Loading...
26 HARDY ST - BUILDING INSPECTION (2) C� a7S "PIM16 111111 fRlA94AD APPROVED BY TW J UPFCIOR„PRIDR TO A PMW AMO ORANTkD CITY OF SALEM � \� w.ro Zan"oww is P'" An 10 Located in Loeaeloa of m .hraonc�ohmfon Yas=No� loildios is Piweity in ft awvsaL Loomed m? YNzZrto_ Permit to: fNT BWLD= PEW APPLICATION FOR: (Circle whW*vw apply) Roof, Reroof. Instal Siding, Construct Dedc. Shed, Pool, R9paidR9plaar, _fit car,J PLEASE PILL OUr LEGIBLY i COMPLETELY TO AVOID DELAYS IN PROCE98M TO THE INSPECTOR OF BUILDINGS:The undgreigned '• hereby apples for a permit to build accordUvg.to the.folbwhtq � .. Owners Name / r Address 6 Phone lei l CIAO o twee, (g 1S ) (,Da- 9 3 Architect's Name Address d Phone Mechanics Name Address Q Phone ( 1 What is ar p.pom it WNW � �J mw.w of bttl~ q.dwMrq.for how many ImOn? wa buYdIq caronn to kw? Mbsafos9 t:Mlnatoe cost I UM L py UW"b 81w A �J ae � *w1urs of Applicant SIGNED UNDER Tt1E PENAL OF PERJURY DESCRIPTION OF WORK.TO BE DONE ' sp k y a, MAIL PERMIT TO: 1 i Y ' s S9NK ,'1 e :JO Jw USN -61 031wuo 1JWkl3d NOLLVOOI Ol JAM:3d / wa NOLLVDru 1/ IC W A Salem Historical Commission 120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970 (978) 745-9595 EXT.311 FAX(978)740-0404 WAIVER OF THE DEMOLITION DELAY ORDINANCE It is hereby certified that the Salem Historical Commission has waived the Demolition.Delay Ordinance for the proposed demolition as described below, as per the requirements set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. Address of Property: 26 Hardy Street Name of Record Owner: Mark& Sandra Connelly Description of Demolition Work Proposed: Demolition of garage. Demolition of conditional on submission of photographs of all four sides of house and copies of'existing condition plan and elevation drawings. Owner is encouraged to setback new addition from main building, so as not to be on even plain. It is strongly recommended that the second floor window over the main entry be retained. i R i II ( B I 9 Dated: 3/22/05 SALEM HISTORICAL COMMISSION I ' � a THIS IS NOT A DEMOLITION PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work:. i4 � 7 a is n 9 i� CITY OF SALEMS, MASSACHUSETTS PUBLIC PROPERTY DEPARTMENT 120 WASHINGTON STREET, 3RD FLOOR SALEM, MA O1970 TEL. (978)745-9595 EXT. 380 04& FAX (978) 740-9848 STANLEY J. LISOVICZ, JR. MAYOR DISPOSAL OF DEBRIS AFFIDAVIT In accordance with the provisions of MGL c 40, S34,I acknowledge that as a condition of Building Permit# all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid-waste disposal facility, as defined by MGL cc III,S150A. The debris will be disposed of at: 2IDII Location of Facility aq 0 Signature of Permit Applicant Datt FULLY complete the following information: (PLEASE PRINT CLEARLY) Name of Permit Applicant Firm Name,if any Address, City dt Sjkw � The above statute requires that debris from the demolition,renovation,rehab or other alteration of building or structure be disposed in a properly-licensed solid-waste disposal facility as defined by MGL cIII, S 150A, and the building permits or licenses are to indicate the location of the facility.