123 FEDERAL ST - BUILDING INSPECTION (2) What is the current use of the Buildin ?
Material of Building? If dwelling.how many units?
Win the Building Conform to Law? e S Asbestos? No
Archned's Name
Address and Phone
Machanic's Name
Address and Phone
Constriction Supervisors License# HIC Registration 0
Estimated Cost of Projed$ Permit Fee Calculation
Permit Fee i Z! s Estimated Cost X$7/51000 Residential
-- _ -- Estimated Cost X S11/51000 Commercial-- --- - -------
An Additional$5.00 is added as an
Administrative charge.
Make sure that all fields are properly and legibly written to avoid delays in processing.
The undersigned does hereby apply for a Building Permit to build to the above stated
specifications. Signed under penalty of perjury X
Date 7
a
0
v
9,� 3
� a. N
v y
CITY OF SALEM
PUBLIC PROPERTY
DEPARTMENT
KALBE -EY DRISLOU.
MAYOl 120 WASMNCTON SIAM•S AtFat,NASSSA61USh'I'IS 01970
Tu-978-74S-9595♦ FAX:978-740-9&6
HOMEOWNER LICENSE EXEMPTION
Please Print
Date 0 7
Job Location ✓
Home Owner Address
Home Owner Telephone < -
Present Mailing Address
The current exemption of"Homeowners"was extended to include owner-occupied
dwellings of two Units or less and to allow such homeowners to engage an individual for
hire who,does not possess a license,provided that the owner acts as supervisor.
DEFINITION OF HOMEOWNER
Person(s)who owns a parcel of land on which he/she resides or intends to reside, on
which there is, or is intended to be,a one or two family dwelling, attached or detached
structures accessory to such use and/or farm structures. A person who constructs more
than one home in a two year period shall not be considered a homeowner. Such
"homeowner"shall submit to the Building Official,on a form acceptable to the Building
Official, that he/she be responsible for all such work performed under the Building
Permit.
The undersigned"homeowner"assumes responsibility for compliance with the State
Building Code and other applicable by-laws and regulations.
The undersigned "homeowner"certifies that he/she understands the City of Salem
Building Department minimum inspection procedures and requirements and that he/she
will comply with said
procedures and P Y p requirements.
HOMEOWNERS SIGNATURE--9/ /
APPROVAL OF BUILDING INSPECTOR ZEz)
See other side for state code
0*-i-
CITY OF SALEM
PUBLIC PROPRERTY
DEPARTMENT
h LF.T!.)RhC H.
.M.;7 og 120 WAM IINGTON STREET •SAIFA1,MAST.%C,I CSL Fr S U 197C
TrI:978-745-9595 ♦ FAX:978-740-9846
Construction Debris Disposal Affidavit
(required for all demolition and renovation work)
In accordance with the sixth edition of the State Building Code, 780 CMR section 111.5
Debris, and the provisions of MGL c 40, S 54;
Building Permit 9 -_-..-.__ is issued with the condition that the debris resulting from
this work shall be disposed of in a properly licensed waste disposal facility as defined by MGL c
111, S 150A.
The debris will be transported by:
-- (name hai, r)
The debris will be disposed of in
laddress of facility)
--- .. .,nature e n applicant
riat�
,!ehri..i i.dni
2
15 t Z4 R
C
ROO Salem Historical Commission
{ f,rp' Kf" "�4
i KY Y Y h
- - 120 WASHINGTON STREET,SALEM,MASSACHUSETTS 01970
(978)745.9595 EXT.311 FAX(978)740-0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
❑ Construction ❑ Moving
❑ Reconstruction Alteration
❑ Demolition Painting
❑ Signage O Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property- 123 Federal Street
Name of Record Owner: Sharon Maguire
Description of Work Proposed:
Replacement of secondary egress to carriage house second floor per sketch submitted. One post on top of
landing and one at bottom of stairs. Risers to be painted black, steps to be deck gray and railing to match
existing white trim ofbuilding. Railing to be 36" high, 4 x 4 posts not to exceed 39" high with pyramid cap.
Ballasters to be 2", 4" an center with standard Brosco beveled capped rail. Railing design to match
photograph submitted including I %" round handrail. Option./or matching 1 ''/z" round handrail to be installed
along building side.
Installation of window above door in rear to match top of leaded window, conditional that the rouindow not be
visible from any public way.
Dated: April 5, 2007 SALEM HISTORICAL COMMISSION
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.
EI`I'Y-OF i
PUBLIC PROPERTY
DEPART141ENT
KI4NEJU cv ORMAN
MAYOR 13D WASMNGTcw SnEET 'yuty.M.%ssACHl:S!'1lS 01970
Tm-91&743.9593•F=97&740.9N6
APPLICATION FOR THE REPAIR. RENOVATION CONSTRUCTION
DEMOLITION. OR CHANGE OF USE OR OCCUPANCY FOR ANY EXISTING
STRUCTURE OR BUILDING
1.0 SITE INFORMATION
Location Name: Building:
Property Address.—— ------ ----— ---- --
/I 3 � -- --
Properly Is located in a;Conservation Area Y/N Historic District YIN
—
2.0 OWNERSHIP INFORMATION
2.1 Owner of Land
Name: J
Address: 1�3
Telephone: Vi—, 173
3.000MPLETE THIS SECTION FOR WORK IN EXISTING BUILDINGS ONLY
Addition Existing
Renovation Number of Stories Renovated
Change in Use New
Demolition Existing
Approximate year of Area per floor(sf) Renovated
construction or renovation �y�
of existing building New
Bdef Description of Proposed Work: (��� FTleheT�-� "..
�ns�.GL �vGn
►�� 16 dj�&sle6ml/ xl�`a w�
Mail Permit to: