Loading...
14 BUENA VISTA AVENUE - BUILDING JACKETor UPC 10330 'm+ N "Wolf2 nAanne0. ON U Certificate No: 146-06 Building Permit No.: 146-06 Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Permits This is to Certify that the RESIDENCE located at Dwelling Type 0014 BUENA VISTA AVENUE in the CITY OF SALEM - - ----------- ----------------- ---------------- ---------------------------------------------------------------- Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY 14 BUENA VISTA AVENUE This permit is granted in confortnity with the Statutes and ordinances relating thereto, and expires .................. ------------ . unless sooner suspended or revoked. Expiration Date Issued On:Wed Feb 20,2008 - --- - -------...- - - -- - - - GeoTMS®2008 Des Lauriers Municipal Solutions,Inc. -----------" "--------------"- ------------ nQVE AO CITY OF SALEM BUILDING PERMIT 0014 BUENA VISTA AVENUE 146-06 GIs#: -o�a5 ' COMMONWEALTH OF MASSACHUSETTS Map: 10009 CITY OF SALEM Block: - Lot: 10296 Category: 101 New Single family Permit# - 146- BUILDING PERMIT Project# JS 2006 0219 Est.Cost: _$350,000.00 Fee: 1$2,105.00 Const.Class: PERMISSION IS HEREBY GRANTED TO: Use Group: Contractor: License: Lot Size(sq.ft): DANCO MANAGEMENT INC. STATE-043536 IZonmg: Owner: SIDERIDI COSTOS t Units Gained: Applicant: DANCO MANAGEMENT INC. Units Lost: Dig Safe#: -�AT: 0014 BUENA VISTA AVENUE ISSUED ON. 09-Aug-2005 AMENDED ON: EXPIRES ON: 09-Feb-2006 TO PERFORM THE FOLLOWING WORK: 146-06 NEW SINGLE HOME TJS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Building Underground: Underground: Underground: Excavation: Service: Meter: Footings: Rough: #jq/pe Roug2�1`, Rougp{ 7\ t,Cl.� Y Foundation: 7 �r'�{{ ( FinaL•!.i�/� /� /�/Q/ Final Q(I, r3 etc Final:�7 r� -7,- o--0 �" Rough Framr J Y D`- •fY � T O- b Fireplac hii c�: D.P.W. Fir Health / �3 d �I (t Insulation::l 7/ Meter: Oil: / Final: (louseSmoke: a,� ^� Treasury: Water: Alarm: Sewer. Sprinklers: , THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Sinature: I't ,I 4E 4t v Fee Type: Receipt No: - Date Paid: Check No: Amount: BUILDING REC-2006-000253 09-Aug-05 6241 $2,105.00 Cali for Permit to Occupy GeoTMS®2005 Des Lauriers M, Imn Si tinni,tnc. BEVERIDGE &DIAMOND :dao The Environmental, Land Use, 2006 and Litigation Law Firm Washington;D.C. Maryland Newyork Massachusetts New Jersey Texas California www.bdiaw.com 0 CITY OF SALEM ?s CONSERVATION COMMISSION January 12, 2007 JG & G Realty Trust Julianna Tache, Trustee 208 Derby Street Salem, Massachusetts 01970 Sent via Certified Mail 7005 3110 0000 7176 6035 Dear Ms. Tache: In accordance with the Massachusetts Wetlands Protection Act and the City of Salem Wetlands Bylaws, you are in violation for the current work that is occurring at 14 Buena Vista West, due to the fact that the Order of Conditions, DEP#64-358, has expired. After visiting the site on January 9, 2007 it was also determined that there were several violations occurring pursuant to the Order of Conditions, DEP#64-358, see attached photo log. The conditions that were in violation included#s 5, 19, 21, 22, 23, 29, 30, 44, and 49, see attached Order of Conditions. Most importantly work was being performed without proper erosion control measures in place. Because this project has not been completed and you are working under an expired Order of Conditions the Salem Conservation Commission must issue the enclosed Enforcement Order , attached, requiring you to cease and desist from any further activity on site. In order for the cease and desist to be lifted and for you to complete your project you must file a Notice of Intent (NOI) and all the submittal requirements with the Conservation Commission and the Massachusetts Department of Environmental Protection (DEP). On October 10, 2006 the Salem Conservation Agent sent you a letter advising you that the Order of Conditions would expire on December 11, 2006 (see attached letter). The letter stated"If this development project has not been completed, than you must submit a written request for an extension of the existing Order of Conditions to the Commission at least 30- days prior to the expiration of the order, as required in the Wetland Protection Act. If the project has not been completed and your Order of Conditions expires, you will be required to file a new Notice of Intent to complete this previously approved project." Enclosed is a Notice of Intent application, which must be filed with the Conservation Commission by January 25, 2007. The Conservation Commission discussed this matter at their regularly scheduled meeting held on Thursday January 11, 2007. Based on the information described above and photographs provided to the Commission from the site visit conducted on January 9, 2007, the 120 WASHINGTON STREET, SALEM, MASSACHUSFTTS 01970 • TEL: 978.745.9595 FAx: 978.740.0404 ♦ WWW.SALEM.COM C, Commission voted to issue an enforcement order to cease and desist immediately. If work continues on the property fines shall be enforced at up to $200 per day. Upon receiving this notice you will have 24 hours to contact me to discuss this matter further. If I am not contacted within 24 hours, the Commission will commence issuing fines of up to $200 a day. Fines will continue to accrue until I am contacted. The Commission also requires that you submit a Notice of Intent by January 25, 2007. Please be advised, that if you fail to submit an Notice of Intent application within the allotted timeframe without first notifying the Commission in writing at least 48 hours in advance, demonstrating good cause for inability to submit the application, the Commission will enforce fines of up to $200 a day until a Notice of Intent is received by the Commission. In the meantime, the Salem Conservation Commission requests that you appear before the Commission at their next regularly scheduled meeting to discuss this matter further. The next meeting is scheduled for January 25, 2007 at 6:00 PM, 120 Washington Street, 3rd Floor. If you cannot attend this meeting please contact me at 978-619-5685. Sincerely, Carey Duques Conservation Agent/Staff Planner Cc: Kevin Comacchio, Chairman Lynn Duncan, Director Planning and Community Development IThomas7St-Pierre,—Buildifig-Inspector ti Beth Rennard, City Solicitor Massachusetts DEP, Northeast Regional Office Encl. Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 9A — Enforcement Order 64-358 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Violation Information Important: This Enforcement Order is issued b When filling out Y: forms on the Salem January12, 2007 computer, use Conservation Commission(Issuing Authority) Date only the tab key to move To: your cursor- do not use the JG & G Realty Trust, Julianna Tache, Trustee return key. Name of Violator 208 Derby Street VQ Address 1. Location of Violation: Property Owner(if different) 14 Buena Vista West Street Address Salem 01970 City/Town Zip Code _Map 9 Lot 93 Assessors Map/Plat Number Parcel/Lot Number 2. Extent and Type of Activity(if more space is required, please attach a separate sheet): The current work occuring at 14 Buena Vista West is in violation because the Order of Conditions, issued under DEP# 64-358, expired on December 11, 2006. The Salem Conservation Commission Agent sent a letter on October 10, 2006 notifying the applicant/landowner. However,the Agent received no response from the applicant/landowner. Therefore the Salem Conservation Commission issues a cease and desist. After visiting the site on January 9, 2007, it was determined that there were several violations per the previous Order of Conditions DEP#64-358. The conditions that were in violation included #s 5, 19, 21, 22, 23, 29, 30, 44, and 49. B. Findings The Issuing Authority has determined that the activity described above is in violation of the Wetlands Protection Act (M.G.L.c. 131, §40) and its Regulations (310 CMR 10.00), because: ® the activity has been/is being conducted without a valid Order of Conditions. w aform9a.dx•rev.7/14/04 Page 1 of 3 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 9A — Enforcement Order 64.358 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP ® the activity has beenfis being conducted in violation of the Order of Conditions issued to: JG & G Realty Trust, Julianna Tache, Trustee December 11, 2003 Name Dated 64-358 5, 19, 21, 22, 23, 29, 30,44, and 49 File Number Condition number(s) B. Findings (cont.) ❑ Other(specify): C. Order The issuing authority hereby orders the following (check all that apply): ® The property owner, his agents, permittees, and all others shall immediately cease and desist from the further activity affecting the Buffer Zone and/or wetland resource areas on this property. ❑ Wetland alterations resulting from said activity should be corrected and the site returned to its original condition. ® Complete the attached Notice of Intent. The completed application and plans for all proposed work as required by the Act and Regulations shall be filed with the Issuing Authority on or before January 25, 2007 Date No further work shall be performed until a public hearing has been held and an Order of Conditions has been issued to regulate said work. ❑ The property owner shall take the following action to prevent further violations of the Act: Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts General Laws Chapter 131, Section 40 provides: "Whoever violates any provision of this section (a) nafor�a.doc•rev.7/14/04 Page 2 of 3 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 9A - Enforcement Order 64-358 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Appeals/Signatures An Enforcement Order issued by a Conservation Commission cannot be appealed to the Department of Environmental Protection, but may be filed in Superior Court. Questions regarding this Enforcement Order should be directed to: Carey Duques Name 978-619-5685 Phone Number Monday, Tuesday,Wednesday 8 am -4 pm; Thursday 8 am-7 pm; and Friday 8 am-12 pm Hours/Days Available Issued by: Salem Conservation Commission In a situation regarding immediate action, an Enforcement Order may be signed by a single member or agent of the Commission and ratified by majority of the members at the next scheduled meeting of the Commission. Signatures, 4005 3110 00W (,03-5- Signature of delivery person or certified mail number wpaform9a.doc•rev.7/14/04 Page 3 of 3 y � r$ya a ('ti �kj' f;y�; i [Y\�`2>~•` ' h g��lyYt,, .I I` a! ..</ S \.^��� + t��} l 1�rul S,Y� � ♦ ��. `i» A. Y T .1a �'' _ � Le���� ) (•y1 :y fir"� '�. 3 r.$ ,�< > 'i v s*'t . �+ .5,• 'du.- ��. i � ' �w'd �' r a� r fit!; W r `( ��d%� t F ��M✓a.cr� }"X��r �lF�•'i {��C liB� G'�'.,fgEv'.i�d�y% R* m�,.��i. /'"i''g J � f'< da'$'�f,p.fi'S aT/s.^...,;xr .yy,,rr i CF ✓E g.� �� r� 5 v;ti� "Zi aji';:""��. <"y e!. rq/�{r,6trf�;"'F'" r8'Y»,}.�.j c+r ...'.,•--��� ��'h »�r�����• �.� may,"ya?` �'y.,� e}' 'F3dr'eFs,,,>;�*+r � B �� � �,':'�i7' r�' P "eK,�v�w)';.,Jry'��, �•`` �; +' �' nfi ot, Qi" is 9411,�, .yVV ! �-� _'?.rr < `� a f¢ .r i� on�c 'Y t ✓�-.c � a 14- L. s'.'r {.i n>.�,a� £ ..?t�,vsF .u�.7"B nt { T»ri4 •� ,agT^i�C�,'�,�+ r,.+ �.,F ::i'�i�,39�*r.Q�yw��/,f°�'r?»�ro�a.Y`d`. `r�^y.4''�''`sa �q�5+ g •A. '+til;��. s k.�"�iy.�1 .. �' �—,{ x+sem' •43':r�,f+��� ���"». y��" �,.'��y� tR r t r` � .. �1 L t: L• A� fps sr�r y. o ii s �r'ry T � S"f Yt' y`���K t .�1�' -� FJ ML+P�s��v ..'� rf 7✓"� ��� ,, ��_ �_a Ys ,pJiy�� ,t � }.. h� F".���a f�d Yr Lr �{ F !s, '`{..•. r� _ 5.�. �• -{ x 1111 1 t .i, s ,,`;:U�.Y"//F i lRs,.-- "1'. •t `+ _. } �rg�py h� !'}ti,�l+'r f 3 ^('` '✓�' S.dc<6 f,y�*vlx rtlJ% u' . iYy`%� t �' Y'��r /` � � a'fJ ISL t �S.,:�i� «�� A�\�',• +t aY^-• -j ,w t.1. � 7 � I°f A\ >/ M rt'. � `�f- Cx ,�rjb tir nom•. Y a At! i 4f iS F d> Sr �cJ; ^7? 'k Ei �'`k 'Y s,`w J ".@tfrT ;^�L Jfr�p:✓nb .' �RS"r by Massachusetts Department of Environmental Protection DEP File Number. IIJBureau of Resource Protection -Wetlands 64-358 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: From: When filling out forms on Salem the computer, Conservaga+Commission use only the tab key to This Issuance if for(check one): move your cursor-do ® Order of Conditions not use the return key. ❑ Amended Order of Conditions go To: Applicant: Property Owner(if different from applicant): JG &G Realty Trust, Julianne Tache,Trustee Same Name Name �m 208 Derby Street Mailing Address Mailing Address Salem MA 01970 Cityrrown state zip Cade City?own State Zip Code 1. Project Location: Lot 1 Buena Vista Avenue Salem Street Address City/Town Map 9 Lot 93 Assessors Map/Plat Number Paroal/Lot Number 2. Property recorded at the Registry of Deeds for: Essex South 7199 111 County Book Page NA Certificate IN registered land) 3. Dates: October 9, 2003 December 11, 2003 December 11, 2003 Date Notice M Intent Filed Date Public Hearing Closed Date of Issuance 4. Final Approved Plans and Other Documents (attach additional plan references as needed): Site Development Permit Plan Located in Salem, Mass. Prepared by Eastern Land Revised Survey Associates, Inc. 12/3/03 5. Final Plans and Documents Signed and Stamped by: Christopher R. Mello(Survey)and Clayton A. Morin (Civil) Name 6. Total Fee: $250.00 (from Appendix 8:Wetland Fee Transmittal Form) WPA Fa 5 Page 1 CO 7 Rev.02100 Massachusetts Department of Environmental Protection DEP File Number. r ^ �}� Bureau of Resource Protection -Wetlands 64358 r"` WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing,this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: ❑ Public Water Supply ❑ Land Containing Shellfish ❑ Prevention of Pollution ❑ Private Water Supply ❑ Fisheries ® Protection of Wildlife Habitat ® Groundwater Supply ❑ Storm Damage Prevention ® Flood Control Furthermore,this Commission hereby finds the project,as proposed,is:(check one of the following boxes) Approved subject to: ® the following conditions which are necessary, in accordance with the performance standards set forth in the wetlands regulations, to protect those interests checked above.This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above,the following General Conditions,and any other special conditions attached to this Order.To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent,these conditions shall control. Denied because: ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations to protect those interests checked above. Therefore,work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. ❑ the information submitted by the applicant Is not sufficient to describe the site,the work,or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Acts interests, and a final Order of Conditions is issued.A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). General Conditions (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed rause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. WPA Farm 5 Paget of 7 Rev.WOO Massachusetts Department of Environmental Protection DEP Fite Number. Bureau of Resource Protection -Wetlands 64.356 WPA Form 5 - Order of Conditions PmvldedbyDEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years,but less than five years,from the date of issuance. 9 this Order is intended to be valid for more than three years,the extension date and the special circumstances warranting the extended time period are set forth as a special condition In this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber,bricks, plaster,wire, lath, paper, cardboard, pipe,tires,ashes, refrigerators, motor vehicles,or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed,or If such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land,the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work Is done.The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection"[or,"MA DEP"j "File Number 64358 " 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A)to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. WPA Farm 5 Page 0 017 Rev.07/00 Massachusetts Department of Environmental Protection DEP File Number Bureau of Resource Protection -Wetlands 64-356 WPA Form 5 — Order of Conditions Provided by0EP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place,the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or water body. During construction,the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. Special Conditions (use additional paper, if necessary): See Attached Findings as to municipal bylaw or ordinance Furthermore,the Salem hereby finds (check one that applies): Conservation Commission ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: Name Municipal Ordinance or Bylaw Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards,and a final Order of Conditions is issued. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or bylaw, specifically: Name Municipal Ordinance or Bylaw The Commission orders that all work shall be performed in accordance with the said additional conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. Page 1017 WPA Fa 5 Rev.07A0 Massachusetts Department of Environmental Protection DEP File Number Bureau of Resource Protection -Wetlands 04— 35ir A WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) Additional conditions relating to municipal ordinance or bylaw: This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions K from the date of issuance. NN&C—a-.,\*A - t\12o43 Data This Order must be signed by a majority of the Conservation Commission.The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant.A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office (see Ap dix and the roperty owner 'tf different from ppli nt). Signatures: On E/�YLnl�+ Of iJe is X 2t 2.003 Day Month and Year before me personally appeared �eo y c. 1Jo,rn.c.,5 to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/sh executed the same as his/her free act and deed. r-" w5t- SO zo o Notary Public My ComMission Expires This Order is issued to the applicant as follows: ❑ by hand delivery on by certified mail, return receipt requested,on lla��z.r�-.bcr 22l 7�'"3 Date Date WPA Form 5 Page 5 017 Rev.02MO Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands 64-358 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order,or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department,with the appropriate filing fee and a completed Appendix E: Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant,if he/she is not the appellant The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131,§40)and is inconsistent with the wetlands regulations(310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations,the Department has no appellate jurisdiction. D. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land,this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of Form 5 shall be submitted to the Conservation Commission listed below. Salem Conservation Commission Page 6 of 7 WPA Fa 5 Rev.07/0 Massachusetts Department of Environmental Protection DEP File Number. Bureau of Resource Protection -Wetlands 64-358 WPA Form 5 - Order of Conditions ProhdeObyDEP s Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Recording Information (cont.) Detach on dotted line,have stamped by the Registry of Deeds and submit to the Conservation Commission. To: Salem conservation Commission Please be advised that the Order of Conditions for the Project at: Lot 1 Buena Vista Avenue 64358 Project Location DEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant WPA Fa 5 Page 7d7 Rev.0200 / Salem Conservation Commission SPECIAL CONDITIONS—DEP FILE #64-358 City of Salem,Lot 1 Buena Vista Avenue 1. The Conservation Agent will be notified 48 hours prior to commencement of construction activities(978-745- 9595 ext 311). Members and agents of the Salem Conservation Commission(Commission)shall have the right to enter and inspect the premises to evaluate and ensure compliance with the conditions and performance standards stated in this Order,the Notice of Intent,the referenced plans,the Act,and 310 CMR 10.00,and may require any information,measurements,photographs,observation and/or materials or may require the submittal of any data or information deemed necessary by the Commission,agent,or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the Commission is satisfied that the work will comply,and has so notified the applicant in writing. 2. Approval of this application does not constitute compliance with any law or regulation other than MGL Chapter 131,Section 40,and Wetlands Regulations 310 CMR 10.00. 3. This Order shall apply to any successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans. These obligations shall be expressed in covenants in all deeds to succeeding owners or portions of the property. 4. The form provided at the end of this Order shall be completed and stamped at the Registry of Deeds after the expiration of the 10-day appeal period and within 30 days of the issuance if no request for appeal has been filed with the Department of Environmental Protection. This form shall be returned to the Commission within 21 days of recording accordance and prior to commencement of any activities subject to the Order of Conditions. 5. Prior to any work commencing,a sign shall be displayed showing DEP file#64358 and not placed on a living tree. 6. The term"Applicant"as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of Intent,supporting documents and this Order of Conditions. The Commission shall be noted in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 7. It is the responsibility of the applicant to procure all other applicable federal,state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L.92-500,86 stat.816),U.S.Army Corp of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified (3) Flood Plain (4) Grading Ordinance 8. If there are conflicting conditions within this Order,the stricter condition(s)shall rule. 9. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 10. The Commission and its Administrator shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 11. All work shall be performed in accordance with this Order of Conditions and approved site plans(s). No alteration of wetland resource areas or associated buffer zone,other than that approved in this Order,shall occur on this property without prior approval from the Commission. r 12. If any changes are made in the above-described plan(s)which may or will alter an area subject to protection under the Wetlands Protection Act,or any changes in activity subject to regulations under G.L.Ch. 131,Section 40,the applicant shall inquire from this Commission in writing,prior to their implementation in the field, whether the change(s)is significant enough to require the filing of a new Notice of Intent. Any error in the plans or information submitted by the applicant shall be considered changes and the above procedures shall be followed. A copy of such request shall at the same time be sent to the Department of Environmental Protection. 13. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued,the applicant or current landowner shall submit to the Commission a signed statement by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 14. Conditions number_as indicated shall continue in force beyond the Certificate of Compliance,in perpetuity, and shall be referred to in all future deeds to this property. PRIOR TO CONSTRUCTION 15. Prior to commencement of any activity on this site,there shall be a PRECONSTRUCTION MEETING between the project supervision;the contractor responsible for the work or its administrator to and phone numbers of all responsible parties shall be registered with the Commission at the pre-construction meeting. 16. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Comtttssion and/or its Administrator shall inspect and approve such installation at the pre-construction meeting. 17. Prior to the commencement of any activity on this site,the applicant or current landowner shall submit to the Commission in writing a construction schedule/sequence of work to complete this project 18. Prior to any work on site,the proposed limits of work shall be clearly marked with stakes or flags and shall be confirmed by the Commission or its Administrator. Such markers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers shall be informed that no use of machinery, storage of machinery or materials,stockpiling of soil or construction activity is to occur beyond this line at anytime. 19. Prior to commencement of construction on site,the limits of wetland resource areas closest to construction activity shall be flagged with surveyor's tape and shall remain in place during construction. The limits of areas to be impacted and the limits of work in the replication area(s)shall be clearly flagged 20. Thereshallbe 25_hay bales and wooden staked stored undercover on the site to be used only for emergency erosion control. EROSION CONTROL 21. Appropriate erosion control devices shall be in place prior to the beginning of any phases of construction,and shall be maintained during construction in the wetland areas and buffer zones. The erosion control specification provided in the Notice of Intent and the erosion control provision in the Order will be the minimum standards for this project;additional measures may be required by the Commission. 22. All debris,fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment from entering wetland resource areas. 23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 24. The areas of construction shall remain in a stable condition at the close of each construction day. r 25. Any de-watering of trenches or other excavations required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharges from de-watering activities shall be filtered through haybale sediment traps,silt filter bags or other means approved by the Commission or its Administrator. 26. Within thirty days of completion of construction on any given portion of the project,all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover,using sufficient top soil to assure long-term stabilization of disturbed areas. 27. If soils are to be disturbed for longer than two months,a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,exposed surfaces shall be stabilized by other appropriate erosion control measures,firmly anchored,to prevent soils from being washed by ram or flooding. DURING CONSTRUCTION 28. A copy of the Order of Conditions,construction plans,and copies of the documents and reports cited in Condition#11,shall be on the site upon commencement and during any site work for contractors to view and adhere to. 29. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 30. Only clean fill,free of masonry,stumps,asphalt,and any other kind of waste material shall be used on the site. 31. All waste products,grubbed stumps,slash;construction materials,etc.shall be deposited at least 100 feet from wetland resource areas and 200 feet from rivers. 32. All filling or removal of waste material from the site shall be done in accordance with the regulations of the City of Salem Health Department. 33. Cement trucks shall not be washed out in any wetland resource or buffer zone area. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be removed by hand. 34. No fuel,oil,or other pollutants shall be stored in any resource area or the buffer zone thereto,unless specified in this Order of Conditions. 35. There shall be no pumping of water from wetland resource areas. 36. During construction,all drainage structures shall be inspected regularly and cleaned as necessary. 37. Immediately following drainage structure installation,all inlets shall be protected by silt fence,hayblae barriers and/or silt bags to filter silt from stormwater before it enters die drainage system. 38. The project shall not cause an increase in run-off onto adjacent properties,either during construction or when completed. 39. The applicant is hereby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including,but not limited to,civil administrative penalties under M.G.L.Chapter 21 A,section 16. POST CONSTRUCTION 40. All disturbed areas, slopes and proposed landscape areas shall be loamed and seeded or stabilized through the use of erosion control blankets or other approved means. All disturbed areas will be graded,loamed,and seeded prior to November 1 of each year,if possible. No disturbed areas or stockpiled material will be left unprotected or without erosion controls during the winter. ,+ 41. Upon completion of construction,the applicant or current landowner shall submit the following to the Commission to request a Certificate of Compliance: (1) A letter requesting a Certificate including the following information: a. Name and address of current landowner, b. Name and address of the individualltrust or other entity to whom the Certificate is to be issued: c. Street address and lot number for the project;and d. DEP file number (2) A letter from a Registered Professional Engineering or Land Surveyor certifying compliance of the property with this Order of Conditions (3) An"As-Built"plan signed and stamped by a Registered Professional Engineer showing post-construction conditions and: a. As-built elevations of all drainage ways constructed within 100 feet of any wetland resource area; b. As-built elevations and grades of all filled or altered wetland resource areas,buffer zones and replicated areas;and c. Distances to all structures within 100 feet of any wetland resource area. 42. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds. 43. If the completed work differs from that in the original plans and conditions,the report must specify how the work differs;at which time the applicant shall first request a modification to the Order. Only upon review and approval by the Commission,may the applicant request in writing a Certificate of Compliance as described above. 44. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Commission and/or its Administrator has authorized their removal. 45. The following condition(s)shall extend beyond the Certificate of Compliance,in perpetuity,and shall be recorded as such on the Certificate of Compliance and in all future deeds to this property: PERPETUAL CONDITIONS 46. There shall be no dumping of leaves,grass clippings,hash or any kind of refuse in the resource area. 47. Herbicides shall not be applied within 100 feet of the wetland. 48. No sodium-based products shall be used for control of ice or snow within 100 feet or the wedand. ADDITIONAL CONDITIONS 49. No work and/or disturbance shall extend beyond the limits s of the staked hay bale line during construction. CITY OF SALEM `F CONSERVATION COMMISSION October 10, 2006 JG&G Realty Trust Juliana Tache,Trustee 208 Derby Street Salem,Massachusetts 01970 Re: DEP #64357 and 358—Construction of portions of two single-family dwellings Lots 1 and 2-12 and 14 Buena Vista Avenue,Salem,Massachusetts Dear Ms. Tache: Please be advised that the Order of Conditions for the above referenced project will expire on December 11,2006. If this development project is complete,you should Request a Certificate of Compliance (enclosed forms) from the Salem Conservation Commission. If this development project has not been completed,than you must submit a written request for an extension of the existing Order of Conditions to the Commission at least 30-days prior to the expiration of the order,as required in the Wetland Protection Act If the project has not been completed and your Order of Conditions expires,you will be required to file a new Notice of Intent to complete this previously approved project. Please contact me at(978) 745-9595 extension 311 if you have any questions. Sincerely, Carey Duques Conservation Agent Planer Enclosures Cc: Attorney Scott Grover 120 WASHINGTON STREET, SALEM, NIASSACHUSETTs 01970 • TEL: 978.745.9595 FAx: 978.740.0404 W iR'..PALEM.COM Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection - Wetlands DEP File Number WPA Form 3 - Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City/Town Important' A. General Information When filling out forms on the computer,use 1. Project Location (Note: electronic filers will click on button for GIS locator): only the tab key to move your cursor-do not use the return a.Street Address b.City/Town c.Zip Code key. { ���n� y. Latitude and Longitude: —I� d. Latitude e.Longitude f.Assessors Map/Plat Number g. Parcel/Lot Number 2. Applicant: a.First Name b.Last Name c.Company Note: Before d.Mailing Address completing this form consult your local e.City/Town f.State g.Zip Code Conservation Commission In.Phone Number i. Fax Number j.Email address regarding any municipal bylaw 3. Property owner (if different from applicant): ❑ Check if more than one owner or ordinance. a.First Name b. Last Name c.Company d.Mailing Address e.City/Town f.State g.Zip Code In.Phone Number i. Fax Number j. Email address 4. Representative (if any): a.Firm b.Contact Person First Name c.Contact Person Last Name d. Mailing Address e.City/Town f.State g.Zip Code In.Phone Number i. Fax Number j. Email address 5. Total WPA Fee Paid(from NOI Wetland Fee Transmittal Form): a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid 6. General Project Description: wpaform3.doc•rev.3129/05 Page 1 of 7 Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection Wetlands DEP File Number WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number City/Town A. General Information (continued) 7. Project Type Checklist: a. ❑ Single Family Home b. ❑ Residential Subdivision c. ❑ Limited Project Driveway Crossing d. ❑ Commercial/Industrial e. ❑ Dock/Pier I. ❑ Utilities g. ❑ Coastal Engineering Structure h. ❑ Agriculture—cranberries,forestry i. ❑ Transportation j. ❑ Other 8. Property recorded at the Registry of Deeds for: a.County b.Page Number c.Book d.Certificate p(if registered land) 9. Has work been performed on the property under an Order of Resource Area Delineation involving Simplified Review within 3 years of the date of this application? a. ❑ Yes b. ❑ No 10. Buffer Zone Only- Is the project located only in the Buffer Zone of a bordering vegetated wetland, inland bank, or coastal resource area? a. ❑ Yes-answer 11 below, then skip to Section C. b. ❑ No - skip to Section B. If yes, no Notice of Intent or Request for Determination of Applicability may be filed for work within the 50-foot-wide area in the Buffer Zone along the resource area during the three-year term of an Order of Resource Area Delineation, or any Extended Order, or until the applicant receives a Certificate of Compliance, whichever is later. 11. Buffer Zone Setback— For projects that involve work only in the buffer zone, select the applicable adjacent resource area (check one): a. ❑ BVW b. ❑ inland bank c. ❑coastal resource area The distance between the closest project disturbance and the associated resource area is: d.linear feet wpaform3.doc•rev.3/29/05 Page 2 of 7 Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection - Wetlands DEP File Number WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number Cily/rown B. Resource Area Effects 1. Inland Resource Areas Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Include Users: Include your Resource Area Size of Pr000sed Alteration Proposed Replacement(if any) document transaction a. ❑ Bank 1.linear feel 2.linear feet number b. ❑ Bordering Vegetated (provided on Wetland 1.square feet 2.square feet your receipt page) with all c. ❑ Land Under 1.square feet 2.square feet supplementary Waterbodies and information you Waterways 3.cubic yards dredged submit to the d. ❑ Bordering Land Department. Subject to Flooding 1.square feet 2.square feet 3.cubic feet of flood storage lost 4.cubic feet of flood storage replaced e. ❑ Isolated Land Subject to Flooding 1.square feet 2.cubic feet of flood storage lost 3.cubic feet of flood storage replaced f. ❑ Riverfront area 1.Name of Waterway(if available) 1.Width of Riverfront Area (check one): ❑ 25 ft. - Designated Densely Developed Areas only ❑ 100 ft. - New agricultural projects only ❑ 200 ft. -All other projects 2. Total area of Riverfront Area on the site of the proposed project: Square Feet 3. Proposed alteration of the Riverfront Area: a.Total Square Feet b. Square Feet within 100 N. c.Square Feet between 100 ft.and 200 ft. 4. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No 5.Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No wpaform3.doc•rev.3/29!05 Page 3 of 7 Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection - Wetlands DEP File Number WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 6o umentrransactionNumber City/Town B. Resource Area Effects 2. Coastal Resource Areas: Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Resource Area Include your Size of Proposed Alteration Proposed Replacement (if anvl document transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below number (provided on b. ❑ Land Under the Ocean 1.square feet your receipt page)with all 2.Cubic yards dredged supplementary information you c. ED Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes submit to the below Department. d. ❑ Coastal Beaches 1.Square feet q 2.Cubic yards beach nourishment e. ❑ Coastal Dunes 1.Square feel q 2.Cubic yards dune nourishment f. ❑ Coastal Banks i.Linear feet g. ❑ Rocky Intertidal Shores 1.Square feet h.❑ Salt Marshes 1.Square feet q 2. Sq tt restoration,rehab.,or creation i. ❑ Land Under Salt Ponds 1.square feet 2.Cubic yards dredged j. [I Land Containing Shellfish 1. Square feet 2. Square feet restoration,rehab. k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1.Cubic yards dredged i. ❑ Land Subject to Coastal Storm Flowage 1. square feet 3. Limited Project: Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 or 310 CMR 10.53? a. ❑ Yes ❑ No If yes, describe which limited project applies to this project: b.Limited Project wpaform3.doc•rev.3/29/05 Page 4 of 7 Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection - Wetlands DEP File Number WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131 , §40 Document Transaction Number City/town C. Bordering Vegetated Wetland Delineation Methodology Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary: Online Users: 1. ❑ Final Order of Resource Area Delineation issued by Conservation Commission or DEP Include your (attached) document transaction 2. ❑ DEP BVW Field Data Form (attached) number (provided on 3. ❑ Final Determination of Applicability issued by Conservation Commission or DEP (attached) your receipt page) with all 4. ❑ Other Methods for Determining the BVW Boundary(attach documentation): supplementary information you a. ❑ 50%or more wetland indicator plants submit to the Department. b. ❑ Saturatedfinundated conditions exist c. ❑ Groundwater indicators d. ❑ Direct observation For all projects affecting other e. ❑ Hydric soil indicators Resource Areas, please r. ❑ Credible evidence of conditions prior to disturbance attach a narrative 5. Other resource areas delineated: explaining how D.D. OtherApplicable Standards and Requirements the resourcePP q area was delineated. 1. Is any portion of the proposed project located in estimated habitat as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program? a. ❑ Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife Route 135, North Drive b.Date of Map Westborough, MA 01581 2. For coastal projects only, is any portion of the proposed project located below the mean high water line or in a fish run? a.❑ Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to: Massachusetts Division of Marine Fisheries 251 Causeway Street, Suite 400 Boston, MA 02114 b. ❑ Not applicable—project is in inland resource area only 3. is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? a. ❑ Yes ❑ No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP Website for ACEC locations). Note: electronic filers click on Website. b.ACEC wpaform3.doc•rev.3/29/05 Page 5 of 7 Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection - Wetlands DEP File Number WPA Form 3 — Notice of Intent 6ument Transact=Numbw Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C ty/Tovm D. Other Applicable Standards and Requirements Online Users: 4. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Include your Restriction Act (M.G.L.c. 131, §40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)? document a ❑ Yes ❑ No transaction number (provided on your receipt 5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the page) with all wetlands regulations, 310 CMR 10.00. supplementary information you a. ❑ Yes ❑ No If yes, describe which exemption applies to this project: submit to the Department. b.Exemption 6. Is this project subject to the DEP Stormwater Policy? a. ❑ Yes ❑ No If yes, stormwater management measures are required. Applicants should complete the Stormwater Management Form and submit it with this form. b. If no, explain why the project is exempt: E. Additional Information Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page)for any of the following information you submit to the Department. i. ❑ USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2. ❑ Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland[BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. 3. ❑ Other material identifying and explaining the determination of resource area boundaries shown on plans (e.g., a DEP BVW Field Data Form). 4. ❑ List the titles and dates for all plans and other materials submitted with this NOI. 5. ❑ If there is more than one property owner, please attach a list of these property owners not listed on this form. 6.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. a. ❑ Attach N01 Wetland Fee Transmittal Form 9. ❑ Attach Stormwater Management Form, if needed. wpaform3.doc•rev.3/29/05 Page 6 of 7 Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection - Wetlands DEP File Number WPA Form 3 - Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 citydrown F. Fees The fees for work proposed under each Notice of Intent must be calculated and submitted to the Conservation Commission and the Department(see Instructions and NOI Wetland Fee Transmittal Form). No filing fee shall be assessed for projects of any city,town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form)to confirm fee payment: 1.Municipal Check Number 2.Check date 3.State Check Number 4.Check date 5.Payor name on check:First Name S.Payor name on check:Last Name G. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, §40. Notice must be made in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location. Signature of Applicant Date Signature of Property Owner(if different) Date Signature of Representative(if any) Date For Conservation Commission: Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents; two copies of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and the city/town fee payment must be sent to the Conservation Commission by certified mail or hand delivery. For DEP: One copy of the completed Notice of Intent(Form 3), including supporting plans and documents; one copy of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and a copy of the state fee payment must be sent to the DEP Regional Office(see Instructions)by certified mail or hand delivery. (E-filers may submit these electronically.) Other: If the applicant has checked the"yes"box in any part of Section D, Item 3,above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. wpaform3.doc•rev.3/29/05 Page 7 of 7 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: A. Applicant Information When filling out forms on the 1. Applicant: computer, use only the tab key to move a. First Name b.Last Name c.Company your cursor- do not use the d.Mailing Address return key. mVQ e.Cityfrown f.Stele g.Zip Code h. Phone Number m,. 2. Property Owner(if different): a.First Name b.Last Name c.Company d.Mailing Address e.City/rown I.State g.Zip Code h. Phone Number - 3. Project Location: a.Street Address b.City/Town To calculate B. Fees filing fees, refer to the category Notice of Intent (Form 3)or Abbreviated Notice of Intent(Form 4): fee list and examples in the The fee should be calculated usinnsructg p the following six-step process and worksheet. Please see filling out WPA 9 instructions for Instructions before fillip out worksheet. Form 3(Notice of Intent). Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone. Step 2/Number of Activities: Identify the number of each type of activity. Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2) times the fee per category (identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. Step 51Totai Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50. W palorrtq.dm•NOI W eUand Fee Transmnal Forth•rev.3/1/05 Page 1 o12 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (continued) Step II/Type of Activity Step?/Number Step Step 4/Subtotal Activity of Activities 3/Individual Fee Activity Fee Step 5/7otai Project Fee: Step 6/Fee Payments: Total Project Fee: a.Total fee from Step 5 State share of filing fee: b. 1/2 total fee less$22.50 City/Town share of filling fee: c. 1/2 total fee plus$22.50 C. Submittal Requirements a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to the Commonwealth of Massachusetts. Department of Environmental Protection Box 4062 Boston, MA 02211 b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and the city/town fee payment. c.) To DEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these electronically.) W palorn 1doc•N01 W eland Fee Transn"al Form•rev.all 105 Page 2 o12 CITY OF SALEM CONSERVATION COMMISSION Mr. Manuel Silva 121 Green Lane Middletown R.I. 02842 Sent via Certified Mail 7005 3110 0000 7176 6042 January 12, 2007 Dear Mr. Silva: In accordance with the Massachusetts Wetlands Protection Act and the City of Salem Wetlands Bylaws, you are in violation for the current work that is occurring on Tinkers Island, due to the fact that a Notice of Intent was not filed with the Conservation Commission and an Order of Conditions has not been obtained. The Salem Conservation Commission received a letter notifying them that construction is occurring on Tinkers Island, see attached letter. The Commission does not have any permits on record stating that this work has been permitted. The Conservation Commission discussed this matter at their regularly scheduled meeting held on Thursday January 11, 2007. Based on the information described above the Commission voted to issue an Enforcement Order, attached, to cease and desist from any future activity of the site, requiring that you stop all work immediately. If work continues on the property fines shall be enforced at $200 per day. Upon receiving this notice you will have 24 hours to contact me to discuss this project. If the agent is not contacted within 24 hours the fines will begin to accumulate at $200 per day until you contact me. In order to be in compliance you will have to file a Notice of Intent (NOI) and all the submittal requirements with the Conservation Commission and the Massachusetts Department of Environmental Protection (DEP). Enclosed is a Notice of Intent application, which must be filed with the Conservation Commission by January 25, 2007. Please be advised, that if you fail to submit an Notice of Intent application within the allotted timeframe without first notifying the Commission in writing at least 48 hours in advance, demonstrating good cause 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 .TEL: 978.745.9595 FAx: 978.740.0404 0 WWW.SALEM.COM for inability to submit the application, the Commission will enforce fines of$200 a day until a Notice of Intent is received by the Commission. The Salem Conservation Commission requests that you appear before the Commission at their next regularly scheduled meeting to discuss this issue. The next meeting is scheduled for January 25, 2007 at 6:00 PM, 120 Washington Street, 3rd Floor. If you do not appear before the Commission on January 25, 2007 the Commission will issue fines of$200 per day. If you cannot attend this meeting please contact me at 978-619-5685. Sincerely, Carey Dugquu3s Conservation Agent/Staff Planner Cc: Kevin Cornacchio, Chairman Lynn Duncan, Director Planning and Community Development Thomas St Pierre, Building Inspector Beth Rennard, City Solicitor Massachusetts DEP Northeast Regional Office Encl. L1Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 1 WPA Form 9A - Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Violation Information Important: This Enforcement Order is issued b When filling out Y: forms on the Salem January 12, 2007 Computer, use Conservation Commission(Issuing Authority) Date only the tab key to move To: your cursor- do not use the Manuel Silva return key. Name of Violator 121 Green Lane Middletown, RI 02842 VQ Address 1. Location of Violation: Property Owner(if different) Tinkers Island Street Address Salem 01970 City/Town Zip Code Assessors Map/Plat Number Parcel/Lot Number 2. Extent and Type of Activity(if more space is required, please attach a separate sheet): The current work occuring on Tinkers Island is being done without an Order of Conditions issued by the Salem Conservation Commission. Therefore the work is being completed in violation of the Wetlands Protection Act. B. Findings The Issuing Authority has determined that the activity described above is in violation of the Wetlands Protection Act (M.G.L. c. 131, §40) and its Regulations (310 CMR 10.00), because: the activity has been/is being conducted without a valid Order of Conditions. ❑ the activity has been/is being conducted in violation of the Order of Conditions issued to: Name Dated wpaform9a.00c•rev.M VO4 Page 1 of 3 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 9A - Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP File Number Condition number(s) B. Findings (cont.) ❑ Other (specify): C. Order The issuing authority hereby orders the following (check all that apply): 0 The property owner, his agents, permittees, and all others shall immediately cease and desist from the further activity affecting the Buffer Zone and/or wetland resource areas on this property. ❑ Wetland alterations resulting from said activity should be corrected and the site returned to its original condition. ■ Complete the attached Notice of Intent.The completed application and plans for all proposed work as required by the Act and Regulations shall be filed with the Issuing Authority on or before January 25 2007 Date No further work shall be performed until a public hearing has been held and an Order of Conditions has been issued to regulate said work. ❑ The property owner shall take the following action to prevent further violations of the Act: Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts General Laws Chapter 131, Section 40 provides: 'Whoever violates any provision of this section (a) shall be punished by a fine of not more than twenty-five thousand dollars or by imprisonment for not more than two years, or both, such fine and imprisonment; or(b) shall be subject to a civil penalty not to exceed twenty-five thousand dollars for each violation". Each day or portion thereof of continuing violation shall constitute a separate offense. "aforvv9a.dw•rev.7/14/04 Page 2 of 3 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 9A — Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Appeals/Signatures An Enforcement Order issued by a Conservation Commission cannot be appealed to the Department of Environmental Protection, but may be filed in Superior Court. Questions regarding this Enforcement Order should be directed to: Carey Duques Name 978-619.5685 Phone Number Monday,Tuesday, Wednesday 8 am -4 pm; Thursday 8 am-7 pm; and Friday 8 am-12 pm. Hours/Days Available Issued by: Salem Conservation Commission In a situation regarding immediate action, an Enforcement Order may be signed by a single member or agent of the Commission and ratified by majority of the members at the next scheduled meeting of the Commission. Signatures: V 3110 dtYx� �1�(a (ob�1Z Signature of delivery person or certified mail number w afcrm9a.doc•rev.7/14/04 Page 3 of 3 January 03 2007 VE Massachusetts Coastal Zone Management JAI" b 9 21,007 251 Causeway Street DEPT. OF PLANNING& Boston, MA 02114-2136 GONM IUNITYOEVELOPP.1ENT Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 City of Salem Conservation Commission Salem City Hall 93 Washington St. Salem, MA 01970 City of Salem Public Properties/Building Department Salem City Hall (3 Washington St. Salem, MA 01970 City of Salem Legal Department Elizabeth Renard,Esq. Acting City Solicitor Salem City Hall 93 Washington St. Salem, MA. 01970 To whom it may concern, It recently came to my attention that a new building (approximately 20' x 30') is being built on the Southwesterly end of Tinkers Island. Tinkers Island is located off the coast of Marblehead and is part of the City of Salem. I was surprised to see a house being built at that location and have done some investigation: The structure is located in the Velocity Zone on ledges between the rocky beach and the top of the coastal bank. No order of conditions has been issued by Salem Conservation Commission or by D.E.P. No building permit has been issued by the Salem Building Department. The island has no municipal services( i.e. sewer and water) and no permit to install a septic system has been issued by the Board of Health. Furthermore I believe that the building is being built on land owned by the City of Salem. I trust that you will look into these matters and see to it that all applicable laws and regulations are followed. Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection - Wetlands DEP Fie Number WPA Form 3 - Notice of Intent LAI Massachusetts Wetlands Protection Act M.G.L. a 131, §40 Document Transaction Number City/rows Important: When filling out A. General Information forms on the computer,use 1. Project Location (Note: electronic filers will click on button for GIS locator): only the tab key to move your cursor-do not a.Street Address b.Ci !Town C.Zi Code use the Tatum tY P key' Latitude and Longitude: d.Latitude e.Longitude Q f.Assessors Map/Plat Number g. Parcel/Lot Number 2. Applicant: a. First Name b.Last Name c.Company Note: Before d.Mailing Address completing this form consult your local e.city/Town f.State g.Zip Code Conservation Commission h. Phone Number I.Fax Number j. Email address regarding any municipal bylaw 3. Property owner (if different from applicant): ❑ Check if more than one owner or ordinance. a.First Name b.Last Name c.Company d.Mailing Address e.City/Town I.State g.Zip Code h. Phone Number i. Fax Number I.Email address 4. Representative (if any): a. Firm b.Contact Person First Name c.Contact Person Last Name d.Mailing Address e.City/rown I.State g.Zip Code h.Phone Number i. Fax Number I.Email address 5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form): a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid 6. General Project Description: wpaform3.doc•rev.3/29/05 Page 1 of 7 Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection Wetlands DEP File Number WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number- City/Town A. General Information (continued) 7. Project Type Checklist: a. ❑ Single Family Home b. ❑ Residential Subdivision c. ❑ Limited Project Driveway Crossing d. ❑ Commercial/Industrial e. ❑ Dock/Pier I. ❑ Utilities g. ❑ Coastal Engineering Structure h. ❑ Agriculture—cranberries, forestry i. ❑ Transportation i. ❑ Other 8. Property recorded at the Registry of Deeds for: a.County b. Page Number c. Book d.Certificate#(if registered land) 9. Has work been performed on the property under an Order of Resource Area Delineation involving Simplified Review within 3 years of the date of this application? a. ❑ Yes b. ❑ No 10. Buffer Zone Only- Is the project located only in the Buffer Zone of a bordering vegetated wetland, inland bank, or coastal resource area? a. ❑ Yes - answer 11 below, then skip to Section C. b. ❑ No- skip to Section B. If yes, no Notice of Intent or Request for Determination of Applicability may be filed for work within the 50-foot-wide area in the Buffer Zone along the resource area during the three-year term of an Order of Resource Area Delineation, or any Extended Order, or until the applicant receives a Certificate of Compliance, whichever is later. 11. Buffer Zone Setback—For projects that involve work only in the buffer zone, select the applicable adjacent resource area (check one): a. ❑ BVW b. ❑ inland bank c. ❑coastal resource area The distance between the closest project disturbance and the associated resource area is: d.linear feet wpaform3.doc•rev.3/29/05 Page 2 of 7 Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection - Wetlands DEP File Number WPA Form 3 — Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number City/Town B. Resource Area Effects 1. Inland Resource Areas Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Resource Area Include your Size of Proposed Alteration Proposed Replacement (if any) document transaction a. ❑ Bank 1.linear feet 2.linear feet number b. ❑ Bordering Vegetated (provided on Wetland 1.square feet 2.square feet your receipt page) with all c. ❑ Land Under 1.square feet supplementary Waterbodies and q 2.square feet information you Waterways 3.cubic yards dredged submit to the Department. d. ❑ Bordering Land Subject to Flooding 1.square feet 2.square feet cubic feet of flood 4.storage lost cubic feet of flood storage replaced e. [J Isolated Land Subject 3. to Flooding 1.square feet 2.cubic feet of flood storage lost 3.cubic feet of flood storage replaced f. ❑ Riverfront area 1.Name of Waterway(if available) 1.Width of Riverfront Area (check one): ❑ 25 ft. - Designated Densely Developed Areas only ❑ 100 ft. - New agricultural projects only ❑ 200 ft. - All other projects 2.Total area of Riverfront Area on the site of the proposed project: Square Feet 3. Proposed alteration of the Riverfront Area: a.Total Square Feet b.Square Feet within 100 ft. c.Square Feet between 100 ft.and 200 ft. 4. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No 5. Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No wpaform3.doc•rev.3/29/05 Page 3 of 7 L11Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection - Wetlands DEP Fila Number WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number Cityrrown B. Resource Area Effects 2. Coastal Resource Areas: Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any) document transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below number (provided on b. ❑ Land Under the Ocean 1.Square feet your receipt page) with all 2.Cubic yards dredged supplementary information you c. Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes ❑ submit to the below Department. d. ❑ Coastal Beaches 1. Square feet 2.Cubic yards beach nourishment e. ❑ Coastal Dunes 1,Square feet q 2.Cubic yards dune nourishment f. ❑ Coastal Banks 1. Linear feet g. ❑ Rocky Intertidal Shores 1.square feet h.❑ Salt Marshes 1.Square feet Q 2. Sq ft restoration,rehab.,or creation i. ❑ Land Under Salt Ponds 1.Square feet 2.Cubic yards dredged j. ❑ Land Containing 1. Shellfish Square feet 2.Square feet restoration,rehab. k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1.Cubic yards dredged i. ❑ Land Subject to Coastal Storm Flowage 1.Square feet 3. Limited Project: Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 or 310 CMR 10.53? a. ❑ Yes ❑ No If yes, describe which limited project applies to this project: b. Limited Project wpaform3.doc•rev.3/29/05 Page 4 of 7 \ Massachusetts Department of Environmental Protection Provided'byDER - j�— Bureau of Resource Protection - Wetlands DEP Pile Number \^1\ WPA Form 3 - Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City/Town C. Bordering Vegetated Wetland Delineation Methodology Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary: Online Users: t. ❑ Final Order of Resource Area Delineation issued by Conservation Commission or DEP Include your (attached) document transaction 2. ❑ DEP BVW Field Data Form (attached) number (provided on 3 ❑ Final Determination of Applicability issued by Conservation Commission or DEP (attached) your receipt page) with all 4. ❑ Other Methods for Determining the BVW Boundary(attach documentation): supplementary information you a. ❑ 50% or more wetland indicator plants submit to the Department. b. ❑ Saturated/inundated conditions exist c. ❑ Groundwater indicators d. ❑ Direct observation For all projects affecting other e. ❑ Hydric soil indicators Resource Areas, please f. ❑ Credible evidence of conditions prior to disturbance attach a narrative 5. Other resource areas delineated: explaining how D. Other Applicable Standards and Requirements the resource pp Q area was delineated. 1. Is any portion of the proposed project located in estimated habitat as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program? a. ❑ Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife Route 135, North Drive b. Date of Map Westborough, MA 01581 2. For coastal projects only, is any portion of the proposed project located below the mean high water line or in a fish run? a. ❑ Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to: Massachusetts Division of Marine Fisheries 251 Causeway Street, Suite 400 Boston, MA 02114 b. ❑ Not applicable—project is in inland resource area only 3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? a. ❑ Yes ❑ No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP Website for ACEC locations). Note: electronic filers click on Website. b.ACEC wpaform3.doc•rev.3/29/05 Page 5 of 7 Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection - Wetlands oEPFaeNumber WPA Form 3 - Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 cityfrown D. Other Applicable Standards and Requirements Online Users: 4. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Include your Restriction Act (M.G.L. c. 131, §40A) or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)? document transaction a. ❑ Yes ❑ No number (provided on your receipt 5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the page) with all wetlands regulations, 310 CMR 10.00. supplementary information you a. ❑ Yes ❑ No If yes, describe which exemption applies to this project: submit to the Department. b. Exemption 6. Is this project subject to the DEP Stormwater Policy? a. ❑ Yes ❑ No If yes, stormwater management measures are required. Applicants should complete the Stormwater Management Form and submit it with this form. b. If no, explain why the project is exempt: E. Additional Information Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you submit to the Department. t. ❑ USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2. ❑ Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. 3. ❑ Other material identifying and explaining the determination of resource area boundaries shown on plans (e.g., a DEP BVW Field Data Form). 4. ❑ List the titles and dates for all plans and other materials submitted with this NOI. 5. ❑ If there is more than one property owner, please attach a list of these property owners not listed on this form. 6.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 6. ❑ Attach N01 Wetland Fee Transmittal Form 9. ❑ Attach Stormwater Management Form, if needed. wpaform3.doc•rev.3/29/05 Page 6 of 7 Massachusetts Department of Environmental Protection Provided by DEP: Buret]au/�ofResource Protection - Wetlands DEP File Number WPA Form — Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City/Town F. Fees The fees for work proposed under each Notice of Intent must be calculated and submitted to the Conservation Commission and the Department(see Instructions and NOI Wetland Fee Transmittal Form). No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form)to confirm fee payment: 1.Municipal Check Number 2.Check date 3.State Check Number 4.Check date 5.Payor name on check: First Name 6. Payor name on check:Last Name G. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, §40. Notice must be made in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location. Signature of Applicant Date Signature of Property Owner(if different) Date Signature of Representative(if any) Date For Conservation Commission: Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents;two copies of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and the city/town fee payment must be sent to the Conservation Commission by certified mail or hand delivery. For DEP: One copy of the completed Notice of Intent(Form 3), including supporting plans and documents; one copy of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and a copy of the state fee payment must be sent to the DEP Regional Office (see Instructions) by certified mail or hand delivery. (E-tilers may submit these electronically.) Other: If the applicant has checked the"yes"box in any part of Section D, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. wpaform3.doc•rev.3129105 Page 7 of 7 L11Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: A. Applicant Information When filling out forms on the 1. Applicant: computer, use only the tab key to move a.First Name b. Last Name c.Company your cursor- do not use the d.Mailing Address return key. wVQ e.City/Town I.State g.Zip Code h. Phone Number 2. Property Owner(if different): a. First Name b. Last Name c.Company d. Mailing Address e.City/Town f.State g.Zip Code h, Phone Number 3. Project Location: a.Street Address b.City/Town To calculate B. Fees filing fees, refer to the category Notice of Intent (Form 3) or Abbreviated Notice of Intent(Form 4): fee list and examples in the The fee should be calculated using the following six-step instructions for 9 g p process and worksheet. Please see filling out WPA Instructions before filling out worksheet. Form 3(Notice of Intent). Step 1lrype of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone. Step 2/Number of Activities: Identify the number of each type of activity. Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2) times the fee per category (identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To calculate the city/town share of the fee, divide the total fee in half and add$12.50. Wpaform3.dm•NO]Wetland Fee Transmittal Form•rev.311/05 Page t of 2 L11Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (continued) Step 1lrype of Activity Step 2/Number Step Step 4/Subtotal Activity of Activities 3/Individual Fee Activity Fee Step 5frotal Project Fee: Step 6/Fee Payments: Total Project Fee: a.Total fee from step 5 State share of filing fee: b. 1/2 total fee fess$12.50 Cityfrown share of filling fee: c. 1/2 total fee plus$12.50 C. Submittal Requirements a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to the Commonwealth of Massachusetts. Department of Environmental Protection Box 4062 Boston, MA 02211 b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and the city/town fee payment. c.) To DEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these electronically.) Wpalorm3.doc•NOI Welland Fee Transftnal Farm•rev.9/1/05 Page 2 o12 , '� � . No\��� APPLICATE�N F�Fi PEiilff T� LOCAI7AN �� ����� �'���� PEFiwAIT GRANTED ��`� �4'� t9 . � _ r v�� �-� ,� ��� i�cTOR eua.ar�s 4 ' _ _ � � � ` . s , i � �*���� �V� $� � Je18FECI��9�1 TD A:P�ANrI B,E1NG LiRIMIT�ED I ` CITY OF SALEM No��v� _ � Od� i v\ WW �,.. Zaynp Diadld . 18 Pf�OpNl)t�M'1 LOCiL�00 Ot �y �QHh�' �/r� MN WdDlb DMllct? YM:N0� � �' �,`.., —� b Rop�r1Y loCM�d In :� ��rMlon An�4 . YM No� BUILDIN�i PERMIT APPUCA710N POR: Permit to: (Circle wt!k:hever appiyl Roof. Raroof. IntWl Sidinp. Conthuct Deck, Shsd P , f�air , . �� 1no� �' PI.EASL�ILL AIIT'LEaIBLY 8�COMPI.�LLY TO A1I�D D�LAYS W pRpCEgSN�Ip TO THE II�SPEC�'�Fi OF BUILDIN(3S: '• Ths �r�pned he►eby appNes tor a ps►mit to build aoco�ip,tp ths toppwiny ap�cil�ati�e: � _ � Owner's Nem� �.as��� S i��q �' � .. Addnss 8 Phone 1� R,i e,���1 S� �r-e. ( G.1� ( 1 ^ l�rohkecc's Nama �,re� �a�le� , �ive.v.es,� �. [f.er� nddress fl Phons ( ) 6Aechanica Neme , Addreas 8� Phone ( 1 wna�nr wpon a euratq� _�,o�ol.e�t�,D n�a arbrq� w��J n.wwrrp,ro►now�r,ny a��w.� � 0 M�bWl�rq oorAoim ro�.w9 � INb�bs9 7.N Farmwd oo�'' J�,��o q�y ue«w• 81� r o4 z93b 1ar x�so�rae • LLc. 8 091?� �� �e`u�nwc� m4 s..��+c�.. : S� ��� ���.. � ���� �SCRI�TO�t OF WORK YO �E �'s ., . ��� ��� � � r a z _ ����i��. �� rGfi1�1� 1�/: �Y�W /�/l��iC1P� C��` ' ��� � a� ,�,�',�,� �N r�C..� � , � - �ec.�d� '��l�4 Dl�l 6� ��A� � i I�T ZQ (o CITY OF SALEM 120UTING SLIP � NEW CONSTRUCTION CERTIFICATE OF OCCUPANCY LOCATION: I� U N/� U iA �U t �"U DATE � � Z— � � APPLICANT• G l�u �r �ay�� J�a,ra��e� , �'�� ASSESSORS � ' U ' ZG- O ; FRANK KULIK �� DATE: (93 Washington Street) � CITY CLERK CHERYL LAPOINTE . � DATE: (93 Washington Street) ' PUBLICE SERVICES , BRUCE THIBODEAU ' � ATE: � D� (120 Washington Street)4'"Floor � y��/ �� �E�`r-ii� / Ny ��O�c�l�7�l�QL. � Y1c9�/4G.a� �r I , WATER � S� °l- LLYt Ltrq N DOTTIE THIBODEAU DATE: ; (I20 Washington Street)4'�Floor � O � CROSS CONNECT SUPERVISOR ,� c�p� BRIAN THIBODEAU DATE: (5 Jefferson Avenue) PLANIVING � � � VALERIE GINGRICH DATE: (120 Washington Street)3 oor CONSERVATION COMMISSI� N . FRANK TAORMINA DATE: 8 � �S �� � (120 Washingron Streey 3`d F7oor ELECTRICAL { ' `'� JOHN GIARDI ' DATE:_c�7�Gi�� (48 Lafayette S FIREPREV ION �,,,���/� ' � "! i ERIN GRIFFIN DATE: " �` S �i� (29 Fort Avenue) �' � : HEALTH < � JOANNE SCOTT DATE: O)' � "v 5 (120 Washington Street Floor ' BUILD[NG � � THOMAS ST.PIERRE i� DATE:�S (120 Washington Street)3`d Floor � • -- ::� � ✓� ��,�on���,�� �.�,��� !�_ Board otEui�ding Regwatioos and Standards License or registratlon valid for individul use only � HOME IMPROVEMENT CONTRACTOR before the ezpiration date. If fouod retum to: � Registration __�pg�7� Board of Buildiug Regulations and Standards ___ _ . _ _ . _ . .. . . Ezpi�atwn:=g/3/ppp�__.____ _ _ One Ashburton Place Rm 1301 _. - -- - - - -Boston,Ma 02108 -- ----__-----------_-. - _ - -- : ,; � . Type: Private Coryoration DANCO BUILDERS ING ' Daniel Tremblay•; 2 Margin Ter ' '� - �p _. , � ` ��� Peabody,A4A 01960 � ar���•� AdminisVator Not v id withoUt Signety e � � ( . . _'__.. ._,_�_.._ . .�.._. - � . !� " ...:. �e �omrmwna�e¢�c o�./�.aaa¢a/eevella �'� s" �- BOARD OF BWL�ING REGULATIONS � � a '; �`' License: CONSTRUCiION SUPE-RVISOR 'i Num�,.GS O43536 ��, �i��-���l6�/1960 � � '�. . �,�s�)�606 Tr.no: 52q0.0: :- / }• k � ., �I _. ._--.__._ . �, ��,., ��, .�' � . �ANIEL E TRE �AX:�; . � 2 MARGIN TER��F._:-z,� G-. � PEABODY, MA 01960�:::'..- � � �__���,� � CommissTooer / .� . . _______.—_ _ ___. > . i - i Oui �" E � � a. u. "' 3 ? g �. i � �� �� g °G �' w � � � LL C�a W= t� W Ql� �Q( 4 m � � � �W W .p � �i '� � W �� Ea 3 � � ° �� �.. � � , O , .. . s � � .r�6�o � __ , �-;�,', {�� ttii:i: � I f _ � /.�� '�`""" -=— T-he Cammonwealth ojMassachusetts - -- -- - - - - _--_-��- ��� -' (' Depa�tmentojlnd�crtrialAccidena �;' -� \� = O/f/ce a//nvesUgaUons 600 �Yashiiiglon S(reet ��;� Boston, hlass. 02111 � , � � �`��,, Workers' Comprnsation Insurance Affidavit � , , nam.c � location� � � � cilz � � ho q Q I am a homeowner performing ell work myself. - � . . � 1-am a sole proprietor and have no onc working in any capaciry � � � - �I am an cmployer providing workert compenscnon For my employees workmg on th�s�ob _ � /�\ ".'¢S BKi' �>�HMdj.Y�'� 9 M.t t1 �`�. . `^ 5 52 �'� c g n,�''F� f3�� � � 3� £`�i'. r k c�: '� c': • .?ts I'� " u-o �4 wY.�`?. .F,o'� �2 a�°.�}.c'�:R';L'4Y'�.. -': as 'S fa X �E�.`,,'�'ii z` � - :«�.q ,$ �' i E ..'�i � `Y< :i� sR�"%.€ - f;� a x 'a d #.�,,,� � i ,..z!6.��3 x i�3. -.��$i ��4 r¢i�i.�s��rFx����`i.�f�"'�x s�E� . - t S` q. `�.\ t ' � �kF�; e� .� rt3 d M � li e F� R, 4�v . �����r � � 4 £ 3 : L r � 3 w f,�iYt t ,. .. 5 ..1 A f� f'.: S �I+'" �::ZFb�'1 ~ : d a" I `�,'.,.'. �' �.Ck ' 1 ...�d Mw.�t4.....Ca�.FR14k � ��i'a� ' ; . � 1 am�e sole proprietor, eenenl eontnetor,or homeowrter(ci�de onrJ and have h'ved the contractors listed below who have � ! che followmg wor6ers compensahon polices � � F�'� .% .� x � y 'L' :f t � S ¢. h � , cnmuanr nime � r � £ � �a"Y' ¢ a 3 qp ma���t� i -, � a4y+i r:. -r s.... ^n; , 4 � '.,,.�. sa�t y,. Y4`s"�a�»���;yF�`�� 4�Y'�'Y"�q"'���3y�': �ddre5f r . t e a q ¢+� . ( p �'P�Rti4 '�a.�� d�� ub ��—.�' � �� x' ��. ������.�wd��fa�+k })sflFai'3 C yLT�+ip ����_-. � i cin- "� +f� ��.�� ��<y£ k E 5{lblt[L�C� -r �'!`�.� � �ia�'°�. �x"s'?�s' ��j.�'i�. � . � � ¢��rhsma�,�.x.qr�k. ''M's s3 � F N.a S�: At'A� scw^�.� x 'i z i �t x,,.P' du� x ae, x 'S p� �§ ^j:.ss ..rnr�.:* , .� 'hk �rx`� ,�t .:r��t z r,Y 2 '�. y�,�."T .'s =f�;�..�� y£ ��� in�urinee eo x .?F„ y,7���;'�% r a e. f.. e�nn�':+pf p�r.L�.,.=e.s'�..Yx a�i,x>"°.S��T*' �°.a� tixk+. �� � z.«Fr��m�''[�'t �F x,, ' � g<-sR�y� ��3�a ' � �f�e. .. � t 2 y�."`f^.�+E3 x ^i Ll ti h�T}Y��� Y^.�Rv � Q4���9 � �� t ���. � a¢.< .��z���s�fg `p t el�a s i t z: �as xx i9 . # � .i � E< j;; s s �y 1 udA�oft ,r ., -- s -� C.,..^��,.'�`t . a � . Sw. t s y� F .:� Ti' � '+:'°��3xn�3"C'��f���s 3 s Y x.�° oQ'�tz w` . � ' ' . .. e . �c +� .. .: s { ,� � '� eai,�`..��,�'�'`r��i.n< o �h''`-�,s*��;,�,x� �ziA�s�t ?�r° '�4��S� T'�ai k,F�`u.ik;F�ca-�$k:�����.gr°2'� . . iniutancs co ,as s_....-a.�=�i :.,,. �r � � :rf�. of�cr%Y�?� ��fi' _�.�`�"8.'S�.2z '-F 7.�rT?:: ��ne<k�Jaihon� s ee � .rta�y�� Fvlurc iu mevr�cnr�npt a1 requfrtJ unJa Sealion ISA of hIC6 ISS<an Ie�J la 1h�impoiilion o!(riminol psnelliii o!�fine up lo SI,300.00�nJ/or unc�aun'impriionmrnl�i wdl us tivil penal(iit in-IA�furm of a$'fOP\VORK ORDER�nJ e fine ofS100.00�Ouy s�oiml me. I unOmnnd IAaI a, aupr of i�u am�amml muy 0<_furwordo0lo 1�<OIT�ce uf Iminiealion�o!Ihe DU for�orcrapv rarifiution. . � /Ao hrie6y erni under Ihr pnin,rp annl(irt f prrjury(hot Ihe informa�ion p.ovided abov�it true and torrrrG ./ / Signature � Dnte � U'�I 6 � ��S Prini namc �'11R l � hY. Q � Phone M- � ��-- 2-b ` � � offrzial wa only, Jo nol wrim in IAis arc�lo Es compined Er dry or io.n oRaial � ciry�r w..n: � p�rmiNiuneo� nDuileine Deponm�ni ' Y� � , OLiccn�ine BoarJ � . �clioc4 d�mmeJiala rUpunx i�rayuiriJ � - OSekUmrn'�Off�a QHohA Dapanmenl .' <onnc�panon: pAon[Y; f101A�r � ���-�,_ � Ir���p IR3I1.\I , •+ �- � f. Srw_ . . r � , ; ' : 976 777-3306 V .O1 Mar-09-O6 11 :49A Dan Hur�lay InsurancQ ( ) C6R �7L wtelMuiwrrm7 A RD_ CERTIFICATE OF LIAI�ILI7Y IN3URANCE o�wcow, o� oslos rnoouceR THIS CERTFIGITF 18188UED A8 A MR'REII OF INPOMAATION ----- — Dan-Hus1�y=lA�urano��AQ�noy_--�.. _ }�-,-.-- _ �..___ �ONLY AND CONFERS NO R16NT6 UPON THE CERTIFIGATE Che�tnnt Gta�, 8uit� 2� HOLOER.THI6`CERTiFICATl-DQE�•MOr�AMENDrE7fTENDOR-�=--_�-- ------ B�v��1 C�d�xal etr�at ALTER THE COVERA6E AFfORDEO BY 1HE POLICIE6 BELOW. Danv�rs FU� 01929-3fi20 � Phone= 978-777^979� Pa::9'78-777-3306 INSUPER9AFFOROINGCOVEMGE ��C• . ._.._..—__.._.. . . ...._ iNw�eo � . we�wFna� Libart __Ntltu�l i . NiURFN M _..... . D•IfCO L�II OC CO. � I710. NSUM1ElIC ... I.. ..___'_— pe��p��Q� N{U0.CPU __.._ 0 6 - NfV�lk�l: COVEHAGES � TNE I'OLiCI[�Of WSWANf.G I 16TF/i 1410W 11�1k�EEN RWKO TO TNC WSIINf)14YG111fKWF FOP 1Hk�'OLA.'W YER�W NVIf+�iEU.N11TM1N8TA/DING �NY�EOIhIIEMEM.TFRM Ofl CONOiT10N f1F aNv CONIRY:T 01�ORIEI100CU1:NT WTNR[lPFCT Tn4MIf.H TMiI CFNi tiG��[MAY�16YUF0 U11 � NAYI'EI1fIW1,T11[INOINI.WCF�FfONPtV/YTHEI'ULICICAO!lCRECO![RfNB6lWJFCT�O�LIIXFICIWII.lJ���U110NSlJIUCO101fI0N'+OfEVtll . GqIGIF6M�(tRE0A1kIlMRYWQANM�Yl1AV[OC6NPi0UCEDBYPwDtWI1 �J(/��►y� . "'" '""' --'—".._.-.. . . __ ►OIKTNUMR1l —... ��Yps�ECilllE'�TlVfIW1 /YY LM�Tf.. ' LIR i W M7UMN�E 1�IlWm � 6ENFML WW1fY - . FAGM4G.VI�RlXCE ! ... . ! . . WMRl7k1UNtNlltl : ; . I qM11fRCMtCkNt144LWIUlY _FIIW�61Nem/Mwl �.__._..._ . ' CwuSunnc :OCCut � utUelwlNry�M�1 �._...___ . • ___" ; .. .- ._. ' - . , p(qa(INAIIMVMMFY IS . � ..___-.__. . I UENFTMAOORfMR i __'" i J_— . . :. . __ PROl1pCl6�CONMIOY ACU'S CtX'lAOGR[GAiCyL�Y(�1f.�PM1E6PtN i --- � � PMILY ��i �'_. LOC � 1UTOYOtl/fWM111Y � CDN&NFb91M(Ut�iNi� t - � NI�/WTO 1s�r��YY1.. ..I. ! KLONNCOMITf�6 lWLYNJURY y E IrM OMWN � 70NlOpLCONiRIfi '"—_-. . + nMCDAl1T0t . I��NT 1 NON-0NNCUAUTOS -��---�-�- PR01FRTr WN+�Gt � "—'_ :hrnrM�t4 CMAO[WY41t 1 - IWTOOMLY CAKCY$N� / . .. . �NY/�A.'TO I ! W0010.vM _�µ'f.� _ � M. � EI{OE�WNI[WIINN.IT' IHICNOGCWHCNGC t_.. �r.f.GMi J CUMo WOf I i AOORcOArF i _� 1 I . a _ � I . I - _ __ __'"... •0lWCTIOIf __ i .__ .. I M1ETCMLLIY ! f i _� yp�pQdl/�NMTpNIMD X.1 .AWf91 . �R •ewtme�s'uwtm � � 'NIY�MWPRFTOWYA�l1KNCMCGufNt �1'18718611012 11/90/0� 11/23/OS kI.GCNIGCqCNI _{ZOOOOO _ � � ����'�'r4R��a���� SEE 11ST11CIII�I1 NOCC lL.qYAc[.FAI-MMIUTE 'ilOOOOO_ , �y�a"'�"'""" [1418FA6l�MULICYLNR t500000 YPCG�W.VIIMiKUN6tYav __ . dME11 i I 0 WCIIRTION Of OrE14110Ni I LOCAl10N31 VFNCIA{I{[CWMONf�ODED�T!IOOItfEYENT I{KCU4�RON7�OM� �. C�spentry. . � � 1 � � ; CERtIp�CATE NOLOER CANCELUTION I � NEID001 ��O�OF�Mf��OV[OC�CIUOlD►OLKAELOEWICH1f0�8F0UliMElillAAlqN ' blRMlllOF,MEIHYMGINYNIGWI�LMOf1WRt�YAIL 1� o►YLYJ�ITIEI� - NOINZ TO M!Cl�TIIGTE IIGOEII MNIEO i0 Mf l!{7,OUf FA0.W!t0 DO�O�NLLL �. IYIO{[NO�l11GlM1M OP tMORI1V OF AMY FWO UfON TNE M1WRE11,II!+lIENTiOq �BIIF�EM�1N1► _ � lOIItIIIE�[NT�T1ri i�l J Nurla �Conc�s ixooi roa1 m 6CORO COR►ORATION 7ilB v �'� � � �_ ��� � o , a � ' o" ., � =y� o j ����� r . � �' _ � m� y O . � � � I I ` s �I n : � �� � � � � � - � ���� � � �� ' . , . _ � �� / � v �� - y£ �—�--- —� � � ��� � 1, ,�� � A�%� � �� � � i��'L \. �' �, l� o v � a_:� C t "�` � ' �� ; � �� I� � \ � -��-�`� �� ' -, �� � J \ �/ � -L ��� Q����V��� ���� � ` �'- � 1 I n � � . � Q c�s1Q" � no- i'` . I � a � i � , '_ � . P� '� i �i��2' i�� �� � �5 �>, p�p � � I �� Ti p�`��S ��, � �� A G�c, � t � � V � �� ,_ I � � � � � ��' i� �o ,�V ��� � 1 . \-. t o % 1 �I \ ` P�� ���' ; , � �, Q a � V � �� �, �� �� �� � �o� h „ �' � �. �:� ' <o, c w� � � � � V`� � E`'o �L�,= � , �v � ,,; � �. � � �� �, /� " VA „ � � - � � ' I ���_ �'� � ��� �`.�o�; � �� � � � � � � � � � � � � � � � �v � � o�. � ' � .. � � �e�� ��, ��,,� ��� ���� , � � �� w � �, �� �,, A � �, � � ' � � . � Q 3 m p � �� d0 � ° / . a� � \V �b� � � �� � � 3 I � o '�/ a A. A, �. c o � t� �p uwi � ' J �, � � `� , > � � \ � I v C� o ,q�'. � \i �� Q ^�y a. ,bZ �`�\` � �, Ur 4i� � m' i�\ � '— 'o � � -�' \ � � �Q / �� C� v; � � � � � � � �"' / / Q o � � � ` � � °� �/ I� � m i � o �/ � �'y�,� � � '✓ / � � C� N� � m � �, �°� l �(�'M� � � � �oA � l � � � c�i � � 0-�9�d/y � '•%C� � � ' � � � . �-� � �d� � �.. � � .� � ��/ �� // � �^' "'+ � ._�� c by, �,C� � � )� _ � � _`� � �� �ro �� /� � I� � i \v � �� 1 '�/ o � � � ,I _o ' �_ o� _ � � � � � � � > — `, — � � o`�? m � � �. S 1 ��, � Q� � - . � � '� - � Qo ` ia`-o . � P � �+ I �3�' � v� �' , � Q �f� T� ._- I Q p �J , ��,. / � /;�� �_� 'Q� ^�` --L_ ��m �/ / ��G � � � � �� � � \ ��� � � .' � �W � ��-� �_ i✓ s j:� / ,8z � / e �� � � � (�� � ' ' � / ( I /�' j Q Q i�`' �L � �\ .9p \� A � �� �� - '� '�;, .bp9s M ���;, (a�z�g�\;'f, ,��-.i i � � � � `/ � ,,�to / // � �� � I \ '�� ��r �jlt-�.l ;� ! . .-�j�O; . E`�j� � j � ' � / ,�/ � �lJ�. _ � / ' � o� �; o � ���� —� ' ', � � — ' � ° I I a/ / � i �/ ��;-���,��� ��� � ��`% � .. ,� � a- � / � ,.� � � � � � � �'� � i i � '� / / �'� � � � Q p / �� � p � �. ' � �� ,�� �� I �\ ��)..�� ��� � � '— �� � �� 'I � � � � � - �'�� i i � � � �� / � , , . � , � I I � // � ��, ; � c � 9 � / /, � I i �' ° / ' / \I , . I ' N _�°' l � TRACEY/CARTER N/F N/F � N�F N�F E�GENE, JR• � M�RLDo2o��y &, CHARLES y �W/LCOX � COSTA & ALLYSOIv' S/DER/D/S JOHN Gl�1RDl �UDITH �ASEY � Qo�k A�E. P �n V S�PNIC NVf ANGERAMO, m � „ W ��c � DA V/D ANGERAMO � �, LIFE ESTATE � -� N 61-�0�4� �,�� , �/ � � a.� N 52"49'38" W � N 52'23'04" W 264.69 67.25' 25 �5 R �� 110 — N1�j: .L�jO� �--- 11�.96' �— 209.a8 54.91' avcNa vu�q LcYUJ �"�� �_� „_,,E_sc �- — � . . . � . , q � / . . - . � �'•. < � � � � N�F �/ — _ � � �oo �\� � — � , o« / / � - , ROSA & -_ — — -- � � - _ � _ � / ' � .__ ��U2cll' N� LF AVF � � � � � r - _ , ( � M/CHAEL � � � i __ � JERMYN f?�AL TY TRUST �� 2o�K MANSI — _ _ � ° \/ / � � � _ � � � — _ _ — - — 90 LOCUS MAP I r X � / ' — / � � —_ _� _ � —t�e I I � � � / / � / � - �r�� � / � � / / � � � � RESOUR E AREA BOUNDARY GENERAL N07ES I" n� N I � / ( � a N � � � � � aZ �� � 8" y 1) TH/S PLAN IS THE RESUL7 OF AN ON THE GROUND FIELD � �I I I � I I� / � � � LO� 1 �;� L� g�9 SURVEY AND PUBLIC A�ND PRIVATE PLANS. gs�' cr � � � �� 3 2) U77UTIES SHOWN ARE BASED UPON F/ELD SURVEY AND I \ �'\ \ � \ �93 � 43,495f SF. / / e RECORD PLANS AND AIRE NOT NECESSAR/LY INDICA7IVE OF \ � �� � �� \ � � /� � N UNDERGROUND COND/TIiONS. ., rn �\ � � \\ i . N 47'24'37- W � � � ,r� � 3) THE CONTRACrOR SNALL BE RESPONSIBLE FOR VERIFYING AND � -� � n M DETERM/N/NG 7HE LOCfV TION, SIZE AND ELEVA rION OF ALL ! N/F •�\ \�\ � � \ \ \ 183.00� � A�r� I � N EX/S71NG UrlUrIES, SHOWN OR NOT SHOWN ON n-IESE PLANS, � � �� �,� �� � � ���5 y PR/OR 70 ANY CONSTR'UCT10N. 7NE ENG/NEER SHALL BE N071FlED I JOHN, lIl & \ � 1� �- P o �� �� a RACHEL BERRY � A� � ��i g`Z � a� y � N lN WR/ANG OF ANY UTlILITIES FOUND INTERFER/NG WI1N 7HE I � \ \ \ \ o-l�- � -- c,; PROPOSED CONS7RUCrlION AND APPROPR/ATE REMEDIAL ACrION � \o�! . � �� �/ _-- � � BEFORE PROCEEDING W/1TH THE WORK. , �� \� � ��� a /!_G o� � � �— --- �� N �s 4) TH/S PLAN lS BASED OJN THE REFERENCED PLANS, DEEDS , � • AND 7HE RESULrS OF ,A F1ELD SURVEY AS OF THIS DArE. � � � — �O RIPRAP LEVEL SPREADER � r �( \ — _ — �— O , _ _ _ — —_ -- — � NO CER17F/CArION IS 1NJTENDED AS TO PROPERTY 7/7LE \ -�� � LOT 57A \ \� � et �Z _ 9� 6" TO 12' STONE, OR AS TO THE EXIS7EM/CE OF UNWRITTEN OR UNRECORDED SEE P,'LAN BY EASTERN LAND SUR l/EY �\ \ 9� h 9v � a �` 30 SF. M I N I M�M EASEMENrS. % \ \ ` ,� _ / �9'3 z \ FCIyqR -- — �� v � F4ElilSED TO JAN. 27, 200.3 \ 9y = ��/ ` QR�Q G`� ����� 5) RESOURCE AREA DELIN�EATIDN BY RI,NMER ENV/RONMENTAL 1 � 9� \ / � � �\ �_ — -� _ �y CONSULTING, NEWBURY, MASS, APRIL 1, 2002. � �\\ \ _ ^ �2� \\ � � �np CAL1 =� -� APPROXIMATE LOCATION OF PROFPOSED WELL �O� � WpTER SERVICE � 9�O �— FINAL LOCATION TO BE DETERMIINED IN THE FIELD � qq \ � " — DF�,k p�ROPOSED _W , � NOTES ���� 1. ZON/NG D/STRICT R1 /4ES/DENTIAL 2. ASSESSORS MAP 9 P.AR r PARCEL 93 �oL � 9 N PRpp� �6 � � �! 9� , �ov � � � ��'f(��Sf� / � � � 3. RECOPD OWNER: JERA'L1YN REALTY TRUST T \ \ '0p �Sr� N� � 9a , Q � j0 4. DEED REFERENCE: BGJOK 7199 PAGE 111 � U90 �,o \ � �• , �f(�q R. -- � � , '� � 5. PLAN REFERENCE.• PL.AN BY EASTERN LAND SURIiEY R 10j d. � LOT 2 ASSOCS. DATED APRIIL 23, 2003 ���� ` � ,o v't�\ ,��o , �� � �` � \ ``� 40' 96- _ F�o RRA�e�� °° — - �oZ ��N� 43,�F95f SF. S ' ��/ � ,o �� ��s� � \ � 2 �04•s; oz � � �oZ ti �o�E � � � � ` \ � ' r 4 � — / � FER 1 �w , " S� � � — ��D8a6 �� \ �\�� �\ a ;� �%% �P��� � \¢ 9 � �� F� � �� SECTION -- VEGETATED SWALE I D � � ,� _�� ,, ,9 ,ov �, �,. ,�o, � Zj � � _ \ � °e RFc� ��� �� ���` �` �� ' � °o � . No Scale -V �.j � � y;/,�T�FS � I \3j � � � 5 �RqR�e � ��� �-. 3 � �!p C�9,p -�� _- - � � � ��q�C EROSION CONTROL. SILT FENCE � � Y .Op. � � ov�--�'��— o,p yGf O�c.G c'. � /o , 9�FP� �03� � GRASSED °— � V � �'� �' � ��,'o� —�o� �� ��C,� �''yy� f'� � SURFACE� �` � I '��',A \ �oN.� � ��►✓ ' �( , - / �s/ / � -�/,, � �— ,o�+ �� � ,�-s" I � ° � � � - .� � I ' / S 7B. S / °S�oP/ �� � c��s O/�",pp'O ���3 '°8 \ Dh F� _ 4" DEPTH OF \ �� � Oe E� . r � "t`` O I / S)R � \ I � � QOP�� ` �,��4�� ���ys�o n.o ' SANDY LOAM�� � i ��0 9, S �o,�p / � ,_\ �/ ,p . c o \ WI iH 10-20% i � \F 6 p ^ i \ ORGANICS & I I � �/� / � �,Z � � �4g •��• ��c S�O ' or, _ _i ;- \ � /\R�' ����� � �\ � �SS MAX. 20% �_2_� \ \ \ �/� io64 64 � ��- � i � � `j ,y0 �o�° OF CLAY ; \�� �4v — r� � � '� � \ �� \ �04 � \ / / - \� L' \ �. � I \ � �oa.r � o$ �� ; �\ (� 2g6.3 „ E � � U � � � S6 ��0 i i�38 � S 6678�12 \ \ `�2' \ \ �� �o� EROSION CONTROL SILT FENCE \ � ,o;,� \� sMH �����,y�F� � S �� � � \� N�F • I � u2 sy,o' r TANIN & SOMPIS SASALUXANON : 2�x2�x4'-6' WOODEN POSTS (� • ' AT 8' O.C. (A�AX) v� \ ��� 3 MIRAFI No. 100 SEDIMENT �� � \ �\ �-- CONTROL FABRIC \ � �\ � �a � HAY BALES \ l `D�.l \ �o9.e � � FLOW DIRECTION ���5 � � � I � / \ //O.� \ ' � EXIST7NG GROUND \ ���� � . G�� \ \� 10]o \ \ \ SEWER AND WATER SERVICES SHALL BE \ FS � � \ \\\\ \ z y SI TE D E VELOP M EN T P I INSTALLED IN ACCORDANCE WITH THE s O \ � ERMIT PLAN REQUIREMENTS OF THE CITY OF SALEM \ �06� �\ �o \ �`Z — IIII — IIII PUBLIC WORKS DEPARTMENT. �08 � � � LOCATED IN ���� — ��� � _ = I I II — I III UNDISIURBED SUBGRADE �� \ \ �ey � S A L E M , M A S S . ROOF RECHARGE BED � � � � � • No scn�E � � \ �io PREPARED BY ,- LOAM AND SEED (MIN.) � '��6 � EASTERN LAND SURVEY A�SOCIATES, INC. L E G E N D ' 7E' NIN O TMH EXISTING TELEPHONE MANHOLE 100 PROPOSED CONTOUR � �e�� 4 y� STORM7Edi S�310 CHAMBERS \ \°;y \ �04�9 \ �� o� CHR/STOPHER R. MELCO, PLS �; o SMH EXISTiNG SEWER MANHOLE 100x0 PROPOSED SPOT GRADE � �a. � \ � i o DMH EXISTING DRAIN MANHOLE ' � * � '� s• � `� �,�►�: ; 104 LOWELL ST. PEABODY MA. 01960 � EXISTING CATCH BASW � / \�/ ". OF kq� ` ' ��� � ow EXISTING HYDRANT * % � \/ � �i��N ' °s'�, 4 oF So� �978� 531 -81211 ' 2' Min. s'y (� io6 <„P '�c+ v 1H Mq � EXISTING WATER GATE SECTION i 1/z' to 3� WASHED STONE � z / / ,v%'s � at' �Q `ST -� CHRISTOPHER N I �S� �' i - - 100 — EXISIING CONTOUR esr sH.w.T. �\ i �a � �� l o CIA�ONA. �'G� » > r 100.00 EXISTING SPOT GRADE �\ i ;�o " ME��o ' I' o ► — t �- UTILITY POLE MIN. 1 INSPECl10N PORT �,\ F,� , <, , - .� No.31317 Q "� 1 � ��ORIN y, SCALE: 1 20 SEPTEMBER 4 2003 3 — STORMTECH SC-310 CHAMBERS '9!� �y � u � � c� CIVIL � ► ¢ PLAN TO FlNISH CRADE IN AN 6' BY 24' STONE LINED F`N 0 � �pF �� 0. � No.309690 ,? = LIGHT ON POST EXCAVA710N �\ T -��6 'Fp �` \ 9\!q��ST� �,+° • 1400 9F�iS7E�`�" �7' � o HH HANDHOLE � s �,\, � �°�.�N� 5U� + ��SIONAL�G�� i ' ' ' ' RETAINING WALL \ / `� � � 1�;������� � 00000000o STONE WALL f -x - %� CURB 4•TYPICAODOWNSPOUiS '\\ \ � � \\ S� ��'Iz� ND�ICA�TIVEPO�FDUNAU�THORIZ DEREPROD CTIONIs ___. � FENCE \ � ' RESOURCE AREA BOUNDARY � � 1 OF THIS PLAN AND IS TO BE CONSIDERED A ' A10 RESOURCE AREA BOUNDARY FLAG ��8 /06 \ �. � �..� COPYRIGHT INFRINGEMENT AND�OR FRAUD. r � � `S � � ENFORCEMENT AUTHORITY SHALL NOT ACCEPT 0 10 20 40 60 80 -" n:i48 ��z S \ PHOTO REPRODUCTION FOR ANY PURPOSE. REVISED I2-3-03 GEOTEXTILE FABRIC ��`� 1 � � � F 12526 LINED EXCAVATION