Loading...
38 CIRCLE HILL RD - BUILDING PERMIT APP (002) The Commonwealth of MassachusettslNSPECTIONAL SEI VICES '> Board of Building Regulations and Standards CITY OF Massachusetts State Building Code,780 C SALEM M815 MAY 18 A SQMd Mar 2011 Building Permit Application To Construct,Repair,Renovate Or Demolish a One-or Two-Family Dwelling This Section For Official Use Only 7� - Building Permit Number: Date Applied: � sad( Building Official(Print Name) Signature Date SECTION 1:SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 1.1 a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.-Sewage Disposal System: Public❑ Private❑ Zone: _ Outside Flood Zone? Municipal❑ On site disposal system ❑ Check if yes❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 O err of cord: I /L/I /I' S�cott�ournier f✓"7 CJ /10 Name(Prin City,State ZI Cure. ' ,U No.and Street Telephone Email Address SECT N 3:DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ Alteration(s) ❑ Addition ❑ Demolition ❑ Accessory Bldg. ❑ Number of Units Other ❑ Specify: Brief DMy c �tio�of Proposed Work': (� SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only Labor and Materials 1.Building $ 1. Building Permit Fee:$ Indicate how fee is determined: ❑Standard City/Town Application Fee 2.Electrical $ ❑Total Project Costa(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $ Suppression) Total All Fees:$ �0 l Check No. Check Amount: Cash Amount: 6.Total Project Cost: $ v 0 Paid in Full ❑Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Const ction SueT or License(CSL) I �,w D��� License Number Expiration e Name of L of e � v List CSL Type(see below) No.and Street Type Description may^ U Unrestricted2 Family (Buildings u el ing cu.ft. UWUJl.11 R Restricted 1&2 Famil Dwelling City/Town,State,ZIP M Masonry RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances I Insulation Telephone Email address D Demolition 5.2 Registered Ho re Improve ``nt Contractor(HIC) ft- HIC V HIC Registration Number Expiration Date Company Name eg' A , No.and Street �, y,�, Email address Ci /Town,State,ZIP (�_ 1 Telephone IQ� SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L,c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes ........ No...........❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Vivint Solar to act on my behalf,in all matters relative to work authorized by this building permit application. 5-14-2015 Print Owner's Name(Electronic Signature) Date SECTION 7b:OWNEW OR AUTHORIZED AGENT DECLARATION By entering my name bel hereby attest under the pains and penalties of perjury that all of the information contained in this appli tion ' true and accurate to the best of my knowledge and understanding. Print Owner's or Authori Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at LA .mass.eov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count - Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" G o G u Il Ilo so l a r 3301 North Thanksgiving Way, Suite 500 Structural Group Lehi, UT 84043 P: (801)234-7050 Scoff E. Wyssling, PE Head of Structural Engineering Scott.wyssling@vivintsolar.com May 13,2015 revised May 14, 2015 Mr. Dan Rock, Project Manager Vivint Solar 24 Normac Road Woburn MA 01801 Re: Structural Engineering Services Fournier Residence 38 Circle Hill Rd, Salem MA S-4257189 4.68 kW System Dear Mr. Rock: Pursuant to your request, we have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site Visit/Verification Form prepared by a Vivint Solar representative identifying specific site information including size and spacing of rafters for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information was prepared by the Design Group and will be utilized for approval and construction of the proposed system. 3. Photovoltaic Rooftop Solar System Permit Submittal identifying design parameters for the solar system. 4. Photographs of the interior and exterior of the roof system identifying existing structural members and their conditions. Based on the above information we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: Description of Residence: The existing residence is typical wood framing construction with the roof system consisting of 2x6 dimensional lumber at 16" on center with 1x8 collar ties every 48". The attic space is unfinished and the photos indicate that there was free access to visually inspect the size and condition of the roof rafters. All wood material utilized for the roof system is assumed to be Spruce-Pine-Fir#2 or better with standard construction components. Our review of the photos of the exterior roof does not indicate any signs of settlement or misalignment caused by overstressed underlying members. Stability Evaluation: A. Wind Uplift Loading 1. Refer to attached Ecolibrium Solar calculations sheet for ASCE/SEI 7-10 Minimum Design Loads for Buildings and other Structures, wind speed of 100 mph based on Exposure Category "B" and 22 degree roof slopes on the dwelling areas. Ground snow load is 40 PSF for Exposure 'B", Zone 2 per(ASCE/SE17-10). 2. Total area subject to wind uplift is calculated for the Interior, Edge and Corner Zones of the dwelling. dudont. solar Page 2 of 2 B. Loading Criteria 10 PSF= Dead Load roofing/framing 40 PSF= Live Load (ground snow load) 5 PSF= Dead Load solar panels/mounting hardware Total Dead Load=15 PSF The above values are within acceptable limits of recognized industry standards for similar structures and in accordance with the 2009 International Residential Code. Analysis performed of the existing roof structure utilizing the above loading criteria indicates that the existing rafters will support the additional panel loading without damage, if installed correctly. C. Roof Structure Capacity 1. The photographs provided of the attic space and roof rafters show that the framing is in good condition with no visible signs of damage caused by prior overstressing. D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent "Ecolibrium Solar Installation Manuat',which can be found on the Ecolibrium Solar website(ecolibriumsolar.com). If duringsolar panel installation, the roof framing members appear unstable or deflect non- P 9 PP uniformly, our office should be notified before proceeding with the installation. 2. The solar panels are 1 Yz'thick and mounted 4 Yz'off the roof for a total height off the existing roof of 6". At no time will the panels be mounted higher that 6"above the existing plane of the roof. 3. Maximum allowable pullout per lag screw is 235 Ibs/inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications for Hem-Fir (North Lumber) assumed. Based on our evaluation, the pullout value, utilizing a penetration depth of 2 1/2", is less than the maximum allowable per connection and therefore is adequate. Based on the variable factors for the existing roof framing and installation tolerances, using a thread depth of 2 1/2" with a minimum size of 5/16" lag screw per attachment point for panel anchor mounts will be adequate with a sufficient factor of safety. 4. Considering the roof slopes, the size, spacing, condition of roof, the panel supports shall be placed at and attached to no greater than every fourth roof rafter as panels are installed perpendicular across rafters and no greater than the panel length when installed parallel to the rafters (portrait). No panel supports spacing shall be greater than four(4) rafter spaces or 64" o/c, whichever is less. 5. Panel supports connections shall be staggered to distribute load to adjacent rafters. Based on the above evaluation, with appropriate panel anchors being utilized the roof system will adequately support the additional loading imposed by the solar panels. This evaluation is in conformance with the 2009 International Residential Code, current industry standards and practice, and based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. "OF Mac Ve rUly yOUfS, y�� �9CyG I � GIVI �' Scott E.Wyssli PE 0.50 MA License No. 505 95 FOis-T FFSSIONA, vivint. solar U � e 38 Circle Hill Rd Salem MA 01970 � N&Ww �IM = -_ Z _ z PV INTERCONNECTION POINT,INVERTER, ————————— — ————— LA�O aEi i LOCKABLE DISCONNECT SWITCH, �y�m'+y0 ANSI METER LOCATION, &UTILITY METER LOCATION I I •L Q o PV SYSTEM SIZE: Li I 4.68 kW DC T BP OF O EL CONDUIT FROM JUNCTION BOX TO ELEC PANEL I I s0^ V I I I � g (1 B)Tnno Solar TSM-260 PA05.18 MODULE I O a 8 I I 9 � e 0 MF!7 m K U m Q I I > D 2 w I z w o z m S w w z m zz z Q K JUNCTION BOX ATTACHED TO I � p ARRAY USING ECO HARDWARE TO I SHEET KEEP JUNCTION BOX OFF ROOF NAME: Z --- --------- ---� a SHEET Lit NUMBER: PV SYSTEM SITE PLAN o SCALE: 3/3T= 1'-0" > a w m m z 0 O mm om �A A 0 0 0 3FO NSW �W NW N� U C m Z (1 m z N O O 3 w x 2 r O O 3 Cn �I W n. J N n D � r Cf) m � m � mN O A CZ O N# O n Z C i a Z INSTALLER:VIVINT SOLAR C mm ROOF mmiNSTALLERNUMBER:1.877.404.4129 �e�o�� solar Fournier Residence PV 2,Q a 1 ^ MA LICENSE:MAHIC 170848 S BNCeirUeHill Rd 01970 PLAN DRAWN BY:EF I AR 4257189 ast Motlifetl:5/13/2015 UTILITY ACCOUNT NUMBER:75628 70005 EcolibriumSolar Layout Skirt e Coupling Note: If the total width of a continuous array exceeds 35 ft, break array to allow for thermal O Clamp expansion and contraction. See Installation Guide for details. Warning: PV Modules may need to be shifted with respect to roof trusses to comply with 0 Bonding Jumper maximum allowable overhang.