6 CAMBRIDGE STREET - BUILDING JACKET 6' Cambridge St,
0001,
_, a ,,." Cm
40
ONE SA.__?,! v .__N" SALEM. MASSACHUSETTS 0197^
.- :S08) 7 -gar zt:T. 3? FAX iq��al 710-0404
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction '. Alteration
❑ Demolition ❑ Painting
❑ Signage ❑ Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic
Districts Ordinance.
District: McIntire
Address of Property: 6 Cambridge St
Name of Record Owner: John & Jude Bedell
Description of Work Proposed:
Installation of two,four light square, wood, glazed cellar sash window and vents on rear of house as per
drawing submitted. Non-applicability due to being minimally visible from any public wary.
Dated: 8/8/96 SALEM HISTORICAL C/OMMISSI N
By:
The homeowner has the option not to commence the work(unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
I
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.
FFHAJ
}
E
O
i
ONE SALEM GF=EN. S. LEM. MASSACHUSETTS 01970
(508) 7^-5-95ec EXT 311 FAX (608) 7x0-0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction Alteration
❑ Demolition Painting
❑ Signage ❑ Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property: 6 Cambridge St.
Name of Record Owner: John& Judy Wang Bedell
Description of Work Proposed:
Option to replace shingles with wood clapboards, smooth side to weather with exposure to match existing
clapboards or, as last resort, to replace shingles with shingles. Either to be painted red to match existing red
on house. Trim and fence to be painted white or repainted in existing. Doors to be painted Fisherman's Blue
Dated: 8/8/96 SALEM HISTORICAL COMMISSION
- �
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.