Loading...
200 FORT AVE - BUILDING INSPECTION The Commonwealth of Massachusetts Department of Public Safety Massachusetts State Building Code(780 CMR) co Building Permit Application for any Building other than a One-or Two-Family Dwelling r (This Section For Official Use Only) Building Permit Number. Date Applied: Building Official: ION 1:LOCATION(Please indicate Block#and Lot#for locations for which a street address is not available) 62 Fd2t Avt S�aG�,. , „a r�i�7a S�1G ti,�r by�cLowS No.and City/Town Zip Code Name of Building(if applicable) SECTION 2•PROPOSED WORK 1 Edition of MA State Code used If New Construction check here❑or check all that apply in the two rows below Existing Building❑ Repair❑ I Alteration ❑ 1 Addition❑ I Demolition 0 (Please fill out and submit Appendix 1) Change of Use ❑ Change of Occupancy ❑ Other t] Specify: Are budding plans and/or construction documents being supplied as part of this permit application? Yes ❑ No ❑ Is an Independent Structural Engineering Peer Review required? Yes ❑ No ❑ Brief Description of Proposed Work: /Pou'l. 5,t), 'p"'aAI ft9 SE 5 at:n per. SECTION 3.COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Investigation and Evaluation is enclosed(See 780 CMR 34) 0 Existing Use Group(s): Proposed Use Group(s): SECTION 4:BUILDING HEIGHT AND AREA Existing Proposed No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.) Total Area(sq.ft.)and Total Height(ft.) SECTION 5:USE GROUP(Check as applicable) A: Assembly A-1❑ A-2❑ Nightclub ❑ A-3 ❑ A-4❑ A-5❑ 1 B: Business ❑ E: Educational ❑ F. Factory F-1❑ F2❑ H: High Hazard H-1❑ H-2❑ H-3 ❑ H-4❑ H-5❑ I: Institutional I-1❑ I-2❑ I-3❑ 1-4❑ M: Mercantile❑ R Residential R-10 R-2❑ R3❑ R-4❑ S: Storage 5-1❑ S-2 0 U: Utility❑ Special Use 0 and please describe below: Special Use: SECTION fx CONSTRUCTION TYPE(Check as applicable) IA 1110 IIA ❑ IIBO IIIAO 1IIB13 1 IV 13 1 VAO VB ❑ SECTION 7:SITE INFORMATION(refer to 780 CMR 111.0 for details on each item) Water Supply: Flood Zone Information Sewage Disposal: Trench Permit: Debris Removal: Public❑ Check if outside Flood Zone❑ Indicate municipal❑ A trench will not be Licensed Disposal Site❑ Private❑ or indentify Zone: or on site system❑ required 0 or trench or specify: permit is enclosed❑ Railroad right-of-way: Hazards to Air Navigation MA Historic Commission Review Process: Not Applicable❑ Is Structure within airport approach area? Is their review completed? or Consent to Build enclosed❑ Yes 0 or No❑ Yes❑ No ❑ SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Code: Use Group(s): Type of Construction: Occupant Load per Floor: Does the building contain an Sprinkler System?: Special Stipulations: SECTION 9: PROPERTY OWNER AUTHORIZATION Name and Address of Property Owner r;.L+y MY 6quzr, )9c,.7 Ave Name(Print) No.and Street City/Town Zip Property Owner Contact Informatiom Title Telephone No.(business) Telephone No. (cell) e-mail address If applicable,the property owner hereby authorizes Name Street Address City/Town State Zip to act on the property owner's behalf,in all matters relative to work authorized by this building permit application. SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 2) B building is less than 35,000 cu.ft of enclosed space and/or not under Construction Control then check here 0 and skip Section 10.1) 10.1 Registered Professional Responsible for Construction Control Name(Registrant) Telephone No. e-mail address Registration Number Street Address City/Town State Zip Discipline Expiration Date 10.2 General Contractor C [rWir) yx-165 (2C9V ✓ uc tsov IivC t Company Name r,5 - o839sb Name of Person Responsible for Construction License No. and Type if Applicable pa�-�y, 02 y/ A (�/�1 H S'r �A/bl"r Street Address City/Town State Zip 9MLC9399- C /ur✓7yOC�W,r�rc Telephone No.(business) Telephone No.(cell) e-mail address SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§25C(6)) A Workers Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit Is a signed Affidavit submitted with this application? Yes❑ No 13 SECTION 12.CONSTRUCTION COSTS AND PERMIT FEE Item Estimated Costs:(Labor and Materials) Total Construction Cost(from Item 6)_$ 1.Building $ Budding Permit Fee=Total Construction Cost x (Insert here 2.Electrical $ appropriate municipal factor)_$ 3.Plumbing $ 4.Mechanical (HVAC) $ Note:Minimum fee=$ (contact municipality) 5.Mechanical (Other) $ Enclose check payable to 6.Total Cost $ (contact municipality)and write check number here SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. �ujv �eyr_ 9�z3 Pam_ S Please print and sign name e57 Title Telephone No. Date Street Address City/Town / /J State Zip t, Municipal Inspector to fill out this section upon application approval• Name Date K �s� NpUF l V d� Desk