i,G( .E✓-5 0 ,_ (✓_ 'oL—_ I�
Company Nye
Name.of Person Responsible for Construction yrcerise No. and Type if Applicable
Street Address City/Town State Zip
Telephone No.(business) Telephone No. cell e-mail address
SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT .G.L.c.152.§25C 6
A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and
submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit.
Is a signed Affidavit submitted with this application? Yes 0 No 0
SECTION 1.2 CONSTRUCTION COSTS AND PERMIT FEE
Item Estimated Costs:(Labor
and Materials) Total Construction Cost(from Item 6)_$
1.Building $ U U G Building Permit Fee=Total Construction Cost x_(insert here
2.Electrical $ appropriate municipal factor)_$
3.Plumbing $
4.Mechanical (HVAC) $ Note:Minimum fee=$ (contac muni M
5.Mechanical Other $ Enclose check payable to
6.Total Cost $ G d o Cj (contact municipality)and write check number here
SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT
By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this
application is true and accurate to the best of my knowle erstanding.
Please print and sign name Title Telephone No. Date
Street Address City/Town State Zip
Municipal Inspector to fill out this section upon application approval: _it�
Name Date