26 HARDY ST - BUILDING INSPECTION (2) C� a7S
"PIM16 111111 fRlA94AD APPROVED BY TW
J UPFCIOR„PRIDR TO A PMW AMO ORANTkD
CITY OF SALEM
�
\� w.ro
Zan"oww
is P'" An 10 Located in Loeaeloa of
m
.hraonc�ohmfon Yas=No� loildios
is Piweity
in
ft awvsaL Loomed
m? YNzZrto_
Permit to: fNT BWLD= PEW APPLICATION FOR:
(Circle whW*vw apply) Roof, Reroof. Instal Siding, Construct Dedc. Shed, Pool,
R9paidR9plaar, _fit car,J
PLEASE PILL OUr LEGIBLY i COMPLETELY TO AVOID DELAYS IN PROCE98M
TO THE INSPECTOR OF BUILDINGS:The undgreigned '•
hereby apples for a permit to build accordUvg.to the.folbwhtq
� ..
Owners Name / r
Address 6 Phone lei l CIAO o twee, (g 1S ) (,Da- 9 3
Architect's Name
Address d Phone
Mechanics Name
Address Q Phone ( 1
What is ar p.pom it WNW � �J
mw.w of bttl~ q.dwMrq.for how many ImOn?
wa buYdIq caronn to kw? Mbsafos9
t:Mlnatoe cost I UM L py UW"b 81w A
�J ae �
*w1urs of Applicant
SIGNED UNDER Tt1E PENAL
OF PERJURY
DESCRIPTION OF WORK.TO BE DONE '
sp k y a,
MAIL PERMIT TO:
1
i
Y '
s
S9NK ,'1 e :JO Jw USN
-61
031wuo 1JWkl3d
NOLLVOOI
Ol JAM:3d /
wa NOLLVDru 1/
IC
W A
Salem Historical Commission
120 WASHINGTON STREET,SALEM, MASSACHUSETTS 01970
(978) 745-9595 EXT.311 FAX(978)740-0404
WAIVER OF THE DEMOLITION DELAY ORDINANCE
It is hereby certified that the Salem Historical Commission has waived the Demolition.Delay Ordinance for the
proposed demolition as described below, as per the requirements set forth in the Historic District's Act (M.G.L.
Ch. 40C) and the Salem Historic Districts Ordinance.
Address of Property: 26 Hardy Street
Name of Record Owner: Mark& Sandra Connelly
Description of Demolition Work Proposed:
Demolition of garage. Demolition of conditional on submission of photographs of all four sides of house and
copies of'existing condition plan and elevation drawings.
Owner is encouraged to setback new addition from main building, so as not to be on even plain. It is strongly
recommended that the second floor window over the main entry be retained.
i
R
i
II
(
B
I
9
Dated: 3/22/05 SALEM HISTORICAL COMMISSION
I '
� a
THIS IS NOT A DEMOLITION PERMIT. Please be sure to obtain the appropriate permits from the Inspector
of Buildings (or any other necessary permits or approvals)prior to commencing work:.
i4
� 7
a
is
n
9
i�
CITY OF SALEMS, MASSACHUSETTS
PUBLIC PROPERTY DEPARTMENT
120 WASHINGTON STREET, 3RD FLOOR
SALEM, MA O1970
TEL. (978)745-9595 EXT. 380
04& FAX (978) 740-9848
STANLEY J. LISOVICZ, JR.
MAYOR
DISPOSAL OF DEBRIS AFFIDAVIT
In accordance with the provisions of MGL c 40, S34,I acknowledge that as a condition
of Building Permit# all debris resulting from the construction activity
governed by this Building Permit shall be disposed of in a properly licensed solid-waste
disposal facility, as defined by MGL cc III,S150A.
The debris will be disposed of at: 2IDII
Location of Facility
aq 0
Signature of Permit Applicant Datt
FULLY complete the following information:
(PLEASE PRINT CLEARLY)
Name of Permit Applicant
Firm Name,if any
Address, City dt Sjkw �
The above statute requires that debris from the demolition,renovation,rehab or other
alteration of building or structure be disposed in a properly-licensed solid-waste disposal
facility as defined by MGL cIII, S 150A, and the building permits or licenses are to
indicate the location of the facility.