Building Permit Application To Construct,Repair, Renovate Or Demolish a
One-or Two-Family Dwelling
This Section For Official Use Only
Building Permit Number: Date p lied: Q
Building Official(Print Name) Signature Date
SECTION l:SITE INFORMATION
1.1 Property Addre s• 1.2 Assessors Map&Parcel Numbers
Lla Is this an accepted street?yes x no Map Number Parcel Number
1.3 Zoning Information: 1.4 Property Dimensions:
Zoning District Proposed Use Lot Area(sq ft) Frontage(ft)
1.5 Building Setback,(R)
Front Yard Side Yards Rear Yard
Required Provided Required Provided Required Provided
1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System:
Public❑ Private❑ Zone: _ Outside Flood Zone? Municipal❑ On site disposal system ❑
Check if yes❑
SECTION 2: PROPERTY OWNERSHIP'
2.1 Owner of Record:JOSIe Tltong
Name(Print) City,Stale,ZIP
34 Circle Hill road 978-740-0697 Cesartitong@yahoo.com
No.and Street Telephone Email Address
SECTION 3:DESCRIPTION OF PROPOSED WORK'(check all that apply)
New Construction t8( Existing Building❑ Owner-Occupied ❑ I Repairs(s) ❑ 1 Alteration(s) ❑ 1 Addition ❑
Demolition ❑ Accessory Bldg.❑ Number of Units_ I Other ❑ Specify:
Brief Description of Proposed Work2: kS
otov n 1+4:tC— So(cLY—
Y104 !�
SECTION 4:ESTIMATED CONSTRUCTION COSTS
Item Estimated Costs: Official Use Only
(Labor and Materials)
I.Building $1000-DO 1. Building Permit Fee:$ Indicate how fee is determined:
2.Electrical
❑Standard City/Town Application Fee
❑Total Project Cost'(Item 6)x multiplier x
3.Plumbing $ 2. Other Fees: $
4.Mechanical (HVAC) $ List:
5.Mechanical (Fire $
Suppression) Total All Fees:$
�a Check No._Check Amount: Cash Amount:_
6,Total Project Cost: $ 0 Paid in Full 0 Outstanding Balance Due:
SECTION 5: CONSTRUCTION SERVICES
5.11_Construction Supervisor License(CSL) 6LS 2,5 4 3 2S— _ /„
—1IX���S ��CXINL.Q.Y1 License Number Expiration
c
Name of CSL Holder
-1 S l r l�[' 1 List CSI,l ype(see below) U
No.and Street lX 1 FYPc Description
SCL (,(_S n t A Q I9 b Lp U Unrestricted(Buildings u to 35, 000 cu.ft.)
�`�l - R Restricted 1&2 Family Dwelling
City/Town,S t• ''/_IP M Masan
RC Roofing Covering
WS Window and Siding
',.G.���'" SF Solid Fuel Running Appliances
�dI�J YVl<1`Cf)(p,Y�V(Uty ayUtt,� I Insulation
Tele hone Email address r"1 I D I Demolition
5.2 Registered Home Improvement Contractor(HIC)
\Ltvi tt SolarDeve.lopeY LLC t--lo�s4on )
HIC Registration Number o[
HIC Company Name or HIC Registrant Name
4g31 N 2OD W . Nn0.Sp10.rc�VkVIV-}go r.
No.and Fl Email address C�rvl-oVoStreet $�k(D�L} -1�13053o1p5
City/Town,State,ZIP Telephone
SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application, Failure to provide
this affidavit will result in the denial of the Issuance of the building permit.
Signed Affidavit Attached? Yes.......... No ...........❑
SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN
OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
1,as Owner of the subject property,hereby authorize Vlv w* Sfl'CL
to act on my behalf,in all matters relative to work authorized by this building permit application.
9/5/14
Print Owner's Name(Electronic Si ture) Date
SECTION 7b:OWNEW OR AUTHORIZED AGENT DECLARATION
By entering my name below,I hereby attest tinder the pains and penalties of perjury that all of the information
contained in[h' pl Lion is true and accurate to the best of my knowledge and understanding.
/'�
`V O-V'- -l' V
Print lu
Shvn �s rr rized Agent's Name(Electronic Signature) Dale
NOTES:
I. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor
(not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration
program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at
www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.eov/dos
2. When substantial work is planned,provide the information below:
Total Floor area(sq.ft.) (including garage, finished basement/attics,decks or porch)
Gross living area(sq, ft.) Habitable room count
Number of fireplaces Number of bedrooms
Number of bathrooms Number of half/baths
'type of heating system Number of decks/porches
Type of cooling system Enclosed Open
3. `Total Project Square Footage"may be substituted for"Total Project Cost'
=' vi V i n Y O Solar 4931 North 300 Nest
Structural Group Provo,UT84604
P: (801)234-7050
Scott E. Wyssling, PE
Head of Structural Engineering scott.wyssling@vivintsolar.com
August 28,2014
Mr. Dan Rock, Project Manager
Vivint Solar
24 Normac Road
Woburn MA 01801
Re: Structural Engineering Services
Titong Residence
34 Circle Hill Road, Salem MA
AR#3225871
5.0 kW System
Dear Mr. Rock:
Pursuant to your request, we have reviewed the following information regarding solar panel installation on
the roof of the above referenced home:
1. Site Visit/Verification Form prepared by a Vivint Solar representative identifying specific
site information including size and spacing of rafters for the existing roof structure.
2. Design drawings of the proposed system including a site plan, roof plan and connection
details for the solar panels. This information was prepared by the Design Group and will
be utilized for approval and construction of the proposed system.
3. Photovoltaic Rooftop Solar System Permit Submittal identifying design parameters for the
solar system.
4. Photographs of the interior and exterior of the roof system identifying existing structural
members and their conditions.
Based on the above information we have evaluated the structural capacity of the existing roof system to
support the additional loads imposed by the solar panels and have the following comments related to our
review and evaluation:
Description of Residence:
The existing residence is typical wood framing construction with the roof system consisting of 2 x 6
dimensional lumber at 16" on center with 1 x 8 collar ties every 32". The attic space is unfinished and
photos indicate that there was free access to visually inspect the size and condition of the roof rafters. All
wood material, utilized for the roof system is assumed to be Spruce-Pine-Fir #2 or better with standard
construction components. Our review of the photos of the exterior roof does not indicate any signs of
settlement or misalignment caused by overstressed underlying members.
Stability Evaluation:
A. Wind Uplift Loading
1. Refer to attached Ecolibrium Solar calculations sheet for ASCE/SEI 7-10 Minimum Design Loads
for Buildings and other Structures, wind speed of 100 mph based on Exposure Category "B" and
24 and 11 degree roof slopes on the dwelling areas. Ground snow load is 40 PSF for Exposure
"B", Zone 2 per(ASCE/SEI7-10).
2. Total area subject to wind uplift is calculated for the Interior, Edge and Corner Zones of the
dwelling.
bieint. solar
Page 2 of 2
B. Loading Criteria
• 10 PSF= Dead Load roofing/framing 40 PSF=Live Load (around snow load)
• 5 PSF= Dead Load solar panels/mounting hardware
Total Dead Load=15 PSF
The above values are within acceptable limits of recognized industry standards for similar
structures. Analysis performed of the existing roof structure utilizing the above loading criteria
indicates that the existing rafters will support the additional panel loading without damage, if installed
correctly.
C. Roof Structure Capacity
1. The photographs provided of the attic space and roof rafters show that the framing is in good
condition with no visible signs of damage caused by prior overstressing.
D. Solar Panel Anchorage
1. The solar panels shall be mounted in accordance with the most recent "Ecolibrium Solar
Installation Manual', which can be found on the Ecolibrium Solar website (ecolibriumsolar.com).
If during solar panel installation, the roof framing members appear unstable, deteriorated,
structurally compromised or deflect non-uniformly, our office should be notified before proceeding
with the installation.
2. Maximum allowable pullout per lag screw is 235 Ibs/inch of penetration as identified in the
National Design Standards (NDS) of timber construction specifications for Hem-Fir (North
Lumber) assumed. Based on our evaluation, the pullout value, utilizing a penetration depth of 2
/z', is less than what is allowable per connection and therefore is adequate. Based on the
variable factors for the existing roof framing and installation tolerances, using a thread depth of 2
/2" with a minimum size of 5/16" lag screw per attachment point for panel anchor mounts should
be adequate with a sufficient factor of safety.
3. Considering the roof slopes, the size, spacing, condition of roof, the panel supports shall be
placed at and attached to no greater than every fourth roof rafter as panels are installed
perpendicular across rafters and no greater than the panel length when installed parallel to the
rafters (portrait). No panel supports spacing shall be greater than four (4) rafter spaces or 64"o/c,
whichever is less.
4. Panel supports connections shall be staggered to distribute load to adjacent rafters.
Based on the above evaluation, it is the opinion of this office that with appropriate panel anchors being
utilized the roof system will adequately support the additional loading imposed by the solar panels. This
evaluation is based on information supplied to us at the time of this report and current industry standards and
practices.
Should you have any questions regarding the above or if you require further information do not hesitate to
contact me.
Ve truly yours, SNOF Mfq
^L2
CAN N
Scott E.Wyssl PE ° 50
MA License N . 50 9pF FGIg7EP�
FSS/ONAI
vivint. solar
34 Circle Hill Road , Salem MA 01970
Qom
z
� _2v=
I I ^N0
II O
I PV SYSTEM SIZE: 5
PV INTERCONNECTION POINT, I I 5.00 kW DC
LOCKABLE DISCONNECT SWITCH,
ANSI METER LOCATION,
&UTILITY METER LOCATION
L.
II I
JUNCTION BOX ATTACHED TO /ti
ARRAY USING ECO HARDWARE TO `0�
KEEP JUNCTION BOX OFF ROOF v
IMCA
I I I *C
IF
I I •a'
IL
1 OF ONDUIT y 5 -
FROM JUNCTIONN TO ELL BOX TO ELEC PANEL r w U
<
I I > M
> U
Z
K w twit
Z m
w
I i i
SHEET
L --- ----- -- —� NAME
W Z
20)Tnna Salar TSM-250 PA05.18 MODULES WITH A �— J
Enohase M215-60-2LL-S2x-ZC MICRO-INVERTER
MOUNTED ON THE BACK OF EACH MODULE
SHEET
NUMBER:
f9
PV SYSTEM SITE PLAN
SCALE: 1/16"= V-0"
a
U e
V CIRCUIT#2: C
f
MODULES N v
TIE INTO METER# m W
99193083
SATELLIT s
DISH m z
62
m�
.O
� 4
❑ Roof Section 1
Roof Azimuth:152
Roof Tilt:24
OOF VENT(S) (7`\jj
�
}l�AA^
0
PLUMBING VENT(S
go m o 4
N p V
Z m Q
> w
Z L U
w ..
d' K m >
Roof Section 2 RR.d Tlt ll 152 7 I
22 MODULES w
SHEET
NAME:
LL Z
0
� a
SHEET
COMP.SHINGLE NUMBER:
PV SYSTEM ROOF PLAN C4
N
SCALE: 1/8"= 1'-0" >
ll
p EcolibriumSolar
Customer Info
Name:
Email:
Phone:
Project Info
Identifier: 9466
Street Address Line 1: 34 Circle Hill Road
Street Address Line 2:
City: Salem
State: MA
Zip: 01970
Country: United States
System Info
Module Manufacturer: Trina
Module Model: TSM 250-PA05.18
Module Quantity: 20
Array Size (DC watts): 8000.0
Mounting System Manufacturer: Ecolibrium Solar
Mounting System Product: EcoX
Inverter Manufacturer: Enphase Energy
Inverter Model: M215
Project Design Variables
Module Weight: 41.0 Ibs
Module Length: 64.95 in
Module Width: 39.05 in
Basic Wind Speed: 110.0 mph
Ground Snow Load:40.0 psf
Seismic: 0.0
Exposure Category: B
Importance Factor: II
Exposure on Roof: Partially Exposed
Topographic Factor: 1.0
Thermal Factor for Snow Load: 1.2
Lag Bolt Design Load- Upward: 820 lbf
Lag Bolt Design Load- Lateral: 300 Ibf
EcoX Design Load- Downward:493 Ibf
EcoX Design Load- Upward: 568 Ibf
EcoX Design Load- Downslope: 353 Ibf
EcoX Design Load- Lateral: 233 Ibf
Module Design Moment—Upward: 3655 in-lb
Module Design Moment—Downward: 3655 in-lb
Effective Wind Area: 20 ft2
Min Nominal Framing Depth: 2.5 in
Min Top Chord Specific Gravity: 0.42
ESE ,
§ 7� �« :> < � � • , » : � » . , \\ 2 « v :222
R
_ Skirt
- Coupling Warning: PV Mod may need »@ shifted with respect Broof trusses @comply with
0 Clamp maximum allowable overhang.
Layout
2\« «< -
�
_ +,
Coupling Warning: PV*&e may need @ be&n with respect»roof trusses to comply with
0 Clamp maximum allowable overhang.