64-374 - 30 CLOVERDALE AVENUE - CONSERVATION COMMISSION i �y-o3 y rvv2- 3� JYA Sii1gle �a..,lr h��c / rjrap wall �y.fy ,. _ h]A AK STRUCTURAL K ENGINEERING Andrew Kuchinsky, P.E. 8 Coleman Street Peabody, MA 01960-4104 978-531-5927 Tel & Fox �f Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number; WPA Form 8B — Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131 40 #s Provided by DEP A. Project Information When ling out 1. This Certificate of Compliance is issued to: II IIIII II IIIII Iillll IIIII IIIIIII forms on the computer, use Angelo&Amy Meimeteas 2005092900588 Bk:24889 Pg:234 only the tab Name ,09/29/2005 14:21:00 OTHER Pe 113 key to move 30 Cloverdale Avenue your cursor- Mailing Address do not use the Salem return key. MA Citylrown State 0 Zipp Code e 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: Atlgeio &Amy Meimeteas Name RRm July 22, 2004 #64-374 Dated DEP File Number 3. The project site is located at: 30 Cloverdale Avenue R CC w C I E®Street Address Salem MAP 9 City/Town LOT 269 O C T 0 7 2005 Assessors Map/Plat Number Parcel/Lot Number DEPT. OF NNING the final Order of Condition was recorded at the Registry of Deeds for: PLC; & COMMUNITY DEVELOPMENT Property Owner(if different) Essex .County 23224 130 Book Page Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: August 26 2005 Date B. Gertifi cation Check all that apply: ® Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed.The project areas or work subject to this partial certification that have been completed and are released from this Order are: naform Bodoc•rev.7/13/04 Pagel of 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided64 374 by DEt' B. Certification (cont.) ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. ❑ Ongoing Conditions: The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). Condition Numbers: C. Authorization Issued by: SALEM September 8 2005 Conservation Commission Date of Issuance This Certificate must be signed by a majority of the Conservation Commission and a copy sent to the applicant and a ropri to DE Regional Office ( ee Attachment). Signatures: v-- .,aform Bb.doc•rev.7/1=4 Page 2 of 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B - Certificate of Compliance #64-374 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP C. Authorization (cont.) Notary Acknowledgement Commonwealth of Massachusetts County of (�45—f ie xll On this Of Aq Day Month Year before me, the undersigned Notary Public, personally appeared 6-0b inns c io I IC N:t q!nrg Devil Pakl n 1 BI> _!TTvr-„� e. ) V' Name of Document sig er proved to me through satisfactory evidence of identification, which was/were �erson�l(p 'l�i'°w'' description of idence of identification to be the person whose name is signed on the preceding or attached document, and acknowledged to me that he/she signed it voluntarily for its stated purpose. As member of SALEM City/TownConservation Commission FRANKTAORMINA �---� Notary Public Sig ature of Not Public {ttYt7 My Commission s Massachusetts My Commission Expires Printed Name of Notary Public April 27,2012 My Cl5mm s n x ires ate) Place notary seal and/or any stamp above signs re of tary blic w afom 8b.doc•rev.7/13/04 Page 3 of 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance #64-374 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. To: Salem Conservation Commission Please be advised that the Certificate of Compliance for the project at: 30 Cloverdale Avenue #64-374 Project Location - DEP File Number Has been recorded at the Registry of Deeds of: Essex County for: Angelo &Amy Meimeteas Property Owner - and has been noted in the chain of title of the affected property on: 9 I aq low �)j=I 9 Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant wpafom 8b.doa•rev.7/13/04 Page 4 of 4 RECEIVED AUG 0 9 2005 DEPT. OF PLANNING& MK AK STRUCTURAL ENGINEERING COMMUNITY DEVELOPMENT 8 Coleman Street Peabody, MA 01960-4104 Tel. & Fax (978) 531-5927 August 5, 2005 Mr. FrankFaormina Planning Department City of Salem 120 Washington Street Salem. MA 01970 REF: 30 Cloverdale Avenue, Salem -- Slope Stabilization -- 1 year later. Dear Mr.Faormina; The engineer made a site visit to the above address on the morning of August 5, 2005. Starting with the enclosed photos # 1 -# 5, the final slope placement is shown, going counter-clockwise about the property. Comparing these photos to the photos taken August 31, 2004 (Report to Conservation Board), the engineer believes the slope of the embankments to have been stable and similar to that of August 31, 2004. The recent photos show a natural vegetation covering over the embankment slopes. This process will continue, until the entire embankment slopes are completely covered. Sincerely, OL - )e'�- Andrew Kuchinsky, P.E. .,,A OF OF Copy: Angelo Meimeteas or Green Mars Construction KUCHIN SKY P.O. Box 2243 STRUC ND.SM Lynn, MA 01903 w ` Y V � � . �11 S�' � �•+C+���it}�� �� �ryv��I� !�Y5 :� Nk zt4a ,d�`3'`� .^ � jr c� rg j y s +• Y `t 'iA •"Y � � , 1� �`.,4 . ��'�•. rN `ra.�L4 � , fir! }I •t �� ''!1i .. � {�`"M'+L. ," yv r � •� � � yp p^ y4�",�`�^,,�� a*Jr` ""�`} .l��T 'w'� � . �.. r• • A � w 5.;�yet "'E]�r -0 "'�"�%t !R� h�kd+ ra '' �' fC Ff���' 'S * i 4 • _ Yr1R"• � ..� y1 'F �/ r ,�Y I �.1�'���5-�L�'w' �ua�..�}'.�•R*kR* a .� T.j/�['. Ta i ��>�� �' Y A .< a ".Y� , t i k+�. .r r� y ��y t.. SR'f 1 4. 4 YF �7-�t r �fRr � ".'•.. ��� . 1:' �—j � �,,.."�^�, a #•.�� • � rtry"� � .t`'a' . Fee' A: „ � � �x a >tl .`� . ��``'N F. •+r'p p] -. * � �T.' �dlx� `fk �t�, a• ;` t R` ..'q yr , M���-I �y'i W 1 t +L `f:t Y �t�'• � f r• �' / +�,x "K` t t e4".a`•��°r �,� a$'i'.:':. a` K- 'lt✓� 3' Y F 1 j�}. 3� ti.} �u .7� � y .... .• �4+ " .. 3 �+r , e r=+ {! y�•_. �}'��. � L' �a-1 £ N]h6l. � aI• P Y �'�"'i a r` E. - t� ( \4 i �'r 'r a ry .aa �' � 4. �irEjy��- yd- y� ��,,�_� 5' ��i � �:tF: C i. 1y +Mr .'I �." , -•»,� R .tea �,. r "46!•' �Y M 1` Yn. '4 • � � � r'T 1 r( ... i/ e X . _ tik, �.�A � yz, . � �+ i •'Rf�.s $', �',.e�y"^1�r ik� �":1. : f et ,t s , .T t �bR Rid• � ry � •q '1Q �. � i'i 'S�'F` 7exA t1- al .� r'"ST`T'.7 a"�r3�k... .� J � �. �ro r ixi. 'Y'�`-'.d t• � �' i �'+[ '� c _ i, �>'�r pE� 'I yyA; vlt � S - ' f" �!I is Vt\ te * 7 •\1 .F.: . ' f e ! e ~ W �.,A �1 / , iy /v� � +F�`r�+• �4'1f• 4� :':'1 a =t `(� t s� M t1 sO.��,p t,.� yi.: a/ A `� ;[ � .X ��`d 7€',Ka.t' RI 1 .,t rrct •- I�"f i� 8:'ret j::}SS7! _ r e .• '�cYr rf",`"�"r't��' F� �[.F '1 � iA.?'J�^'�r^ '.tlN�. t x} n- .7'^ .dye'. r�'•..+�„ "4r '-�Q � �r'.l y 4..: 1�Y�{�.t'��a11�.t�••�. K.� 1 i � f 3t d a .H zr✓'$�i4 •.-r 4 F 4 d�X. .GEt' 1 { >, Y `3�t �}g �'y 104�+t'�. ♦F` ,�"': �fro, '�j5•�r + ���'�!.�}� �'r : �� !tom „_fn ram ''�i'�' _ v -�'• �'�>�'+�`s,, � iF � f ��lEa(,3� � fib' r fat ..iL rY'�bl '"•. !"'. 4 ♦J� U�, { ♦ . �/° �tA, ¢C}/4"�/''1" '. � `e� ��� � ?'°ef'J+r i rfti= \ Sd �t \,_$�k��, a' +357 i V•`: �tG... c. 't: /�Ji Irr .�"1'1 !"S� �AtJr�ret �1 a. , int � d.. "�-,'yF'' •�Z''� � �tt�r]� *���',)+' �y"� �v h, yE<��� 'er f :.���� �4•� �y a 'F" �•'t H.� r' / Y�.�,4.. ! fr � � ��.e T��. �" ,L�+ e { ♦ w tl�"6y -./ e� l `r; r I "`"''vuLa ,}�..-r �,4. YZ F / r..R ."l lei le°t �,�%ry, .rYs� •dk" a o�l r.,+�Y4t' � •i ,riyx��� -4 . +.. �r " '. 3 y � � *�?• ti^'"?. ; ',Kg �{/s:'Y�rR�•'•'�y}ry`,•[� 1}� � .,� j� �" ' \ ` `.t'.^•�< ' I, 3 L �`tt�i .+✓. LI$1 x r'£y w r(r—a.iFa.�i:,� ` .,r i. y�•1�1^��,� Y�,9; ^�l- S l /X C-r � a i.,� �rp 1.�� ��ik i � x_,,(�.�v� �'°RA \ i�iA"-,F•-_ .: 1 r l' � ..r� r� b3 rr�S+M ``l� �;I � Ilsy ' � ' i ,�+�..�� �«d `,"f.@ •y r.: '� �`a �. •�'Y"'-`i 1�y r• .r '•�ir / '..' ' t'"•4s .: ';ii �'t'►y$r� x'X '°�YL 'A'S '•y-' k - t'^ °"'is�+."y''a� ' fs K L � � 'k .dl q S1S•'Brr"� ';.� `3c •a !.'. �\�.y�� /'`�k �r .,� .`r �+'�.I 0. k �A;� � /X�� �Yf � v st .,� y..,71��. • .=yn„X.F� �yky = _�x• ` ;:'+�. « q�+ )" 6 • � 4 n1 �`''�-•� �{ •� ` "Y.. ' r d + �. s a �.^x� •�4 € y�T.r^x""•'. ��'it}+r2 '"{^�`><`�� 4 r. � n� = 'M ',£�t'i y,,.F r.. 1� ��' Xpa: 'Rti t:�;.t +d. '�Y . ' f�.Z•• h`. '3".� .6: .'. r +t tt � �'tm�" Et�d .n... � '"f'ry aA';_ - r+ )$' y y.G r ,l .e. r+ Y , ,,':-1a rF t4;+'°' '/ ` '' ♦ 7 r,W �fi ' L` . ($ `1,r .,}}.., "J•, r'a q +..y�. i 's A./F3 lyfr +{ M � ¢z pr 7 /'.. Z�y . \ �°7 � r°f\y,} •r•x?1l_'t"q �kBy�"�" '' 'i'Orae f'ji(:'IP. r. , :_.{S' k^r+r +, .�.. P`i� )1 r� rt}`�l /� r �r «+y '(ik• �., r" • R n.. ° '. .�{'("''� c$t'. .�q ) �. rr�\.. �t''l r, .!r 37 f,�(��. }j f .,,�'R �w �_ #,'Ff y ' t(''1�.� a< �1. • ,{/.•L�(ft+e'� i�dt34 "') �''�w` w "'if Z Y'Ott` t ' 1 { i, , •` `3 L,fYyp/7 t`C SY r1`hSr�4,rsi T+r '" .: ! ......!`;i.'/ rp , r�' s "'� `� rwt 'L. � " 5;,; 'L ` Y A .- �'�'� .-,;: # �d 's•. r��'r'st ii%p� Z• v !� °Ai'i• +� �r �' y i' gip"-. .i r/ i� .\` , � �f Yt lA ( .,+i .•+ .x�F* ��r. 'a` i+ w. �-"riL}wy� ly'S`� fir' ?.t ;� *� 'ni y,�� �t�� r '� ..�dr�.,, ��:�"�i� ''� e.P :�.-.".�dte�.yk �,�Y`1 it.�:..,y� ¢w.� r'. >; ���/•..)�{tt a'��yn t a�..���„t'%7E�. �� ;� �T . s,. Q y� 7 '9' f'f L( .[c y3�,7f M. xt •` f{�" ':F ..a+' • '�J. I.,b ��,, 'Y. r k. • of ....�Y�,- `) a „�' bb ��,.�. 'f".r YL w' f f� f •♦7 '(9r ^�• y x'" pt,+., SLvt +' y \-F $ rY $-f) y�;. lcy f ; � y y„ � •t '`, f i • r'g{? '4r w •.ry� ' �, a�fl• <"♦.,i) . .'�fr �,,.t(F» ' .« ,.11%-`•'tt)�.(,�,,.ary y:�rrf*' .}`:' Me. .4 , ry.,, ,fir.e�. fi` E,{+.L e�b+4Ea .FyF y �f.N,f�''.. f6.,T+.`iC ..rYf♦ er�-`a{Tx.s"'" at 4�Vf . �h*e"S�".Y4,.. t fr) `s'7�L.d'•�'l f ti..w', lij�r tog � s .E "`,.jy '��'4' plS. 't# "�•.,� f"j� ,'� ��P[I i.q f�ic'C'j-' �s� . /��,�1'�-,a ;f�• �� �/( s i{�� �w:f" 'yam,��, � )s Et ,��,,.i� ��jt��j`' a.F e • /�•'1�� ) � ,) ~�. .• iw t(µ �• .. �'' ,f.R•1 / 1'��ty-.� (?rn �' � , )s P'� �0-t ;� r r 'y�<rly r i� ` y x y 3 if,/� /}l Y 6 f 1� 4f 4f Ac r _""N9 ' ►�`� ���r •'� � , '.# •i`:� '" a � .;-]�{� 3 .. 3 r,r A'a"1) "` / � � t'f`✓ � y Y:' y1l \4 ' r t ��-1{ayl ti"' i' � �4Tr� s `c s .,fi`� �#f}�� ��1t =V e t-, ,:` /, � �,"F") r''�+% ` � r` �it1,*,1P'�' •;,�_ f►t ( �'`� r,"�1�,'2 • G�-"i F glh' •}. � �� `lr � �� �t •,.,3 w.a+rR iT r•$t. -�taF-� l��,x�� r�� �.�(1:��, �rt�['Rj�_;'y' �p r���t 4�.• f {' ,r I �i � J y r"'!E� t S' ��s�O�:J �� � - �� °f`.�a ,. '� '��°�i1{,w�f� ��2 •-q ,r1` '•e 'v• i�y'{��`Yv ''yyj Ss �. ' ':�iq,. `� � w i vJk. �! -4�' '�''•r J}y��rJ�• ) ,"r ; Y�l ' r�M��9".�� 1 •.,) �J rg - ) v�;t�'�-,t�, •`" +� / n �r4rcN „ l.�{l•i'- ,( {��1 a i, Zlrll; ..pst" t �7j:�n: 1(`re �1'•�' Y ' sT{{ )• ! glI' `� �^ l G � r��/ uY �t .�'l � \ +Y 11 r � e of 7t $,�.L'a�(rdi A � fa:'� 4.) �'r /(�(y[7'/, '/(�)t�1 b '+ �. ��$(�[ a ` n . T ' �4 �'�,"A'.)i-.�°, (` �'� (���} f �flk')�i, ., � ,d,. • A. 4i i�7_/"• "� ...r�.-ro f'� � " '�G� ' h ! ) ,� f i' s n '•. #4�¢ t'�k,.aA�.+"' x"�1 ,1' l�'S• '� � .�' x� .� gg I,=. ,, '�fir' ..•+�y �'° . � � fi a E(- ya... '` t,J• � •� '�Yf F +`�.- �,L r. d!'. k •.� i (+ `, r}yT'r"' / y"'a�t mod• ° �h fl t: � � i �.;r�•Py Hi.�'rj5 *�('v� r, r�. { '� -� �'., e� �i \/ •�l r �,� :y. r.,� �� L/ 13 �� w * °,. .AI.f.Y,` r `��<P'����\�,[ y�� t,z �+i� •1 ' �""' .,."� • tea?• g � �� '�+l '.!,� r-3t � � _ � R ,. � s J 4 ✓ e ""' �, ♦i$L` ,44}�s �c a `. �$, . a,�. �1X..' $ "�.r r t`'�� - f� °�� ,Y' L� - 4' • .A '�� (V�. cin ,y Y t:n: �� 7 f19y �•�r,J}� ly + � mart r{ v In 1 ,,//�� L Y ..d F 1 • /t 'a{��q^ 3s A,Y �� �K'1� � �a ' .Y,r 24 �5 All �CiYi � .k � T1 " ►� �� � eJ t�el �r •;� ] �. `.+«' ,y't�n,�t, �n� ��'.,y �':�, Ar � ` i qLr��� � � �,.;5�yy{{��� r +¢. �"4� ^,$rY $_ £€`�'� :' '+4}rt" v .. `�'3y,• 'i .�'� , IL CR id d� f+ { ` mat '" � L Y} r. ^ '. k �' � .Fy '., a�. `¢t` 6' Ma"� rrdr T' 1� ,,� � '1�' •h 4 � a a 4 e`� r � �•t,. r '�, $ �, y [J ,Fch, r' �' �.� Zl� �,. v t�h r �+.� s L f 1 't � Y w / lh J� 9!`'i �� p�. _.P •tpX T...sG' , a e ,4a= C' 4 ttww� �'� �'� �, ]��'�.v'.,�w �. nr' �>,;�C •��''r''r �..t �r..;,�-'�,. � r �:� •f, a t : � rTi il It il 4� 11?► i� FF jj : .ram } '� ¢.u,+.: "..: {rtisv ,s�.ja � i Ar� 4Ya�, �' ♦ il w, S .1 + •...tT Y i . r '" .S . fr. i , psi •. � �, ,�� i� ��..,� � '�..r^I� f . ' �1-�o�a,s-- ,jo CC.ollfiiLDs�LE ,q�, S�34�M . ti.., .} ` P•" ` �.j.yo;' � '" . , sw. .� i\'TAr.�v�"Y+ s,r. y<s t �♦ ',�'^ x s�ia1'I'�4�N.'Yi trrr��3 is�^'f y S'?�. re't.Apia yfm�rz 3r >sr rE xy .. s� l V { k rK.F'p :F +�r }�•1•. � R ". 7 Y -•r °��� �~rj� ��. / �{ � ..�1 p�y,,• 5 r "^ � r��,a ern � f,. � s .6 _,.+— ., , � p � `r•. w- r ! .r yam, yi � m It NA fly, yW .yy I. •� � A {� Fes; L :- /A AK STRUCTURAL ENGINEERING 8 Coleman Street Peabody, MA 01960-4104 Tel. & Fax (978) 531-5927 August 31, 2004 Mr. Kevin Cornachio, Chairperson Conservation Board City of Salem 120 Washington Street Salem, MA 01970 REF: 30 Cloverdale Ave., Salem, MA - Slope Stabilization (D.E.P. 0640374) Dear Mr. Cornachio; The engineer made a site visit to the above address on the morning of August 31, 2004. He observed the final positioning of earth fill, loam, seed and hay mulch, used to modify and stabilize the embankments at 30 Cloverdale Avenue. Photos 1 and 2 show the final 211 slope, placed behind the right corner of the recently built wood-frame dwelling. Photos 3 and 4 show the transition from a 2/1 slope to a 1/1 slope Photo 5 shows the basically 2/1 slope at the far side of the embankment. Photo 6 shows the slope as it develops toward the detention pond. The engineer is confident that the slope modifications will stabilize the embankment and that new vegetation shall soon cover the entire area. The addition of grass and other plant roots in the loam will provide an non-eroding surface. The loaming and planting of grass around the dwelling will ensure that excess stormwater runoff will be controlled as to saturation of sub-surface soil layers. Sincerely, I �'- Andrew Kuchinsky', P.E. Copy: Angelo Meimeteas Green Mars Construction P.O. Box 2243 REW Lynn, MA 01903 a HINNSKY c� STRUCTURAL !b.3QTfi! ` 4 .« . . 3 _ � \ xf « }g . »� I y � k S `�r J rs2—'4��a�P N CL XX yi t a " 8 i,j4� 1� HN'Yi �"5f rq�"�'"J��'�,,��J'Ir�rr! fyy �y k�,��e��✓� ,�`S�1 phi tjWi op n * r t•,�'teV' ������4Y�v. i r :daR � �v fffri�� ,g�, Q�ry"f �'t�xp'��� �'. r M ,d tf IL Y +""2Ynut)Q4tr C YYY��� ,1't1d ®R �5� t }N/ M (•F .I[' ,fie V'I j1 Y�"S1fl4m Ai Ai Ve �],� 4 � r ,✓4� 1C i�dt4 i �' f .�".o...yFtiN h ar i���,: `N� _�,,:yh�.. �(.,�j�i.�.'.tS_N � t c 1t � • • L1Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: 1 WPA Form 5 - Order of Conditions 64-0374 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: SALEM When filling From: 1.Conservation Commission out forms on the computer, 2. This issuance is for(check one): ® Order of Conditions ❑ Amended Order of Conditions use only the tab key to 3. To: Applicant: move your cursor-do not Amy Newton Meimeteas use the return a. First Name b. Last Name c.Company key. InI 123 1/2 Boston Street d. Mailing Address Salem MA 01970 e.City/Town f.State g.Zip Code 4. Property Owner(if different from applicant): Same a. First Name b.Last Name c.Company d.Mailing Address e.City/Town f.State g.Zip Code 5. Project Location: 30 Cloverdale Ave. Salem a.Street Address b.Cily/Town MAP 9 LOT 0269 c.Assessors Map/Plat Number d.Parcel/Lot Number Latitude and Longitude, if known (note: electronic filers will click for GIS locator): e.Latitude f. Longitude 8. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): ESSEX a.County b.Certificate(if registered land) 15802 6 c.Book d.Page 6/10/04 7/22/04 7/22/04 7. Dates: a. Date Notice of Intent Filed b.Date Public Hearing Closed c. Date of Issuance 8. Final Approved Plans and Other Documents (attach additional plan or document references as needed): Slope Stabilization Plan a.Plan Title AK Structural Engineering Andrew Kuchinsky b.Prepared By c.Signed and Stamped by 7/16/04 1" = 30' d.Final Revision Date e.Scale I.Additional Plan or Document Title g.Date 9. Total WPA Fee Paid: $55.00 $15.00 $40.00 a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid wpafonsdm• rev.7123/04 Page 1 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number. WPA Form 5 - Order of Conditions 64-0374 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings 1. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a. ❑ Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution d. ❑ Private Water Supply e. ❑ Fisheries f. ® Protection of Wildlife Habitat g. ❑ Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control 2. This Commission hereby finds the project,as proposed, is:(check one of the following boxes) Approved subject to: ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore,work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued.A description of the performance standards which the proposed work cannot meet is attached to this Order. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 3. ❑ Bank a.linearfeet b.linearfeet c.linearfeet d.linear feet 4. ® Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 5. ❑ Land Under a.square feet b.square feet c.square feet d.square feet Waterbodies and Waterways e.cu.yd dredged f.cu.yd dredged wpaform8.doc• rev.7123/O4 Page 2 of 8 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands L11 WPA Form 5 — Order of Conditions 64-0374 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 6. ❑ Bordering Land Subject to Flooding a.square feet b.square feet - c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet 7. ❑ Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet a. ❑ Riverfront area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet Sq ft between 100-200 ft e.square feet f.square feet Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) s. ❑ Designated Port Indicate size under Land Under the Ocean, below Areas 1o. ❑ Land Under the Ocean a.square feet b.square feet c.cu.yd dredged d.cu.yd dredged 11. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 12. ❑ Coastal Beaches a.square feet b.square feet c.dy nourishmt d.cty nourishmt. 13. ❑ Coastal Dunes a.square feet b.square feet c.dy nourishmt d.dy nourishmt 14. ❑ Coastal Banks a.linear feet b.linear feet 15. ❑ Rocky Intertidal Shores a.square feet b.square feet 16. ❑ Salt Marshes a.square feet b.square feet c.square feet d.q q q square feet 17. ❑ Land Under Salt Ponds a.square feet b.square feet c.cu.yd dredged d.cu.yd dredged 18. ❑ Land Containing Shellfish a,square feet J.square feet c.square feet d.square feet 19. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a-.cu.yd dredged b.cu.yd dredged 20. ❑ Land Subject to Coastal Storm Flowage a.square feet b.square feet wpafor S.doc• rev.7123/04 Page 3 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 64-0374 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions Under Massachusetts Wetlands Protection Act (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years,from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped_by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MA DEP'J "File Number 64-0374 " wpafov S.doc• rev.7/23104 Page 4 of 8 L11Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 64-0374 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions Under Massachusetts Wetlands Protection Act 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A)to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission which reserves the right to require additional erosion and/or damage prevention controls 9 q 9 it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. Special Conditions: If you need more See Attached Sheet space for additional conditions, select box to attach a tex document 23, wpafc"5.dm• rev.7R3104 Page 5 of 8 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions G Massachusetts Wetlands Protection Act M.G.L. c. 131 , §40 D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Furthermore, the hereby finds (check one that applies): Conservation Commission z. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: a. Municipal Ordinance or Bylaw b.Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. 3. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: a.Municipal Ordinance or Bylaw b.Citation The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. If you need more space for c. The special conditions relating to municipal ordinance or bylaw are as follows: additional conditions, select box to attach a text document ❑ E. Issuance This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions#4, from e d to of issuance. az/ 1.Date of issuance Please indicate the number of members who will sign this form: r1 U-Q This Order must be signed by a majority of the Conservation Commission. 2.Number of signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protecti n Regional Office, if not filing electronically (see Appendix A), and the property owner, if differ t fro p li Signatures: awlt-rzLl wpatorm8.dw• rev.6/24104 Page 6 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 64-0374 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 E. Issuance (cont.) Notary Acknowledgement �55 X Commonwealth of Ma/ssachusetts County of On this of a`� 'z' Day Month Year Before me, the undersigned Notary Public, personally appeared Name of Document Signer proved to me through satisfactory evidence of identification,which was/were Description of evidence of idenfification to be the person whose name is signed on the preceding or attached document, and acknowledged to me that he/she signed it voluntarily for its stated purpose. As member of City/Town Conservation Commission b ature of Notary Pu is Printed Name of Notary Public m i aoo 9 Place notary seal and/or any stamp above My Commissio xpires(Date) This Order is issued to the applicant as follows: ❑ by hand delivery on J� by certified mail,return receipt requested,on Date Date J12.3/oy F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department,with the appropriate filing fee and a completed Appendix E: Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, §40)and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. wpafo"5.doc• rev.7/23/04 Page 7 of 8 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions 64-0374 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of this form shall be submitted to the Conservation Commission listed below. SALEM Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. --------- - To: SALEM Conservation Commission Please be advised that the Order of Conditions for the Project at: 30 Cloverdale Avenue 64-0374 Project Location DEP File Number Has been recorded at the Registry of Deeds of: ESSEX County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant wpafortnBAM- rev.7/23/04 Page 8 of 8 SALEM CONSERVATION COMMISSION DEP FILE # 64-0374 CITY OF SALEM, 30 CLOVERDALE AVENUE SPECIAL CONDITIONS 1. The Conservation Agent will be notified 48 hours prior to commencement of construction activities(978-745- 9595 ext.311). Members and agents of the Salem Conservation Commission(Commission)shall have the right to enter and inspect the premises to evaluate and ensure compliance with the conditions and performance standards stated in this Order,the Notice of Intent,the referenced plans,the Act, and 310 CMR 10.00, and may require any information,measurements,photographs, observation and/or materials or may require the submittal of any data or information deemed necessary by the Commission,agent,or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the Commission is satisfied that the work will comply,and has so notified the applicant in writing. 2. Approval of this application does not constitute compliance with any law or regulation other than MGL Chapter 131, Section 40, and Wetlands Regulations 310 CMR 10.00. 3. This Order shall apply to any successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans. These obligations shall be expressed in covenants in all deeds to succeeding owners or portions of the property. 4. The form provided at the end of this Order shall be completed and stamped at the Registry of Deeds after the expiration of the 10-day appeal period and within 30 days of the issuance if no request for appeal has been filed with the Department of Environmental Protection. Tbis form shall be returned to the Commission within 21 days of recording accordance and prior to commencement of any activities subject to the Order of Conditions. 5. Prior to any work commencing,a sign shall be displayed showing DEP file#64-0374,and not placed on a living tree. 6. The term"Applicant"as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 7. It is the responsibility of the applicant to procure all other applicable federal,state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816),U.S.Army Corp of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified (3) Flood Plain (4) Grading Ordinance 8. If there are conflicting conditions within this Order,the stricter condition(s)shall rule. 9. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 10. The Commission and its Administrator shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 12. If any changes are made in the above-described plan(s)which may or will alter an area subject to protection under the Wetlands Protection Act,or any changes in activity subject to regulations under G.L. Ch. 131,Section 40,the applicant shall inquire from this Commission in writing,prior to their implementation in the field, whether the change(s)is significant enough to require the filing of a new Notice of Intent. Any error in the plans or information submitted by the applicant shall be considered changes and the above procedures shall be followed. A copy of such request shall at the same time be sent to the Department of Environmental Protection. 13. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been. issued,the applicant or current landowner shall submit to the Comtission a signed statement by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 14. Conditions number as indicated shall continue in force beyond the Certificate of Compliance,in perpetuity, and shall be referred to in all future deeds to this property. PRIOR TO CONSTRUCTION 15. Prior to commencement of any activity on this site,there shall be a PRECONSTRUCTION MEETING between the project supervision;the contractor responsible for the work or its administrator to and phone numbers of all responsible parties shall be registered with the Commission at the pre-construction meeting. 16. Prior to the pre-construction meeting and commencement of any activity on this site, sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commssion and/or its Administrator shall inspect and approve such installation at the pre-construction meeting. 17. Prior to the commencement of any activity on this site,the applicant or current landowner shall submit to the Commission in writing a construction schedule/sequence of work to complete this project. 18. Prior to any work on site,the proposed limits of work shall be clearly marked with stakes or flags and shall be confirmed by the Commission or its Administrator. Such markers shall be checked and replaced as necessary n is complete. Workers shall be informed that no use of and shall be maintained until all construction p machinery, storage of machinery or materials, stockpiling of soil or construction activity is to occur beyond this line at anytime. 19. Prior to commencement of construction on site,the limits of wetland resource areas closest to construction activity shall be flagged with surveyor's tape and shall remain in place during construction. The limits of areas to be impacted and the limits of work in the replication area(s) shall be clearly flagged. 20. There shall be hay bales and wooden staked stored under cover on the site to be used only for emergency erosion control. EROSION CONTROL 21. Appropriate erosion control devices shall be in place prior to the beginning of any phases of construction,and shall be maintained during construction in the wetland areas and buffer zones. The erosion control specification provided in the Notice of Intent and the erosion control provision in the Order will be the minimum standards for this project;additional measures may be required by the Commission. 22. All debris,fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment from entering wetland resource areas. 23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 24. The areas of construction shall remain in a stable condition at the close of each construction day. 2 25. Any de-watering of trenches or other excavations required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharges from de-watering activities shall be filtered through haybale sediment traps, silt filter bags or other means approved by the Commission or its Administrator. 26. Within thirty days of completion of construction on any given portion of the project,all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover,using sufficient top soil to assure long-term stabilization of disturbed areas. 27. If soils are to be disturbed for longer than two months,a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,exposed surfaces shall be stabilized by other appropriate erosion control measures,firmly anchored,to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 28. A copy of the Order of Conditions,construction plans,and copies of the documents and reports cited in Condition# 11,shall be on the site upon commencement and during any site work for contractors to view and adhere to. 29. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 30. Only clean fill, free of masonry,stumps,asphalt,and any other kind of waste material shall be used on the site. 31. All waste products,grubbed stumps,slash,construction materials,etc. shall be deposited at least 100 feet from wetland resource areas and 200 feet from rivers. 32. All filling or removal of waste material from the site shall be done in accordance with the regulations of the City of Salem Health Department. 33. Cement trucks shall not be washed out in any wetland resource or buffer zone area. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be removed by hand. 34. No fuel,oil,or other pollutants shall be stored in any resource area or the buffer zone thereto,unless specified in this Order of Conditions. 35. There shall be no pumping of water from wetland resource areas. 36. During construction,all drainage structures shall be inspected regularly and cleaned as necessary. 37. Immediately following drainage structure installation,all inlets shall be protected by silt fence,hayblae barriers and/or silt bags to filter silt from stormwater before it enters the drainage system. 38. The project shall not cause an increase in run-off onto adjacent properties,either during construction or when completed. 39. The applicant is hereby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including,but not limited to,civil administrative penalties under M.G.L. Chapter 21A,section 16. POST CONSTRUCTION 40. All disturbed areas,slopes and proposed landscape areas shall be loamed and seeded or stabilized through the use of erosion control blankets or other approved means. All disturbed areas will be graded,loamed, and seeded prior to November I of each year,if possible. No disturbed areas or stockpiled material will be left unprotected or without erosion controls during the winter. 3 41. Upon completion of construction,the applicant or current landowner shall submit the following to the Commission to request a Certificate of Compliance: (1) A letter requesting a Certificate including the following information: a. Name and address of current landowner; b. Name and address of the individual/trust or other entity to whom the Certificate is to be issued: c. Street address and lot number for the project;and d. DEP file number (2) A letter from a Registered Professional Engineering or Land Surveyor certifying compliance of the property with this Order of Conditions (3) An"As-Built"plan signed and stamped by a Registered Professional Engineer showing post-construction conditions and: a. As-built elevations of all drainage ways constructed within 100 feet of any wetland resource area; b. As-built elevations and grades of all filled or altered wetland resource areas,buffer zones and replicated areas; and c. Distances to all structures within 100 feet of any wetland resource area. 42. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds. 43. If the completed work differs from that in the original plans and conditions,the report must specify how the work differs;at which time the applicant shall first request a modification to the Order. Only upon review and approval by the Commission,may the applicant request in writing a Certificate of Compliance as described above. 44. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Commission and/or its Administrator has authorized their removal. ADDITIONAL CONDITIONS 45. A Structural Engineer shall monitor the construction/reconstruction of the boulder wall to ensure that it is fabricated in the proper manner to achieve the approved slope. 46. Prior to earth moving and filling activities,a row of silt fencing backed by one row of staked hay bales shall be installed along the foot of the boulder wall at the Pinch Point Area.The location of the erosion control devices shall be shown on amended plans, and shall be submitted for approval prior to the start of work. 47. The Pinch Point Area,which will be stabilized by a 580 sq ft 2-to-I slope(as shown on the approved plans) shall be filled and compacted every two feet. 48. Once the Pinch Point Area is filled and properly compacted,it shall be hydro-seeded and covered with hay until vegetation has stabilized the slope. 4 2. Continuation of Public Hearing—Notice of Intent—DEP FILE #64-374 - Amy Newton Meimeteas, 123'/z Boston Street, Salem, MA. The purpose of this hearing is to discuss the completion of a riprap wall for a single family dwelling within a Buffer Zone to a Bordering Vegetated Wetland at 30 Cloverdale Avenue. Comments: Denise McClure and I meet with Angelo Meimeteas and his structural engineer on Friday July 16, where the engineer presented his new plans to stabilize the entire riprap wall, including the original pinch point problem. We discussed the compromise that the Commission was willing to except, whereby, the limit of the rear yard delineated by the existing riprap wall will now become the no-build no-disturb line, and the portion of once buildable area will be transferred to the pinch point to stabilize the house and the fill it sit on. I have attached a copy of the amended plans. As you will see, the engineer proposes to cut back roughly 6 feet of the existing yard to rework and stabilize most of the boulder wall to a 1-to-1 slope....by doing this, the footing of the wall will not encroach further into the resource area. However, the pinch point area is proposed to remain a 2-to-1 slope and will extent roughly 20 feet into the resource area, as per the compromise. Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection - Wetlands r - DEP File Number WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document TransacUonNumber City/Town A. General Information 1. Project Lorcattion (Note: electronic filers will click on button for GIS locator): �b L—sb6Jc ih + l 1 4d' X a.Street Address 'I Citylrown a zip code Latitude and Longitude, if Known: Z. G)j Latitude e.Longitude f.Assessors Map/Plat Number g.Pafcel/Lot Number Important: When filling out 2. PPlicant: forms on the computer, use . a. Firs ame b. Last Name only the tab i c.Company - key to move 1 -'� e I Y] .-- your cursor- d Mailf Addr do not use the14 return key. e.Cit !Town - I.state y g•Zip Code 1 h. Phone 2�Number i.Fax Number j.Email address 3. Property owner(if different from applicant): ❑ Check if more than one owner a. First Name b.Last Name c.Company d.Mailing Address Note: Before e.Gry/rown f.state g.Zip Code completing this form consult h.Phone Number i. Fax Number j.Email address your local Conservation 4. Representative (if any): Commission regarding any a. Firm municipal bylaw or ordinance, D. Contact Person First Name c.Contact Person Last Name d.Mailing Address a.Cityll own I.State g.Zip Coda h.Phone Number I.Fax Number J.Email address ❑ Select if from 5. Total WPA Fee Paid you want to see ( Appendix q, Wetland Fee Transmittal Form): Wetland.Fee <3�J— ' S o' Transmittal a.Total Fee Paid D.State Fee Paid Form. gty/C. Town Fee Paid 6. General Project Description: wpaform3Aoc•rev.OW03 Page 7 of a I 1 Massachusetts Department of Environmental Protection Provided by DER Bureau of Resource Protection - Wetlands DEP File Number WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number City/Town A. General Information (continued) 7. Project Type Checklist: a. k Single Family Home b. ❑ Residential Subdivision C. ❑ Limited Project Driveway Crossing d. ❑ Commercial/Industrial e. ❑ Dock/Pier f. ❑ Utilities g. ❑ Coastal Engineering Structure b. ❑ Agriculture—cranberries, forestry i. ❑ Transportation ❑ Other 8. Property recorded at the Registry of Deeds for: �c ,�- H e:Crr'�. a.County b. Book _ ( � c. Page Number d.Certificate#(if registered land) 9. Buffer Zone Only Is the project located only in the Buffer Zone of a bordering vegetated wetland, inland bank, or coastal bank, coastal beach, coastal dune, or salt marsh? a. Yes If yes, skip to Section C. b. ❑ No If no, check the resource areas to be affected by this project, directly below. wpalorm3.doc•rev.O6103 Page 2 of 8 L11Massachusetts Department of Environmental Protection Provided byoEP: Bureau of Resource Protection - Wetlands TEP File Number WPA Form 3 — Notice of intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number Cityrrcwn B. Resource Area Effects 1. Inland Resource Areas Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Resource Area Include your Size of Proposed Alteration Proposed Reolacement(if any) document transaction a. ❑ Bank 1.linear feet 2.linear feet number b. Bordering Vegetated 6 (provided on Wetland 1.square feet 2.square at your receipt page)with all c. ❑ Land Under supplementary Waterbodles and 1.square feet 2.square feet information you Waterways 3.cubic yards dredged submit to the Department. d. ❑ Bordering Land Subject to Flooding 1.square feet 2.square feet cubic feet of Flood storage lost 4.cubic feet of flood storage replaced e. El Isolated Land Subject 3. to Flooding 1.square feet 2.cubic feet of Flood storage lost 3.cubic feet of flood storage replaced f. ❑ Riverfront area 1. Name of Waterway (if available): 2. Width of Riverfront Area (check one): ❑ 25 ft. - Designated Densely Developed Areas only ❑ 100 ft. - New agricultural projects only ❑ 200 ft. -All other projects 3. Total area of Riverfront Area on the site of the proposed project: Square Feet 4. Proposed alteration of the Riverfront Area: a.Total Square Feet b.Square Feet within 100 ft. c.Square Feet between 100 ff.and 200 ft. 5. Has an alternatives analysis been done and is it attached to this NOP ❑ Yes❑ No 6. Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No wpaformldoc•rev.06/03 Page 3 of 8 Massachusetts Department of Environmental Protection Provded`by PEP: Bureau of Resource Protection - Wetlands DEP Flle Numder WPA Form 3 — Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DZment Tiansaohon Number Cityrrown B. Resource Area Effects (continued) 2. Coastal Resource Areas: Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Resource Area Include your Size of Proposed Alteration Proposed Reolacement(if any) document transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below number (provided on b. ❑ Land Under the Ocean 1.Square feet your receipt page)with all 2.Cubic yards dredged supplementary information you c. ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes submit to the below Department. d. ❑ Coastal Beaches 1.square feet 2.Cubic yards beach nourishment e. ❑ Coastal Dunes 1.Square feet q 2.Cubic yards dune nourishment f. ❑ Coastal Banks 1. Linear feet ' g. ❑ Rocky Intertidal Shores 1. Square feet h. ❑ Salt Marshes 1.Square feet q 2.Sq ft restoration,rehab.,or creation i. ❑ Land Under Salt Ponds 1.Square feet 2.Cubic yards dredged j. ❑ Land Containing Shellfish 1. Square feet 2.Square feet restoration,rehab. k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1.Cubic yards dredged 1. ❑ Land Subject to Coastal Storm Flowage t.Square feet 3. Limited Project: Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 or 310 CMR 10.53? a. ❑ Yes ❑ No If yes, describe Which limited project applies to this project: b.Limited Project wpaforrnldoc-rev.OW03 Page 4 of 8 Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection - Wetlands L7EP 51e Numb er A WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 goaumentTransaoonNumber ii/Town C. Bordering Vegetated Wetland Delineation Methodology Check all methods used to delineate the Bordering Vegetated Wetland (BVW)boundary: Online Users: 1.% Final Order of Resource Area Delineation issued by Conservation Commission or DEP Include your (attached)document � _ 3 L' I transaction 2. ❑ DEP BVW Field Data Form (attached) number (provided on 3. ❑ Final Determination of Applicability issued by Conservation Commission or DEP (attached) your receipt page)with all 4. ❑ Other Methods for Determining the BVW Boundary (attach documentation): supplementary information you a. ❑ 50% or more wetland indicator plants submit to the Department. b. ❑ Saturated/inundated conditions exist c. ❑ Groundwater indicators d. ❑ Direct observation For all projects affecting other e. ❑ Hydric soil indicators Resource Areas, please I. ❑ Credible evidence of conditions prior to disturbance attach a narrative explaining how the resource area was D. Other Applicable pplicable Standards and Requirements 1. Is any portion of the proposed project located in estimated habitat as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program? a. ❑ Yes .Z No If yes, include.proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife Route 135, North Drive Westborough, MA 01581 ------------- b.Date of Map 2. For coastal projects only, is any portion of the proposed project located below the mean high water line or in a fish run? ❑ Yes❑ No If yes, include,proof of mailing or hand delivery of NOI to: Massachusetts Division of Marine Fisheries 251 Causeway Street, Suite 400 Boston, MA 02114 XNot applicable—project is in inland resource area only wpafom3.doc•rev.06/03 Page 5 of 8 ILIMassachusetts Department of Environmental Protection Provides by QErP: Bureau of Resource Protection - Wetlands pEP File Number WPA Form 3 — Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Qocumentrransa4nonNumber Cityfrown D. Other Applicable Standards and Requirements (continued) 3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? a. ❑ Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP Website for ACEC locations). Note: electronic filers click on Website. b.ACEC Online Users: 4. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Include your Restriction Act(M.G.L. c. 131, §40A)or the Coastal Wetlands Restriction Act (M.G.L, c. 130, § 105)? document transaction a. ❑ Yes K No number (provided on your receipt 5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the page)with all wetlands regulations, 310 CMR 10:00. supplementary information you a. ❑ Yes [ No If yes, describe which exemption applies to this project: submit to the Department. b.Exemption 6. Is this project subject to the DEP Stormwater Policy? a. ❑ Yes f"No b. If yes, stormwater management measures are required.Applicants should complete Appendix B: Stormwater Management Form and submit it with this form. c. If no, explain why the project is exempt: E. Additional Information Applicants must include the following with this Notice of Intent(NOI). See instructions for details. Online Users: Attach the document transaction number(provided on your receipt page)for any of the following information you submit to.the Department. t.g USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) z.W Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. wpaform3.Eoc-rev.06/03 LlMassachusetts Department of Environmental Protection Provided by DEP,s Bureau of Resource Protection - Wetlands DEP File Number WPA Form 3 — Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 i]oaumentTranssoon;Number Citylrown E. Additional Information (continued) 3. ❑ Other material identifying and explaining the determination of resource area boundaries shown on plans (e.g., a DEP BVW Field Data Form). Online Users: 4 ❑ List the titles and dates for all plans and other materials submitted with this NOI. Include your document 5. ❑ If there is more than one property owner, please attach a list of these property owners not transaction listed on this form. number (provided on 5. ❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. your receipt page)with all 7• ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. supplementary information you 8. ❑ Attach Appendix A, see next page. submit to the Department. s. ❑ Attach Appendix B, if needed. F. Fees The fees fo r work r p oposed under each Notice of Intent must be calculated and submitted to the Conservation Commission and the Department(see Instructions and Appendix B. Wetland Fee Transmittal Form). No fee shall be assessed for projects of the federal government, the Department, or cities and towns of the Commonwealth. Applicants must submit the following information (in addition to pages 1 and 2 of Appendix B)to confirm fee payment: _ 471 u, 1.Municipal Check Number 2.Ch date teL 3.State Check Nun)� r 4.Check d to tw (�V.C, J/lgc= I 1 T_5 5.Payor name o check:'First Name 5. Paybr nsime on check: Last Name wpaform3.00c•rev.06/03 Page 7 of 8 Massachusetts Department of Environmental Provided DEP: Protection r on Bureau of Resource Protection - Wetlands DEP.File Number WPA Form 3 — Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaruon Number City frown G. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, §40. Notice must be made in writing by hand delivery or certified mail (return receipt re ted)to all abutt rs within 100 feet of the propert line of the pyoiect I cation. Signature of Applicant Date Signature of Property owner(if different) Date Signature of Representative(if any) Date For Conservation Commission: Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents; two copies of pages 1 and 2 of Appendix B; and the city/town fee payment must be sent to the Conservation Commission by certified mail or hand delivery. For DEP: One copy of the completed Notice of Intent (Form 3), including supporting plans and documents; one copy of pages 1 and 2 of Appendix B; and a copy of the state fee payment must be sent to the DEP Regional Office (see Instructions) by certified mail or hand delivery. (E-filers may submit these electronically.) Other: If the applicant has checked the`yes"box in any part of Section D, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. wpaform3.doc•rev.OW03 i Page 0 of e i I Frank Taormina From: Joe Nerden Sent: Thursday, June 17, 2004 5:59 PM To: Frank Taormina Cc: Denise McClure; Bruce Thibodeau; Thomas Stpierre Subject: 30 Cloverdale Ave Frank, Based on a review of the drawings you presented to me earlier there seems to be a problem with the applicant submitting complete and clear information. There were at least three drawings we looked at dated 4/30/04, 6/01/04 and 6/09/04. The applicant is asking to revise the rock slope originally intended to a steeper 1-to-1 slope. You have indicated the total height of the wall is approximately 15 to 25 ft. The progression of drawings seems to be the exact same foot-print-plan for each drawing yet the slope of the proposed rock embankment went from 2-to-1 to 1-to-1 . Why did applicant not revise the plan to reflect this request? Also included in the original plan is a cross-section of the sloped 2-to-1 embankment that does not appear on the plans requesting the steeper sloped embankment. Why was the detail not revised instead of removing it completely? I would question the applicant why the change is needed and find out why the structural engineer has not been completely forthcoming with the redesigned embankment. There is not enough information or details to determine how the embankment is to be built nor what components will make it safe and structurally sound. The steeper the slope the more likely that there will be erosion and structural concerns. Additionally, a wall or embankment of this height has to be reviewed and approved by the Building Inspector, in addition to the concerns of this department. Let me know if you have any other questions. Joseph E. Nerden Asst. DPW Director& Asst. City Engineer Department of Public Services 120 Washington Street, 4th Floor Salem, Massachusetts 01970 tel. 978.745.9595 x321 fax. 978.745.0349 email:jnerden@salem.com 1 City of Salem May 14,2004 Members of the Conservation Commission Salem, MA 01970 RE: Order of conditions, Salern-30 Cloverdale Avenue DEP#64-321 Dear Members of the Board: The reason for this meting is to continue complying with the order of conditions. I would like to ask for your permission to amend the original order of conditions for safety reasons only. The planning department requested that a structural engineer needed to see the walls and sign off. Andrew Kuchinsky, engineer from AK Structural Engineering 8 Coleman Street Peabody, MA 01960 made a site visit to the slope on the aftemoon of March 6, 2004. He observed a stone and earth slope, with loose aggregates at a precarious declination. He suggest the following altemative to stabilize the slope: Add earth fill to the ebsting slope, setting a final 2 horizontal to 1 vertical face. Add 4" loam and seed to final face. I would like to thank all the Members of the Board for your time in this matter. Sincer ly; Amy M. Meimeteas