Loading...
231 JEFFERSON AVE - BUILDING JACKET v^ The Commonwealth of Massachusetts '4Q Board of Building Regulations and Standards Tom Massachusetts State Building Code, 780 CMR, 7'"edition Building Dept Building Permit Application To Construct, Repair, Renovate Or Demolish a One-or 71vo-Fontily Duelling v ' This Section For Official Use Only Building Permit Number: Date Applied: Signature: c O Building Commissioner/Inspector of Buildings Date SECTION 1: SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map At Parcel Numbers I.la Is this an accepted street't. yes t/ no Map Number Parcel Number_ 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq R) Frontage(R) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§34) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Zone: _ Outside Flood Zone? Municipal ❑ On site disposal system ❑ Public❑ Private❑ Check if Xes0 SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: AhA/R 14- Gi/-1 ,,0/ J, fE�L11-W Alt game(Print) Address for Service: Signature Telephone SECTION 3: DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction❑ Existing Building 07 Owner-Occupied ❑ Repairs(s) ❑ Alteration(s) ❑ Addition ❑ Demolition ❑ Accessory Bldg. ❑ Number of Units_ I Other ❑ Specify: rief escrip[ion of Proposed Work': SECTION 4: ESTIMATED CONSTRUCTION COSTS Estimated Costs: OMelal Use Only Item Labor and Materials 1. Building $ 1. Building Permit Fee: $ Indicate how fee is determined: ❑Standard City/Town Application Fee 2. Electrical $ ❑Total Project Cost'(Item 6)x multiplier x 3. Plumbing $ 2. Other Fees: $ 4. Mechanical (HVAC) $ List: 5. Mechanical (Fire $ Total All Fees: $ Suppression) Check No. Check Amount: Cash Amount: 6. Total Project Cost: $j Q ❑ Paid in Full ❑ Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Licensed Construction Supervisor(CSL) License Number Expiration Date N.gmc of CSL- Helder r. List CSL Type(see below) Address MD !Resi"t�dcntial Descri Lion Unrstricted u to 35,000 Cu. Ft.) Signature ° Resricted I&2 FamilyDwelling Mason Onl Resdential Roo6n Coverin Telephone f Resdential Window,and Si.Am Residential Solid Fuel Burnin A liance Installation Demolition 5.2 Registered Home Improvement Contractor(HIC) HIC Company Name or HIC Registrant Name Registration Number Address Expiration Date Signature Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes .......... ❑ No........... ❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1• as Owner of the subject property hereby authorize to act on my behalf,in all matters relative to work authorized by this building permit application. Signature of Owner Date SECTION 7b: OWNEW OR AUTHORIZED AGENT DECLARATION 1, Z n A &J ,rl J9� ,as Owner or Authorized Agent hereby declare that the statements and inf, ation on the foregoing application are true and accurate, to the best of my knowledge and behalf. /V f9(.t Prynt 1 1,4 S gnature of Owner or Authorize JAgent Dat Si ned under the ains and enalties of perjury) NOTES: I. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L. c. 142A. Other important information on the HIC Program and Construction Supervisor Licensing(CSL)can be found in 780 CMR Regulations 110.R6 and 110.115, respectively. 2. When substantial work is planned,provide the information below: Total floors area(Sq: Ft.) (including garage, finished basement/attics, decks or porch) Gross living area(Sq. Ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" � 1 t CK 2-2. (ot (of� The Commonwealth of Massachusetts R CEIV�'&AL Board of Building Regulations and Standards (g S Massachusetts State Building Code,780 CMR INSPEC, USE Building Permit Application To Construct,Repair, Renovate Or Demo 1j>�a NVReiqedikatl;OU n I� One-or Two-Fancily Dwelling This Section For Official Use Only Building Permit Number: Date Applie I 1 B Building Official(Print Name) t SignatureLO ate SECTION 1: SITE INFORMATION I 1.1 Property Address: 1.2 Assessors Map &Parcel Numbers 231 Jefferson Ave 1.1a Is this an accepted street?yes no Map Nuunber Parcel Number 1.3 Zoning information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Zone: _ Outside Flood Zone? Public❑ Private❑ Check if yes❑ Municipal 13On site disposal system 11 SECTION 2: PROPERTY OWNERSHIP' 2.1 Owuer'of Record: Stephen Fiste Salem MA Name(Print) City,State,ZIP 231 Jefferson Ave 617-599-8289 No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORIer(check all that apply) New Construction❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ Alteration(s) Cl I Addition ❑ Demolition ❑ Accessory Bldg. ❑ Number of Units Other pecify: PV Solar Brief Description of Proposed Work: Installing 23 PV solar panels On root. SECTION 4:ESTIMATED CONSTRUCTION COSTS Estimated Costs: Item (Labor and Materials) Official Use Only 1.Building $2000 1. Building Permit Fee: $ Indicate how fee is determined: 2.Electrical $21000 ❑ Standard City/Town Application Fee ❑Total Project Cost (Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4. Mechanical (HVAC) S List: 5. Mechanical (Fire $ Suppression) Total All Fees: $ Check No. Check Amount: Cash Amount: 6. Total Project Cost: $23000 ❑Paid in Full Cl Outstanding Balance Due: $ lI i SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) 093115 5/14!15 Joseph Weld-Chirieo License Number Expiration Date Name of CSL Holder List CSL Type(see below) U 11 Hillcrest Ave No.and Street Type Description Seekonk MA 02038 U Unrestricted(Buildings up to 35,000 cu.ft.) R Restricted Idb2 Family Dwelling City/Town,State,ZIP M Masonry RC RooE4 Covering WS Window and Siding SFSolid Fuel Burning Appliances 401-574-6684 I 1 Imulation Telephone Email address D I Demolition 5.2 Registered Home Improvement Contractor(HIC) 170279 10/5/17 Roof Diagnostics Solar / NRG Home Solar HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 101 Constitution Blvd No.and Street Email address Franklin MA 02038 508-315-6663 Ci /Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes .........LVI No ......._.. ❑ SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Joseph Wyld-Chlrleo to act on my behalf,in all matters relative to work authorized by this building permit application. Print me(Electronic Signature) Date SECTION 7b: OWNEW OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained i this ap�py true a c ra the best of my knowledge and understanding. t'rmt Owmer s or A5tKonze A n M1 me Signature) If D.to NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L. c. 142A. Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.eov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq. ft.) (including garage, finished basement/attics,decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of halfibaths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" CCom�//' � �7xlre {` C1dJlldlC Jlt/.Jt ll �fl � fd'C(t;1,1('f'{JIC.tP'11�i OffICC of COI1SLt11lelAffairs and Business Regulation r;$ 10 Part: Plaza - Suite 5170 Boston, Massachusetts 021 16 Home Improvement Contractor Registration RegVilmlion: 170279 Tvpe: LLC Expiration: 10/512017 Trlr 269777 ROOF DIAGNOSTICS SOLAR OF MASS, LL PETER LACAMERA 2100 HIGHWAY 35 SEA GIRT, NJ 08750 Update Address and return card. )lark reason for change. Address Renewal F.Toplopment Lost (:art] SCA t C. 2061. Y11 w* On e orCmauwerAnshy s: 1lumos Rc;;u mien License or registration valid for hmHvhhd use only before the expiration date. If found return to: w•a' , .HOME IMPROVEMENT CONTRACTOR �RegWation. 170279 Type: conceorConsunter,st-mirs and Business Regulation Expiration: 10/512017 LLC 10 Park Plana - Suite 5170 - Boston. AW 02116 ROOF DIAGNOSTICS SOLAR OF MASS, I.I.C. / NRG HOME SOLAR PETER LACAMERA 2100 HIGHWAY 35 SEA GIRT, NJ 06750 ��� ! w l'adrrsrrret:n'S SEA! o�ithout signature iV. U 5}�TRU/CcTuG EKGNEEFS Y � Y October 03,2015 Mr. WissemTaboubi NRG Solar 89F Washington Ave Natick, MA 01760 RE: Fiste Residence Solar Installation 231 Jefferson Ave Salem,MA 01970 Structural Assessment of Roof Framing MPP Project No: 15-2627 Dear Mr. Taboubi: Pursuant to your request,MPP Engineers has performed a limited structural evaluation of the roof framing at the above referenced site to determine if the roof has adequate capacity to support the proposed solar panels. Our analysis was based on the framing information and configurations provided by NRG Solar. It is our understanding that the structural components of the existing roof framing are in good condition. It is further understood that all existing connections between the various roof framing members, including ceiling joists,rafters are adequate to resist the current loading conditions and behave in the manner that a typical rafter and ceiling tie is intended to behave prior to installation of the solar panels. Results East,North west, South, South west,Lower east roofs—adequate to support the proposed solar panels Structural Data and Code Information Our analysis was performed in accordance with the requirements of the 780 CMR 51.00: Massachusetts Residential Code which has adopted the 2009 International Residential Code with Massachusetts amendments. Per Table R301.2 (1), the ground snow load to be used for each town is in accordance with Table R301.2(5). Similarly,the wind speed for each town is in accordance with Table R301.2 (4). The roof framing was analyzed in accordance with Section R104.11 of the of the 2009 International Residential Code which allows for alternate approved design such as using the ASCE 7 code for determining actual snow loads on roofs(e.g. deriving flat or sloped roof snow loads from the specified ground snow load referenced in Table R301.2(5)). Wood members were analyzed and designed in accordance with the NDS 2005. The roof area for the solar panels of this residence is framed in a gable configuration with conventional 2x roof rafters.Roof framing details available have been considered the same for all roofs as per information MPP Engineers, LLC 1 34 South Main Street, Suite D I Allentown,NJ 08501 609-489-5511 (office) I www.mooengineers.com 1 609-489-5916(fax) Fiste Residence Solar Installation 231 Jefferson Ave Salem, MA 01970 provided by NRG Solar. The existing roof structure is in good condition and is assumed to have one layer of asphalt shingles. The pertinent data is listed below: East Roof(11 Panels Total): Rafters: TRUE 2" x 6" (42 Spruce-Pine Fir Assumed) Spacing: 24" O.C. Roof Slope: 40 Degrees Horizontal Projected Length of Rafter (Horizontal Projection): 12.50 feet Ceiling Joists: Present Collar Ties: Present Roof Sheathing: Wood Boards and plywood sheathing Condition of Framing: Good Roof Covering: Asphalt Shingles Ground Snow Load,Pg: 50 PSF from Table R301.2 (5) of Massachusetts Residential Code Importance Factor,L• 1.0 Exposure Factor,Ce: 1.0(Conservatively taken as Partially Exposed) Thermal Factor, Ct: 1.1 with Panels(Cold Roof) 1.0 existing condition (Warm Roof) Design Snow Loads On sloped roof: 26.25 PSF(Existing—Unobstructed Warm Roof) 19.25 PSF(New—Slippery Surface on Cold Roof) North West, South, South west,Lower East Roofs(12 Panels Total): Rafters: Assumed TRUE 2" x 6" (#2 Spruce-Pine Fir Assumed)Verify in field Spacing: Assumed 24" O.C.verify in field Roof Slope: 44 Degrees Horizontal Projected Length of Rafter (Horizontal Projection): 11.00 feet maximum Ceiling Joists: Present Roof Sheathing: Wood Boards and plywood sheathing Condition of Framing: Good Roof Covering: Asphalt Shingles Ground Snow Load,Pg: 50 PSF from Table R301.2 (5) of Massachusetts Residential Code Importance Factor,I: 1.0 Exposure Factor,Ce: 1.0(Conservatively taken as Partially Exposed) Thermal Factor,Ct: 1.1 with Panels (Cold Roof) 1.0 existing condition(Warm Roof) Design Snow Loads On sloped roof: 22.75 PSF(Existing—Unobstructed Warm Roof) 16.68 PSF(New—Slippery Surface on Cold Roof) Wind Speed: 90 MPH from Table R301.2 (4) of Massachusetts Residential Code Exposure B Fiste Residence Solar Installation 231 Jefferson Ave Salem, MA 01970 Analysis Results: General Considerations > The proposed solar panels consist of solar panels which imposes a total weight of approximately 2.5 to 3 pounds per square foot(PSF)on the roof surface. From a practical standpoint,the International Residential Code allows up to 2 roof coverings on a residential dwelling. Each layer of roofing imposes a net load of about 2.5 to 3.0 PSF on the roof. From this perspective, since the existing roof has only a single layer of shingles, a second layer is allowed to be added by the code without analysis. This 2"layer of shingles essentially weighs the same as the proposed solar panels that will be added instead. > Materials such as metal roofs or solar panels are considered slippery surfaces. Since the solar panels are mounted slightly above the roof line, it would be conservative to consider a thermal factor Ct of 1.1,treating the panel surface as a cold roof rather than a warm roof. Based on the roof slope and considering it as a slippery surface,the snow load is reduced by 27%compared with the snow loading directly on the existing shingled roof surface. This reduction equates to 7.00 PSF on East roof and 6.07 PSF on remainder of the roof areas(with proposed panels)which essentially offsets the weight of the solar panels. Gravity Loadine: Main East&West Roofs,Lower west roof—adequate to support the proposed solar panels It is our understanding that the panels will be installed using Unirac rail with L-feet(or equal)at approximately 48 inches on center(e.g. every two to three rafters). The leveling feet will be fastened directly into the existing joists with 5/16"diameter lag screws with a minimum embedment of 2.5". In addition, it is important that the leveling feet support locations be staggered between adjacent pastels so that no single rafter supports more load than under the existing conditions. Wind Loading: Based on our calculations,the net wind loads imposed on the roof framing with an attachment spacing as indicated above will be less than the current loading on the roof framing. In addition, provided that the leveling feet are attached to the roof framing members in a typical staggered fashion,the overall wind loading imposed on the structure and the individual framing members will not be impacted to any great extent. Fiste Residence Solar Installation 231 Jefferson Ave Salem, MA 01970 If you have any questions regarding this matter,please feel free to contact my office at 609489-5511. We appreciate the opportunity to assist you with this evaluation. Sincerely, MPP Engineers,LLC #off„s WR 1rrf42A;tA Krishna J Allam E.I.T. OF 8l4S ASHG N rvl No.4 35 ° a9FG7STEPE�WW2 FSS /ANAL Et��'titi Ashutosh Pa MA Prof.Eng.Lic.No. 48235 I' PROJECT DESCRIPTION: SNF INDE T PROJECCTSITE nrg- =80W ROOF MOUNTED w-t SEE PIAN&VICINITY IMP ! Home SOLAR PHOTOVOLTAIC MODULES w-2 ROOF PLAN&PANELS SOLAR w-3 ROOF ATTACId,IENT DETAIL SYSTEM SIZE: 6.440 kW DC STC PV-3A ELECTRICAL& SIDE t1.EVATION DETAIL ° PV-4 ELECTRIC LINE DIAC-RAM ARRAY AREA. w-5 LABELING R-1: 795.67 ft' w-7 SPECCOma° IRCATION DETAILS AVBW g x°oNiii,zn� R-2. 53.36 fe - w-8 SPECFCATION DETM-S R-3: 53.36 fe w-9 SPECIFICATION DETAILS St R-4: 53.36 fe w-10 SPECFlCATION DETAILS w-It SPECIFICATION DETAILS _ -s &0°F¢g '� R-5: 53.36 fe w-12 SPECtFCATON DETAILS Caueent Nd. t g N t� PV SPECIFICATION DETAILS 231Jefkte°nnve £ U z 1-- Z — Z W i R• WissPn •c". �ao6°n gT.. , . Q w IL 4_ E a 3 w MODULES III w MODULES / 1 _ u-w Q ' o 2 VICINITY MAP w-I SCALE NTS PROJECT SITE ® 0 3 w MODULES W wn. >i a� WQO =ZO IL c DRI4EWAY W F N WLLul E i / ~U-1� R n w MODU ES IL 3 PV MODULES h Dra.eTMG 9 (E) UTILITY METER Rw.El Date: OG-OCT-15 PUN NORTH TITLE SHEET: 1 SITE PLAN f SITE PLAN WITH ROOF PLAN VICINITY MAP w-I SCALE:332 = t o 3 HOUSE PHOTO w-t saes PV—I ARRAY & ROOF AREA CALC'S 3. - $5 }--� —6'-8 5-7�--� Home ROOF R-1 ROOF R-4 � ARRAY AREA : 195.67 fP ARRAY AREA :53.36 f' SOLAR ROOF FACE AREA :478.52 fP ROOF FACE AREA :99.50 fe FACE /EA CO = 40.89%ROOF FACE AREA = RED %B ROOF Q FACE AREA COVERED BY ARRAY FACE AREA COVERED BY ARMY ROOF R-2 ROOF ARRAY AREA : 53.36 R+ ARRAY AREA :53.36 ft' ��, 3 PV MOWLES 3 PJ xx.a�en') 0 MODULESxow.e+u. c ROOF FACE AREA : 99.50 fO ROOF FACE AREA : 101.06 fP 8 ATTACHMENT 046' O.0 MAX 53.36/99.50 = 53.63% ROOF 53.36/101.06= 5280%ROOF 6 ATTPCHMENO.0 MAX FACE AREA COVERED BY ARRAY FACE AREA COVERED BY ARRAY 6•.9" g" N U ROOF R-3 3 PV MODULES„ L0 0 ARRAY AREA : 53.36 fP 9 ATTACHMENT 0 3. 3 r 3 5 ROOF FACE AREA : 101.56 fY N 48'O.0 MAX ip'^t� -.. Lf)52 53.36 101.56 = 52547.ROOF FACE AREA COVERED BY ARRAY 'va Tp•^10° ; - �' '�o a W L 5•_E i a ROOF DESCRIPTION 1 ,g °� O a R-1:COMP.SHINLGES - R-5:COMP. SHINLGES R. - 0 AZIMUT : 7T AZIMUTH : 166' AZIMUTH : 78' , _ 0 - t +� 000 PITCH : 40' PITCH : 44' PITCH : 27 0 � W 1 W w SHADING : 96% SHADING : 997. SHADING : 90% R-2 COMP.SHIM.GES R-4- AZIMUT : 258' AZIMUT : 256 PITCH : 4S PITCH : 41V SHADING :96% SHADING : 98% - 1 i T W LEGEND ® ` 1 - z>O 0 ROOF ATTACHMEM ®_. 1 - - or- ° 2 RAFTER CHIMNEY - 1 W . ® 1 1 �,� F D-pO O PIPE VENT `� w 0) p AIR VENT SKYLIGHTF� LLI _ 'q-� l�' _ w W U_ --- CONDUIT SATELLITE .. S9 _ �.- r N'W Q ELECTRICAL EQUIPMENT ANTENNA N ENPHASE MICROINVERTERS ®. ® WHIRLYBIRD M25O-6O-2LL VE11T-S22 YN VEM 1 MODULE SPEC'S ® ® s 1 1 ENPHASE MICRO-INVERTERS 3Z _ - - 32250-60-211-522 '-3" " � 26 ATTACHMENT 048'O.0 MAY B4, 7MG G UNIRAC SOAR MOUNTRAL 0 3 PV MODULES Rev.a 5.6 9 ATTACHMENT 048'O.0 MAX 17 M MODULES Y` -- I s Dare: OL-OCT-Ii '^ (E) WMY METER TITLE SHEET: T (N) AC DISCONNECT I-PJC/EMT CONDUIT P,44 ROOF PLAN ! NORM PANELS LG280SIC-B3 PANELS-28OW L-GATE 120 CELLULAR (N) PY LOAD CENTER 1 ROOF PLAN WITH PANELS LG PANELS PRODUCTION METER PV-2 I SCALE:3/16'= 1'-0+ FV-2 gyre Home SOLAR `xowni. s LOU U� N U O� Z U �W Q UNIRAC SOLARMOUNT GROUND WEER & Q MODULE CLAMP Q RAIL WITH ECOFASTEN L-FOOT O PV MODULE O p COMPOSITE ASPHALT w' SHINGLES GREENFASTEN FLASHING: ECO-GFI-BLK-612 WITH W ECO-CP-SQ COMPRESSION BRACKET - Q O 5/16"X4" S.S LAG BOLT WITH 2.5' a Z O MINIMUM PENETRATION SEALED WITH O APPROVED SEALANT w < i N W N LL F ~LLI1 F N_7F oma N -- Dre.Bs.: TMG Rrv.By: - DatP OC-OCT-$ 1 ATTACHMENT DETAIL TITLE SHEET: ROOF ATTACMIEr Pv'-3 SCALE:NIS DETAILS PV-3 erg Home SOLAR gxa.a ez�' - NONfLL. C p S ® Mo UT U U� N U QF ZW <W / / QQ u- < Q o �O � N O i 0 FROM UTILITYLI PROVIDER z 1 O (OVERHEAD) q T- lll p— E// � goo o w F-u) i w w ��� 1 o Lmal< FROM PV ARRAY z N Z IMTUO Wl ® V N 79-5—& TMG (E) UTILITY METER L(N) JUNCTION R.I.89: -- (EXTERIOR WALL) BOX FOR ENVOY Dmc OL-OCT-IS (E) TO MAIN SERVICE PANEL (N) 100AMP PV LOAD TITLE SHEET: EIECECAL 1 CENTER (EXTERIOR WALL) SIDE ELEVATION (INTERIOR WALL) (N) GATE 120 CELLULAR ELECTRICAL&SIDE ELEVATION DETAIL DETAIL (N) UTILITY AC DISCONNECT PRODUCTION METER w-aA SCA(E:NTS (EXTERIOR WALL) (EXTERIOR WALL) FV-3,A SERVICE INFO INVERTER SPECS MODULE SPECS nrg. UTILfIY COMPANY NATGRIDENpHASE ODANDtt 23 Home MAIN SERVICE vOtATGE 240V INVERTER TYPE M250-60-2U.-S22 MODULES TYPE LG280SIC-B3 SOLAR MAIN PANEL BRAND CROUSE-HIND QTY 23 WATTAGE 28ON MAIN SERVICE PANEL 125 A WATTAGE 210-30OW NOCT WATFAGE 205W MAIN CIRCUIT BREAKER RATING: t00A SERVICE VOLTAGE: 240V FRAME THICKNESS : 35MM CEC EFFICIENCY 96.5% gx..aleP,= c MAN SERVICE LOCATION SOUTH-EAST WALL FRAME COLOR BLACK SERVICE FEED TYPE OVERHEAD Voc 38.80V xsweu. MAN SERVICE PANEL GROUND EX15PNG GROUND ROD Vpm. 31.90V Isc TD UTILITY 9.33A mp 8.78 U]U FAI I - JUNCTION BOX R1 MwN 5mf,2 Paw.txa 7 1 - L-DATE 120 PRODUCTION METER D3 ssyd MP 3 MSroN1FCf 3 NOR " 3 ' 2 ^��^ 1 BRANCH #1 SOLAR 6 RAY (6.440 kWstcT O K ._. ,aoP D B C ' A vowA&v w PM moacTW w aaxcx Z U E - taw sown ONLY LOAD CENTER ,F +=ORWT w © a-20A/2P soon BREA(EA o .� (-}t Ix wouus!c,mas+o-m w 1 - 20A/2P ENJOY SRE4KER MM, ® _ _ __—L- Q o 1.1E1FA FSI uaass m' Z 1 - 30A AC 06WNNELT a+WMX i �RJIi Q MP 1 - 30A SOLAR SPEAKER 1 '-+ ILL.Be O Be BRANCH #2 suUmi, Oo W'l E_ I It ..IN PM.WII WNNfl'IFD M pWiCX MG N 1208 RULE " W. ID I,mv;'o-as BURSAR FETING: t2S4 L----�P MAIN BRFII cR PATNO. 1IXN rnxm.vm vwu¢ NOTES: (135 X 1.2)- '06 504 IeAoom,W 1. AL.MODULES WILL BE GROUNDED IN ACCORDANCE MYTH NA%BACIGFED: 50A I m41R CODE AND THE MANUFACTURER'S INSTALATONi INSTRUCTIONS. PROPOSED SYSTEM 30.A WA w 2. Al PJ EWIPMfNt SHALL❑STED BY A RECOGNIZEDR) 0 -- _______ _________ © W TESTWG V9. 1 3. NOTIFY SERVING ,KELLY BEFORE ACTIVATION OF PJ - s- ,2 TxxN-P Ipl�sm Z O SYSTEM. t ,x Tian-x Bee/D¢ pill£T Q 1- 4. WHEN A BICKFED BREAKER IS THE METHOD OF IfINfY IN s a'Bi,cwRDDrt O- INIkRCONNfCiION, BREAKER SHALL NOT READ UNE AND Z Q S. WHEN A 84CKFEO BREAKER IS THE METHOD OF UTILITY 1= I11 N Q INTIRCONNECTTON.THE BREAKER SHALL BE INSTALLED w F- AT THE OPPOSOE END OF THE BUS wR OF THE MAIN BREAXERS N 6. WOPo(CLE/JUNCES AROUND ELECTRICAL EOUPMENT WILL LL BE M4INTANED PER NO 110.26(A)(1), 110.26(A) (2) IN U_w 6 110.269A) (3) f W 7. All E TERIOR CONDUNS, FTTIINGS AND OD%ES SHALL BE WEATHER STATION r DO,1 RAN TIGHT AND APPROVED FOR USED IN WETQ LOwTIONS PER NEC 314.15 INFORMATION _N 8. Al METALLIC RACEWAYS AND EQUIPMENTS S`WLL BE eosmm tvcD+Ixl R>aT m BONDED AND ELECRBCALLY CONTINUOUS. AWNE zs ROOF Aw P2 C fY O-BP uv Aeaa Dw 9N69CE lMP �C 3 2 s-/e 1xmm✓-z s-}e lxmu-z s-ea'nmW-x MDA3IIX8 MEBr.GP CARS a L MJVORS ARE [Nc.a GaP m -{R TNmu-z Fs/�D ,-4.TxAN-z TGC/(1` t- }B iHaN-2 Ea/Dm suPPoRRD ON w �mE. SWPORIFD ON w IN+'BIT OOKWT w 1'M mIbUR W,'flit WNRUT PN1QG STBA Nm v Iry F3£aR R Iw SSTBJ NOT m 8a£NR we xRO+AD we xwc wc:xxawc DIMS)N DIRECT wc:aamu DROSS)TO DlAttt 0.` vNIC 6C: 1�ONL IS: t20ML StRiuw LSC 1'.. SJNDCM Isp txW3G DT9.By.: TMG ENPHASE INVERTER TOTAL SYSTEM CALLS JUNCTION BOX TO LOAD CENTER CALC'S JUNCTION BOX TO LOAD CENTER CALLS ENPHASE INVERTFA BRANCH 2 GALL'S ENPHASE INVERTER BRANCH 1 C5LC5 Rev.Bg - ON:23 MAX AQ 28.75A O1Y:71 MAX AC:13.754 Ott:12 MAX P.C:75.00A QTYat WTAC QTY:12 MAX AC: S.00A pace: 04-OCT-IS NOK:i (a0 x xDcT x 1.13 NCC:1 (Q,x nDc)x I.xs Noe:1 (Crc x rmcN x um NOQ 1 (mr x wc)x 1.2s NOC:I (OT(x ImcA x t ss TITLE SHEET: WIRE GAUGE#8 WIRE OCP:47.00A WIRE GAUGE:#8 WIRE OCP:33.50A WIRE GAUGE#8 WIRE OCP:33.50A ARE GAUGE:#12 WIRE OCP:23.50A WIRE GAUGE:#12 WIRE OCP:23.50A ELECTRIC TEMP RATING 75'C AVP Ralnc x Tom x-lua TEMP RATING:7TC +Es BADN4 x TBAP DE-m7 TEMP RATING:75'C Alm PA;vx x TEBP vE—uTB TEMP RATING:75C ANP RATWD x Tp1P vE-lurz TEMP RATING:75'C Avm WIND x aPm ceywc LINE DIAGRAM AMP RATING:50 A vAv Ae ro ec las ort muu ro AMP RATING 50A uA>;Ac m%,Ass w EW A, AMP RATING:50A vol AC m�ua OR ewa AMP RATING:25A I.ux x TO BE usa ON ROU, AMP RATING:254 uw Ac m RE less OR mwa WIRE Dw FOR WNE TO RE m"In ACP FOA Ala 0 BE TD xwe DCP FOR M�m BE TO MIRE DCI PYt WBa TO RE To RME aP FOR Mac To ae TEMP DE-RATE 0.94 errRD.s WWI,Nm TEMP DE-RATE:0.67 ARPRDve'D BY m,I Nm TEMP DE-RATE:0.67 ARROYO BA Wt r� TEMP DE-RATE: 0.94 mR.m+ED a W,1 NO TEMP OE-RATE 0.94 AWRWm er WI,Nm Pv H� ALL LABELING SHALL FOLLOW THE ANSI Z535.4-2011 STANDARD SOLAR yeo � DISCONNECTION MEANS; TO BE TO BE INSTALLED AT MAIN SERVICE aex c INSTALLED AT All AC DISCONNECTS PANEL AS PER NEC 2014 690,54: xowa�. � PER NEC 2014 690.13 (B) AC OPERATING VOLTS:240 VOLTS "°'"""• SOLAR AC DISCONNECT AC OPERATING CURRENT:28.75 AMPS Ul U U, DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION; TO BE INSTALLED AT DISCONNECTING MEANS PER NEC 2014 690.17 (E) Z w WARNING Q m ELECTRIC SHOCK HAZARD. DO NOT TOUCH TERMINALS. Q TERMINALS ON BOTH THE LINE IL-K AND LOAD SIDE MAY BE ENERGIZED O IN THE OPEN POSITION Q 0 N INVERTER OUTPUT CONNECTION; TO BE INSTALLED AT MAIN SERVICE PANEL PER NEC 2014 705.12 (D)(2) WARNING Z>p INVERTER OUTPUT CONNECTION 111 Q DO NOT RELOCATE THIS OVERCURRENT DEVICE (LILI p N Be r N W TO BE INSTALLED AT MAIN SERVICE w Dj a PANEL AND UTILITY NET METER: F-LU LU F U)�Q WARNINGS— DUAL POWER SOURCES, m N N SECOND SOURCE IS PV SYSTEM TO BE INSTALLED AT MAIN SERVICE PANEL IN THE EVENT OF SUPPLY SIDE CONNECTION: ory.M.; --- WARNING D0 4 7MG SUPPLY SIDE CONNECTIONIN Rev.B9: - USE FOR PV INTERCONNECTION D"te: OL-OC7-15 TITLE SHEET: LABELING PV-5 The Commonwealth of Massachusetts Board of Building Regulations and�S t {L D RV�CE9 CITY OF i. Massachusetts State Building Cdgiskl SALEM Revised tLlar 2011 Building Permit Application To Construct, Repaib$eQp�jl r [Arni*i0ti One-or Ttivn-Fnrnily Dwe! IIPI Lv This Section For Official Use Only Building Permit Number: Date Applied: a ZU Building Official(Print Name) Signature Dale I SECTION 1:SITE INFORMATION 1.1 Property Ad r ss: 1.2 Assessors Map&r Parcel Numbers I.la Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: LJ Property Dimensions: Zoning District Proposed Use Lot Area(sq fu Frontage(11) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Zone: Outside Flood"Lone? Public❑ Private❑ — Check if ycs❑ Municipal❑ On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: , a 11 �7�,ONPn �i S� ✓G` 1e f^�1 Nu'm�7e'�(77Prl!int T� � � City,State, rnJ f ocT7P rS6N 6L212'LL vlgr( No.and Street Telephone —� Email Address SECTION 3: DESCRIPTION OF PROPOSED WORK=(check:dl that apply) New Construction ❑ Existing Building❑ Owner-Occupied Repairs(s) ❑ 1 Alteration(s) ❑ Addition Demolition ❑ 1 Accessory Bldg.❑ Numberof Units I Other ❑ Spccify: Brie//ff�=ription ti Pr poosed Work'': {-�� a��- • r i e c k- SI e �DtY�G -- IYl SECTION a: ESTIMATED CONSTRUC ION COSTS Item Estimated Costs: Official Use Only Labor and Materials I. Building $ f Z0 0 6, 1. Building Permit Fee: $ Indicate how fee is determined: ❑Standard City/rown Application Fee 2. Electrical $ ❑Total Project Cost'(Item 6)x multiplier x 3. Plumbing $ 2. Other Fees: $ T. iYlechanical (1IVAC) $ List: 5. Mechanical (Fire $Suppression) 'folal All Fees: $ Check No. Check Amount: Cash Amount: (. "f�ot�al"Project Cost: $ ' 2 O 0 ° ❑ Paid in Full ❑Outstanding Balance Due: C fkL i V3%L-a, `� IU 5 �3 G1 SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) lU.srJJJ 4 I.iccnsc Number Expiration Date Name of CSL Holder List CSL Type(sue below) !'1 !3C Yt(rt dint .type Description No.and Street U Unrestricted(Buildings up to 35,000 cu. ft. R Restricted I&2 Family Dwelling City/Fown,State,ZIP M Masonry RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances I Insulation Telephone Email address D Demolition - 5.2 Registered Home Improvement Contractor(11IC) HIC Registration Number Expiration Dale HIC Comp.my Name or I IIC Registrant Name No.and Street Email address City/Town,State,ZIP Telephone SECTION 6: WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152. § 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes.......... ❑ No...........❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1,as Owner of the subject property,hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. Print Owner's Name(Electronic Signature) Date SECTION 7b:OWNER' OR AUTHORIZED AGENT DECLARATION By entering my name below, I hereby attest under the pains and penalties of perjury that all of the information contained in this a li pion is true and accurate to the best of my knowledge and understanding. 5' ,2 vi Prbt wn 's or AalhUriZ d Agent's Name(electronic Signature) Lute NOTES: I. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program), will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.aov/oca Information on the Construction Supervisor License can be found at www.ntass.gov/dys 2. When substantial work is planned, provide the information below: Total floor area(sq. ft.) (including garage, finished basement/attics,decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system_ Number of decks/porches Type of cooling system Enclosed Open :i. "Total Project Square Footage"may be substituted for"Total Project Cost" ��VSE • tl ! Y -- --- ------- — %' c---- 4' jo OID 3z'yg" OV - -beoR —. oval —--r a a-states Qm% y"x4~Rxs� C Tco: aa- z 6 is 8' 9Pvc Dedtzo.� iQ.'a�s,. 4- 4"X4"X ta' 'P} 16:dAcl. 68r" i5- G" ReWER 0anrka�s rwa eeao�s 4 S°aftk 4s.- �ocg� av�.. 6z+Ea;o� xetr�'s 3a: ro�� 3" 6xiea:oa ScAE.�S IOo: 45a- lb"V. Sc•wr r as O 30.' /0- &°nJb GoNGf�.BFG 3:Eat►.; C-6-as � " J �8� 3 8" RerrND E a08 s 6.oa% sawzfeat .►Ma s GvS 014." 1 - 0ox b"C� sepawe ARarr.� /r�W" • `5bc -i- E�►tuS67�S