DECISION OF THE PETITION OF CHRIS DELORENZO REQUESTING A
VARIANCE FOR THE PROPERTY LOCATED AT 10 CALIBRESE STREET R-1
A hearing on this petition was held May 16, 2001 with the following Board Members
present: Nina Cohen, Chairman, Richard Dionne, Stephen Buczko and Stephen Hams.
Notice of the hearing was sent to abutters and others and notices of the hearing were
properly published in the Salem Evening New in accordance with Massachusetts General
Laws Chapter 40A.
The petitioner is requesting a Variance for relief for from rear yard setback to construct
an addition (a bath) on the existing building for the property located at 10 Calibrese
Street located in an R-1 zone.
The Variances, which have been requested, upon a finding Board that:
a. Special conditions and circumstances exist which especially affect the land, building
Or structure involved and which are not generally affecting other lands, buildings,
and structure involve.
b. Literal enforcement of the provisions of the Zoning Ordinance would involve
substantial hardship, financial or otherwise, to the petitioners..
c. Desirable relief may be granted without substantial detriment to the public good and
Without nullifying or substantially derogating from the intent of this district of the
purpose of the Ordinance
The Board of Appeal, after careful consideration of the evidence presented at the hearing,
and after viewing the plans, makes the following findings of fact:
1. His contractor,Mr. Don Carter, represented the petitioner.
2. Plans were submitted showing the addition to the property.
3. There was no opposition to the petition.
On the basis of the above finding of fact, the evidence presented at the hearing, the
Zoning Board of Appeal concludes as follows:
DECISION OF THE PETITION OF CHRIS DELORENZO REQUESTING A
VARIANCE FOR THE PROPERTY LOCATED AT 10 CALIBRESE STREET R-1
page two
1. Special conditions exist which especially affect the subject property but not the
district in general.
2. Literal enforcement of the provisions of the Zoning Ordinance would involve
substantial hardship to the petition.
3. Desirable relief can be granted without substantial detriment to the public good and
Without nullifying or substantially derogating from the intent of the district or the
purpose of the Ordinance.
Therefore,the Zoning Board of Appeal voted 5-0,to grant the Variances requested,
subject to the following conditions;
1. Petitioner shall comply with all city and state statures, ordinances, codes and
regulations.
2. All construction shall be done as per the plans and dimensions submitted.
3. All requirements of the Salem Fire Department relative to smoke and fire safety
shall be strictly adhered to.
4. Petitioner shall obtain building permit prior to beginning any construction.
5. Exterior finishes of the new construction shall be in harmony with the existing
structure.
6. A Certificate of Occupancy must be obtained.
Variance Granted
May 16, 2001
Richard Dionne,Member
Board of Appeal
DECISION OF THE PETITION CHRIS DELORENZO REQUESTING A VARIANCE FOR
THE PROPERTY LOCATED AT10 CALIBRESE STREET R-1
page three
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND
THE CITY CLERK
Appeal from this decision, if any, shall be made pursuant to Section 17 of the
Massachusetts General Laws Chapter 40A, and shall be filed within 20 days after the
date of filing of this decision in the office of the City Clerk. Pursuant to
Massachusetts General Laws Chapter 40A, Section 11. The Variance or Special
Permit granted herein shall not take effect until a copy of the decision bearing the
certificate of the City Clerk that 20 days have elapsed and no appeal has been filed,
or that, if such appeal has been filed, that is has been dismissed or denied is
recorded in the South Essex Registry of Deeds and indexed under the name of the
owner of record or is recorded and noted on the owner's Certificate of Title.
Board of Appeal
CITY OF SALEM, MASSACHUSETTS
• BOARD OF APPEAL CIT", 0r SALEf�9. MA
120 WASHINGTON STREET, 3RD FLOOR CLERK'S OFFICE
SALEM, MA 01970
TEL. (978) 745-9595
FAX (978) 740-9846
STANLEY J. LISOVICZ, JR. 1001 JAN 28 P 12: 00
MAYOR
DECISION OF THE PETITION OF DIANE & DOMINIC DELORENZO REQUESTING A
VARIANCE FOR THE PROPERTY LOCATED AT 10 CALABRESE STREET R-1
A hearing on this petition was held January 16, 2002 with the following Board Members
present: Nina Cohen, Richard Dionne, Nicholas Helides, Bonnie Belair and Joan
Boudreau. Notice of the hearing was sent to abutters and others and notices of the
hearing were properly published in the Salem Evening News in accordance with
Massachusetts General Laws Chapter 40A.
The petitioner is requesting a Variance from front setback to construct a farmer's porch
for the property located at 10 Calabrese Street located in a R-1 zone.
The Variances, which have been requested, may be granted upon a finding by this
Board that:
a. Special conditions and circumstances exist which especially affect the land, building
or structure involved and which are not generally affecting other lands, buildings and
structure involve.
b. Literal enforcement of the provisions of the Zoning Ordinance would involve
substantial hardship, financial or otherwise, to the petitioners.
c. Desirable relief may be granted without substantial detriment to the public good and
without nullifying or substantially derogating from the intent of the district of the
purpose of the Ordinance.
The Board of Appeal, after careful consideration of the evidence presented at the ,
hearing, and after viewing the plans, makes the following findings of fact:
1. Petitioner appeared before the Board to request a front setback of 12 feet to allow
construction of a raised front porch to enclose the existing door and extend 20feet
along the front of the existing structure.
2. Plans were submitted showing the proposed construction.
3. There was no opposition to the proposed petition.
r
DECISION OF THE PETITION OF DIANE & DOMINIC DELORENZO REQUESTING A
VARIANCE FOR THE PROPERTY LOCATED AT 10 CALABRESE STREET R-1
pagetwo
On the basis of the above findings of fact, and on, the evidence presented at the
hearing, the Zoning Board of Appeal concludes as follows
1. Special conditions exist which especially affect the subject property but not the
district in general.
2. Literal enforcement of the provisions of the Zoning Ordinance would involve
substantial hardship to the petitioner.
3. Desirable relief can be granted without substantial detriment to the public good and
Without nullifying or substantially derogating from the intent of the district or the
purpose of the Ordinance.
Therefore, the Zoning Board of Appeal voted 5-0, to grant the Variances requested,
subject to the following conditions;
1. Petitioner shall comply with all city and state statures, ordinances, codes and
regulations.
2. All construction shall be done as per the plans and dimensions submitted.
3. All requirements of the Salem Fire Department relative to smoke and fire safety shall
be strictly adhered to.
4. Petitioner shall obtain a building permit prior to beginning any construction.
5. A Certificate of Inspection shall be obtained.
6. Exterior finishes of the new construction shall be in harmony with existing structure.
VARIANCE GRANTED
JANUARY 16, 2002
Nina Cohen
Chairman, Board of Appeals
r
DECISION OF THE PETITION OF DIANE & DOMINIC DELORENZO REQUESTING A
VARIANCE FOR THE PROPERTY LOCATED AT 10 CALABRESE STREET R-1
page three.
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND
THE CITY CLERK
Appeal from this decision, if any, shall be made pursuant to Section 17 of the
Massachusetts General Laws Chapter 40A, and shall be filed within 20 days after the
date of filing of this decision in the office of the City Clerk. Pursuant to
Massachusetts General Laws Chapter 40A, Section 11. The Variance or Special
Permit granted herein shall not take effect until a copy of the decision bearing the
certificate of the City Clerk that 20 days have elapsed and no appeal has been filed,
or that, if such appeal has been filed, that is has been.dismissed or denied is
recorded in the South Essex Registry of Deeds and indexed under the name of the
owner of record or is recorded and noted on the owner's Certificate of Title.
Board of Appeal
February 17, 1994 /
Mrs. Diane DeLorenzo /
23 Seaview Avenue
Marblehead, MA 01945
Leo E. Tremblay
Director of Public Property
One Salem Green
Salem, MA 01970
Dear Mr. Tremblay:
I am responding to your letter dated 2/15/94 sent to my mother, Mrs. Dorothy E. Dallaire, concerning the
unshoveled sidewalk at 10 Calabrese Street.
Attached you will find a copy of a letter regarding my concerns about inadequate plowing, sent to Mayor
Harrington on March 18, 1993, as well as his response to me.
As a taxpayer in the City of Salem, I do believe that the tax money is used to pay the plowing contractors. The
plowing at 10 Calabrese Street is still being done in a less than satisfactory manner, requiring my mother to pay
a person to shovel between 10 and 16 feet of the street, which is the responsibility of the City to be cleared
by the plowing contractor. My mother is elderly and quite ill with a heart condition. Taxes are already paid
by us to cover the clearing of the street by the City in front of 10 Calabrese Street, and in addition to paying the
taxes we have to again pay a person to clear the street. To clear the street takes at least 1 hour before even
reaching the sidewalk into the driveway which is, as your letter states, 'bur responsibility." Because of this
added burden placed upon the person shoveling the street and the added cost to my mother, the sidewalk in front
of the house remains unshoveled. My mother lives on a very limited income. Why should she have to pay a
person to shovel the street which is the responsibility of the City, when she has already payed taxes for this
service which is not being done. The time and money that could be put toward a person shoveling the sidewalk
is being used to shovel the street because the contractor insists on not plowing along the curve. This problem
also affects the residents of 6 Calabrese Street. There is no reason why the person doing the plowing does not
do it properly. Because of my many phone calls to the Public Works Department last winter, during one storm
the plow driver did cut into the curb, leaving a very small section of street needing to be shoveled -- this was
understandable -- so, this proves that if done right, there is no need to leave 10-16 feet of the street unplowed
needing to be shoveled.
If this problem persists, I suggest the Public Works Department send someone to shovel the sidewalk at no extra
cost to us, since we are doing the work of the Public Works Department by shoveling the street.
I intend to, again, contact the Mayor's Office and the Public Works Department. As soon as I receive a
response from them on how they intend to correct this ongoing problem, I will contact you with our "plan of
action" for a problem caused by the lack of commitment on the part of the plowing contractor who is getting
paid extremely well with taxpayers money for a job he obviously chooses not to do correctly.
Should you wish to discuss this matter further, I may be reached at the above address.
Mrs. Diane DeLorenzo
att.
cc: Mayor Harrington
Public Works Department
J. Donahue, Councilor
Certificate Number: B-2002-0697 Permit Number: B-2002-0697
Commonwealth of Massachusetts
City of Salem
This is to Certify that the —S-in,gle Fam"illy,Bu.i.lding,............... ............. ....... located at
Building Type
...... ...,1.,0..l,4LA-B.R.ESE STREETin the City of
Sq4em
Address Town/City Name ............
IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY
10 CALABRESE STREET
This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and
expires ......................-.....AW-Applicable_.... unless sooner suspended or revoked.
Expiration Date
Issued On: Thursday, August 07, 2014
0010 CALABRESE STREET 701-2002
GIs#: 19792 COMMONWEALTH OF MASSACHUSETTS
Map: 125
Black: CITY OF SALEM
Lot: 0375
Permit Building
Category: 434R6idential:add1t1 BUILDING PERMIT
permit# . . 701-2002
Project# JS-2002-1608
Est. Cost: $305.00`
Fee: $50,000.00 PERMISSION IS HEREBY GRANTED TO:
Const.Class: Contractor: License:
Use Group: McKinnon Construction General Contractor-Salem#997
Loc Size(sq.ft.): 5000 . Owner: DELORENZO DIANE
Zoiung: Rr : Applicant: DELORENZO DIANE
nits Gained: i
ilnit-Lost AT: 0010 CALABRESE STREET
ISSUED ON: 02-May-2002 AMMENDED ON: EXPIRES ON: 02-Nov-2002
TO PERFORM THE FOLLOWING WORK:
701-2002;Construct 2nd levl over main house for 3 brs and 1 bath and 1 st fl porch(5'x 20'w/stairs. TSP
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Electric Gas Plumbing 7Rough
Underground: Underground: Underground: :
Service: Meter:
Rough: —� _O� Rough: Rough: n:
J Final: at: Final: me: !o v
`{ r
p "GAS-fir
Fireplace/Chimney:
D.P.W. Fire Health
Insulation:
Meter: Oil:
Final:
House# Smoke:
Treasury:
Water: Alarm:
Sewer: Sprinklers:
THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM ON VIOLATION OF Al OF
ITS RULES AND REGULATIONS.
Signature: d
Fee Type: Receipt No: Date Paid: Check No: Amount:
BUILDING REC-2002-001723 30-Apr-02 4134 $50,000.00
a.
i
GeoTMS®2002 Des Lauriers Municipal Solutions,Inc.
Oe
The Commonwealth of Massachusetts
y Board of Building Regulations and Standards CITY OF
Massachusetts State Building Code, 780 CMR SALEM
a ,— Revised Hlnr 2011
Building Permit Application To Construct, Repair, Renovate Or Demolish a
One-or Tivo-Family Dtvelling
This Section For Official E^Only
Building Permit Nwnber: Date qppl ieedd�:'y"�,�
Building Official(Print Name) Signature Date
te /
SECTION I:SITE INFORMATION
1.1 Propertyp/A ress: 1.2 Assessors Map& Parcel Numbers
1.1 a Is this an accepted street?yes no Map Number Parcel Number
1.3 Z ninI Information: 1.4 Property Dimensions:
Zoning District Proposed Use Lot Area(sq Il) Frontage(Il)
1.5 Building Setbacks(ft) Cl)
Front Yard Side Yards Rear Yard am
Required Provided Required Provided Required Ppe�ided Drn
Nm
1.6 Water Supply:(Nl.QL c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal Systemtt� Z1
Public❑ Private❑ Zone: _ Outside Flood Zone'? �Y <
Check if ves❑ Municipal ❑ On site disposal item A
SECTION 2: PROPERTY OWNERSHIP' N
2.1 O nerof;n Recordg: J/
n _07 WiZ o�q7 '
Nume(Print) City,Stute,ZII'
l o (&,d4 .+ALax1 - I_ q 7 e- 7diAdeIy� k ,cam
No.
and Stmat "felephone Emil Address
SECTION 3: DESCRIPTION OF PROPOSED WORK'(check all that apply)
New Construction ❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ Alteration(s) 13 Addition ❑
Demolition ❑ Accessory Bldg. ❑ Number of Units_ Other ❑ Spccily:
Brief Description of Proposed Work'':_
SECTION 4: ESTIMATED CONSTRUCTION COSTS
Item Estimated Costs: Official Use Only
Labor and Materials)
I. Building $ I. Building Permit Fee: $ Indicate how fee is determined:
�. Electrical $ ❑Standard Cityfrown Application Fee
❑'rotal Project Cost(Item 6)x multiplier x_
3. Plumbing $ 9, Other Fees: S
4. Mechanical (IIVAC) $ List:
5. Mechanical (Fire
Su�xession) $ Total All Fees: $_
6. Total Project Cost $ Check No. Check Amount: Cash Amount:_
3 Uvv ❑ I aid in Pull ❑ Outstanding Balance One:
5 g-W T 7f
l/stye to
r
SECTION 5: CONSTRUCTION SERVICES
5.1 Construction Supervisor License(CSL)
License Number fxpiradon Date
Name of CSL Holder
List CSL Type(se•below) ,
NoEandStreet Type Descripti n
lJ Unresiric ed Buildi u to 35,000 cu. ft.)
CitState,ZIP R Restricted &2it Dwcllid�
M Mason
RC Roofjn Cover
WS Wrhdow and Sidi
SP Solid Fuel Burning liances
I Insulation
Telephone Email address D Demolition
5.2 Registered Home Improvement Contractor(MIC)
1 HIC Registratio Number Expiration Dale
f IIC Company Name or FIIC Regis • rt Nam
No.and Strut[ k.unit address
r
Ci[ /'Down,State,ZIP fele hone
SECTION 6: WORKERS'COM ENSA'rION INSURANCE AFFIDAVIT(NLC.L.c. 152.§ 25C(6))
'Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide
this affidavit will result in the denial of the Issuance of the building permit.
Signed Affidavit Attached? Yes .......... ❑ No...........❑
c n SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN
z OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
1, as Owner of the subject properly, hereby autho ize
to act on my behalf, in all matters relative to work u ized by this building permit application.
Print Owner's Name(Electronic Signature) I
Date
SECTION 76: OWNER` OR AUTHORIZED AGENT DECLARATION
By entering my name below, I hereby attest under the pains and penalties of perjury that all of the information
contained in this applicatio is true and accurate to the best of my knowledge and understanding.
Print Owner's or Authorized gent'sName f Icclronic Signature)
Late
NOTES:
1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor
(not registered in the Home Improvement Contractor(HIC) Program), will not have access to the arbitration
program or guaranty fund under NLG.L.a 142A.Other important information on the HIC Program can be found at
www.ntass.gov/oca Information on the Construction Supervisor License can be found at www.rnass.eov/dps
-T.—When substantial work is planned,provide the information below:
Total floor area(sq. ft.) _(including garage, finished basement/attics,decks or porch)
Gross living area(sq. R.)_ Habitable room count
Number of fireplaces _ Number of bedrooms _
Number of bathrooms _ Number ofhalf/baths
Type of heating system_ _ Number of decks/porches _
Type ofcooling system_ Enclosed Open _
3. "Total Project Square Footage"may be substituted for"Total Project Cost'