Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
19 JUNIPER AVE - BUILDING INSPECTION (2)
Lt The Corrdtryirnwealth of Massachusetts 1 Board of Bu6dIng Regulations and Standards SPED ECFd VICES \ Massachusetts State Building Code, 780 CMR Al a " Revised Mar 2011 Building Permit Application To Construct, Repair, Renovate Or Demolijii A �� q One-or Two-Family Dwelling 8a }� This Section For Official.Use Only J Building Permit Number: Dat pplied: Building Official(Print Name) Signature L,1 bate 1 SECTION 1:SITE INFORMATION 1.1 PiP,@rtY Paris:� � 1.2 Assessors Map&Parcel Numbers / I.I a Is this an accepted st eet?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(11) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c.40,§54) 1.7 Flood Zone information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: Outside Flood Zone? Municipal❑ On site disposal system ❑ Check ifyes❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record:David McDonald Salem, MA. 01970 Name(Print) City,State,ZIP 19 Juniper Ave 978-745-6559 Doffa50@gmail.com No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ Alteration(s) ❑ 1 Addition ❑ Demolition ❑ Accessory Bldg. ❑ Number of Units_ Other ❑ Specify: Brief Description of Proposed Work'': SAsl x SU Ctzlrn S Vr'1 SECTION 4: ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials) 1.Building $ "� 5• ry I. Building Permit Fee:$ Indicate how fee is determined: 2.Electrical $ ❑Standard City/Town Application Fee ❑Total Project Costs(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $ Suppression) Total All Fees:$ 6.Total Project Cost: Check No. Check Amount: Cash Amount: $ 2 .� ❑Paid in Full ❑Outstanding Balance Due: tt to � SECTION 5: CONSTRUCTION SERVICES 5.1 \Co/n�s`trMuction Supervisor License(CSL) 0��2�' 1 �J a ' 1Q_c, —Shp`(�2�� License Numbe`r'� Expiration Date Name of CSL Holder ' v f 1 'Om aj--) _e ^ List CSL Type(see below) U No.and Street [lam` Type Description Gj T Xh , r p U Unrestricted(Buildings u to 35,000 cu.it.) =�5. �l/v✓ R Restricted 1&2 FamilyDwelling City/Towo,State,Lf M Mason ry RC Roofing Covering WS Window and Siding _ \,.' SF Solid Fuel Burning Appliances I�61J05�w's MMS0\PAV y\ ll�itUY I Insulation Telephone Email address D Demolition 5.21 'Regisfteredd Home Improvement Contractor(HIC) \,����j \1h11�0 V\`\/ \ Y l't `.^�`ar HIC Registration Number Expiration Date HIC Co�pgygy,LN,am rj-IIC,Registlan[Name No.an `tree[ -),VaAWA W Email address City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes ..........❑ No...........❑ SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize \/w\Yl t SD\�Cky- to act on my behalf, in all matters relati c to work authorized by this building permit application. (� cy,` �('I 12/03/14 Print Owner's Name(Electronic Signature) Date SECTION 7b:OWNER' OR AUTHORIZED AGENT DECLARATION By entering my name below, I hereby attest under the pains and penalties of perjury that all of the information P P p J r y contained in this application is true and accurate to the best of my knowledge and understanding. ' __ la `� -1` J Print Ownere :_a c nic Si nature)Vs or Authorized enP (Ele , Date NOTES: I. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. I42A.Other important information on the HIC Program can be found at www.mass.eov/oca Information on the Construction Supervisor License can be found at www.mass.eov/das 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" wt ti ° I A CERTIFICATE OF LIABILITY INSURANCE DATE(MMoomyr) 10/31/2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS 'CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT MARSH USA INC. NAME' 122517TH STREET,SUITE 1300 PHONENo.Ert: INC,No DENVER,CO 80202-5534 E-MAIL Attn:Denver.cerbequest@marsh.com,Fax:212.948.4381 ADDRESS: INSURE S AFFORDING COVERAGE NAICd 462738-STND-GAWUE-14-15 INSURER A:Evanston Insurance Company 35378 INSURED Vivint Solar,Inc: INSURER B:Zurich American Insurance Company 16535 Vivint Solar Developer LLC INSURER c:American Zurich Insurance Company 40142 3301 North Thanksgiving Way S INSURER D Suite 500 Lehi,UT 84043 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: SEA-002368030-08 REVISION NUMBER:0 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUER POLICY EFF POLICY UP LTR TYPE OF INSURANCE 1him 28aPOLICY NUMBER (NINIIII IMMUDOVYYYY) LIMITS A GENERAL LUBIUTY 14PKGWE00274 11/0112014 11/01/2015 EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY PREMISES Ea ocarrence $ 50,000 CLAIMS-MADE 1XI OCCUR MED EXP(Anycnepersom $ 5,000 X $5,000 Ded.BI&PD PERSONAL&ADV INJURY $ 1,000,000 GENERALAGGREGATE S 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP ADD $ 2,000,000 POLICY FX PRO- LOC $ B AUTOMOBILE LIABILITY BAP509601500 11101/2014 11/012015 E emitlentSINGLE LIMIT $ 1,000,000 JX AM.AUTO BODI LY INJURY(Per Person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS X NON-OWNED PROPERTY DAMAGE $ HIRED AUTOS AUTOS Per acdtlem A UMBRELLA UAB X OCCUR 14EFXWE00088 11/012014 11/012015 EACH OCCURRENCE $ 5,000,000 X EXCESS UAS CIAIMSMADE AGGREGATE $ 5,000,000 DED RETENTION$ S C WORKERS COMPENSATION WC509601300 11/01/2014 11/012015 WC STATU- OTH- AND EMPLOYERV LIABIUTY YIN B ANY PROPRIETOR/PARTNER/EXECUTIVE NIA WC509601400 11/01/2014 11/0114015 E.L.EACH ACCIDENT $ 1,000,000 OFFICEWMEMBER EXCLUDED? 1,000,000 (Mandatory in NH) E.L.DISEASE-EA EMPLOYE $ Vas,describe under 1,000,000 DESCRIPTION OF OPERATIONSbalow E.L.DISEASE-POLICY LIMIT $ A Errors&Omissions& 14PKGWE00274 11/012014 11/01/2015 LIMIT 1,000,000 Contractors Pollution DEDUCTIBLE 5,000 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (AttacA ACORD 101,Additional Remarks Schedule,If more space Is required) The Certificate Holder and others as defined in the written agreement ale included as additional insured where required by written contract with respect to General Liability.This insurance is primary and non- contributory over any existing insurance and limited to liability arising out of the operators of the named insured and where required by written contract Waiver of subrogation is applicable where required by written contract with respect to General Liability and Workers Compensation. CERTIFICATE HOLDER CANCELLATION Cityof Salem SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 93 Washington Street THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Salem,MA 01970 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE of Marsh USA Inc. Kathleen M.Parsloe ./ .!!u x_bt. JQ[¢!s� ©1988-2010 ACORD CORPORATION. Ali rights reserved. ACORD 26(2010105) The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts Department of Industrial Accidents o- ice of Investigations I Congress Street,Suite 100 Boston,MA 02114-2017 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/ElectriciansMumbers Applicant Information Please Print Letribly Name (Business/organization/individual): yivint Solar Developer, LLC Address: 3301 North Thanksgiving Way,Suite 500 City/State/Zip:Lehi, UT 84043 Phone #:801-377-9111 Are you an employer? Check the appropriate box: Type of project(required): 1.■ I am a employer with 10 4. ❑ I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. ❑New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g, ❑ Demolition working for me in any capacity. employees and have workers' 9 ❑ Building addition [No workers' comp. insurance comp. insurance? required.] 5. ❑ We are a corporation and its ME] Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their I LEJ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no Solar Installation employees. [No workers' 13.❑� Other comp. insurance required.] *Any applicant that checks box#1 most also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Zurich American Insurance Company Policy#or Self-ins. Liicc... 4:WC 509601300 Expiration Date: 11/1/2015 Job Site Address: I" t �U A2L2' . ONA M City/State/Zip: —S-A LQ y 1 I Attach a copy of the workers' compensate n policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct Sianature: ' Date: Phone#: 801-2296459 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: n VIVINT SOLAR DEVELOPER LLC PHILIP F ZA14PITELLA JR (EL) 4931 N 300 K PROVO UT 84604 row,nh,D.ma mmw nu wrrarwom R OMMON•W ACTH OF M LISEM • ;ACT �• a b'� ELCCTkICIA*SZ` tic t ISSUES THE FOLLOWING MERSE AS f RBD MASTE�RJL.ECTRIC[AN VIVFWT SOLAR DEVELOPER LLC PHILIP Er '1WLLA JR 4931 N_ 300 w , CVO wr 84604 —___13141 A 0713lf 101- 80 V ovo nl solar 3301 North Thanksgiving Way,Suite 500 Structural Group Leh;,UT84043 P: (801)234-7050 Scott E. Wyssling, PE Head of Structural Engineering Scott.wysslingCO vivin tso tar.com December 1,2014 Mr. Dan Rock, Project Manager Vivint Solar 24 Normac Road Woburn MA 01801 Re: Structural Engineering Services McDonald Residence 19 Juniper Avenue, Salem MA S-4067523 3.825 kW System Dear Mr. Rock: Pursuant to your request, we have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site Visit(Verification Form prepared by a Vivint Solar representative identifying specific site information including size and spacing of rafters for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information was prepared by the Design Group and will be utilized for approval and construction of the proposed system. 3. Photovoltaic Rooftop Solar System Permit Submittal identifying design parameters for the solar system. 4. Photographs of the interior and exterior of the roof system identifying existing structural members and their conditions. Based on the above information we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: Description of Residence: The existing residence is typical wood framing construction with the roof system consisting of 2 x 6 dimensional lumber at 24"on center. The attic space is unfinished and photos indicate that there was free access to visually inspect the size and condition of the roof rafters. All wood material utilized for the roof system is assumed to be Spruce-Pine-Fir#2 or better with standard construction components. Our review of the photos of the exterior roof does not indicate any signs of settlement or misalignment caused by overstressed underlying members. Stability Evaluation: A. Wind Uplift Loading 1. Refer to attached Ecolibrium Solar calculations sheet for ASCE/SEI7-10 Minimum Design Loads for Buildings and other Structures, wind speed of 100 mph based on Exposure Category "B" and 27 degree roof slopes on the dwelling areas. Ground snow load is 40 PSF for Exposure"B", Zone 2 per (ASCE/SE17-10). 2. Total area subject to wind uplift is calculated for the Interior, Edge and Corner Zones of the dwelling. vivint. so I an .a Y Page 2 of 2 B. Loading Criteria • 10 PSF= Dead Load roofing/framing 40 PSF=Live Load (around snow load) • 5 PSF= Dead Load solar panels/mountina hardware Total Dead Load=15 PSF The above values are within acceptable limits of recognized industry standards for similar structures. Analysis performed of the existing roof structure utilizing the above loading criteria indicates that the existing rafters will support the additional panel loading without damage, if installed correctly. C. Roof Structure Capacity 1. The photographs provided of the attic space and roof rafters show that the framing is in good condition with no visible signs of damage caused by prior overstressing. D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent "Ecolibrium Solar Installation Manual', which can be found on the Ecolibrium Solar website (ecolibriumsolar.com). If during solar panel installation, the roof framing members appear unstable, deteriorated, structurally compromised or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. Maximum allowable pullout per lag screw is 235 Ibs/inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications for Hem-Fir (North Lumber) assumed. Based on our evaluation, the pullout value, utilizing a penetration depth of 2 '/2", is less than what is allowable per connection and therefore is adequate. Based on the variable factors for the existing roof framing and installation tolerances, using a thread depth of 2 1/2" with a minimum size of 5/16" lag screw per attachment point for panel anchor mounts should be adequate with a sufficient factor of safety. 3. Considering the roof slopes, the size, spacing, condition of roof, the panel supports shall be placed at and attached to no greater than every other roof rafter as panels are installed perpendicular across rafters and no greater than the panel length when installed parallel to the rafters (portrait). No panel supports spacing shall be greater than two (2) rafter spaces or 48" o/c, whichever is less. 4. Panel supports connections shall be staggered to distribute load to adjacent rafters. Based on the above evaluation, it is the opinion of this office that with appropriate panel anchors being utilized the roof system will adequately support the additional loading imposed by the solar panels. This evaluation is based on information supplied to us at the time of this report and current industry standards and practices. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. Ve truly yours, SH OF �Cy 2� E f V y CIVI Scott E. Wysst PE 0 50 MA License N . 50 9oF FGISTEQ� FSSfONA- vivi t. s o l a r 4 10 U 19 Juniper Ave, Salem MA 01970 A JUNCTION BOX ATTACHED TO N m m ARRAY USING ECO HARDWARE TO Na'o m KEEP JUNCTION BOX OFF ROOF Ld— Oo PV SYSTEM SIZE: a I 3.825 kW DC p N I I I m PV INTERCONNECTION POINT, o, m LOCKABLE DISCONNECT SWITCH, ANSI METER LOCATION, I n ) g m $ a &UTILITY METER LOCATION 0 G w U m I N Q 45'OF 1"PVC CONDUIT > u FROM JUNCTION BOX TO ELEC PANEL z w w z w z _______ _______� FF � 3 n n < �a ? ? f o SHEET NAME: wg (15)Yinoli Enemy YL255P-29b MODULES WITH A a Enohase M215-60-2LL-S2x-ZC MICRO-INVERTER MOUNTED ON THE BACK OF EACH MODULE SHEET NUMBER: PV SYSTEM SITE PLAN 4 Ek -_ SCALE: 3/32"= T-0" d m m z ti N rJ H b Z b\N\W1,\\\\,m D U� 2� m< z m O� m m o0 < a c 0 my w� A A 000 _y O �n O N D � r Cn m -< Cn °= m o X 9 O O z m r D Z ;= INSTALLER VIVINTSO AR as . �{ McDonald Residence PV2.0 p ROOF my MA LICENSE:MAHC170MB4044129 V5AnI5o � l SaemuMAr01970 PLAN DRAWN BY:Jerry S AR 4067523 ast Mo lified:11/17/2014 ( i UTILITY ACCOUNT NUMBER:87926-57015 CLAMP MOUNTING c N SEALING PV3.0 DETAIL WASHER - LOWER "mw SUPPORT ® �c � P.m �°dz PV MODULES, TYP. MOUNT `4"'"^ ""`" O C a OF COMP SHINGLE ROOF, FLASHING O < PARALLEL TO ROOF PLANE C 2 1/2" MIN U 5/16"0 x 4 1/2" 1.� MINIMUM STAINLESS fT'L PV ARRAY TYP. ELEVATION STEEL LAG SCREW V NOT TO SCALE TORQUE=1322 ft-Ibs 0 CLAMP ATTACHMENT (!) NOT TO SCALE , N CLAMP+ ATTACHMENT CANTELEVER L/4 OR LESS *G COUPLING J L=PERMITTED CLAMP ECO SPACING SEE CODE COMPLIANT COMPATIBLE LETTER FOR MAX ALLOWABLE MODULE CLAMP SPACING. Q 0 � PERMITTED COUPLINGCLAMP+ 5 m_ a ATTACHMENT CLAMP CLAMP °m d < SPACING w E N COUPLING PHOTOVOLTAIC MODULE F < a w w z m w z Z Z Q mt77 SHEET NAME: L=PORTRAIT CLAMP SPACING Z 0LU ECO 2 LU p COMPATIBLE SHEET L=LANDSCAPE MODULE PV SYSTEM MOUNTING DETAIL NUMBER: CLAMP SPACING s (MODULES IN PORTRAIT/LANDSCAPE NOT TO SCALE 1 M NOT TO SCALE > Inverter Ratings(Guide Section 4) O Conduit and Conductor Schedule !, Inverter MakWMWeI Eaphase M215E0$1-L$ -ZC I Tog nempicn wia Cwpe #WConducbn Condon Type capi+a've ati MODULE DETAIL Max DC Volt Rng as VoM Max power®40•C 215 Want t spacesengege vde-TnwWo tz AwG 4 NrA-FreaAi, V Neminal ACVdt". 240 Vans 1 one Caper Gai FCesse.) a.. 1 WA-Free Air NIA-Free A. ^ opYingh Energy YL255P-29b Max AC cures tie Amps z Inwril +o. a c a.r ` m SOLAR MODULE Max OCPD Rating 20 KWP g T ,Ns-e,W,a 9AwG we 0'r be Number of PaneWLiru+it 1'/ a THWW3 aAWG g PVC 0'1' m NOTES FOR INVERTER CIRCUITS(Guide S a and 9l: a Ta N+ rm-G .+e aAwc t Pvc o'-r ^�` 1 ection m W Qom 1.)IF UTILITY REOUIRESA VISIBLE-BREAK SWITCH,DOES THIS PV Module Ratin s STC Guide Sections �m<m Emphasis M215-60-2LLS2x-2C SWITCH MEET THE REQUIREMENTS? 9 @ ( ) a,i _ MICRO-INVERTER AT YES NO XNA Model MakelMotlel Yingll Energy YL255P-29b -�'�7 >s a EACH MODULE,ATTACHED Max Power-Pcint Current('up) Bax Amps aep z WITH ECO HARDWARE 2.)IF GENERATION METER REQUIRED,DOES THIS METER Max PowerPoint Voltage lVmp) 30.fi Volts �Om wO SOCKET MEET THE REQUIREMENTS? OpenCircult Volage(Voc) 38.7 Volts � U YES NO XNq ShpdCircuit Current(in) BBB Amps O < 3)SIZE PHOTOVOLTAIC POWER SOURCE(DC)CONDUCTORS Max Series Fuse(OCPD) 15 Amps Q BASED ON MAX CURRENT ON NEC 690.53 SIGN OR CCPD Nominal Maximum Power at STC(Paul 255 Wafts MICROINVERTER CONNECTION _ RATING AT DISCONNECT. Maximum System Volage R00nECy600(UL) V j TO ENGAGE TRUNK CABLE 4.)SIZE INVERTER OUTPUT(AC)CONDUCTORS ACCORDING Vpp Temperature Coefficient -0.32 %PC C ^ TO INVERTER OCPD AMPERE RATING(See Guide Sari 9). G V 5.)TOTAL OF 1 INVERTER OCPDIs).ONE FOR EACH NOTES FOR ARRAY CIRCUIT WIRING IGUIde Sector 6 antl 0 and Amountlix of: W CIRCUIT.DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120%BUSBAR EXCEPTION IN 1.)Lowest expected ambient temperature based on ASHRAE minimum mean extreme k6 BARE CU GROUND NEC590.64(8)(2)(a)? RYES NO dry bulb temperature for ASHRAE location most similar to installation location: -19-C (GROUNDING ARRAY) Signs(See Guide Section 7) 2.)Highest continuous ambient temperature based on ASHRAE highest month 2%dry bulb temperature for ASHRAE location most similar to insta0atlon location: 39-C n �, Sign for inverter OCPD and AC Disconnect: 3.)2005 ASHRAE fundamentals 2%resign temperatures do not exceed 47-C in the United States(Palm Springs,CA is 44.1-CL For less than 9 currentcanui ng canductors Solar PV System AC Point of Connection in roofmounted sunlit conduit al least es'above roof and using the outdoor design AC Output Current 13.50i)i100 Amps temperature of 47•C or less(all of United States). Nominal AC Voltage 2401 Volts T)12 AWG,90-C conductors are generalty acceptable for modules with Inc of 7.68 Amps fro or less when protected by a 12-Amp or smaller fuse. THIS PANEL ILI BY AND S2PLEBOURCES IT)10 AWG.90-C conductors are general) acceptable for modules with Isc of 9.6 Amps(UTILITY AN060lAR) YP or less when protectedb a 1 SoAmp or smaller fuse. NOTE: NEUTRAL CONDUCTOR(S)OMITTED FOR CLARITY .�C ALL INVERTER OUTPUT CIRCUITS WILL HAVE A NEUTRAL CONDUCTOR � J to ENVOY BOX a '. m m 3 ey RWP Nal KO � N < ti Z POINT OF DELIVERY ' w ac at \yaPo SIEMENS AND INTERCONNECTION ¢ < m \Gd'GZ MURRAY 60A/240V )' O F p UNFUSED NEMA3 M ? ? f ep ❑ � COMBINER LNF222R OR PV CIRCUIT 1: 15 MODULESIPARALLEL 0\0\ PANEL 125A/240V SREC/ANSI EQUIVALENT SHEET f.FG O•o\P!, LWO04NR METER NAME: \�O JAWA EXISTING �< OR EQUIVALENT 240V/100A w 2' "SPLICE \ 15 LOAD-CENTER ZUr20A � OSHEET " NUMBER: MILBANK VISIBLE/LOCKABLE 1 pJUNC3 1ODA OR 3 'KNIFE'A/C 3 WITH EQUIVALDISCONNECT NEC 2014 Compliant GROU E 1.0 U5934-XL-BLG E 1.0 E 1.0 Il.l Vivint Solar - PV Solar Rooftop System Permit Submittal 1. Project Information Project Name: DOROTHY MCDONALD Project Address: 19 JUNIPER AVE,SALEM MA A.System Description: The array consists of a 3.825 kW DC roof-mounted Photovoltaic power system operating in parallel with the utility grid.There are (15) 255-watt modules and(15)215-watt micro-inverters,mounted on the back of each PV module.The array includes (1) PV circuit(s).The array is mounted to the roof using the engineered racking solution from EcoEbrium Solar. B.Site Design Temperature: (From Boston Logan INT'L ARPT weather station) Average low temperature: -21.1 °C (-5.98 OF) Average high temperature: 38.4°C (101.12 OF) C. Minimum Design Loads: Ground Snow Load: 40 psf (State Board BR&S) Design Wind Speed: 100 mph (State Board BR&S) 2. Structural Review of PV Array Mounting System: A.System Description: 1.Roof type: EcoX Comp. Shingle 2.Method and type of weatherproofing roof penetrations: Flashing B. Mounting System Information: 1.Mounting system is an engineered product designed to mount PV modules 2.For manufactured mounting systems, following information applies: a.Mounting System Manufacturer: Ecollbrium Solar b.Product Name: Eeorall c.Total Weight of PV Modules and mounting hardware: 631.6 Ibs d.Total number of attachment points: 34 e.Weight per attachment point: 18.57 Ibs f.Maximum spacing between attachment points: * See attached engineering calcs g.Total surface area of PV array: 263.76 square feet h.Array pounds per square foot: 2.39 Ibs square foot i.Distributed weight of PV array on roof sections: -Roof section l: (15)modules,(34)attachments 1857 pounds vivint. solar 4� 41 3. Electrical Components: A. Module (UL 1703 Listed) Qty Yingli Energy YL255P-29b 15 modules Module Specs Pmax-nominal maximum power at STC - 255 watts Vmp-rated voltage at maximum power - 30 volts Voc-rated open-circuit voltage - 37.7 volts Imp-rated current at maximum power - 8.49 amps Ise-rate short circuit current - 9.01 amps B. Inverter (UL 1741 listed) City Enphase M215-60-2LL-S22 15 inverters Inverter Specs 1. Input Data (DC in) Recommended input power(DC) - 260 watts Max.input DC Voltage - 45 volts Peak power tracking voltage - 22V-36V Min./Max.start voltage - 22V/45V Max.DC short circuit current - 15 amps Max.input current - 10.5 amps 2. Output Data (AC Out) Max.output power - 215 watts Nominal output current - 0.9 amps Nominal voltage - 240 volts Max.units per PV circuit - 17 micro-inverters Max. OCPD rating - 20 amp circuit breaker C. System Configuration Number of PV circuits 1 PV circuit 1 - 15 modules/inverters (20) amp breaker 2011 NEC Article 705.60(8) vivant. L3 o la r Pi D. Electrical Calculations 1.PV Circuit current PV circuit nominal current 13.5 amps Continuous current adjustment factor 125% 2011 NEC Anicic 705.60(B) PV circuit continuous current rating 16.875 amps 2. Overcurrent protection device rating PV circuit continuous current rating 16.875 amps Next standard size fuse/breaker to protect conductors 20 amp breaker Use 20 amp AC rated fuse or breaker 3.Conductor conditions of use adjustment(conductor ampacity derate) a.Temperature adder Average high temperature 38.4°C (101.12°F) Conduit is installed 1" above the roof surface Add 22°C to ambient 2011 NEC Article 705.60(B) Adjusted maximum ambient temperature 60.4°C (140.72°F) b. PV Circuit current adjustment for new ambient temperature Derate factor for 60.4°C (140.72°F) 71% 2011 NEC Article 705.60(B) Adjusted PV circuit continuous current 23.7 amps c.PV Circuit current adjustment for conduit fill Number of current-carrying conductors 3 conductors Conduit fill derate factor 100% 2011 NEC Article 705.60(B) Final Adjusted PV circuit continuous current 23.7 amps Total derated ampacity for PV circuit 23.7 amps Conductors (tag2 on 1-line)must be rated for a minimum of 23.7 amps THWN-2 (90°C) #14AWG conductor is rated for 25 amps (Use#14AWG or larger) 2011 NEC Article 705.60(B) 4.Voltage drop (keep below 3%total) 2 parts. 1.Voltage drop across longest PV circuit micro-inverters (from modules to j-box) 2.Voltage drop across AC conductors (from j-box to point of interconnection) 1.Mirco-inverter voltage drop: 0.24% The largest number of micro-inverters in a row in the entire array is 9 inCircuit 1. According to manufacturer's specifications this equals a voltage drop of 0.24%. 2. AC conductor voltage drop: =I x R x D (+240 x 100 to convert to percent) = (Nominal current of largest circuit) x(Resistance of#14AWG copper) x (Total wire run) = (Circuit 1 nominal current is 13.5 amps)x(0.00319Q) x(90� -(240 volts) x (100) 1.61% Total system voltage drop: 1.85% vivint, solar .a EcolibriumSolar Customer Info Name: Email: Phone: Project Info Identifier: 16790 Street Address Line 1: 19 Juniper Ave Street Address Line 2: City: Salem State: MA Zip: 01970 Country: United States System Info Module Manufacturer: Yingh Solar Module Model: YL255P-29b Module Quantity: 15 Array Size (DC watts): 3825.0 Mounting System Manufacturer: Ecolibrium Solar Mounting System Product: EcoX Inverter Manufacturer: Enphase Energy Inverter Model: M215 Project Design Variables Module Weight: 40.8 Ibs Module Length: 65.0 in Module Width: 39.0 in Basic Wind Speed: 110.0 mph Ground Snow Load: 40.0 psf Seismic: 0.0 Exposure Category: B Importance Factor: II Exposure on Roof: Partially Exposed Topographic Factor: 1.0 Wind Directionality Factor: 0.85 Thermal Factor for Snow Load: 1.2 Lag Bolt Design Load - Upward: 820 Ibf Lag Bolt Design Load - Lateral: 288 Ibf EcoX Design Load - Downward: 493 Ibf EcoX Design Load - Upward: 568 Ibf EcoX Design Load - Downslope: 353 Ibf EcoX Design Load - Lateral: 233 Ibf Module Design Moment— Upward: 3655 in-lb Module Design Moment—Downward: 3655 in-lb Effective Wind Area: 20 ft2 Min Nominal Framing Depth: 2.5 in Min Top Chord Specific Gravity: 0.42 � 8 i� EcolibriumSolar 'Plane Calculations (ASCE 7-10): roof 1 Roof Shape: Gable Edge and Corner Dimension: 3.0 ft Roof Type: Composition Shingle Stagger Attachments: No Average Roof Height: 30.0 ft Include Snow Guards: No Least Horizontal Dimension: 25.0 ft Roof Slope: 27.0 deg Truss Spacing: 24.0 in Snow Load Calculations Description Interior Edge Corner Unit Flat Roof Snow Load 33.6 33.6 33.6 psf Slope Factor 0.79 0.79 0.79 Roof Snow Load 26.5 26.5 26.5 psf Wind Pressure Calculations Description Interior Edge Corner Unit Net Design Wind Pressure Uplift -19.4 -31.9 -47.9 psf Net Design Wind Pressure Downforce 11.4 11.4 11.4 psf Adjustment Factor for Height and Exposure Category 1.0 1.0 1.0 Design Wind Pressure Uplift -19.4 -31.9 -47.9 psf Design Wind Pressure Downforce 16.0 16.0 16.0 psf ASD Load Combinations Description Interior Edge Corner Unit Dead Load 2.3 2.3 2.3 psf Snow Load 26.5 26.5 26.5 psf Downslope: Load Combination 3 11.8 11.8 11.8 psf Down: Load Combination 3 23.1 23.1 23.1 psf Down: Load Combination 5 11.7 11.7 11.7 psf Down: Load Combination 6a 25.1 25.1 25.1 psf Up: Load Combination 7 -10.4 -17.9 -27.5 psf Down Max 25.1 25.1 25.1 psf Spacing Results(Landscape) Description Interior Edge Corner Unit Max Allowable Spacing Between Attachments 65.6 65.6 62.7 in Max Spacing Between Attachments With Rafterf Russ Spacing of 24.0 in 48.0 48.0 48.0 in Max Cantilever from Attachment to Perimeter of PV Array 21.9 21.9 20.9 in Spacing Results(Portrait) Description Interior Edge Corner Unit Max Allowable Spacing Between Attachments 43.6 43.6 43.6 in Max Spacing Between Attachments With Rafter/Truss Spacing of 24.0 in 24.0 24.0 24.0 in Max Cantilever from Attachment to Perimeter of PV Array 14.5 1p'4.5 14.5 in i� EcolibriumSolar Layout Skirt o Coupling O Clamp Warning: PV Modules may need to be shifted with respect to roof trusses to comply with ® Bonding Jumper maximum allowable overhang. EcolibriumSolar 'Distributed Weight (All Planes) In Conformance with Solar ABC's Expedited Permit Process for PV System (EPP) Weight of Modules: 612 Ibs Weight f Mounting System: g o ou S s e 68 Ibs 9 Y Total System Weight: 680 Ibs Total Array Area: 264 ft2 Distributed Weight: 2.58 psf Number of Attachments: 34 Weight per Attachment Point: 20 Ibs Bill Of Materials Part Name Quantity ECO-001_101 EcoX Clamp Assembly 34 ECO-001_102 EcoX Coupling Assembly 16 ECO-001_105B EcoX Landscape Skirt Kit 4 ECO-001 105A EcoX Portrait Skirt Kit 1 ECO-001_103 EcoX Composition Attachment Kit 34 ECO-001_109 EcoX Electrical Assembly 1 ECO-001_106 EcoX Bonding Jumper Assembly 5 ECO-001_104 EcoX Inverter Bracket Assembly 15 ECO-001 338 EcoX Connector Bracket 15 A iN iq