Loading...
11 FAIRMOUNT ST - BUILDING PERMIT APP The Commonwealth of Massachusetts INSREC71 NAL SERVICES Board of Building Regulations and Standards CITY OF Q EBuilding Massachusetts State BuildingCode, 780 CMR SALEM 1414 DEC -R4is &�Building Permit Application To Construct, Repair, Renovate Or Demolish a l One-or Two-Family Dwelling This Section For Official Use Only Perini[Number: Date APPIied: A-" Building Official(Print Name) Signature Date v SECTION 1:SITE INFORMATION LI Proper ddress: 1.2 Assessors Map&Parcel Numbers 1.Ia Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage 01) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.EL c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: _ Outside Flood Zone?Check if yes❑ Municipal❑ On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner of Record: Joseph Hill Salem, MA. 01970 Name(Print) City,State,ZIP 11 Fairmount st 978-744-8029 Towncar89@comcast.net No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ Alteration(s) ❑ Addition ❑ Demolition ❑ 1 Accessory Bldg. ❑ 1 Number of Units_ Other ❑ Specify: Brief Description of Proposed Work': In S tin SECTION 4: ESTI ATED CONSTRUCTION COSTS Item Estimated Costs: (Labor and Materials) Official Use Only 1.Building $ V(Iu ,Do 1. Building Permit Fee:$ Indicate how fee is determined: 2.Electrical $ '� Q.� ❑Standard City/Town Application Fee ❑Total Project Cost'(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (IIVAC) $ List: 5.Mechanical (Fire Su cession $ Total All Fees:$ Check No. Check Amount: Cash Amount: 6.Total Project Cost: I S ❑Paid in Full ❑Outstanding Balance Due: ui N r SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) , J C�YY11�S s1-1PY'c r Y� O�t�25y P n l� License Number Ez motion Date Name of CSL Holder U Fl:�i List CSL Type(see below) U No.and Street 1 C/v` Type Description U Unrestricted(Buildings up to 35,000 cu.ft.) City/Town,State,ZI/lN' t lJ�l "1 R Restricted 1&2 Famil Dwellin M Masonry RC Roofing Covering WS Window and Siding _ c ,,.• SF Solid Fuel Burning Appliances 7�1�05 �J M1�15(�Pr1'�iU�Vi�}�.�i�lY I Insulation Telephone Email address D Demolition 5.21 'Reg`isftere/d�Home Improvement Contractor(HIC) \,055q S , V V \ r `t c `a`r HIC Registration Number Expiration Date HIC Corpq�gy1Nn r HIC,Regis ant Name No.an ``�/rllr''e''IletV' Email address City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? _Yes ..........❑ No...........0 SECTION 72: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize y Aoyl t SD\k)ky- to act on my behalf, ' a ma rs re to work authorized by this building permit application. 11/24/14 Print Owner's Name( ctronic Signature) Date SECTION 7b: OWNER' OR AUTHORIZED AGENT DECLARATION By entering my name below, I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. � �� I a-b icy Print Owner's or Authorized Agent' me(Ele nic Signature) Date NOTES: I. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. I42A.Other important information on the HIC Program can be found at www.mass.eov.'oca Information on the Construction Supervisor License can be found at www.mass.eov/d ads 2. When substantial work is planned,provide the information below: Total floor area(sq. ft.) (including garage,finished bmement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" «I «i „i + 33111 North Thanksgiving Way,Suite SUU Structural Group Lehi,UT 84043 P: (801) 234-7050 Scott E. Wyssling, PE Head of Structural Engineering scott.wyssling[a vivintsolar.com November 20, 2014 Mr. Dan Rock, Project Manager Vivint Solar 24 Normac Road Woburn MA 01801 Re: Structural Engineering Services Hill Residence 11 Fairmount Street, Salem MA S-4061445 4.845 kW System Dear Mr. Rock: Pursuant to your request, we have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site VisiUVerification Form prepared by a Vivint Solar representative identifying specific site information including size and spacing of rafters for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information was prepared by the Design Group and will be utilized for approval and construction of the proposed system. 3. Photovoltaic Rooftop Solar System Permit Submittal identifying design parameters for the solar system. 4. Photographs of the interior and exterior of the roof system identifying existing structural members and their conditions. Based on the above information we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: Description of Residence: The existing residence is typical wood framing construction with the roof system consisting of 2 x 6 dimensional lumber at 24” on center. Collar ties were not present during the inspection. The attic space is unfinished and photos indicate that there was free access to visually inspect the size and condition of the roof rafters. All wood material utilized for the roof system is assumed to be Spruce-Pine-Fir #2 or better with standard construction components. Our review of the photos of the exterior roof does not indicate any signs of settlement or misalignment caused by overstressed underlying members. Stability Evaluation: A. Wind Uplift Loading 1. Refer to attached Ecolibrium Solar calculations sheet for ASCE/SEI 7-10 Minimum Design Loads for Buildings and other Structures, wind speed of 100 mph based on Exposure Category "B" and 47 degree roof slopes on the dwelling areas. Ground snow load is 40 PSF for Exposure "B", Zone 2 per (ASCE/SEI 7-10). 2. Total area subject to wind uplift is calculated for the Interior, Edge and Corner Zones of the dwelling. blbint. so , �; I f Page 2 of 2 B. Loading Criteria 10 PSF= Dead Load roofing/framing 40 PSF=Live Load (around snow load) 5 PSF= Dead Load solar panels/mountina hardware Total Dead Load=15 PSF The above values are within acceptable limits of recognized industry standards for similar structures. Analysis performed of the existing roof structure utilizing the above loading criteria indicates that the existing rafters will support the additional panel loading without damage, if installed correctly. C. Roof Structure Capacity 1. The photographs provided of the attic space and roof rafters show that the framing is in good condition with no visible signs of damage caused by prior overstressing. D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent "Ecolibrium Solar Installation Manual', which can be found on the Ecolibrium Solar website (ecolibriumsolar.com). If during solar panel installation, the roof framing members appear unstable, deteriorated, structurally compromised or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. Maximum allowable pullout per lag screw is 235 Ibs/inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications for Hem-Fir (North Lumber) assumed. Based on our evaluation, the pullout value, utilizing a penetration depth of 2 Yz', is less than what is allowable per connection and therefore is adequate. Based on the variable factors for the existing roof framing and installation tolerances, using a thread depth of 2 1/2" with a minimum size of 5/16" lag screw per attachment point for panel anchor mounts should be adequate with a sufficient factor of safety. 3. Considering the roof slopes, the size, spacing, condition of roof, the panel supports shall be placed at and attached to no greater than every other roof rafter as panels are installed perpendicular across rafters and no greater than the panel length when installed parallel to the rafters (portrait). No panel supports spacing shall be greater than two (2) rafter spaces or 48"o/c, whichever is less. 4. Panel supports connections shall be staggered to distribute load to adjacent rafters. Based on the above evaluation, it is the opinion of this office that with appropriate panel anchors being utilized the roof system will adequately support the additional loading imposed by the solar panels. This evaluation is based on information supplied to us at the time of this report and current industry standards and practices. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. erytrulyyours, o=� jNOF yG _e Y 10 40 Scott E. Wy ling, o so MA License No. ST 9p�, FGI576P'0 FSSIONA& N o U c��: (1)60,W W �CpO OQZ (n E2z IL n0 U JUNCTION BOX ATTACHED TO a) � Q I ARRAY USING ECO HARDWARE TO I V J KEEP JUNCTION BOX OFF ROOF r PV SYSTEM SIZE: I I O 4.845 kW DC ) I Q Z I I E cu � < c N Q_ 1 75'OF 1"PVC CONDUIT ^ FROM JUNCTION BOX TO ELEC PANEL I 4— !� e � V INTERCONNECTION POINT, I O < m o a I LOCKABLE DISCONNECT SWITCH, 1 ANSI METER LOCATION, I 0 ¢ V Q &UTILITY METER LOCATION z E < m • > f U L I I W W c..- � cu W Z 3 F F 2 Z 0 _ _____ —_— ____ SHEET NAME: F- g (19)VIn9II Eperpv YL255P.29b MODULES WITH A W a Enphase M21560-2LL-S2x-ZC MICRO-INVERTER SHEET MOUNTED ON THE BACK OF EACH MODULE NUMBER: PV SYSTEM SITE PLAN o r SCALE: 3/32"= 1'-0" > d �m Ur N L T�NmW V COm OQz z �LLmz Roof Section 1 W��o Roof Azimuth:150 p Roof Tilt:47 T= a ROOF VENT(5 OMP.SHINGLE 2 r 1 �f (l; • I � o •� a I � $ j I I I I < n pmaS x > z U z W .. K R I ) V CIRCUIT#2: w z PVCIRCUIT#1 9MODULES ¢10 MODULES TIE INTO METER# N 21 982385 z Z p SHEET NAME: LILZ 0 � a SHEET NUMBER: PV SYSTEM ROOF PLAN 4 N • SCALE: 3/16"= V-0" > n. CLAMP MOUNTING SEALING PV3.0 DETAIL WASHER v c LOWER 0.m SUPPORT " com •��\Efi WLLd2 wo PV MODULES, TYP. MOUNT OF COMP SHINGLE ROOF, FLASHING PARALLEL TO ROOF PLANE / 2 1/2" MIN 5/16"0 x 4 112" MINIMUM STAINLESS 1PV ARRAY TYP. ELEVATION STEEL LAG SCREW NOT TO SCALE TORQUE=13t2 R-Ibs CLAMP ATTACHMENT r . NOT TO SCALE � s N m CLAMP+ ATTACHMENT CANTELEVERU OR LESS •C COUPLING J L=PERMITTED CLAMP ®®® ECO SPACING SEE CODE COMPLIANT COMPATIBLE LETTER FOR MAX ALLOWABLE MODULE CLAMP SPACING. e v, m PERMITTED COUPLING 3 m CLAMP+ CLAMP o r ATTACHMENT SPAC NG CLAMP F w g ma COUPLING - PHOTOVOLTAIC MODULE > u w .. wrc m J w m SHEET NAME: L=PORTRAIT � CLAMP SPACING ~ Zt7 Q ECO Wp COMPATIBLE SHEET L=LANDSCAPE MODULE PV SYSTEM MOUNTING DETAIL NUMBER: CLAMP SPACING MODULES IN PORTRAIT/LANDSCAPE NOT TO SCALE 1 M NOT TO SCALE > a Inverter Ratings(Guide Section 4) Invener MakelMMa Eaphaw M21560-21-82 7C O Conduit and Conductor Schedule MODULE DETAIL Max CC vat lams 45 Volta as m..npm„ ws.Gana. asdixaH. cmJna t' s.. Max Power@40-C 215 Wat6 I Enpluv evou r xu.T HWNR 11FWG 4 LwE WA-FraxM ear Nominal AC Voltage 240 Volk Yingli Energy VL255P-29b Max AC Current e9 Amps I T�CZppe Grouts IEGGGEL) IOAWG fi WA-FF'reGe Nr WA-Free Nrt j SOLAR MODULE Max OCPD False zo Amps V Unl Max Numberol PanexiCiruu 17 z 5awx z-Gmum eAWG I we o-rra 3 WWxa 6AwG wG P'-r I- V NOTES FOR INVERTER CIRCUITS(Guide Section 8 and 9), 3 wx-z-Grv.rra aAwG I Pau 0 1. m m m w 1.)IF UTILITY REQUIRES A VISIBLE BREAK SWITCH,DOES THIS PV Module Ratings@STC(Guide Section 5) -�Efj EOphase M215E0-2LL-S2z-ZC SWITCH MEET THE REDUIREMENTMENTS? Model MakelModel Youth Energy YL255P-29b Z MICRO-INVERTERAT YES NO XNA 9i m Er EACH MODULE,ATTACHED Wx Poweraoint Currenl(Imp) 8.32 Amps /��//LL o z WITH ECO HARDWARE 2J IF GENERATION METER REQUIRED,DOES THIS METER Max Poweruarus Voltage Vero) 31 Volk LL�an=O SOCKET MEET THE REQUIREMENTS? Opt ircuit Voiage(Va.) 38.7 Volk U YES NO XNA ShobCiarml CUnent(1a) 888 Amps Q P BASED N MAX CURRENT TON NEC 69R.53 SIGOR CONDUCTORS Max Series Fuse Maximum CPmPower 15 Amps BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPO Nominal Maamum Power at STC(Pmax) 255 Walls MICROINVERTER CONNECTION _ RATING AT DISCONNECT. Masimum System Voltage 1000(IECy600(UL) j TO ENGAGE TRUNK CABLE 4.)SIZE INVERTER OUTPUT(AC)CONDUCTORS ACCORDING Voc Temperature Coefficient -0.32 W'C TO INVERTER OCPO AMPERE RATING(See Guide Section 9). ll 5.)TOTAL OF 2 INVERTER OCPO(s).ONE FOR EACH NOTES FOR ARRAY CIRCUIT WIRING IGulde Section 6 and 8 and Appendix Dl- PV CIRCUIT.[TOES TOTAL SUPPLY BREAKERS COMPLY WITH 120%BUSBAR EXCEPTION IN 1.)Lowest expected ambient temperature based on ASHRAE minimum mean extreme NEC 690.64(8)(2)PH XYES NO dry bulb temperature for ASHRAE location most similar W installation location: -19-C y N BARE CU GROUND ---- ( L _ (GROUNDING ARRAY) Signs(See Guide Section 7) 2.)Highest continuous ambient temperature based on ASHRAE highest month 2%dry bulb temperature for ASHRAE location most Similar to installafon location: 39-C Sign for inverter OCPD and AC Disconnect: 3.)2005 ASHRAE fundamentals 2%design temperatures do net exceed 47-C in the United States(Palm Springs,CA is 44.1'C).For less than 9 currentcarrying conductors Gr. Solar PV System AC Point of Connection in mofmounted sunlit conduit at least CS'above roof and using the outdoor design AC OUtput Cunent 1100000 Amps temperature of 47-C or less(all of United States)in . Nominal AC V....e 240 Valls a,)12 AWG,90-C conductors are generally acceptable for modules with lad of768 Amps or less when protected by a 12-Amp or smaller fuse. ra TH IS PANEL FED BY MULTIPLE SOURCES m (UTILITY AND SOLAR) bJ 10 AWG.90-C conductors are generally acceptable for modules widr lsc,of 9.6 Amps or less when protectedb a 1 5-Amp or smaller fuse. o® NOTE:NEUTRAL CONDUCTOR(S)OMITTED FOR CLARITY •� ALL INVERTER OUTPUT CIRCUITS WILL HAVE A NEUTRAL CONDUCTOR � J 0 ca an PV CIRCUIT 1: 10 MODULES/PARALLEL ENVOY BOX 8 3r ae aca T be IC r 1 � fam -�, -_✓, _�, E t O MURRAY POINT OF DELIVERY COMBINER AND INTERCONNECTION w w z m EL 125A/240V SIEMENS J j \GSGLW0D4NR 60A/240V r 9 _, 3 I P\F`20 EQUIVALENT UNFUSED NEMA3 M z z < PV CIRCUIT 2: 9 MODULESIPARALLEL O°' ?� �F� SREC/ANSI E�UZVAL NT SHEET o O.o\�-p( METER NAME: \�O • ///��' EXISTING Q • • • O O I \P 1501 240V1150A Ill 1 A LOAD-CENTER Z f' • • • J� ✓� \ 3 AA Q SHEET ___ ____ ______}__ ___ ____ _____ NUMBER: _______ ___ ____ \\ MILBANK VISIBLE/LOCKABLE � JUNCTION BOX '2 \\ 3 100A DR '� 'KNIFE'NC '3 O NEC 2014 Compliant WITH IRREVERSIBLE E 1 0 \ EQUIVALENT DISCONNECT GROUND SPLICE \ E 1.0 U5934-XL-BLG E 1.0 E 1.0 Ld EcolibriunnSolar Layout Skirt e Coupling ® Clamp Warning: PV Modules may need to be shifted with respect to roof trusses to comply with Bonding Jumper maximum allowable overhang. i° i