11 CHURCH ST - BUILDING INSPECTION (7) The Commonwealth of Massachusetts
Board of Building Regulations and Standards CITY
Massachusetts State Building Code,780 CMR,7'edition OF SALEM
Revised January
Building Permit Application To Construct,Repair,Renovate Or Demolish a I, 2008
One-or Two-Family Dwelling
This Section For fficial Use Only
Building Permit Num D to Ap d: q
Signature: V �
Building Commissioner/Ins or of Buildings ate
SECTION 1: Si I RMATION
1.1 f C�.cwtGhl 1.2 Assessors Map&Parcel Numbers
Lla Is this an accepted street?yes no Map Number Parcel Number
13 Zoning Information: 1.4 Property Dimensions:
Zoning District Proposed Use Lot Area(sq ft) Frontage(ft)
1.5 Building Setbacks(ft)
Front Yard Side Yards Rear Yard
Required Provided Required Provided Required Provided
1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System:
Zone: _ Outside Flood Zone?
Public❑ Private❑ Check if yes❑ Municipal❑ On site disposal system ❑
SECTION 2: PROPERTY OWNERSHIP'
2.1 Owner'of Record: -
Name(Print) Address for Service:
Signature Telephone
SECTION 3: DESCRIIP�TION OF PROPOSED WORK'(check all that apply)
New Construction❑ Existing Building cen Owner-Occupied Repairs(s) Alteration(s) ❑ Addition ❑
Demolition ❑ Accessory Bldg.❑ 1 Number of Units_ I Other ❑ Specify:
Brief Description of Proposed Work': Co mP Q 14;r r- 2r G 043
SECTION 4:ESTIMATED CONSTRUCTION COSTS
item Estimated Costs: Official Use Only
Labor and Materials
1.Building $ qD, p t) 1. Building Permit Fee:$ Indicate how fee is determined:
a 0 0 ❑Standard City/Town Application Fee
2.Electrical $ ❑Total Project Cost'(Item 6)x multiplier x
3.Plumbing24$ DDO 2. Other Fees: $
4.Mechanical (HVAC) $ List:
5.Mechanical (Fire $Suppression) Total All Fees:$
DO� Check No. Check Amount: Cash Amount:
6.Total Project Cost: $ L U 0 Paid in Full 13 Outstanding Balance Due:
r
SECTION 5: CONSTRUCTION SERVICES
5.1 //Licensed Construction SupervisorS(CSL) G �CJ�fc 3._[,7 go
L% fZA79 W t. C//�''� J� License Num/beer/ Expiration Date
Name of CSL-Holder U 13 �'crl2 TJ l � f�� U I� � List CSL Type(see below)
Address f� N Type Description
U Unrestricted to 35,000 Co.Ft.
R Restricted 1&2 Family Dwelling
Signature M Masonry Only
us -5-qv- y 3 S� RC Residential Roofing Covering
Telephone WS Residential Window and Siding
SF Residential Solid Fuel Burning Appliance Installation
$$�t�te�e�t �p m� g�p D Residential Demolitionq
S� FLt{JKHp11��ffroCSeK(JUrtractor(HIC) �SS /d L
HIC Co�npang Name or HIC Regts�ent I�[arfte I Registration Number
(o �P E HooL( n7on
Address
Expiration Date
Signature Telephone
SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.C.152.§ 25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide
this affidavit will result in the denial of the Issuance of the building permit.
Signed Affidavit Attached? Yes ..........❑ No...........❑
SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN
OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
6 rS r, J ��j P r as Owner of the subject property hereby
authorize e o/ to act on my behalf,in all matters
relative to work authorized by this building permit application.
t, — a .IzZ/z661
Signature of Owner Date — f
SECTION 7b:OWNFW OR AUTHORIZED AGENT DECLARATION
I, (re f-arA ,as Owner or Authorized Agent hereby declare
that the statements and informa n on a foregoing application are true and accurate,to the best of my knowledge and
behalf. I
Print Name " c,
Signature of O er or Authon gent Date
(Signed under the pain;and a res of
NOTES:
1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor
r (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration
program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program and
Construction Supervisor Licensing(CSL)can be found in 780 CMR Regulations 110.R6 and 110.115,respectively.
2. When substantial work is planned,provide the information below:
Total floors area(Sq.Ft.) (including garage,finished basementlattics,decks or porch)
Gross living area(Sq.Ft.) Habitable room count
Number of fireplaces Number of bedrooms
Number of bathrooms Number of half/baths
Type of heating system Number of decks/porches
Type of cooling system Enclosed Open
3. "Total Project Square Footage"may be substituted for"Total Project Cost"
City of Salem, MA - Fees Page 1 of 1
Salem City Hall
93 Washington Street,
l+ill Q ph:ph: MA 09970
97 978-745-9595
Fees
Minimum Building Permit Fee is$25.00
Rates are$7.00 per$1000 spent, plus a $5.00
Administrative Fee for Residential Properties
$11.00 per$1000 spent, plus a$5.00 Administrative Fee for Commercial Properties.
Archive Search Requests$30.00
Zoning Letters$30.00
Certificate of Inspection basic fee is$40.00(some properties are subject to a different fee schedule due to the nature
of their use group.)
Certificate of Occupancy where applicable is$30.00
Plumbing and Gas Permits are granted to Licensed Tradespeople only no fee schedule is provided at this location, call
the Inspector for these rates.
YV
http://www.satem.com/Pages/SalemNIA_PublicProperties/fees?textPage=1 9/24/2009
{ � Board of Building Regulations and Standard
�V ^Cdnstruction Supervisor License
i
.License: CS 59495 `
Restricted to:.00.. _
,.:GERARD E{M_CGQNAGLE JR �-
13 GROVE F C t
,. NATICK, MAD 50
Expiration: 911 912 01 0
Conun i.. ioner Tr#: 3970 -
BELFOR(01 Belfor Property Restoration
POOPENTYNEETONAIION
Client: Obert,Tim
Property: II Church St#123
Salem,MA 01970
Operator Info:
Operator: JCAMERAN
Estimator: Jason Camerano Business: (508)544-4325
Business: 4-6 Avenue E
Hopkinton,MA 01748
Type of Estimate: Water Damage
Date Entered: 7/29/2009 Date Assigned:
Price List: MAB05B_JUL09
Restoration/Service/Remodel
Estimate: OB ERT(REPAIRS4)
BELFOR J*J Belfor Property Restoration
PROPERTYRIST61ATION
OBERT(REPAIRS4)
OBERT(REPAIRS4)
DESCRIPTION CALC QNTY
2. Taxes,insurance,permits&fees(Bid item) 1 1.00 EA
5. Project Supervisor 15 15.00 HR
Supervisor to arrange inspections,pull permits,arrange subcontractors,purchase and deliver materials
224. General Demolition-Demolition of areas to prepare for 35 35.00 HR
repairs
3. Haul debris-per pickup truck load-including dump fees 1 1.00 EA
Load of trash from the I st level
4. Single axle dump truck-per load-including dump fees 1 1.00 EA
Load of debris from the basement
223. General Laborer-Ongoing and post construction cleanup 10 10.00 HR
NOTES:
Base Level
T n Master Bed Ceiling Height: 7'8"
4
511.11 SF Walls 208.68 SF Ceiling
719.79 SF Walls&Ceiling 208.68 SF Floor
1 _•� 23.19 SY Flooring 66.67 LF Floor Perimeter
66.67 LF Ceil.Perimeter
DESCRIPTION CALC QNTY
7. Detach&Reset Light fixture 1 1.00 EA
8. Batt insulation-6"-R19 32 32.00 SF
9. 5/8"drywall-hung,taped,floated,ready for paint 273 273.00 SF
Ceiling and walls
215. Seal then paint the surface area(2 coats) 719.22 719.22 SF
27. Baseboard-4 1/4" 22 22.00 LF
28. Paint baseboard-two coats 66.67 66.67 LF !i
29. Paint bifold door set-slab only-2 coats(per side) - 2 2.00 EA !i
OBERT(REPAIRS4) 9/24/2009 Page: 2
BELFOR(0) Belfor Property Restoration
reorurreesrOOAnua
CONTINUED-Master Bed
DESCRIPTION CALC QNTY
2 closet doors
30. Paint door slab only-2 coats(per side) 2 2.00 EA
31. Paint door/window trim&jamb-2 coats(per side) 2 2.00 EA
204. Carpet (F)*1.15 239.98 SF
15%waste added for Carpet.
205. Carpet pad F 208.68 SF
NOTES:
T Spare Bed Ceiling Height:TV
r
403.78 SF Walls 172.92 SF Ceiling
576.69 SF Walls&Ceiling 172.92 SF Floor
i
19.21 SY Flooring 52.67 LF Floor Perimeter
¢ 52.67 LF Ceil. Perimeter
1
DESCRIPTION CALC QNTY
200. Carpet (F)*1.15 198.85SF
15%waste added for Carpet.
201. Carpet pad F t72.92 SF
NOTES:
OBERT(REPAIRS4) 9/24/2009 Page: 3
BELFOR(01 Belfor Property Restoration
e94 YEirr RlnotETION
L
Bath Closet Ceiling Height:7'8"
3.10• 90.72 SF Walls 8.46 SF Ceiling
3 s 99.18 SF Walls&Ceiling 8.46 SF Floor
0.94 SY Flooring 11.83 LF Floor Perimeter
�3.1a•• -i 11.83 LF Ceil.Perimeter
DESCRIPTION CALC QNTY
114. Seal/prime the walls and ceiling-one coat WC 99.18 SF
115. Paint the walls and ceiling-two coats WC 99.18 SF
116. Cove base molding-rubber or vinyl,4"high 10 10.00 LF
206. Carpet (F)*1.15 9.73 SF
15%waste added for Carpet.
207. Carpet pad F 8.46 SF
NOTES:
Bed Closet Ceiling Height: T 8"
H3'10'-
3.s. 122.67 SF Walls 15.75 SF Ceiling
o even W 139.42 SF Walls&Ceiling 15.75 SF Floor
1.75 SY Flooring 16.00 LF Floor Perimeter
1 �e'u••., 16.00 LF Ceil.Perimeter
�3 m•
DESCRIPTION CALC QNTY
103. 5/8"drywall-hung,taped,floated,ready for paint 20+30 50.00 SF
104. Seal/prime the walls and ceiling-one coat WC 138.42 SF
105. Paint the walls and ceiling-two coats WC 138.42 SF
106. Cove base molding-rubber or vinyl,4"high to 10.00 LF
208. Carpet (F)*L15 18.11 SF
15%waste added for Carpet.
OBERT(REPAIRS4) 9/24/2009 Page:4
BELFOR 1*1 Belfor Property Restoration
reos[mreEsroRmae
CONTINUED-Bed Closet
DESCRIPTION CALC QNTY
209. Carpet pad F 15.75 SF
NOTES:
Bathroom Ceiling Height: TV
s 227.44 SF Walls 49.17 SF Ceiling
276.61 SF Walls&Ceiling 49.17 SF Floor
5.46 SY Flooring 29.67 LF Floor Perimeter
h l 29.67 LF Ceil. Perimeter
r5 2
w�
DESCRIPTION CALC QNTY
249. R&R Metal studding,2 1/2"wide, 16"OC,25 Ga. 40 40.00 SF
Removal of metal framing and replacement to fit a 5ft nib
202. 1/2"drywall-hung,taped,floated,ready for paint 168.17 168.17 SF
33. Batt insulation-6" -R19 116.92 116.92 SF
203. Seal then paint the walls and ceiling(2 coats) WC 276.61 SF
38. (Install)Exhaust fan 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
39. (Install)Toilet 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
41. Medicine cabinet-Detach&reset 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
42. (Install)Countertop-cultured(simulated)marble 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
43. (Install)Sink-single 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
OBERT(REPAIRS4) 9/24/2009 Page: 5
BELFOR J01 Belfor Property Restoration
p Y
YEOYERYp ESTYSSTIOM
CONTINUED-Bathroom
DESCRIPTION CALC QNTY
44. Sink faucet-Detach&reset 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
45. (Install)Vanity 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
231. (Install)Bathtub 1 1.00 EA
Customer must buy the new bath tub
47. (install)Shower faucet/head/rod 2 2.00 EA
We would install the old one or the customer could purchase a new one to be installed
Includes shower faucet and shower jets that the customer will purchase
239. Electrician-per hour 3 3.00 FIR
Labor and materials to separate the existing switch that has fan and wall light on one. Also add in a third switch for the new light
over the shower
48. (Install)Light fixture 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
236. Recessed light fixture-Premium grade 1 1.00 EA
Light to be installed over the new bath tub
50. Paint door slab only-2 coats(per side) 2 2.00 EA
51. Paint door/window trim&jamb-2 coats(per side) 2 2.00 EA
248. Carpenter-General Framer-per hour 2 2.00 FIR
Labor to create 2 built in shelves in the shower area
230. (Install)Ceramic tile-Bath tub surround 60 60.00 SF
Customer must buy the tile
233. Remove Ceramic tile-floor F 49.17 SF
235. Floor preparation for ceramic F 49.17 SF
234. (Install)Ceramic tile- floor F 49.17 SF
Customer must buy the new tile
237. Tile/stone sealer F+60 109.17 SF
238. (Install)Shower door 1 1.00 EA
New door to be purchased by the customer
OBERT(REPAIRS4) 9/24/2009 Page: 6
BELFOR t9j Belfor Property Restoration
PBOPEgtYq[gTOgqT10X
CONTINUED-Bathroom
DESCRIPTION CALC QNTY
NOTES:
Far s Hall Ceiling Height:7' 8"
1]
Xd :, 283.67 SF Walls 71.50 SF Ceiling i
1 355.17 SF Walls&Ceiling 71.50 SF Floor
>a e• 7.94 SY Flooring 37.00 LF Floor Perimeter
37.00 LF Ceil.Perimeter
q19
DESCRIPTION CALC QNTY
63. Drywall patch/small repair,ready for paint 1 1.00 EA
212. Seal then paint the surface area(2 coats) 281.11 281.11 SF
66. Baseboard-4 1/4" 3 3.00 LF
67. Paint baseboard-two coats 27.66 27.66 LF
68. Paint bifold door set-slab only-2 coats(per side) 2 2.00 EA
2 closet doors
69. Paint door slab only-2 coats(per side) 4 4.00 EA
70. Paint door/window trim&jamb-2 coats(per side) 4 4.00 EA
210. Carpet 39.78 39.78 SF
211. Carpet pad 39.78 39.78 SF
NOTES:
OBERT(REPAIRS4) 9/24/2009 Page: 7
BELFOR t9) Belfor Property Restoration
PROPRRTTRrRTORRTIOR
Laundry Room Ceiling Height: 7'8"
3 a -{ 92.00 SF Walls 9.00 SF Ceiling
T 3• T 101.00 SF Walls&Ceiling 9.00 SF Floor
b R
1 m 1.00 SY Flooring 12.00 LF Floor Perimeter
T 12.00 LF Ceil.Perimeter
DESCRIPTION CALC QNTY
93. Paint the surface area-two coats 92 92.00 SF
94. Stackable washer and dryer-Remove&reset 1 1.00 EA
95. Clean floor F 9.00 SF
NOTES:
u
�61z� Office Ceiling Height:T 8"
6 233.83 SF Walls 55.50 SF Ceiling
289.33 SF Walls&Ceiling 55.50 SF Floor
6.17 SY Flooring 30.50 LF Floor Perimeter
1 30.50 LF Ceil.Perimeter
DESCRIPTION CALC QNTY
81. Batt insulation-6"-RI 72 72.00 SF
216. 5/8"drywall-hung,taped,floated,ready for paint 82 82.00 SF
Ceiling and walls
85. Baseboard-4 1/4" PF 30.50 LF
86. Vapor barrier- 15#felt F 55.50 SF
87. Engineered wood flooring F 55.50 SF
89. Paint the walls and ceiling-two coats WC 289.33 SF -
90. Paint baseboard-two coats PF 30.50 LF
91. Paint door slab only-2 coats(per side) 1 1.00 EA
OBERT(REPAIRS4) 9/24/2009 Page: 8
BELFOR J*J Belfor Property Restoration
Pea PERTYPurollmox
CONTINUED-Office
DESCRIPTION CALC QNTY
193. Paint door/window trim&jamb-2 coats(per side) 1 1.00 EA
92. (Install) Light fixture 1 1.00 EA
NOTES:
Hall Closet Ceiling Height:7'8"
84.33 SF Walls 7.50 SF Ceiling
T s,
91.83 SF Walls&Ceiling 7.50 SF Floor
1 0.83 SY Flooring 11.00 LF Floor Perimeter
3•4.___I 11.00 LF Ceil.Perimeter
DESCRIPTION CALC QNTY
127. Drywall patch/small repair,ready for paint 1 1.00 EA
125. Paint the surface area-two coats 95.5 95.50 SF
126. Cove base molding-rubber or vinyl,4"high 10 10.00 LF
213. Carpet (F)*1.15 9.63 SF
15%waste added for Carpet.
214. Carpet pad F 7.50 SF
NOTES:
Main Level
OBERT(REPAIRS4) 9/24/2009 Page:9
BELFOR(0) Belfor Property Restoration
PBOPFBTYM[F1011FTION
ire•--a Kitchen Ceiling Height: 8'
328.00 SF Walls 102.00 SF Ceiling
'_,•__.FI¢he� 430.00 SF Walls&Ceiling 102.00 SF Floor
11.33 SY Flooring 41.00 LF Floor Perimeter
J. 1 41.00 LF Ceil. Perimeter
DESCRIPTION CALC QNTY
177. Refrigerator-Remove&reset 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
178. Ice maker-Detach and reset 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
179. Microwave oven-over range type-Detach&reset 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
182. (Install)Sink faucet-Kitchen 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
183. (Install)Garbage disposer 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
184. (Install)Dishwasher 1 1.00 EA
We would install the old one or the customer could purchase a new one to be installed
189. Batt insulation-6"-R19 156.62 156.62 SF
199. 1/2"drywall-hung,taped,floated,ready for paint 88 88.00 SF
198. Seal then paint the surface area(2 coats) 313.24 313.24 SF
229, Cabinet and Countertop upgrade per the attached proposal 1 1.00 EA
240. (Install)Built-in oven 1 1.00 EA
241. (Install)Range-drop in 1 1.00 EA
242. (Install)Ceramic tile 24 24.00 SF
Backsplash on one wall
243. Remove Ceramic tile-floor F 102.00 SF
244. Floor preparation F 102.00 SF
245. Engineered woad flooring F 102.00 SF
246. .Vapor barrier- 159 felt F 102.00 SF
247. Plumber-per hour 4 4.00 FIR
Labor and materials to relocate the sink,ice maker and garbage disposal
250. Electrician-per hour 5 5.00 FIR
Labor to re-wire the kitchen area as needed to allow for new appliance and layout changes.
OBERT(REPAIRS4) 9/24/2009 Page: 10
BELFOR(01 Belfor Property Restoration
PROP[BITP[6r011AT1OM
CONTINUED-Kitchen
DESCRIPTION CALC QNTY
NOTES:
s.e'=` Hall Ceiling Height: 8'
s• 0'_- 108.00 SF Walls 55.86 SF Ceiling
f 163.86 SF Walls&Ceiling 55.86 SF Floor
'aa °- 6.21 SY Flooring 13.50 LF Floor Perimeter
3 tc i
- -- 13.50 LF Ceil. Perimeter
32
Missing Wall: I - 8'4" X 0'0" Opens into LR Goes to Floor/Ceiling
Missing Wall: 1 - 3'0"X 0'0" Opens into Upper Stairs Goes to Floor/Ceiling
Missing Wall: 1 - 5'4"X 0'0" Opens into Entry Goes to Floor/Ceiling
DESCRIPTION CALC QNTY
164. Engineered wood flooring 54.72 54.72 SF
166. Vapor barrier- 15#felt 54.72 54.72 SF
167. Drywall patch/small repair,ready for paint 1 1.00 EA
168. Paint the surface area-two coats 89.11 89.11 SF
169. Baseboard-4 1/4" 12 12.00 LF
170. Base shoe 10.67 10.67 LF
171. Paint baseboard-two coats 10.67 10.67 LF
173. Seal&paint base shoe or quarter round 10.67 10.67 LF
OBERT(REPAIRS4) 9/24/2009 Page: 11
BELFOR 101 Belfor Property Restoration
PNOPENTYNESTON1nON
CONTINUED-Hall
DESCRIPTION CALC QNTY
NOTES:
Ent"
`'- - Upper Stairs Ceiling Height: 13'
—IH 3'
194.83 SF Walls 20.50 SF Ceiling
•� 215.33 SF Walls&Ceiling 20.50 SF Floor
PlI n I
- 2.28 SY Flooring 13.83 LF Floor Perimeter
16.83 LF Ceil.Perimeter
Missing Wall: 1 - 3'0"X 0'0" Opens into Hall Goes to Floor/Ceiling
Missing Wall: 1 - 3'0" X 0'0" Opens into Landing Goes to Floor/Ceiling
DESCRIPTION CALC QNTY
153. Paint the surface area-two coats 181.83 181.83 SF
152. Step charge for"waterfall"carpet installation 8 8.00 EA
217. Carpet 38 38.00 SF
218. Carpet pad 38 38.00 SF
NOTES:
OBERT(REPAIRS4) 9/24/2009 Page: 12
BELFOR t6j Belfor Property Restoration
vRevurreurneenox
Landing Ceiling Height: 13'
-- -- F-3'r• _ T_ 192.83 SF Walls 27.08 SF Ceiling
„Q io 219.92 SF Walls&Ceiling 27.08 SF Floor
3.01 SY Flooring 14.83 LF Floor Perimeter
i r
1 14.83 LF Coil.Perimeter
Missing Wall: 1- 3'0"X 0'0" Opens into Upper Stairs Goes to Floor/Ceiling
Missing Wall: 1 - 3'2"X 0'0" Opens into Lower Stairs Goes to Floor/Ceiling
DESCRIPTION CALC Q NTY
144. Paint the walls-two coats W 192.83 SF
219. Carpet (F)"1.15 31.15 SF
15 %waste added for Carpet.
220. Carpet pad F 27.08 SF
NOTES:
2
r-3 io M- E Lower Stairs Ceiling Height: 15'
s'2 253.83 SF Walls 21.11 SF Ceiling
t, 274.94 SF Walls&Ceiling 21.11 SF Floor
2.35 SY Flooring 16.50 LF Floor Perimeter
19.67 LF Ceil.Perimeter
Missing Wall: 1- 3'2" X 0'0" Opens into Landing Goes to Floor/Ceiling
DESCRIPTION CALC QNTY
OBERT(REPAIRS4) 9/24/2009 Page: 13
BELFOR 141) Belfor Property Restoration
veartrtwureeAnox
CONTINUED-Lower Stairs
DESCRIPTION CALC QNTY
135. Step charge for"waterfall"carpet installation 7 7.00 EA
136. Paint the surface area-two coats 238.83 238.83 SF
221. Carpet 39.06 39.06 SF
222. Carpet pad 39.06 39.06 SF
NOTES:
Entry Closet Ceiling Height: 8'
~4 4 104.00 SF Walls 10.00 SF Ceiling
4' 114.00 SF Walls&Ceiling 10.00 SF Floor
1 1,�` - 1.11 SY Flooring 13.00 LF Floor Perimeter
4.4• 13.00 LF Ceil.Perimeter
is
DESCRIPTION CALC QNTY
175. Engineered wood flooring 10 10.00 SF
176. Vapor barrier- 15#felt 10 10.00 SF
NOTES:
OBERT(REPAIRS4) 9/24/2009 Page: 14
BELFOR(0) Belfor Property Restoration
veav[xrvusraunox
_ Entry Ceiling Height: 8'
i T 4'4' 136.00 SF Walls 28.89 SF Ceiling
Ni
"'°`" 164.89 SF Walls&Ceiling 28.89 SF Floor
j 3.21 SY Flooring 17.00 LF Floor Perimeter
17.00 LF Ceil. Perimeter
Missing Wall: 1- 5'4"X 0'0" Opens into Hall Goes to Floor/Ceiling
DESCRIPTION CALC QNTY
174. Paint the surface area-two coats 137.33 137.33 SF
NOTES:
LR Ceiling Height: 19'
1352.00 SF Walls 294.86 SF Ceiling
1646.86 SF Walls&Ceiling 294.86 SF Floor
32.76 SY Flooring 66.33 LF Floor Perimeter
� 74.67 LF Ceil. Perimeter
Missing Wall: 1- 8'4" X 0'0" Opens into Hall Goes to Floor/Ceiling
DESCRIPTION CALC QNTY
154. Regrout stone floor 15 15.00 SF
156. Vapor barrier- 15#felt 291.86 291.86 SF
194. Engineered wood flooring 291.86 291.86 SF
158. Drywall patch/small repair,ready for paint 1 1.00 EA
OBERT(REPAIRS4) 9/24/2009 Page: 15
BELFOR t0j Belfor Property Restoration
POOPPOTYOFSTORMON
CONTINUED-LR
DESCRIPTION CALC QNTY
159. Paint the surface area-two coats 1340.67 1340.67 SF
160. Baseboard-4 1/4" 12 12.00 LF
161. Base shoe 65.83 65.83 LF
162. Paint baseboard-two coats 65.83 65.83 LF
172. Seal&paint base shoe or quarter round 65.83 65.83 LF
163. Detach&Reset Screen door-metal-30"-36"-full screen 2 2.00 EA
(no glass)
NOTES:
Grand Total Areas:
4,719.06 SF Walls 1,158.78 SF Ceiling 5,877.83 SF Walls and Ceiling
1,158.78 SF Floor 128.75 SY Flooring 463.33 LF Floor Perimeter -
0.00 SF Long Wall 0.00 SF Short Wall 477.83 LF Ceil.Perimeter
1,158.78 Floor Area 1,277.58 Total Area 4,719.06 Interior Wall Area
2,561.67 Exterior Wall Area 242.17 Exterior Perimeter of
Walls
0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length
0.00 Total Ridge Length 0.00 Total Hip Length
OBERT(REPAIRS4) 9/24/2009 Page: 16
Base Level
n'm'
16' 3'6' S'
BLd➢p¢
�3'10'-
I
T ''
6 13
T
13'10•
3'
1
34" 1
Id'6'
6'0.
' Base Level
OBERT(REPAIRS4) 9/24/2009 Page: 17
i
Main Level
T , tze• .
T
]'ID'
]'—1 �2'2'
1
13'1
6tlocQ�A
—a'd'
m �
T
z'
7 14➢9.8a4an" m La�SL+�¢
3'd'—y •
1�
T
era• .
� 98 66 ry�
1 17 z 4
Main level
OBERT(REPAIRS4) 9/24/2009 Page: 18
CITY OF SALEM
PUBLIC: PROPRERTY
DEPARTMENT
Construction Debris Disposal .Midas it
Irequired lirr all demolition anJ repo\aeon wurk)
In accurdance wth the sixth edition ul'thc State Building Code, 7S0 CAIR section I 11 5
Debris, and the provisiuns of SIGL c 40. S 54;
Building Permit it is issued with the condition that the debris resulting from
this work shall he disposed of in a properly licensed waste disposal facility as defined by V GL c
111. S 150A.
The debris will he transported by:
I nime ul hauler)
1 he debris wi, be disposcdd o,t in
Iname of Iau Ily) (/
LIJJn.. „r rx Iluvl
I
1a51 Iulc rt p:nnn .yglh.�nl
i
Motu
p'r a K Oct