Loading...
0008 - 0010 CENTRAL STREET - BPA 'i - oo The Commonwealth of Massachusetts c Department of Public Safety �i�9 ! Ntassdchusuns Shute Building Codo(7SU CMR) Building Permit Application for any Building other than a One-or Two-Family Dwelling (This Section Foi.Official Use Only) D Building Permit Number: Date Applied: Building Official: oSECTION 1: CA' ION(Please indicate Block k and Lot N for locations for which a street address is not available No.and Street City/Town Zip Code Name of Building(if applicable) SECTION 2:PROPOSED WORK Edition of NIA State Code used If New Construction check here❑or check all that apply in the two rows below Existing Building IV Repair❑ Alteration ❑ Addition ❑ Demolition ❑ (Please fill out and submit Appendix 1) t Change of Use ❑ Change of Occupancy ❑ Other ❑ Specify: Are building plans and/or construction documents being supplied as part of this permit application? Yes No ❑ Is an Independent Structural Engineering Peer Review required? Yes ❑ No ❑ Brief Description of Proposed Work: GUNA% Ij1`l LAIX1nS 0(41�tf VG11 SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Investigation and Evaluation is enclosed(See 780 CNIR 31) ❑ Existing Use Group(s): Proposed Use Group(s): SECTION 4:BUILDING HEIGHT AND AREA Existing Proposed No.of Floors/Stories(include basement levels)&Area Per Floor(sq. ft.) Total Area(sq. ft.)and Total Height(ft.) SECTION 5:USE GROUP(Check as applicable) A: Assembly A-1 ❑ A-2❑ Nightclub ❑ A-3 ❑ A4❑ A-5❑ B. Business 16 E: Educational ❑ F: Facto F-1 ❑ F2❑ H: High Hazard H-I ❑ H-2❑ H-3 ❑. H-3❑ 1-1-5❑ 1: Institutional I-1 ❑ 1-2❑ I-3❑ 1-4❑ NE Mercantile❑ R: Residential R-1❑ R 2❑ R-3❑ R-1❑ S: Storage S-1 ❑ 5-2❑ U: Utility❑ Special Use❑and please describe below: Special Use SECTION 6:CONSTRUCTION TYPE(Check as ap livable) IA ❑ IB ❑ IIA ❑ IIB ❑ IfIA ❑ 1116 ❑ -IV ❑ 1 VA ❑ VB ❑ SECTION 7:SITE INFORMATION(refer to 760 CNIR 111.0 for details on each item) Water Supply: Flood Zone Information: Sewage Disposal: Trench Permit: Debris Removal: Public❑ Check if outside Flood Zone❑ Indicate municipal❑ A trench,w'I not be Licensed Dls Deal Site❑ spec V Private❑ or indentify Zunc. or on site system ❑ required a"r trench orpermit is enclosed ❑ Railroad right-of-way: Hazards to Air Navigation: Not Applicable❑ Is Structure uvithin,u irport approach area? Is their review uanpleled? or Consent to Build enclosed ❑ Yes ❑ or No❑ Yes❑ No ❑ SECTION B:CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Code Use Group(s): "Fype of Construction. Occupant 1_011d per Moor: - DOCS the building contain an Sprinkler System?:___Special Stipulations: SyE�CTION 9: PROPERTY OWNER AU'HIORIZATION Name and��ddres� rf I n t r wn V O \V Name(Print) Nu.and Street City/Town Zip Property Owner Contact Inform atio � S S G O IV F3 6 013 c � D H / 1 rd ) Title Telephone No. (business) Telephone No. (cell) e-mail address If applicable, the property owner hereby authorizes Name Street Address City/Town State Zip to act on the property owner's behalf, in all matters relative to work authorized by this building permit application. SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 2) If building is less than 35,000 cu.ft.of enclosed space and/or not under Construction Control then check here O and skip Section 10.1 10.1 Registered Professional Responsible for Construction Control Name(Registrant) Telephone No. e-mail address Registration Number Street Address City/Town State Zip Discipline Expiration Date 10.2 General Contractor DriS6G �Sbhr�l C an�mneor15c��\ CS ►2 Nude of Person Responsi a for Constructs License No. and Type if Ap licab Street Address ity/Town State Zip Telephone No. business Telephone No. cell e-mail address SECTION 11:WOHKF16'Citt`1PINSA't ON INFUWAN(T Aj 1-li);AVl1' M.G.L.c.152.§25C 6 A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the suance of the building permit. Is a signed Affidavit submitted with this application? Yes No 13 SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE Item Estimated Costs: (Labor and Materials) Total Construction Cost(from Item 6)_$ 1. Building $ Building Permit Fee=Total Construction Cost x_(Insert here 2. Electrical $ appropriate municipal factor)_$ 3. Plumbing $ 1. Nlechanical (HVAC) S Note: Minimum fee=$ (contact municipality) 5. \lechanical Other $. Enclose check payable to 6.Total Co $ (contact municipality)and write check number here 2 SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT By entering my na ne below, I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Please print and sign name Title WFulcion Dale Street Address City/Town Municipal Inspector to fill out this section upon application approval: U�- ne Date FERGAL BRENNOCK PE CONSTRUCTION & ENGINEERING SERVICES April 29, 2011 Mr. Tom Daniel Economic Development Manager, City of Salem, Department of Planning and Community Development 120 Washington Street Salem, MA 01970 RE: Submittal of supplemental requested information per Design Review Board meeting on 04/27/11 with respect to the Replacement of Retaining Wall & Slab at The Trolley Depot, 4 Central Street, Salem, MA. Dear Mr. Daniel, Thank you, your staff and the Design Review Board for your time last Wednesday evening in an effort to replace the failing retaining wall & slab at the above property. Per The City of Salem Design Review Board request attached is the supplemental information: Revised drawing in a pdf format which will be stamped upon request showing 1. A more detailed wall/slab interface 2. Notation of one added riser at the top of the steps 3. Referencing a second MA building code for the rail/guard requirements. 4. Reference to New Railing on Slab per Morin Fabrication Sketch (attached) Project photos with description showing existing condition and adjacent property with concrete brick interface. Proposed Railing Sketch from Morin Fabrication (Railing Contractor) that is to be used on the project. I have been informed that per Tom St. Pierre of the Building Department, the railings on the slab have to be replaced. The attached sketch reflects a similar railing installation project at The Tavern on The Square (intersection of Washington Street and Derby Street) which can be viewed at any time for comparison. This work was complete about 1 year ago. We trust that the above information satisfies yours and the Boards needs, should you need anything else, please do not hesitate to ask. Once again, thank you for your time and David Jaquith from the Board who is so kind as to volunteer his time and attention to this matter. Yours sincerely, i e al Brennock PE Attachments : Revision I April 29 Drawing,2 pages of Project Photos, I Page of Railing Sketch from Morin Fabrication. 538 MAIN STREET WATERTOWN MA 02472 FERGALBRENNOCKOHOTMAIL.COM 617 828 0376 ®,A . BUILD ADJACEGT \ BUILDIINGT T CONCRETE \ CONCRETE t STEPS RISERS) STEPS ET RISERS) i w ..., a. . . EXISTING ELEVATION RETAINING WAL SIDEWA K cEN RAI STREE PROPOSED ELEVATION FACADE TO MATC SIDEWALK cErvrRAL STREE 1t _ IT -.�- ' k ' .fir 1, s, y ,IS4'k Y A n yy`'%'?• y� CENTMLSTREET SIDEWALK TG B C �. SIDEWALK CENTRAL STREST BROOMEO CONCHAE EXISTING PLAN REDBRIQKP"vERs PROPOSED PLAN CROSS SLOPE TO /SAWCUTS\ /MATCH TREAD 8"CMU BACKED RETAINING WALL O S"CMUBACKEORAAININGWALL - Ox/n LONG SLOPE 2%CR BS #4 REBARSNV O/C VERTICAL ON EXISTING FOOTING 1ASEUMED O © SLOPE FICAL 244 HORIWNTAL ATTOP&BOTTOM ADEQUATE). DRILL&GROUT#4 e. COURSE BOND BEAM REBAR INTO EDITING TO MATCH I 94 DOWELS 01 S"O/C FROM WALL WALLVERDCALS. TO NEW 6"CONCRETE SLAB STRUCTURAL PLAN GROUT FILL CM UCELLS %"AIR VOID �B 6"AI NFORAIN MID N CRETE DEPT"WIT # FACADE.WENCMUAND BRICK REINFORCED MID OEPTN WITH#4 FACADE.WEEP HOLES @2.O/C NEW RAILING R SOAR @IB"O/C E/W.SUBGRAOE B / CLEAN CRUSHED STONE%••MAX RED BRICK FACADE ON RETAINING AGGREGATE COMPARED, WJLLTO MATCH EDISTING SCHEME. F 1"SAWCUT �C 6•'BROOM FINISH PERP TO DIRECTION G` REPLACMENTXANORAILE PER MORIN 99 OFTRAVEL2%CROSS SLOPE,FLAT FABRICATION SKETCH ACCOMPANYING O EKIAING _ .'2•CHAMFER L NGRUDINALLY. SAWCUTSLAB TX IS DRAWING.TO CODE ICMR 1009& �' GRADE/DRIVEWAY �RVB FIN LINE$ 1"DEEP INTO 3 EQUAL PARTS, 1012).RAILING TO BE EMBEDDED 6••INTO DRILL&/ \EDISTING 1 SMOOTH C WET CURE SLAB,DRIP EDGE IN S LAB,SLEEVED OR CORED WITH GROUT. GROUT FOOTING CONC.FACE OVERHANG. 4000PEI,%"ADS, xlla. D"DRIP EDGE AIR ENTRAINED CONCRETE. UNCHANGED EDEPS TO REMAIN WALL DETAIL SECTION —BRICK FACADE CMU WALL CAP DETAIL CAP DETAIL SECTION(NTS) ELEVATION(NTS) FERGAL BRENNOCK PE NOTES: CLIENT/OWNER: TITLE: s........nrxcxr PROJECT: CITYOFSALEM: 538 MAIN STREET, XB 1 SOS CUSTOMS HOUSE NO wlxD I.APRR20,2011 WATERTOWN, xc�oxouxmor REALTY TRUST/BRENDA& SCALE: �•N=p.O•N RENOVATION TO RETAINING PER DEs NREVIwBOA rvx iox r xxvrr — UNO WALL AND SLAB AT SIDE A.Nore F 1 RISER MA 02472 rc nelnE xo.ox. xv.xo.E.n.•x.xe..xew DAVID BUTLER TRUSTEES 1.O^DETAIL ENTRANCE OF 4 CENTRALST, e.BIOW LAT CAP 6178280376 SALEM,MA.FERGALORL cRExlAcc.IQ.m RAILATsu uNOCKOH AIL.co xx�movrx.. AsrM sls.xuoxmrowsm sw REVISIONS:I.AlI L2R,2011 DATE: APH L6.2011 [f}C ST sl}I�NI 7VRcF4L Bf OV I;� "IL 194) !uC<(-TF"Ci�44 N� fl�L/Scow 8 yyRo�N� 5/e "oo rEFe �a�f 6'«c pL) (a� rl roN 44'Q" f�R[/uEQ�f /til�(J GLOSS /SUJ 0 - LAW 0 0 0 0 0 0 o nuu�eounr 0 0 Mtlun�rr�oa '. 1ffi QZ`fig r rr olwu irooM m, d II II p II 11 L ry NiOk//J F,46,'1c4VAJ(j NC. M4, o Z. y 5 2oN AD N 0 a