Loading...
11 CHURCH ST - BUILDING INSPECTION (7) The Commonwealth of Massachusetts Board of Building Regulations and Standards CITY Massachusetts State Building Code,780 CMR,7'edition OF SALEM Revised January Building Permit Application To Construct,Repair,Renovate Or Demolish a I, 2008 One-or Two-Family Dwelling This Section For fficial Use Only Building Permit Num D to Ap d: q Signature: V � Building Commissioner/Ins or of Buildings ate SECTION 1: Si I RMATION 1.1 f C�.cwtGhl 1.2 Assessors Map&Parcel Numbers Lla Is this an accepted street?yes no Map Number Parcel Number 13 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Zone: _ Outside Flood Zone? Public❑ Private❑ Check if yes❑ Municipal❑ On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: - Name(Print) Address for Service: Signature Telephone SECTION 3: DESCRIIP�TION OF PROPOSED WORK'(check all that apply) New Construction❑ Existing Building cen Owner-Occupied Repairs(s) Alteration(s) ❑ Addition ❑ Demolition ❑ Accessory Bldg.❑ 1 Number of Units_ I Other ❑ Specify: Brief Description of Proposed Work': Co mP Q 14;r r- 2r G 043 SECTION 4:ESTIMATED CONSTRUCTION COSTS item Estimated Costs: Official Use Only Labor and Materials 1.Building $ qD, p t) 1. Building Permit Fee:$ Indicate how fee is determined: a 0 0 ❑Standard City/Town Application Fee 2.Electrical $ ❑Total Project Cost'(Item 6)x multiplier x 3.Plumbing24$ DDO 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $Suppression) Total All Fees:$ DO� Check No. Check Amount: Cash Amount: 6.Total Project Cost: $ L U 0 Paid in Full 13 Outstanding Balance Due: r SECTION 5: CONSTRUCTION SERVICES 5.1 //Licensed Construction SupervisorS(CSL) G �CJ�fc 3._[,7 go L% fZA79 W t. C//�''� J� License Num/beer/ Expiration Date Name of CSL-Holder U 13 �'crl2 TJ l � f�� U I� � List CSL Type(see below) Address f� N Type Description U Unrestricted to 35,000 Co.Ft. R Restricted 1&2 Family Dwelling Signature M Masonry Only us -5-qv- y 3 S� RC Residential Roofing Covering Telephone WS Residential Window and Siding SF Residential Solid Fuel Burning Appliance Installation $$�t�te�e�t �p m� g�p D Residential Demolitionq S� FLt{JKHp11��ffroCSeK(JUrtractor(HIC) �SS /d L HIC Co�npang Name or HIC Regts�ent I�[arfte I Registration Number (o �P E HooL( n7on Address Expiration Date Signature Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.C.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes ..........❑ No...........❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 6 rS r, J ��j P r as Owner of the subject property hereby authorize e o/ to act on my behalf,in all matters relative to work authorized by this building permit application. t, — a .IzZ/z661 Signature of Owner Date — f SECTION 7b:OWNFW OR AUTHORIZED AGENT DECLARATION I, (re f-arA ,as Owner or Authorized Agent hereby declare that the statements and informa n on a foregoing application are true and accurate,to the best of my knowledge and behalf. I Print Name " c, Signature of O er or Authon gent Date (Signed under the pain;and a res of NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor r (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program and Construction Supervisor Licensing(CSL)can be found in 780 CMR Regulations 110.R6 and 110.115,respectively. 2. When substantial work is planned,provide the information below: Total floors area(Sq.Ft.) (including garage,finished basementlattics,decks or porch) Gross living area(Sq.Ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" City of Salem, MA - Fees Page 1 of 1 Salem City Hall 93 Washington Street, l+ill Q ph:ph: MA 09970 97 978-745-9595 Fees Minimum Building Permit Fee is$25.00 Rates are$7.00 per$1000 spent, plus a $5.00 Administrative Fee for Residential Properties $11.00 per$1000 spent, plus a$5.00 Administrative Fee for Commercial Properties. Archive Search Requests$30.00 Zoning Letters$30.00 Certificate of Inspection basic fee is$40.00(some properties are subject to a different fee schedule due to the nature of their use group.) Certificate of Occupancy where applicable is$30.00 Plumbing and Gas Permits are granted to Licensed Tradespeople only no fee schedule is provided at this location, call the Inspector for these rates. YV http://www.satem.com/Pages/SalemNIA_PublicProperties/fees?textPage=1 9/24/2009 { � Board of Building Regulations and Standard �V ^Cdnstruction Supervisor License i .License: CS 59495 ` Restricted to:.00.. _ ,.:GERARD E{M_CGQNAGLE JR �- 13 GROVE F C t ,. NATICK, MAD 50 Expiration: 911 912 01 0 Conun i.. ioner Tr#: 3970 - BELFOR(01 Belfor Property Restoration POOPENTYNEETONAIION Client: Obert,Tim Property: II Church St#123 Salem,MA 01970 Operator Info: Operator: JCAMERAN Estimator: Jason Camerano Business: (508)544-4325 Business: 4-6 Avenue E Hopkinton,MA 01748 Type of Estimate: Water Damage Date Entered: 7/29/2009 Date Assigned: Price List: MAB05B_JUL09 Restoration/Service/Remodel Estimate: OB ERT(REPAIRS4) BELFOR J*J Belfor Property Restoration PROPERTYRIST61ATION OBERT(REPAIRS4) OBERT(REPAIRS4) DESCRIPTION CALC QNTY 2. Taxes,insurance,permits&fees(Bid item) 1 1.00 EA 5. Project Supervisor 15 15.00 HR Supervisor to arrange inspections,pull permits,arrange subcontractors,purchase and deliver materials 224. General Demolition-Demolition of areas to prepare for 35 35.00 HR repairs 3. Haul debris-per pickup truck load-including dump fees 1 1.00 EA Load of trash from the I st level 4. Single axle dump truck-per load-including dump fees 1 1.00 EA Load of debris from the basement 223. General Laborer-Ongoing and post construction cleanup 10 10.00 HR NOTES: Base Level T n Master Bed Ceiling Height: 7'8" 4 511.11 SF Walls 208.68 SF Ceiling 719.79 SF Walls&Ceiling 208.68 SF Floor 1 _•� 23.19 SY Flooring 66.67 LF Floor Perimeter 66.67 LF Ceil.Perimeter DESCRIPTION CALC QNTY 7. Detach&Reset Light fixture 1 1.00 EA 8. Batt insulation-6"-R19 32 32.00 SF 9. 5/8"drywall-hung,taped,floated,ready for paint 273 273.00 SF Ceiling and walls 215. Seal then paint the surface area(2 coats) 719.22 719.22 SF 27. Baseboard-4 1/4" 22 22.00 LF 28. Paint baseboard-two coats 66.67 66.67 LF !i 29. Paint bifold door set-slab only-2 coats(per side) - 2 2.00 EA !i OBERT(REPAIRS4) 9/24/2009 Page: 2 BELFOR(0) Belfor Property Restoration reorurreesrOOAnua CONTINUED-Master Bed DESCRIPTION CALC QNTY 2 closet doors 30. Paint door slab only-2 coats(per side) 2 2.00 EA 31. Paint door/window trim&jamb-2 coats(per side) 2 2.00 EA 204. Carpet (F)*1.15 239.98 SF 15%waste added for Carpet. 205. Carpet pad F 208.68 SF NOTES: T Spare Bed Ceiling Height:TV r 403.78 SF Walls 172.92 SF Ceiling 576.69 SF Walls&Ceiling 172.92 SF Floor i 19.21 SY Flooring 52.67 LF Floor Perimeter ¢ 52.67 LF Ceil. Perimeter 1 DESCRIPTION CALC QNTY 200. Carpet (F)*1.15 198.85SF 15%waste added for Carpet. 201. Carpet pad F t72.92 SF NOTES: OBERT(REPAIRS4) 9/24/2009 Page: 3 BELFOR(01 Belfor Property Restoration e94 YEirr RlnotETION L Bath Closet Ceiling Height:7'8" 3.10• 90.72 SF Walls 8.46 SF Ceiling 3 s 99.18 SF Walls&Ceiling 8.46 SF Floor 0.94 SY Flooring 11.83 LF Floor Perimeter �3.1a•• -i 11.83 LF Ceil.Perimeter DESCRIPTION CALC QNTY 114. Seal/prime the walls and ceiling-one coat WC 99.18 SF 115. Paint the walls and ceiling-two coats WC 99.18 SF 116. Cove base molding-rubber or vinyl,4"high 10 10.00 LF 206. Carpet (F)*1.15 9.73 SF 15%waste added for Carpet. 207. Carpet pad F 8.46 SF NOTES: Bed Closet Ceiling Height: T 8" H3'10'- 3.s. 122.67 SF Walls 15.75 SF Ceiling o even W 139.42 SF Walls&Ceiling 15.75 SF Floor 1.75 SY Flooring 16.00 LF Floor Perimeter 1 �e'u••., 16.00 LF Ceil.Perimeter �3 m• DESCRIPTION CALC QNTY 103. 5/8"drywall-hung,taped,floated,ready for paint 20+30 50.00 SF 104. Seal/prime the walls and ceiling-one coat WC 138.42 SF 105. Paint the walls and ceiling-two coats WC 138.42 SF 106. Cove base molding-rubber or vinyl,4"high to 10.00 LF 208. Carpet (F)*L15 18.11 SF 15%waste added for Carpet. OBERT(REPAIRS4) 9/24/2009 Page:4 BELFOR 1*1 Belfor Property Restoration reos[mreEsroRmae CONTINUED-Bed Closet DESCRIPTION CALC QNTY 209. Carpet pad F 15.75 SF NOTES: Bathroom Ceiling Height: TV s 227.44 SF Walls 49.17 SF Ceiling 276.61 SF Walls&Ceiling 49.17 SF Floor 5.46 SY Flooring 29.67 LF Floor Perimeter h l 29.67 LF Ceil. Perimeter r5 2 w� DESCRIPTION CALC QNTY 249. R&R Metal studding,2 1/2"wide, 16"OC,25 Ga. 40 40.00 SF Removal of metal framing and replacement to fit a 5ft nib 202. 1/2"drywall-hung,taped,floated,ready for paint 168.17 168.17 SF 33. Batt insulation-6" -R19 116.92 116.92 SF 203. Seal then paint the walls and ceiling(2 coats) WC 276.61 SF 38. (Install)Exhaust fan 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed 39. (Install)Toilet 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed 41. Medicine cabinet-Detach&reset 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed 42. (Install)Countertop-cultured(simulated)marble 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed 43. (Install)Sink-single 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed OBERT(REPAIRS4) 9/24/2009 Page: 5 BELFOR J01 Belfor Property Restoration p Y YEOYERYp ESTYSSTIOM CONTINUED-Bathroom DESCRIPTION CALC QNTY 44. Sink faucet-Detach&reset 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed 45. (Install)Vanity 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed 231. (Install)Bathtub 1 1.00 EA Customer must buy the new bath tub 47. (install)Shower faucet/head/rod 2 2.00 EA We would install the old one or the customer could purchase a new one to be installed Includes shower faucet and shower jets that the customer will purchase 239. Electrician-per hour 3 3.00 FIR Labor and materials to separate the existing switch that has fan and wall light on one. Also add in a third switch for the new light over the shower 48. (Install)Light fixture 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed 236. Recessed light fixture-Premium grade 1 1.00 EA Light to be installed over the new bath tub 50. Paint door slab only-2 coats(per side) 2 2.00 EA 51. Paint door/window trim&jamb-2 coats(per side) 2 2.00 EA 248. Carpenter-General Framer-per hour 2 2.00 FIR Labor to create 2 built in shelves in the shower area 230. (Install)Ceramic tile-Bath tub surround 60 60.00 SF Customer must buy the tile 233. Remove Ceramic tile-floor F 49.17 SF 235. Floor preparation for ceramic F 49.17 SF 234. (Install)Ceramic tile- floor F 49.17 SF Customer must buy the new tile 237. Tile/stone sealer F+60 109.17 SF 238. (Install)Shower door 1 1.00 EA New door to be purchased by the customer OBERT(REPAIRS4) 9/24/2009 Page: 6 BELFOR t9j Belfor Property Restoration PBOPEgtYq[gTOgqT10X CONTINUED-Bathroom DESCRIPTION CALC QNTY NOTES: Far s Hall Ceiling Height:7' 8" 1] Xd :, 283.67 SF Walls 71.50 SF Ceiling i 1 355.17 SF Walls&Ceiling 71.50 SF Floor >a e• 7.94 SY Flooring 37.00 LF Floor Perimeter 37.00 LF Ceil.Perimeter q19 DESCRIPTION CALC QNTY 63. Drywall patch/small repair,ready for paint 1 1.00 EA 212. Seal then paint the surface area(2 coats) 281.11 281.11 SF 66. Baseboard-4 1/4" 3 3.00 LF 67. Paint baseboard-two coats 27.66 27.66 LF 68. Paint bifold door set-slab only-2 coats(per side) 2 2.00 EA 2 closet doors 69. Paint door slab only-2 coats(per side) 4 4.00 EA 70. Paint door/window trim&jamb-2 coats(per side) 4 4.00 EA 210. Carpet 39.78 39.78 SF 211. Carpet pad 39.78 39.78 SF NOTES: OBERT(REPAIRS4) 9/24/2009 Page: 7 BELFOR t9) Belfor Property Restoration PROPRRTTRrRTORRTIOR Laundry Room Ceiling Height: 7'8" 3 a -{ 92.00 SF Walls 9.00 SF Ceiling T 3• T 101.00 SF Walls&Ceiling 9.00 SF Floor b R 1 m 1.00 SY Flooring 12.00 LF Floor Perimeter T 12.00 LF Ceil.Perimeter DESCRIPTION CALC QNTY 93. Paint the surface area-two coats 92 92.00 SF 94. Stackable washer and dryer-Remove&reset 1 1.00 EA 95. Clean floor F 9.00 SF NOTES: u �61z� Office Ceiling Height:T 8" 6 233.83 SF Walls 55.50 SF Ceiling 289.33 SF Walls&Ceiling 55.50 SF Floor 6.17 SY Flooring 30.50 LF Floor Perimeter 1 30.50 LF Ceil.Perimeter DESCRIPTION CALC QNTY 81. Batt insulation-6"-RI 72 72.00 SF 216. 5/8"drywall-hung,taped,floated,ready for paint 82 82.00 SF Ceiling and walls 85. Baseboard-4 1/4" PF 30.50 LF 86. Vapor barrier- 15#felt F 55.50 SF 87. Engineered wood flooring F 55.50 SF 89. Paint the walls and ceiling-two coats WC 289.33 SF - 90. Paint baseboard-two coats PF 30.50 LF 91. Paint door slab only-2 coats(per side) 1 1.00 EA OBERT(REPAIRS4) 9/24/2009 Page: 8 BELFOR J*J Belfor Property Restoration Pea PERTYPurollmox CONTINUED-Office DESCRIPTION CALC QNTY 193. Paint door/window trim&jamb-2 coats(per side) 1 1.00 EA 92. (Install) Light fixture 1 1.00 EA NOTES: Hall Closet Ceiling Height:7'8" 84.33 SF Walls 7.50 SF Ceiling T s, 91.83 SF Walls&Ceiling 7.50 SF Floor 1 0.83 SY Flooring 11.00 LF Floor Perimeter 3•4.___I 11.00 LF Ceil.Perimeter DESCRIPTION CALC QNTY 127. Drywall patch/small repair,ready for paint 1 1.00 EA 125. Paint the surface area-two coats 95.5 95.50 SF 126. Cove base molding-rubber or vinyl,4"high 10 10.00 LF 213. Carpet (F)*1.15 9.63 SF 15%waste added for Carpet. 214. Carpet pad F 7.50 SF NOTES: Main Level OBERT(REPAIRS4) 9/24/2009 Page:9 BELFOR(0) Belfor Property Restoration PBOPFBTYM[F1011FTION ire•--a Kitchen Ceiling Height: 8' 328.00 SF Walls 102.00 SF Ceiling '_,•__.FI¢he� 430.00 SF Walls&Ceiling 102.00 SF Floor 11.33 SY Flooring 41.00 LF Floor Perimeter J. 1 41.00 LF Ceil. Perimeter DESCRIPTION CALC QNTY 177. Refrigerator-Remove&reset 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed 178. Ice maker-Detach and reset 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed 179. Microwave oven-over range type-Detach&reset 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed 182. (Install)Sink faucet-Kitchen 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed 183. (Install)Garbage disposer 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed 184. (Install)Dishwasher 1 1.00 EA We would install the old one or the customer could purchase a new one to be installed 189. Batt insulation-6"-R19 156.62 156.62 SF 199. 1/2"drywall-hung,taped,floated,ready for paint 88 88.00 SF 198. Seal then paint the surface area(2 coats) 313.24 313.24 SF 229, Cabinet and Countertop upgrade per the attached proposal 1 1.00 EA 240. (Install)Built-in oven 1 1.00 EA 241. (Install)Range-drop in 1 1.00 EA 242. (Install)Ceramic tile 24 24.00 SF Backsplash on one wall 243. Remove Ceramic tile-floor F 102.00 SF 244. Floor preparation F 102.00 SF 245. Engineered woad flooring F 102.00 SF 246. .Vapor barrier- 159 felt F 102.00 SF 247. Plumber-per hour 4 4.00 FIR Labor and materials to relocate the sink,ice maker and garbage disposal 250. Electrician-per hour 5 5.00 FIR Labor to re-wire the kitchen area as needed to allow for new appliance and layout changes. OBERT(REPAIRS4) 9/24/2009 Page: 10 BELFOR(01 Belfor Property Restoration PROP[BITP[6r011AT1OM CONTINUED-Kitchen DESCRIPTION CALC QNTY NOTES: s.e'=` Hall Ceiling Height: 8' s• 0'_- 108.00 SF Walls 55.86 SF Ceiling f 163.86 SF Walls&Ceiling 55.86 SF Floor 'aa °- 6.21 SY Flooring 13.50 LF Floor Perimeter 3 tc i - -- 13.50 LF Ceil. Perimeter 32 Missing Wall: I - 8'4" X 0'0" Opens into LR Goes to Floor/Ceiling Missing Wall: 1 - 3'0"X 0'0" Opens into Upper Stairs Goes to Floor/Ceiling Missing Wall: 1 - 5'4"X 0'0" Opens into Entry Goes to Floor/Ceiling DESCRIPTION CALC QNTY 164. Engineered wood flooring 54.72 54.72 SF 166. Vapor barrier- 15#felt 54.72 54.72 SF 167. Drywall patch/small repair,ready for paint 1 1.00 EA 168. Paint the surface area-two coats 89.11 89.11 SF 169. Baseboard-4 1/4" 12 12.00 LF 170. Base shoe 10.67 10.67 LF 171. Paint baseboard-two coats 10.67 10.67 LF 173. Seal&paint base shoe or quarter round 10.67 10.67 LF OBERT(REPAIRS4) 9/24/2009 Page: 11 BELFOR 101 Belfor Property Restoration PNOPENTYNESTON1nON CONTINUED-Hall DESCRIPTION CALC QNTY NOTES: Ent" `'- - Upper Stairs Ceiling Height: 13' —IH 3' 194.83 SF Walls 20.50 SF Ceiling •� 215.33 SF Walls&Ceiling 20.50 SF Floor PlI n I - 2.28 SY Flooring 13.83 LF Floor Perimeter 16.83 LF Ceil.Perimeter Missing Wall: 1 - 3'0"X 0'0" Opens into Hall Goes to Floor/Ceiling Missing Wall: 1 - 3'0" X 0'0" Opens into Landing Goes to Floor/Ceiling DESCRIPTION CALC QNTY 153. Paint the surface area-two coats 181.83 181.83 SF 152. Step charge for"waterfall"carpet installation 8 8.00 EA 217. Carpet 38 38.00 SF 218. Carpet pad 38 38.00 SF NOTES: OBERT(REPAIRS4) 9/24/2009 Page: 12 BELFOR t6j Belfor Property Restoration vRevurreurneenox Landing Ceiling Height: 13' -- -- F-3'r• _ T_ 192.83 SF Walls 27.08 SF Ceiling „Q io 219.92 SF Walls&Ceiling 27.08 SF Floor 3.01 SY Flooring 14.83 LF Floor Perimeter i r 1 14.83 LF Coil.Perimeter Missing Wall: 1- 3'0"X 0'0" Opens into Upper Stairs Goes to Floor/Ceiling Missing Wall: 1 - 3'2"X 0'0" Opens into Lower Stairs Goes to Floor/Ceiling DESCRIPTION CALC Q NTY 144. Paint the walls-two coats W 192.83 SF 219. Carpet (F)"1.15 31.15 SF 15 %waste added for Carpet. 220. Carpet pad F 27.08 SF NOTES: 2 r-3 io M- E Lower Stairs Ceiling Height: 15' s'2 253.83 SF Walls 21.11 SF Ceiling t, 274.94 SF Walls&Ceiling 21.11 SF Floor 2.35 SY Flooring 16.50 LF Floor Perimeter 19.67 LF Ceil.Perimeter Missing Wall: 1- 3'2" X 0'0" Opens into Landing Goes to Floor/Ceiling DESCRIPTION CALC QNTY OBERT(REPAIRS4) 9/24/2009 Page: 13 BELFOR 141) Belfor Property Restoration veartrtwureeAnox CONTINUED-Lower Stairs DESCRIPTION CALC QNTY 135. Step charge for"waterfall"carpet installation 7 7.00 EA 136. Paint the surface area-two coats 238.83 238.83 SF 221. Carpet 39.06 39.06 SF 222. Carpet pad 39.06 39.06 SF NOTES: Entry Closet Ceiling Height: 8' ~4 4 104.00 SF Walls 10.00 SF Ceiling 4' 114.00 SF Walls&Ceiling 10.00 SF Floor 1 1,�` - 1.11 SY Flooring 13.00 LF Floor Perimeter 4.4• 13.00 LF Ceil.Perimeter is DESCRIPTION CALC QNTY 175. Engineered wood flooring 10 10.00 SF 176. Vapor barrier- 15#felt 10 10.00 SF NOTES: OBERT(REPAIRS4) 9/24/2009 Page: 14 BELFOR(0) Belfor Property Restoration veav[xrvusraunox _ Entry Ceiling Height: 8' i T 4'4' 136.00 SF Walls 28.89 SF Ceiling Ni "'°`" 164.89 SF Walls&Ceiling 28.89 SF Floor j 3.21 SY Flooring 17.00 LF Floor Perimeter 17.00 LF Ceil. Perimeter Missing Wall: 1- 5'4"X 0'0" Opens into Hall Goes to Floor/Ceiling DESCRIPTION CALC QNTY 174. Paint the surface area-two coats 137.33 137.33 SF NOTES: LR Ceiling Height: 19' 1352.00 SF Walls 294.86 SF Ceiling 1646.86 SF Walls&Ceiling 294.86 SF Floor 32.76 SY Flooring 66.33 LF Floor Perimeter � 74.67 LF Ceil. Perimeter Missing Wall: 1- 8'4" X 0'0" Opens into Hall Goes to Floor/Ceiling DESCRIPTION CALC QNTY 154. Regrout stone floor 15 15.00 SF 156. Vapor barrier- 15#felt 291.86 291.86 SF 194. Engineered wood flooring 291.86 291.86 SF 158. Drywall patch/small repair,ready for paint 1 1.00 EA OBERT(REPAIRS4) 9/24/2009 Page: 15 BELFOR t0j Belfor Property Restoration POOPPOTYOFSTORMON CONTINUED-LR DESCRIPTION CALC QNTY 159. Paint the surface area-two coats 1340.67 1340.67 SF 160. Baseboard-4 1/4" 12 12.00 LF 161. Base shoe 65.83 65.83 LF 162. Paint baseboard-two coats 65.83 65.83 LF 172. Seal&paint base shoe or quarter round 65.83 65.83 LF 163. Detach&Reset Screen door-metal-30"-36"-full screen 2 2.00 EA (no glass) NOTES: Grand Total Areas: 4,719.06 SF Walls 1,158.78 SF Ceiling 5,877.83 SF Walls and Ceiling 1,158.78 SF Floor 128.75 SY Flooring 463.33 LF Floor Perimeter - 0.00 SF Long Wall 0.00 SF Short Wall 477.83 LF Ceil.Perimeter 1,158.78 Floor Area 1,277.58 Total Area 4,719.06 Interior Wall Area 2,561.67 Exterior Wall Area 242.17 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length OBERT(REPAIRS4) 9/24/2009 Page: 16 Base Level n'm' 16' 3'6' S' BLd➢p¢ �3'10'- I T '' 6 13 T 13'10• 3' 1 34" 1 Id'6' 6'0. ' Base Level OBERT(REPAIRS4) 9/24/2009 Page: 17 i Main Level T , tze• . T ]'ID' ]'—1 �2'2' 1 13'1 6tlocQ�A —a'd' m � T z' 7 14➢9.8a4an" m La�SL+�¢ 3'd'—y • 1� T era• . � 98 66 ry� 1 17 z 4 Main level OBERT(REPAIRS4) 9/24/2009 Page: 18 CITY OF SALEM PUBLIC: PROPRERTY DEPARTMENT Construction Debris Disposal .Midas it Irequired lirr all demolition anJ repo\aeon wurk) In accurdance wth the sixth edition ul'thc State Building Code, 7S0 CAIR section I 11 5 Debris, and the provisiuns of SIGL c 40. S 54; Building Permit it is issued with the condition that the debris resulting from this work shall he disposed of in a properly licensed waste disposal facility as defined by V GL c 111. S 150A. The debris will he transported by: I nime ul hauler) 1 he debris wi, be disposcdd o,t in Iname of Iau Ily) (/ LIJJn.. „r rx Iluvl I 1a51 Iulc rt p:nnn .yglh.�nl i Motu p'r a K Oct