\� Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — 'Certificate of Compliance 64-41'2
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 provided by DEP
A. Project Information
Important:
When filling put 1. This Certificate of Compliance is issued to:
forms on the
computer,use Massachusetts Electric Company
only the tab key Name
to move your 40 Sylvan Way
cursor-do not Mailing Address
:use the return
key. Waltham MA 02451
f� Cityrrown State zip Code
2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued to:
(� Massachusetts Electric Company
rtnm. a �J Name
4/2712006 64-412
Dated DEP,File Number
3. The project site is located at
89 Lafayette Street Salem
Street Address Citylrown
34 433
Assessors MapMat Number - Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Properiy Omer(if'different)
Essex 25953 532
,County - Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's'agent,
on:
11/112012
Data Please Return to:
Brian J.Mulcahy/Legal Department
National Grid
O S 40 L Sylvan.Road GCiv n000H1 Waltham Mt 02451-1120
ripaGmBb.ea ree.17113/09 ,WPA Fd"813 Ceildrale el Caopliance•Page1 ot3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number
WPA Form 813 Certificate of Compliance 64-412
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification
Check all that apply:
Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed.The project areas or work subject to this partial certification that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions:The following conditions of the Order shall continue:
(include any conditions contained in the Final Order, such as maintenance or
monitoring,thatshoUld continue for a longer period).
Condition Numbers:
C. Authorization
Issued by,
Salem
1 /�a
Conservatlo.Commission Da a of suance.
This Certificate must be signed by a majority of the Conservation Commission and a
copy sentto the applicant and appropriate DEP Regional Office.(See
'
http://www,mass.nov/deo/about/region/findvour.htm). `
s r .
Signatures:
ter' f
WahrrGb.dm-rev.12MOS WPA'Fom 8B Ceniftew,of Canprwie;•Page 2 W3
Massachusetts Department of Environmental Protection
`;�-- Bureau of Resource Protection =Wetlands DEP File Number:
WPA form 8B — Certificate of Compliance 64-412
Massachusetts Wetlands Protection Act M.G.L. c._ 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:--- -- --- -- - - ----------- ----- --- - - --- ----- ----- —------------- -- --
' aw 0-M
Conservation.Commission
Please be advised that the Certificate of Compliance for the project at:
sal 1-0 64 o.liP S+. roil - /a
Project Location J DEP File Number
Has been recorded at the Registry of Deeds of:
E-C'SA ' -
County
for: MaS50.Chur,0±GS �y p }�C t nbriponI
Property Owner
and',has been noted in the chain of title of the affected property on:
Date Book Page'.
If recorded land,the instrument number which identifies this transaction is:,
$k 3 2o] - P 5� ` 5-
If registered land, the document number which identifies thistransaction is.
Document Number - -
Signature of Applicant
vpalrm8b eoc-lev.120f/69 WPA Form 88.Cwtift ate of Comphanea.:Page 3 of 3
�o
r k
CITY OF SALEM
II �
CONSERVATION COMMISSION
May 1, 2006
Joshua Holden
National Grid
170 Medford Street
Malden, Ma 02148
Re: Order of Conditions —DEP #64-412— 89 Lafayette Street, Salem, MA
Dear Mr. Holden:
Enclosed, please find the Order of Conditions for the above referenced project.
Following the 10-day appeal period (after May 7, 2006), this document and the attached
Special Conditions must be recorded at the Essex County Registry of Deeds (36 Federal
Street, Salem, MA) prior to any work cotVnencing on site. Once recorded, please return
a copy of Page 9 of the Order of Conditions, which will indicate to the Salem
Conservation Commission that the document has been recorded.
If you have any further questions or concerns, please feel free to contact me at 978-745-
9595 x 311.
Sincerely,
Gvitti—�
Ylanner
ao na
/Harbor Coordinator
Enclosures
120 WASHINGTON STREET, SALEM, MASSACHUSEws 01970 • TEL: 978.745.9595 FAX: 978.740.0404 ♦ WWW.S.ALFM.COM
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number.
WPA Form 5 - Order of Conditions #64-412
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
Important: Salem
When filling From: 1.Conservation Commission
out fors on
the computer, 2. This issuance is for(check one): a. N Order of Conditions b. ❑ Amended Order of Conditions
use only the
tab key to 3.To: Applicant:
move your
cursor-do not Joshua Holden National Grid
use the return a.First Name b. Last Name c.Company
key. 170 Medford Street
d.Mailing Address
°d Malden Massachusetts 02148
e.Cityrrown f.State g.Zip Code
4. Property Owner(if different from applicant):
Massachusetts Electric Co.
a.First Name b.Last Name c.Company
25 Research Drive
d.Mailing Address
Westborough Massachusetts 01582
e.CWTown I.State g.Zip Code
5. Project Location:
89 Laffayette Street Salem
a.Street Address b.City/Town
Map 34 Lot 0433
c.Assessors Map/Plat Number d.Parcel/Lot Number
Latitude and Longitude, if known (note:
electronic filers will click for GIS locator): e.Latitude f.Longftude
s. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel):
Essex
a.County b.Certificate(if registered land)
23049 93
a Book d.Page
�. Dates: March 9, 2006 April 27, 2006 Apfl 27, 2006
a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance
s. Final Approved Plans and Other Documents(attach additional plan or document references as
needed):
Proposed Switchgear Installation
a.Plan Title
ENSR/AECOM
b.Prepared By c.Signed and Stamped by
February 2006 V=30'
d.Final Revision Date e.Scale
Representative Duct Bank Cross Section March 2006
I.Additional Plan or Document Title g.Date
wparam5.doc•rev.311105 Page 1 ora
Massachusetts Department of Environmental Protection
DEP File Number:
Bureau of Resource Protection -Wetlands
WPA Form 5 - Order of Conditions #64412
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
t. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ® Public Water Supply b. ® Land Containing Shellfish c. ® Prevention of Pollution
d. ® Private Water Supply e. ® Fisheries f. ® Protection of Wildlife
Habitat
g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project,as proposed,is: (check one of the following boxes)
Approved subject to:
a. N the following conditions which are necessary in accordance with the performance standards set
forth in the wetlands regulations. This Commission orders that all work shall be performed in
accordance with the Notice of Intent referenced above, the following General Conditions, and any
other special conditions attached to this Order.To the extent that the following conditions modify or
differ from the plans, specifications,or other proposals submitted with the Notice of Intent,these
conditions shall control.
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the
wetland regulations. Therefore,work on this project may not go forward unless and until a new Notice
of Intent is submitted which provides measures which are adequate to protect these interests, and a
final Order of Conditions is issued. A description of the performance standards which the
proposed work cannot meet Is attached to this Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the
effect of the work on the interests identified in the Wetlands Protection Act. Therefore,work on this
project may not go forward unless and until a revised Notice of Intent is submitted which provides
sufficient information and includes measures which are adequate to protect the Acts interests, and a
final Order of Conditions is issued. A description of the specific information which Is lacking and
why it is necessary Is attached to this Order as per 310 CMR 10.05(5Hc).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
3. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and 30
Weiland boundary(if available) a.linear feet
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. ❑ Bank a.linear feet b.lineaffeet c.lineaffeet d.linear feet
5. ❑ Bordering Vegetated
Wetland a.square feet b.square feet c.square feet d.square feet
6. ❑ Land Under Waterbodies a.square feet D.square feet c.square feet d.square feet
and Waterways
e.cu.yd dredged f.cu.yd dredged
wyafam doc• rev.31105 Page 2 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions #64-412
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
7. ❑ Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet f,cubic feet g.cubic feet h.cubic feet
a. ❑ Isolated Land Subject
to Flooding a.square feet b.square feet
Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
11,900 750(temp)
g. ® Riverfront area a.total sq.feet b,total sq.feet
290(temp) 290(temp)
Sq ft within 100 it a square feet ii.square feet e.square feet f.square feet
Sq ft between 100-2D0It 460 (temp) 460(temp)
g.square feet h.square feet i.square feet 1.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
to. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
m ❑ Land Under the Ocean a,square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13. ❑ Coastal Beaches a.square feet b.square feet c.Hy nounshmt. d.dy nourishmt.
14. ❑ Coastal Dunes a.square feet b.square feet c.cJy nourishmt. d.ch'nourishmt
15. ❑ Coastal Banks a,linear(feet b.linear feet
16. ❑ Rocky Intertidal Shores a.square feet b.square feet
17. ❑ Salt Marshes a.square feet b.square feet c.square feel d.square feet
18. ❑ Land Under Salt Ponds a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
is. ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a.cu.yd dredged b.cu.yd dredged
21. 0 Land Subject to Coastal 750 750
Storm Flowage a.square feet b.square feet
•patonnS doc• rev.311005 Papa 3 of 9
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection -Wetlands
WPA Form 5 - Order of Conditions #64-412
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the perrnittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes,ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, refrigerators, motor vehicles,or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection"[or, 'MA DEP"]
"File Number f164-412
wpefoffn5doc m.W 005 Pap 4 as
LlMassachusetts Departirnent of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 5 - Order of Conditions #64412
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before DEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance(WPA Form 8A)to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the
property subject to this Order and to any contractor or other person performing work conditioned by
this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wettand,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetiand boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
18. All work associated with this Order is required to comply with the Massachusetts Stomnwater Policy
Standards.
Special Conditions:
If you need more See Attached Sheet
spacefor
additional
conditions,
select box to
attach a text
document 8
wp8kxTn5.d=-n ,3nN5 Page 5cr9
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection -Wetlands
WPA Form 5 - Order of Conditions #64-412
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ❑ Yes ❑ No
2. The hereby finds(check one that applies):
Conservation Commission
3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
a.Municipal Ordinance or Bylaw b.Citation
Therefore,work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final Order of
Conditions is issued.
a. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
a.Municipal Ordinance or Bylaw b.Citation
The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above.To the extent that the following conditions modify or
differ from the plans, specifications,or other proposals submitted with the Notice of Intent, the
conditions shall control.
If you need more
space for c. The special conditions relating to municipal ordinance or bylaw are as follows:
s
additional
conditions,
select box to
attach a text
document ❑
wpefmm5.doc• rev.311A5 Pepe 6 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 5 - Order of Conditions #64412
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special April 27, 2006
condition pursuant to General Conditions$4, from the date of issuance. 1.Date of Issuance
Please indicate the number of members who will sign this form: five(5)
This Order must be signed by a majority of the Conservation Commission. 2.Number of signers
The Order must be mailed by certified mail(return receipt requested)or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Signatures:
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
27th of April 2006
On this Day Month Year
Before me, the undersigned Notary Public, Kevin Comacchio, Michael Blier, Kevin Carr,
personally appeared David Pabich,&Joe Fumad
proved to me through satisfactory evidence of identification, which was/were
personally known
Description of evidence of idenMfcation
to be the person whose name Is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of Salem Conservation Commission
Cityrrown
FRANKTAORMINA
Notary Publiccz,
\ T
VI
ommomveath atMas My Commission Expires
April 27,2012 Sign re ofry P lid
Printed Na a of Notary Public
Place notary seal and/or any stamp above �a�`1 '�
My Comm' ion Expires( te)
This Order is issued to the applicant as follows:
❑ by hand delivery on ❑ by certified mail, return receipt requested,on
Date Date
wpaforrM,doc• rev.3nN5 Pepe 7 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 5 - Order of Conditions #64-412
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant,the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions.
The request must be made by certified mail or hand delivery to the Department, with the appropriate filing
fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR
10.03(7)within ten business days from the date of issuance of this Order.A copy of the request shall at
the same time be sent by certified mail or hand delivery to the Conservation Commission and to the
applicant, if he/she is not the appellant.Any appellants seeking to appeal the Departments Superseding
Order associated with this appeal will be required to demonstrate prior participation in the review of this project.
Previous participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or
Determination, or providing written information to the Department prior to issuance of a Superseding Order
or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act, (M.G.L. c. 131, §40)and is inconsistent with the wetlands regulations(310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G,Recording Information Is available on the following page.
rpa(urei5Aoc• rev.31IMS Page B of
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection -Wetlands
WPA Form 5 - Order of Conditions #64-412
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Regisbys Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information
on Page 7 of this form shall be submitted to the Conservation Commission listed below.
SALEM
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
-------------------------------------------------------------------------------------------------------------------------
To:
SALEM
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
89 Lafayette Street #64-412
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner
and has been noted in the chain of We of the affected property in:
Boric Page
In accordance with the Order of Conditions issued on:
Date
If recorded land,the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpabmd.doc• nwr VIM Pape 9 Of
Attachment to Order of Conditions # 64-412
Page lof 5
SALEM CONSERVATION COMMISSION
DEP FILE #64412
89 Lafayette Street(Massachusetts Electric/National Grid)
City of Salem,Massachusetts
ADDITIONAL FINDINGS
Based on the Estimated Habitats or Rare Wildlife and Certified Vernal Pools Map (June 1, 2003) from Natural
Heritage&Endangered Species Program(NHESP)of the Massachusetts Division of Fisheries and Wildlife, it has
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any
vernal pools.
This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L.Chapter 131,Section 40 and the City
of Salem Wetlands Protection Ordinance,Salem Code Chapter 34,Section 34-1 —34-13.
This Order permits the installation of an above ground switchgear and duct bank to replace oil filled transformers
located within manholes. The work will alter 750 sq feet of Riverf ont Area(290 in the inner riparian zone and 460
in the outer riparian zone)and 750 sq ft of Land Subject to Coastal Storm Flowage.
GENERAL CONDITIONS
I. This Order of Conditions must be recorded in its entirety(all 5 pages)at the Essex County Registry of
Deeds or the Land Court for the district in which the land is located,after the expiration of the 10-day
appeal period and within 30 days of the issuance. A copy of the recording information must be
submitted to the Salem Conservation Commission before any work approved in this Order
commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131,Section 40,Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands
Protection Ordinance,Salem Code Chapter 34,Section 34-1 —34-13.
3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones,other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
4. Prior to any work commencing,a sign shall be displayed showing DEP File 064-412,and not placed on
a living tree.
5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
6. With respect to this Order,the Commission designates the Conservation Agent as its agent with powers
to act on its behalf in administering and enforcing this Order.
7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at
any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131,
a�P
Attachment to Order of Conditions # 64412
Page Hof 5
Section 40,the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
8. The term"Applicant'as used in this Order of Conditions shall refer to the owner,any successor in
interest or successor in control of the property referenced in the Notice of intent, supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act(P.L.92-500, 86 stat. 816),U.S. Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec.27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G.L.Ch.21 A ss7
and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the
septic system within 100 feet of wetlands shall be submitted to the Commission prior to
construction initiation.
(4) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR
744.).
10. If there are conflicting conditions within this Order,the stricter condition(s)shall rule.
11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods
and boundary during construction if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
14. The work shall conform to the following attached plans and special conditions:
Final Approved Plans
Proposed Switchgear Installation
(Tide)
February 2006
(Dated)
ENSR/AECOM
(Signed and Stamped by)(Prepared by)
City of Salem Conservation Commission
(On file with)
15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved
plan(s)shall require the applicant to file a Notice of Project Change with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field,as to whether the
Attachment to Order of Conditions# 64-412
Page 3of 5
change(s)is substantial enough to require filing a new Notice of Intent or a request to correct or amend
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued,the applicant or current landowner shall submit to the Commission a statement signed by the
buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
17. Condition Number as indicated shall continue in force beyond the Certificate of Compliance,in
perpetuity,and shall be referenced to in all future deeds to this property.
PRIOR TO CONSTRUCTION
18. Prior to the commencement of any activity on this site other than activities listed above,there
shall be a Pre-Construction Mating between the project supervisor,the contractor responsible for the
work,and a member of the Conservation Commission or its Administrator to ensure that the
requirements of the Order of Conditions are understood. The staked erosion control line shall be
adjusted,if necessary,during the pre-construction meeting. Please contact the Conservation Commission
Agent at(978)745-9595 ext 311 at least forty-eight(48)hours prior to any activity to arrange for the
pre-construction meeting.
19. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Administrator shall inspect and approve such installation at the pre-construction
meeting.
20. No clearing of vegetation,including trees,or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
21. There shall be twenty(20)hay bales and wooden stakes under cover on the site to be used only for
emergency erosion control.
EROSION CONTROL
22. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in the wetland areas and buffer zones. The erosion control
specifications provided in the Notice of Intent and the erosion control provision in the Order will be the
minimum standards for this project;the Commission may require additional measures.
23. All debris,fill and excavated material shall be stockpiled a location far enough away from the wetland
resource areas to prevent sediment from entering wetland resource areas.
24. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
25. The area of construction shall remain in a stable condition at the close of each construction day.
26. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through hay bale sediment traps, silt filter bags or other means approved by the Commission or its
Administrator.
IN Attachment to Order of Conditions # 64-412
Page 4of 5
27. Within thirty(30)days of completion of construction on any given portion of the project,all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
vegetative cover,using sufficient top soil to assure long-term stabilization of disturbed areas.
28. If soils are to be disturbed for longer that two(2)months,a temporary cover of rye or other grass should
be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,
exposed surface shall be stabilized by other appropriate erosion control measures,firmly anchored,to
prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
29. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
30. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
31. All waste products,grubbed stumps,slash;construction materials,etc. shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
32. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
33. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil
prior to seeding and final stabilization.
34. Immediately following drainage structure installation all inlets shall be protected by silt fence,haybale
barriers and/or silt bags to filter silt from stormwater before it enters the drainage system.
35. There shall be no pumping of water from wetland resource areas.
36. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
37. During construction,all drainage structures shall be inspected regularly and cleaned as necessary.
38. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including,but not limited to,civil administrative
penalties under M.G.L Chapter 21A,section 16.
AFPER CONSTRUCTION
39. Upon completion of construction and final soil stabilization,the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance(COC):
(1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
(3) An"As-Built"plan signed and stamped by a Registered Professional Engineer or Land Surveyor
showing post-construction conditions within all areas under the jurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at a minimum:
Attachment to Order of Conditions # 64-412
Page 6of S
(a) All wetland resource area boundaries with associated buffer zones and regulatory setback
areas taken from the plan(s)approved in this Order of Conditions;
(b) Locations and elevations of all stormwater management conveyances,structures and best
management designs, including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
(c) Distances from any structures constructed under this Order to wetland resource areas-
"structures"include,but are not limited to,all buildings,septic system components,wells,
utility lines,fences,retaining walls,and roads/driveways;
(d) A line delineating the limit of work-"work"includes any filling,excavating and/or
disturbance of soils or vegetation approved under this Order,
40. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds
and a copy of the recording submitted to the Salem Conservation Commission.
41. If the completed work differs from that in the original plans and conditions,the report must specify how
the work differs; at which time the applicant shall fast request a modification to the Order. Only upon
review and approval by the Commission,may the applicant request in writing a Certificate of
Compliance as described above.
42. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Administrator has
authorized their removal.
ADDITIONAL CONDITIONS
43. Applicant shall install pervious geo-grid material in/around the new switchgear structure and cover with
loam and seed.
1
1 National Grid
' Malden, Massachusetts
Notice of Intent
1 Switchgear and Duct Bank
Installation
Salem, Massachusetts
1
Prepared for:
nationalgrid
1
1
1
' February 2006
Document Number 04940-103-200
ENSR I AECOM
ENSR
2 Technology Park Drive,Westford, Massachusetts 01886-3140
' T 978.589.3000 F 978.589.3100 w enscaecom.com
8 March 2006
Mr. Frank Taormina, Conservation Agent
Salem Conservation Commission
' 120 Washington Street, 3`d Floor
Salem, MA 01970
RE: Notice of Intent for Proposed Switchgear and Duct Bank Installation, 89 Lafayette Street,
Salem, MA. ENSR Project#04940-103.
Dear Mr. Taormina:
On behalf of Massachusetts Electric Company (dba National Grid (Grid)), ENSR herein submits a
Notice of Intent for proposed installation of duct banks and switchgear within an existing easement at
89 Lafayette Street in Salem, Massachusetts. The proposed installation will be conducted along the
southern limits of the driveway of the Beverly Cooperative Bank. This proposed installation will occur
within the 200-foot Riverfront Area of the South River and within the 100-foot Buffer Zone of Coastal
Bank. No work will be conducted affecting the South River. The installation of the switchgear will
replace oil-filled transformers located within existing manholes in Lafayette Street. Duct banks
containing electrical conduits are necessary to connect the proposed switchgear with existing electrical
components in the manholes. This work is necessary to replace older, oil-filled equipment. The
company's goal is to complete the installation in spring 2006.
It is Grid's understanding that portions of the proposed work is located within Filled Tidelands and as
such, we will be requesting a Minor Modification from MA DEP's Waterways Department in accordance
with existing Chapter 91 Waterways Licenses for the site. As a portion of the project is subject to
jurisdiction of M.G.L. c. 91 and Grid is requesting authorization under 310 CMR 9.00 in the form of a
Minor Modification, the portion of work located within Riverfront Area is exempt from requirements for
Riverfront Area pursuant to 310 CMR 10.58(6).
The enclosed NOI includes a project description, characterization of the wetland resource areas, plans of
existing and proposed conditions, sedimentation and erosion control details, the appropriate fees and
application forms, and 100-foot certified abutters list, abutter notification, and affidavit of service. It is our
understanding that this NOI will be placed on the docket for your March 23, 2006 public hearing. Please
do not hesitate to call me at 978/589-3000 x3579 if you have any questions with respect to this filing or
require additional information to complete your review. Thank you for your attention to this matter.
I
T ly,
a . D sl ets, P S
etlands Scientist
attachments
cc: J. Callanan, J. Holden, S. Sobolewski, Grid
', Salem NOI cover letter.doc
wr "g C e771
mow•!' L►; WE 11v\ „
MMNA'.
WN
VAN
RIM
Vg
► fit %, �..�` � 1° ► �� .
pMi.-1"....L.:. yr� is
,r �®1-won ,
�� - �.e I6►�
1 �y
'. a 1��1 � , f
Po ti a.• r �e 11. -� V vi jlx s
1
Site Locus ENSR AECOri
r•
Massachusetts Electric Company
Switchgear
Salem, MA • �_
1 1 ° 1 • 1 1
1 11 111 111 111 � 111
1 1 1
tENSR AECOM
Contents
WPA Form 3
, i
ATTACHMENT A PROJECT NARRATIVE
1.0 INTRODUCTION ........................................................................................................................................1-1
2.0 Existing Conditions..................................................................................................................................2-1
2.1 Wetland Resource Areas.................................................................................................................2-1
2.1.1 Wetlands Resources..........................................................................................................2-1
2.2 Soils..................................................................................................................................................2-1
2.3 Floodplain.........................................................................................................................................2-1
2.4 Rare Species....................................................................................................................................2-1
3.0 Description of Proposed Activities........................................................................................................3-1
3.1 Construction Methodology...............................................................................................................3-1
ATTACHMENT B PLANS AND DETAILS
ATTACHMENT C REPRESENTATIVE PHOTOGRAPHS
ATTACHMENT D CERTIFIED ABUTTERS LIST, ABUTTER NOTIFICATION
FORM, AND AFFIDAVIT OF SERVICE
March 2006
National Grid—Salem Swilchgear NOI
ENSR AECOM
List of Figures
Figure 1. Site Locus
Figure 2. FEMA Map
Figure 3. MA NHESP Priority Habitats of Rare Species, Estimated Habitats of Rare Wildlife and Certified
Vernal Pools Map
Figure 4. Proposed Switchgear Installation
Figure 5. Representative Duct Bank Cross-Section
Figure 6. Representative Switchgear Specification
Figure 7. Hay Bale Sediment Barrier
i
National Grid—Salem Switchgear N01 jj March 2006
Massachusetts Department of Environmental Protection Provided byDEP a j
Bureau of Resource Protection - Wetlands DEP File Number a
WPA Form 3 — Notice of Intent tM
Document Transaction Numbed
lem
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Sa __
City/Town
Important:When filing out A. General Information
forms on the
computer,use 1. Project Location (Note: electronic filers will click on button for GIS locator):
only the tab key
to move your 89 Lafay
use the return ette Street Salem 01970
cursor-do not a.Street Address b.City/Town c.Zip Code
key. 42.5192oN 70.8931oW
Latitude and Longitude: J.Latitude e.Longitude
Map 34 Lot 0433-0
f.Assessors Map/Plat Number g.Parcel/Lot Number
2. Applicant:
Joshua Holden National Grid
a.First Name b.Last Name c.Company
Note: 170 Medford Street
Before d.Mailing Address
completing this Malden MA 02148
form consult
your local e.Cityrrown I.State g.Zip Code
Conservation 781-388-5555 joshua.holden@us.ngrid.com
Commission h.Phone Number i.Fax Number I.Email address
regarding any
municipal bylaw 3. Property owner(if different from applicant): ❑ Check if more than one owner
or ordinance.
Massachusetts Electric Co.
a.First Name b.Last Name c.Company
25 Research Drive
d.Mailing Address
Westborough MA 01582
e.City/Town f.State g.Zip Code
h.Phone Number i.Fax Number I.Email address
I
4. Representative (if any):
ENSR
a.Firm
Andrea Desilets
b.Contact Person First Name c.Contact Person Last Name
I 2 Technology Park Drive
d.Mailing Address
Westford MA 01886
e.CityrTown f.State g.Zip Code
978-589-3000 978-589-3100 adesilets@ensr.aecom.com
h.Phone Number i.Fax Number I.Email address
5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
$750 $362.50 $387.50
a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid
6. General Project Description:
Installation of above-ground metal-clad switchgear and duct bank within Riverfront Area and buffer
zone of Coastal Bank to replace underground oil-filled transformers located within manholes in
Lafayette Street. Switchgear and portions of duct bank will be installed adjacent to Beverly
Cooperative Bank.
wpafonn3.doc•rev.3/29/05 Page 1 of 7
,f
Massachusetts Department of Environmental Protection Provided by DEP 4
~ Bureau of Resource Protection - Wetlands
r ` DEP File Number
1 , WPA Form 3 - Notice of Intent !
--Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
A. General Information (continued)
7. Project Type Checklist:
' a. ❑ Single Family Home b. ❑ Residential Subdivision
c. ❑ Limited Project Driveway Crossing d. ❑ Commercial/Industrial
e. ❑ Dock/Pier f. IN Utilities
g. ❑ Coastal Engineering Structure h. ❑ Agriculture—cranberries, forestry
i. ❑ Transportation j. ❑ Other
8. Property recorded at the Registry of Deeds for:
Essex 93
a.County b.Page Number
23049
c.Book d.Certificate#(if registered land)
9. Has work been performed on the property under an Order of Resource Area Delineation involving
Simplified Review within 3 years of the date of this application?
a. ❑Yes b. ® No
10. Buffer Zone Only- Is the project located only in the Buffer Zone of a bordering vegetated wetland,
inland bank, or coastal resource area?
a. ❑ Yes-answer 11 below, then skip to Section C.
b. ® No-skip to Section B.
If yes, no Notice of Intent or Request for Determination of Applicability may be filed for work within the
50-foot-wide area in the Buffer Zone along the resource area during the three-year term of an Order
of Resource Area Delineation, or any Extended Order, or until the applicant receives a Certificate of
Compliance,whichever is later.
11. Buffer Zone Setback—For projects that involve work only in the buffer zone, select the applicable
adjacent resource area(check one):
a. ❑ BVW b. ❑ inland bank c. ❑ coastal resource area
The distance between the closest project disturbance and the associated resource area is:
�. d.linear feet
wpaform3.doc•rev.3/29105 Page 2 of 7
Massachusetts Department of Environmental Protection Provided by DEP g ,
Bureau of Resource Protection - Wetlands
DEP Fie Number.
WPA Form 3 - Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
B. Resource Area Effects
1. Inland Resource Areas
Check all that apply below.Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction a. ❑ Bank 1.linear feet 2.linear feet
number b. ❑ Bordering Vegetated
(provided on Wetland 1.square feet 2.square feet
your receipt
page)with all c. ❑ Land Under 1.square feet 2.square feet
supplementary Waterbodies and
information you Waterways 3.cubic yards dredged
submit to the d. ❑ Bordering Land
Department. Subject to Flooding 1.square feet 2.square feet
3.cubic feet of Flood storage lost 4.cubic feet of Flood storage replaced
e. ❑ Isolated Land Subject
to Flooding 1.square feet
2.cubic feet of flood storage lost 3.cubic feet of flood storage replaced
South River
f. ® Riverfront area
i.Name of Waterway(if available)
1.Width of Riverfront Area (check one):
❑ 25 ft. - Designated Densely Developed Areas only
'� ❑ 100 ft. -New agricultural projects only
® 200 ft. -All other projects
2.Total area of Riverfront Area on the site of the proposed project: 11,900
Square Feet
3. Proposed alteration of the Riverfront Area:
750 (temporary) 290 (temporary) 460 (temporary)
a.Total Square Feet b.Square Feet within 100 ft. c.Square Feet between 100 ft.and 200 ft.
4. Has an alternatives analysis been done and is it attached to this NOI? N Yes❑ No
5.Was the lot where the activity is proposed created prior to August 1, 1996? N Yes❑ No
wpaform3.doc•rev.3/29/05 Page 3 of 7
1
Massachusetts Department of Environmental Protection Provided by DEP i
Bureau of Resource Protection - Wetlands
DEP File Number,
WPA Form 3 - Notice of Intent `
(, Document Transaction Number,
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
r. City/Town
B. Resource Area Effects
2. Coastal Resource Areas:
Check all that apply below. Attach narrative and supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
number
(provided on b. ❑ Land Under the Ocean 1.Square feet
your receipt
page)with all 2.Cubic yards dredged
supplementary Indicate size under Coastal Beaches and/or Coastal Dunes
information you c. ❑ Barrier Beach below
submit to the
Department. d. ❑ Coastal Beaches 1.Square feet 2.Cubic yards beach nourishment
e. ❑ Coastal Dunes 1.Square feet 2.Cubic yards dune nourishment
'! f. ❑ Coastal Banks 1.Linear feet
g. ❑ Rocky Intertidal Shores 1.Square feet
h.❑ Salt Marshes 1.Square feet 2.Sq it restoration,rehab.,or creation
i. ❑ Land Under Salt Ponds 1.Square feet
2.Cubic yards dredged
j. ❑ Land Containing
Shellfish 1.Square feet 2.Square feet restoration,rehab.
k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1.Cubic yards dredged
i. ® Land Subject to Coastal <750 sq.ft
Storm Flowage 1.Square feet
3. Limited Project:
Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR
10.24 or 310 CMR 10.53?
a. ❑ Yes ® No If yes, describe which limited project applies to this project:
rb.Limited Project
wpaform3.doc•rev.3/29/05 Page 4 of 7
Massachusetts Department of Environmental Protection Provided by DEP —°
Bureau of Resource Protection - Wetlands a
DEP File Number a
WPA Form 3 — Notice of Intent
Document Transaction Number,
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 _Salem
City/Town
C. Bordering Vegetated Wetland Delineation Methodology
Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary:
Online Users: t. ❑ Final Order of Resource Area Delineation issued by Conservation Commission or DEP
Include your (attached)
document
transaction z. ❑ DEP BVW Field Data Form(attached)
number
(provided on 3. ❑ Final Determination of Applicability issued by Conservation Commission or DEP(attached)
your receipt
page)with all 4. ❑ Other Methods for Determining the BVW Boundary(attach documentation):
supplementary
information you a. ❑ 50%or more wetland indicator plants
submit to the
Department. b. ❑ Saturated/inundated conditions exist
c. ❑ Groundwater indicators
d. ❑ Direct observation
For all projects
affecting other e. ❑ Hydric soil indicators
Resource
Areas, please f. ❑ Credible evidence of conditions prior to disturbance
attach a
narrative 5. Other resource areas delineated:
explaining how D. Other Applicable Standards and Requirements
the resource Pp q
area was
delineated. 1. Is any portion of the proposed project located in estimated habitat as indicated on the most recent
Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and
Endangered Species Program?
j� a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
2003 Atlas, 2005 Route 135, North Drive
revisions Westborough, MA 01581
2. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a.❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to:
Division of Marine Fisheries-Southeast Marine Fisheries Station
50A Portside Drive
Pocasset, MA 02559
b. ❑ Not applicable—project is in inland resource area only
1 3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a. El Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP
Website for ACEC locations). Note: electronic filers click on Website.
b.ACEC
wpaform3.doc•rev.3/29/05 Page 5 of 7
Massachusetts Department of Environmental Protection Provided by DEP
Bureau of Resource Protection - Wetlands DEP File Number
(� WPA Form 3 - Notice of Intent = X
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem Document Transaction Number:
City/Town
D. Other Applicable Standards and Requirements
Online Users: 4. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Include your Restriction Act(M.G.L. c. 131, §40A)or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)?
document
transaction a. ❑ Yes ® No
number
(provided on
' your receipt 5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the
page)with all wetlands regulations, 310 CMR 10.00.
supplementary
information you a. ❑ Yes ® No If yes, describe which exemption applies to this project:
submit to the
Department. b.Exemption
6. Is this project subject to the DEP Stormwater Policy? a. ❑ Yes ® No
If yes, stormwater management measures are required. Applicants should complete the Stormwater
Management Form and submit it with this form.
b. If no, explain why the project is exempt:
No new impervious surfaces will result from this project.
E. Additional Information
Applicants must include the following with this Notice of Intent(NOI). See instructions for details.
Online Users:Attach the document transaction number(provided on your receipt page)for any of
the following information you submit to the Department.
1. ® USGS or other map of the area (along with a narrative description, if necessary)containing
' sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. ® Plans identifying the location of proposed activities(including activities proposed to serve as
a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative
to the boundaries of each affected resource area.
3. ❑ Other material identifying and explaining the determination of resource area boundaries
-� shown on plans(e.g., a DEP BVW Field Data Form).
4. 0 List the titles and dates for all plans and other materials submitted with this NOI.
5. ❑ If there is more than one property owner, please attach a list of these property owners not
' listed on this form.
6.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
a. ® Attach NOI Wetland Fee Transmittal Form
9. ❑ Attach Stormwater Management Form, if needed.
wpaform3.doc•rev.3/29/05 Page 6 of 7
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/TownF. Fees
The fees for work proposed under each Notice of Intent must be calculated and submitted to the
Conservation Commission and the Department(see Instructions and NOI Wetland Fee Transmittal
Form).
No filing fee shall be assessed for projects of any city,town, county,or district of the Commonwealth,
federally recognized Indian tribe housing authority, municipal housing authority,or the Massachusetts
Bay Transportation Authority.
Applicants must submit the following information(in addition to pages 1 and 2 of the NOI Welland
Fee Transmittal Form)to confirm fee payment
1.Municipal Check Nu 2.Check date I
P `�T` 3)mil�l l
3.State Che�ck Nwnbennr 4.Check date
5.Payor name oncheck:First Nana] 6.Payor name on check:Last Name
G. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying
plans,documents,and supporting data are true and complete to the best of my knowledge. I understand
that the Conservation Commission will place notification of this Notice in a local newspaper at the
expense of the applicant in accordance with the wetlands regulations,310 CMR 10.05(5)(a).
_ I further certify underpenalties of perjury that all abutters were notified of thisapplitxtion, pursuant to the -••• ••• ••
requirements of M.G.L.c. 131,§40. Notice must be made in writing by hand delivery or certified mail
(retur
n all abutters within 100 feet of the property line of the car ' location.
Date
Sig re of r frf rent) Date 2
111
tion Comtom iss(ion:
) J Date
FwCe
To ofth ce u
Of Intent(Form 3), Including supporting plans and documents;two copies
of pages 1 and 2 of the NOI Welland Fee Transmittal Form;and the cIty/town fee payment must be sent to the
Conservation Commission by certified mail or hand delivery.
For DEP:
_ One copy of the completed Notice of Intent(Form 3), including supporting plans and documents;one copy of
pages 1 and 2 of the NOI Wetland Fee Transmittal Form;and a copy of the state fee payment must be sent to
the DEP Regional Office(see Instructions)by certified mail or hand delivery.(E-filers may submit these
electronically.)
Other:
If the applicant has checked the"yes"box in any part of Section D,-Item 3,above, refer to that section and the
Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely
' manner may result in dismissal of the Notice of Intent.
wparorm3.doc•rev.3/29105 Page 7 of 7
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important: A. Applicant Information
When filling out
forms on the 1. Applicant:
computer, use
only the tab Joshua Holden National Grid
key to move a.First Name b.Last Name c.Company
your cursor- 170 Medford Street
do not use the d.Mailing Address
return key. Malden MA 02148
e.City/Town I.State g.Zip Code
uD 781-388-5555
h.Phone Number
2. Property Owner(if different):
Massachusetts Electric Co.
a.First Name b.Last Name c.Company
25 Research Drive
d.Mailing Address
Westborough MA 01582
e.Cityfrown f.State g.Zip Code
h.Phone Number
3. Project Location:
89 Lafayette Street Salem
a.Street Address b.CiVTown
To calculate B. Fees
filing fees, refer
to the category Notice of Intent(Form 3)or Abbreviated Notice of Intent(Form 4):
fee list and
examples in the The fee should be calculated using the following six-step process and worksheet. Please see
instructions for
filling out WPA Instructions before filling out worksheet.
Form 3(Notice of
Intent). Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and
bufferzone.
Step 2/Number of Activities: Identify the number of each type of activity.
Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the
instructions.
Step 4lSubtotal Activity Fee: Multiply the number of activities (identified in Step 2)times the fee per
category (identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a
Riverfront Area in addition to another Resource Area or the Buffer Zone,the fee per activity should be
multiplied by 1.5 and then added to the subtotal amount.
Step 5frotal Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract
$12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50,
Wpform3 dot•N01 wetland Fee Transmittal Form•rev.31105 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Fees (continued)
Step 1/Type of Activity Step 2/Number Step Step 4/Subtotal Activity
of Activities 3/Individual Fee
Activity Fee
2j 1 $500.00 $500.00
' Riverfront Area multiplier x 1.5 $250.00
Step 5rrotal Project Fee:
Step 6/Fee Payments:
r, Total Project Fee: $750.00
a.Total fee from Step 5
State share of filing fee: $362.50
b. 1/2 total fee less$12.50
City/Town share of filling fee: $387.50
c. 1/2 total fee plus$12.50
C. Submittal Requirements
a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee,
payable to the Commonwealth of Massachusetts.
Department of Environmental Protection
Box 4062
Boston, MA 02211
b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent;
a copy of this form; and the city/town fee payment.
c.) To DEP Regional Office(see Instructions): Send a copy of the Notice of Intent or Abbreviated
' Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of
Intent may submit these electronically.)
Wpaform3 doc•N01 Welland Fee Transmittal Foen•rev.WV05 Page 2 of 2
i
", °�' x' €s' ^;. 5f .�I `I'iFleet'Bank rf , s r sg .: x� , fsfl-'�' s-
'+a ,`Psl11SRC r rat�nn -* -a € Gbnnecacul-: r :, �.r�1P. � � �39, .7*7 r
..,�� .t �� `-
G c"2'1'eehnulogyParkDnve -
� -- AUt>86 P"' } 03/01120D6 t
.»..v .'j ,o,. a i L *ua. �� „a1 si3.a w-Zs 6t x i#, azz-c V .w' �' F 4 v L wwX��"
M2 9
�£� v +b+ gi` F' `x`�,je�:3jk`�"-��Yi' "� 'P .:€ `" G°.,. a, t
"� 'i, s#�:E„e` '' _+^� Fi3 s } i,' su '
y�h /�R rr3r t� sc..rq$g y�r $-P `�YS SQ�Cxs^'S4.zv yi- zs^r-
se � ,u-4 i •� � Lx i +eM '� a t fl g - y„ Yold Afler9Q Days.
igg
. 4a s*'-9-r »s#»;.. k€ =v ,�a `& € h ...., {
['z ui flz
CI NE Ct OF SAM M —
SVIM U a 4 , 4 e S-d i{ „�T�...
s w QAI$FR AT iI?J CQIT
- IL i 3
At
M1^s8-' NSt 2 iltGi DR
[ 7 Af wa
as zti P+s a f �--
01
:a2e,�
� a QRR' �.0iDfl445l� a6751ai�� it € r ?f .� " ,
- .,,r k CJI�G VTo " 31572a
s 1s xt _ C6nneMCUY
);+ .�(IXpTai1011 -rq a �# , f isa �53=44fi19 � i -E 9 �� 3i
a'ech"rtL' igy`Park`bt-iie f #_ �� '
c .'TilIqs. y t s H 3 03f07{200�; ,
t _ 4 w t # n 9 @ t 1 £
- tn
F
3ai`s,.. j«g.x ^a
rx
$ "3i fi2.50 E
5
r PAY �7���sCrt�;7a� �vtlGbs�°[lan�.
Tsai
-s
z= N"R <k"'#•.m y ra ,_ �,,v"'r# s "'"" t4,..a F� St b '�i ���i� f*
. x riT
s ,"ka.-w
M dk- '3#k. T=-�-
-S+ YIITi#'� S' n YR A S akt" "ak
SflrTtlE €C(yMMOyYJtFA1 TH OF(QIASSACHItSTTS s}r " -
[ OE2DER"
DEP
BOSTON Mik 022
IT
A t u■ i395g72u� is =ZL9DD�,45�' 67x. NS4
}
� r;s. �• � �S � ,.wm�,� *�"' 4 < � 8 ys,..;.at q s-< wx e _r, �, . '�g v�-.--b __ �_� a . r., n .. . ..
i
i
1
' ENSR AECOM
r
III
1
ATTACHMENT A
PROJECT NARRATIVE
1
1
r
i
r
ENSR AECOM
1.0 INTRODUCTION
Massachusetts Electric Company, dba National Grid (Grid), is planning to install an electrical switchgear within
an easement located alongside the Beverly Cooperative Bank at 89 Lafayette Street in Salem, Massachusetts
(see Figure 1). The proposed work includes the removal of two oil-filled transformers in existing manholes
within Lafayette Street, installing approximately 275 linear feet of conduit, and installing an above-ground
electrical switchgear. This project is proposed by Grid to replace older, oil-filled equipment.
Although the proposed switchgear installation will be conducted in uplands in its entirety, a Notice of Intent is
required to permit activities occurring within the 100-foot Buffer Zone of Coastal Bank of the South River (310
CMR 10.30). No work will be conducted affecting the South River or within Coastal Bank.
A portion of the proposed work is located within Filled Tidelands and is subject to the jurisdiction of 310
CMR 9.00 (Chapter 91 Waterways Regulations). Grid is requesting a Minor Modification from MA DEP's
Waterways Department in accordance with existing Chapter 91 Waterways Licenses for the site.
Pursuant to 310 CMR 10.58(6)(i):
Structures and activities subject to a M.G.L. c. 91 waterways license or permit, or authorized prior to
1973 by a special act, are exempt, provided the structure or activity is subject to jurisdiction and obtains a
license,permit or authorization under 310 CMR 9.00.
As a portion of the project is subject to jurisdiction of M.G.L. c. 91 and Grid is requesting authorization
under 310 CMR 9.00 in the form of a Minor Modification, the portion of work located within Riverfront
Area is exempt from the requirements for Riverfront Area.
1-1 March 2006
National Grid—Salem SwitchgearN01.
ENSR AECOM
1
2.0 Existing Conditions
2.1 Wetland Resource Areas
2.1.1 Wetlands Resources
The Grid easement and the Beverly Cooperative Bank are located west of the South River. The South River,
a tidal river, terminates at the site and is entirely confined by a concrete and stone sea wall at this location.
' The site was inspected by an ENSR Wetland Scientist on November 29, 2005. The resource areas observed
at the site included Riverfront Area, Land Under the Ocean, Coastal Bank, and Land Subject to Coastal Storm
Flowage. Due to the presence of a seawall confining the South River channel and high pedestrian traffic in the
area, the limits of Coastal Bank were not hung with sequentially numbered flagging. These resource areas
and associated buffer zones are indicated on Figure 4 in Attachment B.
2.2 Soils
According to the Soil Survey of Essex County, Massachusetts, Southern Part(USDA, SCS, 1984), the area of
proposed work is categorized as Urban Land (Ur). Urban lands are soils that have been altered or obscured
by urban works and structures. The properties of these soils are highly variable.
2.3 Floodplain
The Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) for the City of
Salem indicates that the base flood elevations for the South River (Land Subject to Coastal Storm Flowage
(LSCSF)) at the site is mapped at 10 feet NGVD 1929 (Figure 2). A portion of the conduit and the switchgear
will be located within LSCSF. However, as the work will be conducted below-grade, the work area will be
restored to grade, and the project will not result in a net loss of flood storage.
2.4 Rare Species
Review of the 2003 Massachusetts Natural Heritage and Endangered Species Program Atlas and the 2005
Priority Habitat mapping revisions (Figure 3)indicates that the project site is not within or adjacent to any areas
listed as Priority Habitats of Rare Species or Estimated Habitats of Rare Wildlife and Certified Vernal Pools.
r
r
1 National Grid—Salem Switchgear NOI 2-1 March 2006
Imo► rrw imam r ae M M M go M M
IY Lf 5 a T A 'l 'f
=t1E}I
' 'b
e �e i is H RRIF tl .� 2 m`O 5r.45 -
APPROXIMATE SCALE
t
-
�C, 500 O 500 FC['f
K
f Y l 9 y 1
'Z ZONE
NATIONAL FLOOD INSURANCE PROGRAM
.r rrE r_ P<
3 ;4Nil
s r SA9 EFA ZONE C o
m s
m\ sA ?ti SALEM COMMON v FIRM
FLOOD INSURANCE RATE MAP
\ 4 SOUT `9y
VI 50 P9 C>
(n A WA H1N �� 90 O
_ � O
— " — —� CITY OF w
eH/5 SALEM, M
MASSACHUSETTS r
E�Y�—lye T / `t m 9Z Al Z T
zI w�' �i i N F E33EX COUNTY m 0 T
r o "cmm sAv 3 "�.S d O C
PANEL 1 OF 5 `D O x m
N
EET�_�r IEEE MAP INDEX FOR PRNEl6 NOT PpINTEDI y yy
G C N N
-' cH �� , s ✓ t�, CD
t
�
'n1
�� t VMMUNITY-PANEI NUMBER
O E A�
J 1 4 t \ q
?50102 0001 B ,
MAPRE9ISEU.
AUGUST5,1985
ZONE B, mC — — m ZONE C
---- —
ZONE A4 Federal Emergency Management A enc
This is an official copy of a portion of the abow referenced flood map. It
vets extracted using F-MIT On-tine. This map ticea not reflect changes
r amendments which may haw been made subsequent to the date on the
title black. For the latest product mbrmaton about National Flood Insurance
Program flood maps check the FEMA Flood Map Store at vrww.msc fema.gov
5
\\Legend
- - �
M1 Habitats
aNk
t SFr E y
F
t., t • ,�y,,r�
wj- -
'''" fj r.�'i�` a ��P'9 i e • ��.. w.1 '3 t
vy
r
AIM '
USGS Topographic
F 1`fa r."^ a ,.� 1 .+�.d. to [ S �� 2� •
{�•jts;;..4YV 4V�t# } {..P F h 1 � .� p?�r� 'h ,ice A"' �+.y �l
e
•p t•� �Y � i5fi- 9 1 !
g • y_ 5 - y 'k .aW� +�
Quadrangle • • • '
Salem,MA
1 • • •
s•
Meters
• _ •_
1 975 1,300
Feet
500 1,000 2,000 3,000 4,000
ENSR ( AECOM
3.0 Description of Proposed Activities
The proposed activities at 89 Lafayette Street will include the installation of approximately 275 feet of concrete-
encased conduit and the installation of an electrical switchgear. This work will be partially conducted within the
buffer zone of Coastal Bank and within Riverfront Area and Land Subject to Coastal Storm Flowage of the
South River, as illustrated on the attached plans (Attachment B). This section provides general details of
construction methodology, temporary impacts and an alternatives analysis for work within Riverfront Area.
3.1 Construction Methodology
Currently, two manholes located within Lafayette Street contain oil-filled transformers. Grid is proposing the
removal of these transformers and their replacement with an above-ground switchgear. The switchgear
consists of a metal-clad cabinet measuring approximately 5 ft by 5 ft 7 inches and will be mounted on a
concrete pad measuring 5 ft 6 inches by 6 ft along the southern limits of a Grid easement located adjacent to
the Beverly Cooperative Bank (see Figure 4). Grid is proposing the installation of duct banks to connect
' electrical components within the manholes to the new switchgear. Two duct banks will be installed that will
each contain four 4-inch PVC conduits and will be encased in concrete. These two duct banks will span east
across Lafayette Street from the existing manholes to the bank driveway where they will be joined. The duct
banks will span approximately 50 to 75 feet across Lafayette Street before joining. Where joined, the duct
bank will be installed approximately 130 feet east and will terminate at the proposed switchgear. This portion
of the duct bank will contain eight 4-inch PVC conduits encased in concrete. The duct bank excavation will be
up to four feet wide and not more than four feet deep.
Placement of these features will take place within the existing Grid easement between Lafayette Street and the
South River basin. Mechanical backhoes or excavators will be used to excavate the duct bank trench to the
desired dimensions. Once the trench has been completed along a specific reach of the alignment, the conduit
will be placed in the trench, encased in concrete, and covered with a minimum depth of 30 inches of clean fill.
All open excavations will be covered prior to the completion of each workday, and excess excavated material
generated will be transported off-site. Grid will properly dispose of surplus fill excavated, removed, or in
connection with its proposed work in compliance with applicable laws, including the provisions of 310 CMR
40.0460 (URAM)of the Massachusetts Contingency Plan to the extent they are applicable.
All areas of disturbed soil will be backfilled to pre-construction grade. The portion of the duct bank installation
' within Lafayette Street and the paved Beverly Cooperative Bank parking lot will be patched at the completion
of the installation. Where the installation occurs within grassed areas, a native upland grass seed mix will be
broadcast in an effort to expedite vegetation establishment.
To protect the wetland resource areas associated with the adjacent South River, Grid will install staked hay
bales around the portions of the duct bank within buffer zone and around the proposed switchgear location. If
necessary and as site conditions warrant, MECo is prepared to work avoiding the lunar high tides to minimize
the probability of having tidally-influenced groundwater entering the duct bank trench. Should any dewatering
be required, water will be pumped to a vacuum truck and will be disposed of properly off-site. All
sedimentation and erosion control devices will remain in place until the work area has been stabilized. The
temporary impacts associated with this project will occur in Buffer Zone, Riverfront Area, and Land Subject to
Coastal Storm Flooding. All work will be landward of the top of bank of the South River.There will be no work
conducted below the top of bank.
3-1 March 2006
National Grid—Salem Switchgear NOI
IENSR AECOM
ATTACHMENT B
PLANS AND DETAILS
i
1
1
1
� 1
' ENSRIRECOM
ATTACHMENT C
REPRESENTATIVE PHOTOGRAPHS
i
1 ENSRIAECOM
i
i
' t
1
' View of bank driveway and Grid easement, facing west
1
1
Swrtchgear location
+R�}4
View of duct bank alignment and switchgear location, facing west
1
ENSRIAECOM
a
Switchaear location
Arun��
Y
' View of switchgear location relative to the South River, facing east
r
lj Y
# 9
Representative view of the South River and seawall, facing north
ENSRIAECOM
' ATTACHMENT D
' CERTIFIED ABUTTERS LIST,ABUTTER NOTIFICATION FORM,
AND AFFADAVIT OF SERVICE
AFFIDAVIT OF SERVICE
Under the Massachusetts Wetlands Protection Act
(to be submitted to the Massachusetts Department of
Environmental Protection and the Conservation Commission
when filing a Notice of Intent)
I, Andrea M. Desilets, hereby certify under the pains and penalties of perjury that on
March 8, 2006 1 gave notification to abutters in compliance with the second paragraph of
the Massachusetts General Laws Chapter 131, Section 40, and the DEP Guide to
' Abutter Notification dated April 8, 1994, in connection with the following matter:
A Notice of Intent filed under the Massachusetts Wetlands Protection Act by
National Grid with the Salem Conservation Commission on March 8, 2006 for
installation of a duct bank and switchgear at 89 Lafayette Street (Map 34, Lot
433) in Beverly, Massachusetts.
' The form of the notification, and a list of the abutters to whom it was given and their
add sses, a4ttached this Affidavit of Service.
e Date
t
ParcellD Location Owner Co-Owner Mailing Address Citv State Zip
34-0232-0 9 PEABODY STREET BEVERLY COOPERATIVE BANK 254 CABOT STREET BEVERLY MA 01915
34-0400-0 86 LAFAYETTE STREET D P C TRUST DESCHAMPS HENRY P P O BOX 127 SALEM MA 01970
34-0415-0 90 LAFAYETTE STREET RCG 90 LAFAYETTE LLC 17 IVALOO ST SUITE 100 SOMERVILLE MA 02143
34-0416-0 82 84 LAFAYETTE STREET LAFAYETTE REALTY TRUST WEIZMANN HAIM TR 56 WINSHAW ROAD SWAMPSCOTT MA 01907
34-0430-0 73 LAFAYETTE STREET BEVERLY CO-OPERATIVE BANK 254 CABOT STREET BEVERLY MA 01915
34-0431-0 75 LAFAYETTE STREET BEVERLY CO-OPERATIVE BANK 254 CABOT STREET BEVERLY MA 01915
34-0432-0 85 87 LAFAYETTE STREET BEVERLY CO-OPERATIVE BANK 254 CABOT STREET BEVERLY MA 01915
34-0433-0 89 LAFAYETTE STREET MASSACHUSETTS ELECTRIC CO CIO PROPERTY TAX DEPT 25 RESEARCH DR WESTBOROUGH MA 01582
34-0434-0 91 LAFAYETTE STREET WENDYS OLD FASHIONED HAMBL OF NEW YORK INC P 0 BOX 256 DUBLIN OH 43017
34-0435-0 15 PEABODY STREET SALEM CITY OF SALEM MA 01970
34-0443-0 311 DERBY STREET SOUSA JEROME R JR P O BOX 224 NORTH HAMPTONNH 03862-0224
34-0444-0 315 DERBY STREET SALEM CITY OF
End of Report
1
Notification to Abutters Under the
' Massachusetts Wetlands Protection Act
In accordance with the second paragraph of Massachusetts General Laws
tChapter 131, Section 40, you are hereby notified of the following.
' A. The name of the applicant is Massachusetts Electric Company (dba National
Grid
' B. The applicant is filing a Notice of Intent with the Conservation Commission for
the municipality of Salem seeking permission to remove, fill, dredge, or alter an
Area Subject to Protection Under the Wetlands Protection Act (General Laws
' Chapter 131, Section 40).
C. The address of the lot where the activity is proposed is the Grid easement
' adjacent to the Beverly Cooperative Bank, 89 Lafayette Street, Salem,
Massachusetts (Assessors Map 34, Lot 0433).
' D. Copies of the Notice of Intent may be examined at the Salem Conservation
Commission, 120 Washington Street, 3rd Floor, Salem, MA between the hours
of 8:30am to 4:30pm Monday through Friday.
' E. Copies of the Notice of Intent may be obtained from the applicant's
representative by calling this telephone number: (978) 589-3000 x3579
' between the hours of 8:30am and 5:OOpm on the following days of the week:
Monday through Friday .
' F. Information regarding the date, time, and place of the public hearing may be
obtained from the Salem Conservation Commission by calling this telephone
number (978) 745-9595 x311 between the hours of 8:30am to 4:301)m Monday
through Friday.
NOTE: Notice of public hearing, including its date, time, and place, will be published
' at least five (5) days in advance in the The Salem Evening News newspaper.
NOTE: Notice of the public hearing, including its date, time and place, will be
posted in the City or Town Hall not less than forty-eight (48) hours in advance.
NOTE: You may also contact your local Conservation Commission or the nearest
Department of Environmental Protection Regional Office for more information about
this application or the Wetlands Protection Act. To contact DEP, call:
Central Region: (508) 792-7650 Northeast Region: (617) 654-6500
' Southeast Region: (508) 946-2700 Western Region: (413) 784-1100
About ENSR: ENSR Locations '
ENSR,an AECOM company,is a leading Alaska Azerbaijan
worldwide environmental services firm. Alabama Belgium 1
Founded in 1968,ENSR serves industrial California Bolivia
companies and government agencies with - Colorado Brazil
consulting,engineering,remediation,and Connecticut Canada
environmental health and safety solutions. Georgia England Florida China '
ENSR is a recipient of the BP HSSE Illinois France
Diamond Award,Textron Environmental Louisiana Germany
Remediation Partner in Excellence Award, Maine Ireland
and Environmental Business Journal Maryland Italy
awards. As an AECOM company,ENSR is Massachusetts Japan '
part of a global design and management Michigan Malaysia
company with 24,000 employees Minnesota Mexico
shlreli
worldwide serving the transportation, NeWHamhi
New Jersey ,PScotltland
facilities,and environmental markets. New York Thailand '
North Carolina Turkey
Ohio Venezuela
Pennsylvania -
_ Rhode Island Headquarters
South Carolina Westford '
Texas Massachusetts
Virginia USA
Washington 800.722.2440
Wisconsln
1
1
• 1
1
t
www.ensr.aeoum.com ENSR I AECOM
s
J µ + •M
IL Al,
e
Wi
ALA ii Tr"F i�.SH.GI
•
q
Legend wli
100-R Burm Zane
+ • 200-ft Riverpont Area
—?oP of Bank '- ', 4 T"atlia*
South River s �'.� Isaawen7 °1
e condullo M
existing nahholo MIS Lerov-dw 81 <4:'t2 ,+ G V
ma
proposed switchgear
Osown awr ve.q
etockPile 4 t ou!• >{4¢4,rs;ixox
r: sPwA•
•••staked hay bolas
�^ Concrete curb
Cum * 311P•it Arm tOBd euga.Ton k�`'v '
Lfj /^ g e
Concrete ^' f '•Y ti. Y`o R E
2' Landscaped Area
Pedestrian WdOcway k 7 c �' - . . t s 4�a S .,..�.: Inde
e r ¢Nannp_s.n ham Z
s S u L.. �,.�.. i i t"%{. < p 5'C w
Twee» .
0e4p 81nN L I �4 r{ s x1 . i '3 jy
I l T L Y E at Y g or
auix eiva!'r e r O r f"u ,a, '`•+
It
.2 y d
f � E
r Proposed Switchgear �p
/(/1111 Proposed 84"PVC Condults
=k L s `y 8T•g a `$
+/ i Encased In Concrete ; E](g 8 c
Proposed 44-PVC end i- or SN
Encased In Conam
Y � y
i E y
� 6
i 4EAir�p Lw _m
x
tam Latgam at t
t <'
4
y F Numee.,
4
4 Y
A
k el tedyema
A
- � Feet sn.0 Nomcor.
` 0 60 I
Design Plan
� j/T ✓ P T � 4 a'„'
d
� 11
'-
V
;�ll5q S,N
A '.�t91� si ' • •
r
e r
3Y$
g• _ ,
A t
5
d� y
� s a
mp
4�1�N Leif ./1♦�
dim ism
if
•rb •,.r 1 ,�
SN