52 BUFFUM STREET - BUILDING JACKET Pendaf e
a Esselte
74520 400/6P4
J
Otg of ' SUlem, tt�sttthusetts
h
._ Pepttrtment of Public 55erbires
...7
� Q@ne �Sttlem (green
745-9595 ext. 321
CHARLES F.OIJIGLEY
City Engineer
Director of Public Services
August 21, 1996
Anthony and Linda Mirabito
52 Bujjum Street `
Salem, MA 01970
Re: Account#001091
Dear Mr.Mirabito
I have reason to believe that the meter in the above building has been tampered with. On May 10,
1996 the meter reading was 35,900. On or about August 15, 1996 the meter reading was 35.200(see
enclosure). When the meter reader returned to inspect the meter on August 21. he found the seals to be
cut and the meter installed backwards.
Under authority granted by Salem Ordinance Sec. 32-18(enclosed)the City Engineer may levy a
fine of $500.00 for such tampering. Further, Ordinance Sec. 32-12 authorizes the Superintendent of the
water department to shut off the water for any violation of the regulations and not let it back on until full
payment is made. I have notified the City Engineer of the evidence of tampering(current reading was less
than the last reading),and have recommended that a fine in the amount of $250.00 be assessed.
As the meter has been tampered with, water and sewer usage for the quarter ending August 30 is
an estimate based on the prior average usage of 5000 c.f. G quarter.Payment of the$250.00 fine and all
outstanding FY 96(July 1, 1995 to June 30, 1996)and FY 97 water and sewer charges must be received
by this office within 14 days, or I will order the water shut off.
You are also required to make an apponament to have the meter correctly installed and sealed by
the water department.
meet
Christopher Ke
Water Registrar/Business Manager
cc: H. Jiadosz, C.F.Quigley, R. Ledouc L. Tremblay,N.LaPointe, J. Scott,D. Charette
No. 3y City of Salem )C)o Ward
:a
j 9
APPLICATION
FOR
PERMIT TO BUILD ADDITION, MAKE ALTERATIONS OR NEW CONSTRUCTION
IMPORTANT-Applicant to complete all items in sections:1, Il, Ill, IV. and IX-
/J �/�• 1 V�
I. AT(LOCATION) SZ /7Ul'�Ih. ZONING
1 DISTRICT
LOCATION No.l s EEn
OF BETWEEN AND
BUILDING CROSS STREET CROSS ETI
LOT
SUBDIVISION LOT BLOCK SIZE
II. TYPE AND COST OF BUILDING -All applicants complete Parts A -D
A. TYPE OF IMPROVEMENT D. PROPOSED USE-FOR"DEMOLITION"USE MOST RECENT USE
1 F-1 New building Residential Nonralidentiel
2 ❑ Adtlitron 111 reswenual.enter number of new 12 F7 One family 18 ❑ Amusement,recrettoonel
nousmg units wow,it any,In pan D, 17) 19 � Chrucn.other religious
13 Two it m _ore family-Enter number
3 � Alteration ISee 2 d!X)vel of units .......... .__._.....__....................... 20 Industrial
21 Cl Parking garage
4 Repair repacemem 14 ❑ Transient hotel,motel,or cormrtory-
Enternumberofunits 22 ❑ Service salon, alr garage
ng(ll muttdamtl residential.enter number _ ���������������� 23 Ho
����������� � sHow".institutionalinstitutionalional
5 � Wracking y
of amts in building in Part D. 17) 1°, I 24 ❑ Office.bank,parteseoral
6 Moving(rekicaoonl 16 C Carport 25 ❑ Public utility_
26 C] School.library.other educational
i Foundation only 17 ❑ Omer-Specify
27 ❑ Stores,mercantile
a.OW{JERSHIP 28 Q Tanks.towers
8 iwl�a Private(individual,corporation,nonprofit py ❑ Other-Specrty
institution,et0.1
9 Q Public(Federal,Sate.a to=government
C.COST (Oma centsi NonresidentW-Describe m dead proposed use of buildings.e.g.,food PMC8WffV pant
machine shop,laundry budding at hosoial,elemenarY school,secondary schddi.ooaepe,
""""""""."-"'............""""
10. Cost of improvement $ V00Parochial school.parking garage for department store.renal office budding,of 6oe building
""""'"' ........... at industrial otam.If use of existing budding is being changed.enter Proposed use.
io be installed but not included
in the above cost / oO
a. Electrical........................-................................................
b. Plumbing............._._......................._................._._...._.. Qo
Heating.air conditioning _._....._..._._._..._......._.__
C. Other(elevator,etc.( ......_..._..._..........._...................... /y�
ii TOTAL COST OF IMPROVEMENT g II QW
III. SELECTED CHARACTERISTICS OF BUILDING - For new buildings and additions. complete Parts E - L:demolition,
complete only Parts J & M. all others skip to IV
E. PRINCIPAL TYPE OF FRAME F. PRINCIPAL TYPE OF HEATING FUEL G. TYPE OF SEWAGE DISPOSAL I. TYPE OF MECHANICAL
d0 ❑ Masonry(wall bears gl 35 Gas 40 Public or private company will there be central air
31 Wood frame 36 ❑ Oil 41 � private iseptx:tank.eld.l conditioning?
32 ❑ Structural steel 37 ❑ Electricity 44 ❑ Yes 456 No
TYPE OF WATER SUPPLY
33 � Reinforced concrete 38 ❑ Coal H. Will(trait by an elevator?
34 Other-Smcm, 39 Other-SmcIN 42 I&Publrc or private company 46 ❑ yes 47 c� No
43 F1 Perivatiweil,asteml �}
31MENSIONS M. DEMOLITION OF STRUCTURES:
=A. Number of stones ....._......___.
?. Total scuare feet of hour area Has Approval from Historical Commission been received
all Room based on exlwcr
dimensabs ..............................__. for any structure over fifty(50)years? Yes_ No_
i0. Total lana area.so.it............................__......._......_..,, Dig Safe Number
NUMBER OF OFF-STREET PARKING SPACES Pest Control:
`,1. Enclosed .__..................... .............. __-
HAVE THE FOLLOWING UTILITIES BEEN DISCONNECTED?
szOmdoom........................._................................................. Yes No
iESIDENTI/LL BUILDINGS ONLY Water.
Electrics
Gas:
Full........................................... Sewer:
14. Number of
bathrooms DOCUMENTATION FOR THE ABOVE MUST BE ATTACHED
Partial-----------.------ BEFORE A PERMIT CAN BE ISSUED.
COMPLETE THE FOLLOWING:
Historic District? Yes_ No✓✓ (If yes, please enclose documentation from Hist Cont.)
Conservation Area? Yes_ No✓ (If yes,please enclose Order of Conditions)
Has Fire Prevention approved and stamped plans or applications? Yes_ No
Is property located in the S.RA district? Yes_ No
Comply with Zoning? Yes�NO_ (If no,enclose Board of Appeal decision)
Is lot grandfathered? Yes_ Nov (If yes,submit documentation/if no.submit t?^- _
If new construction,has the proper Routing Slip been enclosed? Yes_ No_
Is Architectural Access Board approval required?, Yes_ No_ (If yes,submit documentation)
Massachusetts State Contractor License# '//'qc Salem License#
Home Improvement Contractor# Q S-67/ ( Homeowners Exempt form(If applicable) Yes v No_
CONSTRUCTION TO BE COMMENCED WITHIN SIX(6)MONTHS OF ISSUANCE OF BUILDING PERMIT
-NSTRUCTION IS TO BE COMPLETED BY: 5' / q If an extension is necessary, please submit
in writing to the Inspector of Buildings.
IDENTIFICATION - To be completed by all applicants
Nacre Mailing address-Number,street,city.arid state ZIP Cube iel.No.
sz .
+or
e
Td n
d 8 7ql-3zgq
actor Builder's
Ucense No.
W or
? er
hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application
is his authorized agent and we o all applicable laws of this jurisdiction.
ature of i nt Address z Application date
V `
DO NOT WRITE BELOW THIS LINE
VI. VALIDATION
Building n� FOR DEPARTMENT USE ONLY
Permit number O�
BuildingUse Group
Permit issued 19 ��,,//�
Fire Grading
Building 1-7
Permit Fee $ /�< �) Live Loading
i
Certificate of Occupancy $ Occupancy Load
Approved by:
Drain Tile $
Plan Review Fee $
RLE
NOTES AND Data • (For department use)
7 re-
PERMIT TO BE MAILED TO:
DATE MAILED:
Construction to be started by: Y/I' Completed by: G/
VI ZONING PLAN EXAMINERS NOTES
DISTRICT
USE
FRONT YARD
SIDE YARD SIDE YARD
I
REAR YARD
I
NOTES
S(TE OR PLOT PLAN -For Appttcant Use
N
I