Loading...
11 GREENWAY RD - BUILDING INSPECTION � �ZIS c� g53 *� The Commonwealth of Massachusetts Board of Building Regulations and Standards CITY OF Massachusetts State Building Code,780 CMR SALEM .,. Revised Mar 2011 Building Permit Application To Construct,Repair, Renovate Or Demolish a 7C One-or Two-Family Dwellingme This Section For Official Use Only - le Building Permit Number: Date Applied: -20 M 1 Building Official(Print Name) Signature SECTION 1: SITE INFORMATION - _ - l.l Pro Address• Py�tY 1.2 Assessors Map&Parcel Numbers N - �����sypr�I1L11�d_JP Y(I'( . 1.1 a Is this an accepted stree . yes .x no Map Number Parcel Number - - - 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq In Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,.§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: _ Outside Flood Zone?Check if yes❑ Municipal❑ On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 caner'of Record:- - �av Name(Print) City,State,ZIP No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK(check all that apply) New Construction Existing Building❑ Owner-Occupied ❑ 1 Repairs(s) ❑ 1 Alteration(s) ❑ Addition ❑ Demolition ❑ Accessory Bldg.❑ Number of Units_ I Other ❑ Specify: Brief Description of Proposed Work': LLn Dhotovn I-F0.1G Solar Sys-I>'.wIS P-F ic'an s a�j SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials 1.Building $ Oa 1. Building Permit Fee:$ Indicate how fee is determined: 2.Electrical $ ❑Standard City/Town Application Fee ❑Total Project Cost'(Item 6)x multiplier x 3. Plumbing $ 2. Other Fees: $ 4. Mechanical (HVAC) $ List: 5.Mechanical (Fire $ Suppression) Total All Fees:$ Check No. Check Amount: Cash Amount: 6. Total Project Cost: $ 6C �� 0 Paid in Full ❑Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1Construction Supervisor License(CSL) 045 25 4 S6 2$ 9 J�wme.S -z-mel rvia.ln License Number Expfration Date Name of CSL Holder 2 I 1 ' C6 V-\ S �L List CSL Type(see below) U No.and Street 1 Type Description S� lY (!S A I O I(] I ^ U Unrestricted(Buildings u to 35,000 car—ft.) �`�l _l sY R Remitted 1&2 FamilyDwelling City/Tow Sys,ZIP M Masonry (/ RC Roofin Covering WS Window and Siding 1Fs13 DlnS SF Solid Fuel Burning Appliances YVICLSDIGu V(Utr p�pnity� I Insulation Tel hone Email address W D Demolition 5.2 Registered Home Improvement Contractor(HIC) olar vet opey- L LC HIC Registration Number Expira on Date HIC Com any Name or HIC Registrant Name --- 4a3Pt�. , Dw . w.aso�(5�VIVl�+so Y P No,and Street t?'r $ Email address Cayh trDVD I}1001{ —I8'13053o1e5 Cit /Town, State,ZIP Tel- hone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes.......... No...........❑ SECTION 79:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize VI V 1✓1'F Sn l ar to aLonmy behalf,in all mattersrelative to work authorized by this building permit application. ka-,. �I�lly Prmt Owner's Name(E onic Signature) Date SECTION 7b:OWNERr OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in th' p ' tion is true and accurate to the best of my knowledge and understanding. \/wtvlt O-e- 3),3/lq . Print O s r rind Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.eov/oca Information on the Construction Supervisor License can be found at www.mass.sov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basemenUattics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" d I t,®ngress Mreet, Iutte I UU Boston, MA 02114-2017 avuvw.inass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Vivint Solar Developer, LLC Address:4931 North 300 West City/State/Zip:Provo, UT 84604 Phone#:801-704-9389 Are you an employer? Check the appropriate box: 'Type of project(required): l.0 I am a employer with 10 4. ❑ I am a general contractor and I employees (full and/or part-time)." have hired the sub-contractors 6. New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have 8_ ❑ Demolition working for me in any capacity. employees and have workers' 9. ❑ Building addition [No workers' comp. insurance comp. insurance. required.] 5. ❑ We are a corporation and its 10.0 Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 1 I.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.0 Roof repairs insurance required.] t c. 152, yS 1(4), and we have no employees. [No workers' 13.0 Other comp. insurance required.] 'Any applicant that checks hox#I must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they am doing all work and then hire outside contractors must submit a new affidavit indicating such. Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. P am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: New Hampshire Insurance Comany Policy#or Self-ins. Lic. #:029342228 Expiration Date:11-01-14 Job Site Address: Xl�� City/State/Zip: �Qho fl2k njg6- - Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required trader Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I'do hereby ce under.th"e pawls and penalties ofperjury that the information provided above is true and correct Signature: %// i � � — Date: Phone #: 801-704 9389 Official use only. Do not write in this area, to be completed by city or town official. City or Town: Permit/License # Issuing Authority(circle one): I. Board of Health 2.Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector b. Other Contact Person: Phone#: Office of Consumer Affairs find Business Regulation —t 10 Park Plaza - Suite 5170 Boston, Massachusetts 02116 Home Improvement Contractor Registration Registration: 170848 Type: Supplement Card VIVINT SOLAR DEVELOPER LLC. Expiration: 1/512016 JAMES SHERMAN 4931 NORTH 300 WEST PROVO, LIT 84604 Update Address and return card.Mark reason for change. scA 1 is 2at-05111 Address Renewal ❑ Employment Lost Card iJ�te I(.'om�mto6tloelll�i,O�VOLC[uda [i�d ffice of Consumer Affairs&Business Regulation License or registration valid for individul use only ME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: Office of Consumer Affairs and Business Regulation Registration: 170848 Type: 10 Park Plaza-Suite 5170 Expiration: 1/5/2016 Supplement Card Boston,MA 02116 - VIVINT SOLAR DEVELOPER LLC. JAMES SHERMAN i 4931 NORTH 300 WEST PROVO, UT 84604 Undersecretary Not valid without signature -- f Massachusetts -Department of Public Safety Board of Building Regulations and Standards r Construction Superlisor License: CS-045254 ,ir1 M1 JAMES R SE ERMAN Q h 81 MAIN ST SAUGUS MA 01906 V Expiration Commissioner 08/28/2014 CONSULTING Wyssling Consulting 321 West Main Street Boonton, NJ 07005 Scott E. Wyssling, PE, PP, CME office (973) 335-3500 cell(201) 874-3483 fax (973)335-3535 swyssling@wyssfingconsulting.com February 25, 2014 Mr. Dan Rock, Project Manager Vivint Solar 24 Normac Road Woburn MA 01801 Re: Structural Engineering Services Coffin Residence 11 Greenway Road, Salem MA AR#3578507 6 kW System Dear Mr. Rock: Pursuant to your request, we have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site Visit/Verification Form prepared by a Vivint Solar representative identifying specific site information including size and spacing of rafters for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information was prepared by Vivint Solar and will be utilized for approval and construction of the proposed system. 3. Photovoltaic Rooftop Solar System Permit Submittal prepared by Vivint Solar identifying design parameters for the solar system. 4. Photographs of the interior and exterior of the roof system identifying existing structural members and their conditions. Based on the above information we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: Description of Residence: The existing residence is typical wood framing construction with the roof system consisting of 2 x 6 dimensional lumber at 16" on center with 2 x 4 collar ties every 96". The attic space is unfinished and photos indicate that there was free access to visually inspect the size and condition of the roof rafters. All wood material utilized for the roof system is assumed to be Spruce-Pine-Fir #2 or better with standard construction components. Our review of the photos of the exterior roof does not indicate any signs of settlement or misalignment caused by overstressed underlying members. Stability Evaluation: A. Wind Uplift Loading 1. Refer to attached ZEP calculations sheet for ASCE/SEI 7-10 Minimum Design Loads for Buildings and other Structures, wind speed of 100 mph based on Exposure Category "B" and 24 degree roof slopes on the dwelling areas. Ground snow load is 40 PSF for Exposure"B", Zone 2 per(ASCE/SEI 7-10). 2. Total area subject to wind uplift is calculated for the Interior, Edge and Corner Zones of the dwelling. Page 2 of 2 B. Loading Criteria • 10 PSF=Dead Load roofing/framing . 40 PSF = Live Load (ground snow load) • 5 PSF=Dead Load solar Panels/mounting hardware Total Dead Load=15 PSF The above values are within acceptable limits of recognized industry standards for similar structures. Analysis performed of the existing roof structure utilizing the above loading criteria indicates that the existing rafters will support the additional panel loading without damage, if installed correctly. C. Roof Structure Capacity 1. The photographs provided of the attic space and roof rafters show that the framing is in good condition with no visible signs of damage caused by prior overstressing. 2. The dwelling owners shall be made aware that long term build-up of heavy snow conditions may produce deflections in the roof. If any deflection is noticed, then it is recommended that the solar panels be cleared of accumulated snow more than one (1) foot deep over a period of one week. If no deflections are visible under any snow loading over a period of time, then there is no need to clear the solar panels. D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent "ZEP Code Compliant Installation Manuaf', which can be found on the ZEP website (zepsolar.com). If during solar panel installation, the roof framing members appear unstable, deteriorated, structurally compromised or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. Maximum allowable pullout per lag screw is 235 Ibs/inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications for Hem-Fir(North Lumber) assumed. Based on our evaluation, the pullout value, utilizing a penetration depth of 2 '/z", is less than what is allowable per connection and therefore is adequate. Based on the variable factors for the existing roof framing and installation tolerances, using a thread depth of 2 ''/s' with a minimum size of 5/16" lag screw per attachment point for panel anchor mounts should be adequate with a sufficient factor of safety. 3. Considering the roof slopes, the size, spacing, condition of roof, the panel supports shall be placed at and attached to no greater than every fourth roof rafter as panels are installed perpendicular across rafters and no greater than the panel length when installed parallel to the rafters (portrait). No panel supports spacing shall be greater than four(4) rafter spaces or 64" o/c, whichever is less. 4. Panel supports connections shall be staggered to distribute load to adjacent rafters. Based on the above evaluation, it is the opinion of this office that with appropriate panel anchors being utilized the roof system will adequately support the additional loading imposed by the solar panels. This evaluation is based on information supplied to us at the time of this report and current industry standards and practices. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. Ae y'IV99 �U c Scott E. Wys PE avi v MA Licens o. 5 7 o.50 9p�, FGIST-P�c FSSIONM_ ILW VV CONSULTING a_ Vivint Solar - PV Solar Rooftop System Permit Submittal 1. Project Information Project Name: Paul Coffin Project Address: 11 Greenway Rd,Salem MA A.System Description: The array consists of a 6 kW DC roof-mounted Photovoltaic power system operating in parallel with the utility grid.There are(24)250- watt modules and(24)215-watt micro-inverters,mounted on the back of each PV module.The array includes (2)PV circuit(s).The array is mounted to the roof using the engineered racking solution from Zcp Solar. B.Site Design Temperature: (From Boston Logan INT'L ARPT weather station) Average low temperature: -21.1 °C (-5.98°F) - Average high temperature: 38.4°C (101.12°F) C. Minimum Design Loads: Ground Snow Load: 40 psf (State Board BR&S) Design Wind Speed: 100 mph (State Board BR&S) 2.Structural Review of PV Array Mounting System: A.System Description: 1.Roof type: Comp.Shingle 2.Method and type of weatherproofing roof penetrations: Flashing B.Mounting System Information: 1.Mounting system is an engineered product designed to mount PV modules 2.For manufactured mounting systems,following information applies: a.Mounting System Manufacturer: Zep Solar b.Product Name: ZS Comp c.Total Weight of PV Modules and mounting hardware: 1032 lbs d.Total number of attachment points: 35 c.Weight per attachment point: 29.48 Ibs/square foot f.Maximum spacing between attachment points: 'See attached Zep engineering talcs g.Total surface area of PV array: 422.64 square feet h.Array pounds per square foot-. 2.44 Ibs/square foot i.Distributed weight of PV array on roof sections: -Roof section 1: (24)modules,(35)attachments 29.48 pounds per square foot vivint. solar 3. Electrical Components: A. Module (UL 1703 Listed) Qty Trina TSM 250-PA05.18 24 modules Module Specs Pmax-nominal maximum power at STC - 250 watts Vmp-rated voltage at maximum power - 30.3 volts Voc-rated open-circuit voltage - 37.6 volts Imp-rated current at maximum power - 8.27 amps Ise-rate short circuit current - 8.85 amps B. Inverter (UL 1741 listed) Qty Enphase M215-60-2LL-S22 24 inverters Inverter Specs 1. Input Data (DC in) Recommended input power(DC) - 260 watts Max.input DC Voltage - 45 volts Peak power tracking voltage - 22V-36 V Min./Max. start voltage - 22V/45V Max.DC short circuit current - 15 amps Max.input current - 10.5 amps 1. Input Data (DC in) Max.output power - 215 watts Nominal output current - 0.9 amps Nominal voltage - 240 volts Max.units per PV circuit - 17 micro-inverters Max.OCPD rating - 20 amp circuit breaker C.System Configuration Number of PV circuits 2 PV circuit 1 - 12 modules/inverters (15)amp breaker PV circuit 2 - 12 modules/inverters (15) amp breaker vivint.solar D. Electrical Calculations 1.PV Circuit current PV circuit nominal current 10.8 amps Continuous current adjustment factor 125% 2011 NEC Axide 705.60(B) PV circuit continuous current rating 13.5 amps 2. Overcurrent protection device rating PV circuit continuous current rating 13.5 amps Next standard size fuse/breaker to protect conductors 15 amp breaker Use 15 amp AC rated fuse or breaker 3.Conductor conditions of use adjustment(conductor ampacity derate) a.Temperature adder Average high temperature 38.4°C (101.12°F) Conduit is installed 1"above the roof surface Add 22°C to ambient 2011 NEC Table 310.15(B)(3)(c) Adjusted maximum ambient temperature - 60.4°C (140.72°F) In.PV Circuit current adjustment for new ambient temperature Derate factor for 60.4°C (140.72°F) 71% 2011 NEC Tablc 310.15(B)(2)(a) Adjusted PV circuit continuous current 19 amps c.PV Circuit current adjustment for conduit fill Number of current-carrying conductors 6 conductors Conduit fill derate factor 80% 2011 NEC Table 310.15(B)(3)(a) Final Adjusted PV circuit continuous current 23.7 amps Total derated ampacity for PV circuit 23.7 amps Conductors(tag2 on 1-line)must be rated for a minimum of 23.7 amps THWN-2(90°C) #14AWG conductor is rated for 25 amps (Use#14AWG or larger) 2011 NEC Table 310.15(B)(16) 4.Voltage drop(keep below 3%total) 2 parts, 1.Voltage drop across longest PV circuit micro-inverters (from modules to j-box) 2.Voltage drop across AC conductors(from j-box to point of interconnection) 1.Mirco-inverter voltage drop: 0.31% The largest number of micro-inveners in a row in the entire array is 8 inCircuit 1.According to manufacturer's specifications this equals a voltage drop of 0.31 %. 2.AC conductor voltage drop: =I x R x D (=240 x 100 to convert to percent) _ (Nominal current of largest circuit)x (Resistance of#14AWG copper)x (Total wire run) _ (Circuit 1 nominal current is 10.8 amps)x(0.0031952)x(150� +(240 volts)x(100) 2.15% Total system voltage drop: 2.46% vivint, solar 2/22/2014 3578507-Zepulator R ZepSolar Engineering Calculations 3578507 Name: _ Street Address: 11 Greemnay Rd Email: Suite/PO#: Phone: City,State,Zip:Salem,Massachusetts 01970 Country:United States System Details Module Manufacturer Trina Solar Mounting System Zep Solar PV Module TSM-250-PA05.18 Manufacturer Quantity of PV Modules 24 Mounting System Type ZS Comp Array Size (kM 6.000 Roof type Composition Shingle Attachment Type Comp Mount,Type C Module-level Enphase Energy-M215-Z electronics. 7zepulator.comlprojects/46214/summary'engineering_pri nt 114 L i 2/22/2014 3578507-Zepulator 7 Engineering Calculations Design Variables Description(Symbol) Value Unit Module Orientation Landscape Module Weight 44.8 Ibs Average Roof Height(h) 30.0 ft Least Horizontal Dimension(Ihd) 25.0 ft Edge and Corner Dimension"a" 3.0 ft Roof Slope(0) 24.0 deg Rafter/Truss spacing 16.0 in Rafterfrruss dimension Min.nominal framing member depth of 4" Basic Wind Speed(V) 110 mph E)posure Category B Ground Snow Load (Pg) 40 psf Risk Category II Topographic Factor(Kit) 1.0 Thermal Factor for Snow Load(Ct) 1.2 E)posure Factor for Snow Load(Ce) 0.9 Effective Wind Area 10 ft2 Snow Load Calculations (Using calculation procedure of ASCE 7-10 Chapter 7) Description(Symbol) Interior Edge Corner Unit _ Flat Roof Snow Load(Pt) 30.2 30.2 30.2 psf Slope Factor(Cs) 0.8 0.8 0.8 Roof Snow Load 25.3 25.3 25.3 psf Wind Pressure Calculations (Using simplified procedure of ASCE 7-10 Chapter 27) Description (Symbol) Interior Edge Corner Unit Net Design Wind Pressure uplift(Pnet30_up) -19.9 -34.7 -51.3 psf Net Design Wind Pressure downforce(Pnet30_down) 12.5 12.5 12.5 psf http:/A w 2epulatu.con/projects/46214/summary'engineering_jyint 24 2/22/2014 3578507-Zepulator u Adjustment Factor for Height and Exposure Category(A) 1.0 1.0 1.0 Design Wind Pressure uplift(W„P) -19.9 -34.7 -51.3 psf Design Wind Pressure downforce(Wdo,Hn) 16.0 16.0 16.0 psf ASD Load Combinations (Using calculation procedure of ASCE 7-10 Section 2.4) Description (Symbol) Interior Edge Corner Unit Dead Load(D) 2.5 2.5 2.5 psf Snow Load (S) 23.1 23.1 23.1 psf Load Combination 1 (D+0.75"(0.61Wdo r)+0.75'S) 25.4 25.4 25A psf Load Combination 2(D+0.6'Wdmn) 11.9 11.9 11.9 psf Load Combination 3(D+S) 23.4 23.4 23.4 psf Uplift Design Load(0.6'D+0.6'W„p) -10.5 -19.4 -29.4 psf Mammum Absolute Design Load(Pabs) 25A 25.4 25.4 psf Spacing Calculations Description(Symbol) Interior Edge Corner Unit Max allowable spacing between attachments 72.0 72.0 72.0 in User selected spacing between attachments given a rafter/truss spacing of 16.0 in 64.0 64.0 64.0 in Max cantilever from attachments to perimeter of PV array 24.0 24.0 24.0 in Distributed Weight and Weight per Attachment Point Calculations (In conformance with Solar ABC's Expedited Permit Process for PV System (EPP)) Description(Symbol) Value Unit Weight of Modules 1075.2 Ibs Weight of Mounting System w 82.45 Ibs Total System Weight 1157.65 Ibs Total Array Area -422.72 ft2 Distributed Weight - 2.74 psf Total Number of Attachments 35 Weight per Attachment Point 33.08 psf http:/Aw .zepulata.con-dprcjects/46214/suariarVwgineering_print 314 2/22/2014 3578507-Zepulator ;a I hV./hw ..zepulator.corrVprojects/46214/sum Vengineering_print 4/4 a) 75'OF 1"PVC CONDUIT PV INTERCONNECTION POINT, FROM JUNCTION BOX TO ELEC PANEL N o LOCKABLE DISCONNECT SWITCH, ANSI METER LOCATION, (n m o m &UTILITY METER LOCATION i N v r LL j dz q ��lA� rQ O C U O - JUNCTION BOX ATTACHED TO ARRAY USING ZEP ZS-GAB TO A KEEP JUNCTION BOX OFF ROOF o N® o 0 - 1 PV SYSTEM SIZE: m (a 6.00kWDC M1 R z W Z 0 J Z C z zN ' _ z � /�\ SHEET a///�y���1J/��' NAME: — 24)Tm.Solar TSM-250 PA05.1B MODULES WITH A Lij Z n Ennh M215-60�2L ~L-Ste-ZC MICRO-INVERTER J v MOUNTED ON THE BACK OF EACH MODULE (n a SHEET NUMBER: ? PV SYSTEM SITE PLAN 4 SCALE: 3/32"= V-0" > a N ti Vm 9 m2 < uy N NO 00 OC y CH m ma m N O 2 2 m m 00 880 ti y �3 Cn W WE CD CI N� J� c AX D C r cn m w � ° m X O O v� n 3 T1 O p V CC f my y N� Z ci Di INSTALLER:VIVINTSOLAR Coffin Residence m 3 m INSTALLER NUMBER:1 877.404.4129 .ry Rd P�/ 2.0 M y ROOF m y MA LICENSE:MAHIC 170848 �+ �/ ���• Salem,MA 11 19 0 V L PLAN DRAWN BY:Cody C1 AR 3578507 1 Last Modified:2/10/2014 UTILITY ACCOUNT NUMBERS 0083856008 a) c a� MOUNTING PVS.O DETAIL (n 3 511B'&18,1'STAINLESS LEVELING FOOT(23LF STEEL M.B.:TORQUE=1fi 1NEs. LL�az —J COMP MOUNT(ZSCMA( h OU WASXER PACKAGED U WATERPROOFING. T WITH COMP MOUNT LE" Q PV MODULE,TVP.MOUNT AS NEEDED O TO RAFTERS OF COMP, SHINGLE ROOF,PARALLEL U WITH PLANE OF ROOF PV ARRAY TYP. ELEVATION 5116'01414'MINIMUM 5„ E STAINLESS STEEL LAG SCREW ID TORQUE=1.t flJM. NOT TO SCALE _ .-A pO,^ VJ LEVELING FOOT ON COMP MOUNT r PERMITTEO LEVELING NOT TO SCALE FOOT SPACING • LEVELING FOOT(iSLFB) : FRAMINGRELOWSXOWN r ...ED FDR CLARITY C II ZEP COMPATIBLE P m m PV MODULE XVBRIO INTERLOCK Q m o II I U CANTILEVER=VJ L=PERMITIE°$PACING E Q T O L 5 .EE COpE CINAPLIANCE LETTER FOR ALLOWABLE SPACING PXOTOVOLTAIL MODULE O Or of N ; I I I I w ; wz I I I Dz I I I I ` 3 z z In " INTERLOCK(2SILB) HYBRID INTERLOCK NAMET LEVELING FOOT(ZS FBI ROOFFRAMMG ~LEVELING FOOT( LFB)2 Z J I a � O "TER`DLK(:SILK( FO svol„G°NG IPV SYSTEM MOUNT DETAIL SHEET NUMBER: (MODULES IN PORTRAIT/LANDSCAPE SCALE:3/8'=1'-0" M NOT TO SCALE • a Inverter Ratings(Guide Section 4) MODULE DETAIL Ma.DC VatFaceel E"°he+.Mz1s6o-2u-s2x-zc 45 vore O Conduit and CDntluGGr Schedule Max Partner a 40-C z15 watt+ a oe+ulpllon we Gaua. xaC'cxcxa Gandmlrym ComuB sore Pe nernael AC VWeBe 240 Volta age.Ele-THWN-2 12 AWG 4 NIA Free Nr N/A-Free Air Tana Solar TSM-250 Pi 10 ce Max AC Cur,Mt 0.9 Amps Ground lEGWGEC) fiAWG 1 NIA-Gree Air NIA-Fne Alr 'l to SOLAR MODULE Max DCPD Rating 2B Amp+ IOAwc s we �tV�und BAWG 1 PVC 0'�1' /,�Max Number of Pa"elYCirWil 11 BAWG ] PVC ' y/und BAWG 1 PVC U-1. NOTES FOR INVERTER CIRCUITS(Guide Section 6 and 2), of m w 1.)IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH,DOES THIS 3 6 PV Module Ratings @ STC(Guide Section 5) SWITCH MEET THE REQUIREMENTS'! Z Emphasis M215-60-2LL-S2X-ZC YES NO XNA Model MakeMt"eel Tine Solar TSM-250 PA05.18 N��Z MICROANVERTERAT Max Power-Paint Current form zes Amps LL1L. 2.)IF GENERATION METER REQUIRED,DOES THIS METER Max Powm-Paint Volume(Vmp) 30.4 Volts frj30 EACH MODULE,ATTACHED SOCKET MEET THE REQUIREMENTS? �` U Open-Circuit Voltage(Voc) 3i2 Volts U WITH 2EP HARDWARE YES NO XNA Shot-Circuit Current purl 8,37 Amps Q 3t SIZE PHOTOVOLTAIC POWER SOURCE(Di CONDUCTORS Max Senea Fort.QCPD) - 15 Amps 0 BASED ON MAX CURRENT CN NEC 690.53 SIGN OR OCPD Nominal Maximum Paver at STC(Pmaq 240 Wane RATING AT DISCONNECT. Maximum System V011age 1000(IECy600(a I j 4.)SIZE INVERTER OUTPUT(AC)CONDUCTORS ACCORDING Voc Temperature Coefficient 0.32 %PC #6 BARE CU GROUND ^ TO INVERTER OCPD AMPERE RATING(See Guide Section 9). (GROUNDING MODULE V 5.)TOTALOF 2 INVERTEROCPD(s).ONE FOR EACH NOTES FOR ARRAY CIRCUIT WRING(Guide Section 6 and and Appendix 01: &INVERTER) Pad CIRCUIT.DOER TOTAL SUPPLY BREAKERS COMPLY �• WITH 120%BUSBAR EXCEPTION IN It Leveet expected ambient temperature based on ASHRAE minimum mean Extreme NEC 690.641 RYES NO dry bulb temperature for ASHRAE location most similar to instellemon location: -19-C MICROINVERTER CONNECTION , Signs(See Guide Section 7) 2.)Highest continuous ambient temperature based on ASHRAE highest month 2%dry bulb rat TO ENGAGE TRUNK CABLE temperature for ASHRAE location most similar to installatlon location: 39-C Sign for inverter OCPD and AC Disconcert: 3.)2005 ASHRAE fundamentals 2%design temperatures do not exceed 47-C in the N Solar PV System AC Point of Connectionin United States(Palm Springs,CA is 44.1'C).For less than 9 current-mrt ang conductors mof-mounted sunlit conduit at east as-above roof and using the outdoor design AC output Current 21 600000 Amps temperature of 47-C or less(all of United States). Nominal AC Voltage 2401 Volts a.)12 AWG,90"C conductors are generally acceptable for modules with lsc of 7,68 Amps < or less when protected by a 121 or smaller fuse. c THIS PANEL FED BY SOURCES h)10 Aii 90°C conductors w are generally acceptable for modules with so of 9.6 Amps (UTILITY AND AND SOLARLTIPLE SOLAR)' or less when protectedb a I 6Annp or smaller fuse. •em � A PV CIRCUIT 1: 12 MODULES/PARALLEL air POINT OF DELIVERY < to to AND INTERCONNECTION a m o m e A ® O f N • • • J` x/. so K U Z ad Q a VISIBLE/LOCKABLE M > D E u I COMBINER SREC/ANSI 'KNIFE'A/C ni ¢ so PV CIRCUIT 2: 12 MODULES/PARALLEL i PANEL METER DISCONNECT Le w 0 i 6--, zdb� w w Q Q Q • • •UXU4 15A Z ZSHEET t5A NAMELU Q____ _ Z1r _-_____ ______ _ ______ __ __VisionMetedng Siemens I 240V1200A 3 V2Si 3 IfLNF222R 3 1LOAD-CENTER 60A/240V SHEET E 1.0 E 1.0 UNFUSED E 1.0 NUMBER: it NEMA3 GROUND SPLICE O NOTE: NEUTRAL CONDUCTOR(S)OMITTED FOR CLARITY - A INVVTER OUTPUT CIRCUITS WILL HAVE A NEUTRAL CONDUCTOR LLI