December 30, 2009
Costa Sideridis
2 Autumn View
Salem,MA 01970
Re: Certificate of Compliance—DEP#64-448- 14 Buena Vista West, Salem, MA
Dear Mr. Sideridis:
Enclosed, please find the Certificate of Compliance for the above referenced project. This
Document must be recorded at the Essex County Registry of Deeds, Shetland Park 45
Congress Street, Suite 4100 Salem, Massachusetts. Please fill out and return the Recording
Information on page 4 of the Certificate of Compliance, which will indicate to the Salem
Conservation Commission that the document has been recorded.
If you have any further questions please feel free to contact me at (978) 619-5685.
Sincerely,
Carey D ues
Conserva ion Agent/ Staff Planner
Enclosures
CC: DEP Northeast Regional Office
Massachusetts Department of Environmental Protection
-- Bureau of Resource Protection - Wetlands DEP File Number,.
WPA Form 8B — Certificate of Compliance
64-448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the Costa Sideridis
computer, use Name
only the tab
key to move 2 Autumn View
your cursor- Mailing Address
do not use the Salem MA 01970
return key. City/rown State Zip Code
ur
ail. I I 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to:
Costa Sideridis
Name
July 19, 2007 64-448
Dated - DEP File Number
3. The project site is located at:
14 Buena Vista West Salem
Street Address City/Town
9 296
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different)
Essex 27254 269
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent, on:
December 10, 2009
Date
B. Certification
Check all that apply:
® Complete Certification: It is hereby certified that the work regulated by the above-referenced
Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the
above-referenced Order of Conditions have been satisfactorily completed. The project areas or work
subject to this partial certification that have been completed and are released from this Order are:
wpaform so doc•rev.7113104 Page I of 4
I
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
} WPA Form 8B — ertificate of Compliance 64-448
Massachusetts Wetla s Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification (c t.)
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced
Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no
longer valid. No future work subject to regulation under the Wetlands Protection Act may
commence without filing a new Notice of Intent and receiving a new Order of Conditions.
❑ ongoing Conditions: The following conditions of the Order shall continue: (Include any
conditions contained in the Final Order, such as maintenance or monitoring, that should continue
for a longer period).
Condition Numbers:
C. Authorization
Issued by:
Salem 1z of
Conservalion Commission Date of issuance
This Certificate must be signed by a majority of the Conservation Commission and a copy sent to the
applicant and appropriate DEP Regional Office(See Attachment).
Signature .
C
wpeform Bb.doc•rev.71I=4 Page 2 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
- WPA Form 8B — Certificate of Compliance sa aaa
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
C. Authorization (cont.)
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
10 December 2009
On this Day Of Month Year
before me, the undersigned Notary Public, personally appeared
B. Christie C. McCauley M. Blier, A. Hamilton, J. Knisel and D. Ricciarelli,
Name of Document Signer
proved to me through satisfactory evidence of identification, which was/were
personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged
to me that he/she signed it voluntarily for its stated purpose.
As member of Salem Conservation Commission
City/Town
6 4kvim
R.DU011EB
O YAIMON
w
l�
Signature of otary Public
Carev R. u ues
Printed Name of Notary Public
August 16, 2013
My Commission Expires(Date)
Place notary seal and/or any stamp above Signature of Notary Public
wpafcrm NAM•rev.7113,04 Page 3 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance
64-448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of
Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:
Salem
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County
for:
Property Owner
and has been noted in the chain of title of the affected property on:
I
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
------------------
Signature of Applicant
v form SCAM-rev.7/13104 Page 4 of
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
DEP Regional Addresses
Massachusetts Wetlands Protection Act M.G.L. c.. 131, §40
Mall transmittal forms and DEP payments,payable to:
Commonwealth of Massachusetts
Department of Environmental Protection
Box 4062
Boston, MA 02211
DEP Western Region Adams Colvin Hampden Monroe Pittsfield Tynngham
Dwight Street Agawam Conway Hancock Montague Plainfield wales
436 Dwi
9 Alford Cumvnngton Hatfield Monterey Richmond Were
Suite 402 Amhenl Dalton Hawley Montgomery Rowe Warvtck
Springfield, MA 01103 Ashfield Deerfield Heath Monson Russell Washington
Becker Easlharrpton Hinsdale Mount Washington Sandisfield Wendell
Phone:413-784.1100 BHcherlo,n East Longmeadow Holland New Ashford Savoy Westfield
Fax:413-784.1149 Bemardslon Egremont Holyoke New Marlborough Shelfleld Westhampton
Blandlmd Emng Huntington New Salem Shelburne West Springfield
Brimfield Florida Lanesacaugh North Adams Shreesbury West Slockoridga
Auckland Gill Lee Northampton Southampton Whately
Chademoot Goshen Lenox Northfield South Hadley Wilbraham
Cheshire Granby Lemrett Orange Southwick Williamsburg
Chester Grenville Leyden Otis Springfield Williamstown
Chesterfield Great Bamngton Longmeadow Palmer Stockbridge Windsor
Chicopee Greenfield Ludlow Pelham Sunderland Worthington
Clarksburg Hadley Middlefield Peru Tolland
DEP Central Region Acton Chariton Hopkinton Millbury Rutland Uxbridge
627 Main Street Aenbumham Clinton Hubbarditon MalNne Shirley women
Ashby Douglas Hudson New Braintree Shrewsbury Webster
Worcester,MA 01608 Atha Dudley Holliston Northborough Southborough Westborough
Phone:508-792.7650 Auburn Dunslable Lancaster Northbndge Southbridge West Boylston
Fax:508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield
Same Fitchburg Leominster Oakham Starting Westford
TDD: 508-767-2788 Bellingham Gardner Libteton Oxford Stow Westminster
Benin Grafton Lunenburg Panics, Sturbridge Wlnchendon
Blackstone Groton Marlborough Pepperell Sultan Worcester
action Harvard Maynard Petersham Templeton
Boxborough Hardwa Medway Phillipston Townsend
Boylston Holden Mention Princeton Tyngsoorough
Brookfield Hopedale Milford Royalston Uplon
DEP Southeast Region Abington Dartmouth Freetown Maltapdsed Provinceidin Tilbury
20 Riverside Drive Acushnel Dennis Gay Head Middleborough Raynham Truro
Attleboro Dighton Gaanold Nantucket Rehoboth Wareham
Lakeville,MA 02347 Avon Duxbury Halifax Near Bedford Rochester Wellfieel
Phone:508-946.2700 Barnstable Eastham Hanover North Attleborough Rockland West Bridgewater
Fax: 508-947-6557 Berkley wa
ey Easlendgeter Hanson Norton szndvirh Westport
Bourne Easton Hanech Norwell Scituate West Tilbury
TDD: 508-946.2795 Bremnter Edgartawn Kingston Oak Shire Seekonk Whitman
Bridgeminfler Fairhaven Lakeville Orleans Sharon Wrentham
Brockton Fall River Mansfield Pembroke Somerset Yarmouth
Carver Falmouth Manor PlalnWlle Stoughton
Chatham Foxborough Marshfield Plymouth Swansea
Chilmark Franklin Mashpee Plymplan Taunton
DEP Northeast Region Amesbury Chelmsford Hingham Merrimac oumcy Wakefield
1 Winter Street Antiwar Chelsea Holbrook Methuen Randolph Walpole
Arlington Conasset Hull Middleton Reading Waltham
Boston, MA 02108 Ashland Concord Ipswich Millis Revere walertown
Phone:617-654-6500 Bedford Darman Lawrence Million Rockport Wayland
Fax: 617-556-1049 Belmont Dedham Lexington Nahant Row m lay Wellesl
Beverly Dover Lincoln Nat,* Salem Warman,
TDD:617-574-6868 seen® Discus Lowell Needham Salisbury West Newbury
Boston Essex Lynn Newbury Saugus Westin
Boxford Everett Lynnfield Newburyport Sherbom Westwood
Brammis, Framingham Malden NevAon Somerville Weymouth
Brookline Georgetown Manchester-By-The-See Norfolk Stoneham Wilmington
Burlington Gloucester Marblehead North Andover Sudbury Winchester
Cambridge Gravesend Medfield North Reading Swampswtl Winthrop
Canton Hamillon Medford Norwaad Tewksbury Woburn
Cannes Haverhill Melrose Peabody Topefield
wpaforni8b.doc-DEP Addresses•rev.12110,09 Page I of I
CITY OF SALEM
CONSERVATION COMMISSION
August 7, 2007
Costa Sideridis
2 Autumn View
Salem, MA 01970
Re: Order of Conditions—DEP #64-448
14 Buena Vista Ave (West),Salem,Massachusetts
Dear Mr. Sideridis:
Enclosed, please find the Order of Conditions for the above referenced project.
Following the 10-day appeal period, which has passed, this document and the attached
Special Conditions must be recorded at the Essex County Registry of Deeds (36 Federal
Street, Salem, MA). Once recorded, please return a copy of Page 9 of the Order, which
will indicate to the Commission that the document has been recorded.
As indicated in the Order,prior to any work commencing:
1. final plans must be submitted to the Conservation Commission,
2. this Order must be recorded,
3. a sign shall be displayed showing DEP File# 64-448 within public view, and
4. contact me at least 48 hours prior to any activity to schedule a pre-construction
meeting to review the Order with your hired contractor.
If you have any further questions, please feel free to contact me 978-619-5685.
Sincere
Carey Duq es
Conservati Agent/ Staff Planner
Enclosures
CC: DEP Northeast Regional Office
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
Important: Salem
When filling From: 1.Conservation Commission
out forms on
the computer, 2. This issuance is for (check one): a. ® Order of Conditions b. ❑ Amended Order of Conditions
use only the
tab key to 3. To: Applicant;
move your
cursor-do not Costa Sideridis
use the return a. First Name b. Last Name c.Company
key. 2 Autumn View
d. Mailing Address
a6 Salem MA 01970
e.City/Town I.State g.Zip Code
^� 4. Property Owner(if different from applicant):
a. First Name b. Last Name c.Company
d. Mailing Address
e.City/Town I.State g.Zip Code
e. Project Location:
14 Buena Vista West Salem
a.Street Address b.City/Town
9 296
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known (note:
electronic filers will click for GIS locator): e.Lattude I.Longitude
6. Property recorded at the Registry of Deeds for (attach additional information if more than one parcel):
Essex So. District
a.County b.Certificate(if registered land)
22610 P77
c.Book d. Page
May 7, 2007 June 28, 2007 July 19, 2007
7. Dates: a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance
s. Final Approved Plans and Other Documents (attach additional plan or document references as
needed):
Site Development Permit Plan
a.Plan Tide
Christopher Mello, PLS Christopher Mello, PLS
b.Prepared By c.Signed and Stamped by
TBD 1"=20'
d.Final Revision Date e.Scale
I.Additional Plan or Document Title g. Date
wyalorm5.00c• rev.&M5
Pape 1 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-446
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
i. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution
d. ® Private Water Supply e. ❑ Fisheries f. ® Protection of Wildlife
Habitat
g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance standards set
forth in the wetlands regulations. This Commission orders that all work shall be performed in
accordance with the Notice of Intent referenced above, the following General Conditions, and any
other special conditions attached to this Order.To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these
conditions shall control.
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the
wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice
of Intent is submitted which provides measures which are adequate to protect these interests, and a
final Order of Conditions is issued. A description of the performance standards which the
proposed work cannot meet is attached to this Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the
effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this
project may not go forward unless and until a revised Notice of Intent is submitted which provides
sufficient information and includes measures which are adequate to protect the Act's interests, and a
final Order of Conditions is issued. A description of the specific information which is lacking and
why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
3. ® Buffer Zone Impacts: Shortest distance between limit of project disturbance and 2
wetland boundary (if available) a.linear feet
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
a. ❑ Bank a.linear feet b.linear feet c.linear feet d.linear feet
5. ❑ Bordering Vegetated
Wetland a.square feet b.square feet c.square feet d.square feet
6. ElLand Under Waterbodies a.square feet b.square feet c.square feet d.square feet
and Waterways
e.cu.yd dredged f.cu.yd dredged
wpalormMoc• rev.311/05
Page 2 019
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
7. ❑ Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet
s. ❑ Isolated Land Subject
to Flooding a.square feet b.square feet
Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
s. ❑ Rivertront area a.total sq.feet b.total sq.feet
Sq ft within 100 It c.square feet d.square feet e.square feet f.square feet
Sq It between 100-200 If
g.square feet h.square feet i.square feet I.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
to. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
11. ❑ Land Under the Ocean a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13. ❑ Coastal Beaches
a.square feet b.square feet c.cry nourishmt. d.r/y nourishmt.
14. ❑ Coastal Dunes a.square feet b.square feet c.c/y nourishmt. d.c/y nourishmt
15. ❑ Coastal Banks a.linear feet b.linear feet
16. ❑ Rocky Intertidal Shores a.square feet b.square feet
17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet
18. ❑ Land Under Salt Ponds a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
19. ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet J.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a.cu.yd dredged b.cu.yd dredged
21. ❑ Land Subject to Coastal
Storm Flowage a.square feet b.square feet
vv,aforrr5.doc• rev.311/05
Page 3 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity complying IY 9 in with all
P
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe,tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped b the Registry of Deeds prior to the Y 9 ry r P commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection"[or, "MA DEP"]
"File Number 64-448 "
w afomZ.occ• rev.3/1105
Pape 4 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before DEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A)to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition #12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the
property subject to this Order and to any contractor or other person performing work conditioned by
this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy
Standards.
Special Conditions:
If you need more
space for
additional
conditions,
select box to
attach a text
document
wpatorm5.dw• rev.311/05 Page 5 of 9
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions 64-448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The hereby finds (check one that applies):
Conservation Commission
3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
a.Municipal Ordinance or Bylaw b.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final Order of
Conditions is issued.
4. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
a.Municipal Ordinance or Bylaw b.Citation !,
The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the
conditions shall control.
If you need more space for c. The special conditions relating to municipal ordinance or bylaw are as follows:
additional The special conditions attached to this Order of Conditions relate to both the City of Salem's local
conditions,select box to ordinance and the Massachusetts Wetlands Protection Act.
attach a text
document
wpatorm5.dc• rev.311/05 Page 6 of 9
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions 64-448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special 28 07-
condition pursuant to General Conditions #4, from the date of issuance. 1.Date o Is u nce
Please indicate the number of members who will sign this form:
This Order must be signed by a majority of the Conservation Commission. 2.Number of Signers
The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protect) n Regional Office, if not filing electronically, and the property owner, if different
from applican
Signatures* /
t �
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
28 June 2007
On this Day of Month Year
Before me, the undersigned Notary Public, K. Cornacchio, D. Pabich, U011111hir, K. Glidden,
personally appeared D. Summery
proved to me through satisfactory evidence of identification, which was/were
personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of Salem Conservation Commission
Cityrrown
CAREV R DUOM
y Pdaft
MOVAHL M
Aupuq 10.2013 Signature of otary Public
Carey R. u ues
Printed Name of Notary Public
13
Place notary seal and/or any stamp above My ust
is on Ex
My Commission Expires(Date)
This Order is issued to the applicant as follows:
❑ by hand delivery on [� by certified mail, return receipt requested,on
` W
Date Date
woatorrr5.00c• rev.3/1/05 Page 7 of 9
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions.
The request must be made by certified mail or hand delivery to the Department,with the appropriate filing
fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR
10.03(7) within ten business days from the date of issuance of this Order.A copy of the request shall at
the same time be sent by certified mail or hand delivery to the Conservation Commission and to the
applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding
Order associated with this appeal will be required to demonstrate prior participation in the review of this project.
Previous participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or
Determination, or providing written information to the Department prior to issuance of a Superseding Order
or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act, (M.G.L. c. 131, § 40) and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
"afor v.doo• rev.311/05 Page 8 of 9
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-448
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions.The recording information
on Page 7 of this form shall be submitted to the Conservation Commission listed below.
Salem
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
------------------------------------------------------------------------------------------------------------------------
To:
Salem
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
14 Buena Vista West 64-448
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform5.doc• rev.311I05 Page 9 of
Attachment to Order of Conditions # 64-448
Page lof 5
SALEM CONSERVATION COMMISSION
DEP FILE #64-448
14 Buena Vista Ave (West)
City of Salem, Massachusetts
ADDITIONAL FINDINGS
Based on the Estimated Habitats or Rare Wildlife and Certified Vernal Pools Map (June 1, 2003) from Natural
Heritage &Endangered Species Program(NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any
vernal pools.
This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L. Chapter 131, Section 40 and the City
of Salem Wetlands Protection Ordinance, Salem Code Chapter 34,Section 34-1 —34-13.
This Order pernuts the re-grading, of a existing slope, stabilization of this slope, installation of plantings and
landscaping within the buffer zone to bordering vegetated wetlands. A previously existing Order of Conditions
DEP #64-358 expired and the construction work on the exterior of the home was not complete. Therefore the
landowner had to re-file a Notice of Intent in order,to complete the necessary work. During the process of filing a
new Notice of Intent,the applicant coordinated with the Conservation Agent and received approval to install erosion
control measures to help stabilize the embankment while awaiting an Order of Conditions. This order permits the
work described above which includes the re-grading of the slope to 2:1 in the western section of as shown on the
final approved plan. All of the approved work is located within buffer zone to a bordering vegetated wetlands. The
distance between the closest project disturbance and the wetlands is 2 feet. Revised plans are to be submitted to the
Conservation Commission and work cannot begin until these plans have been received by the Conservation
Commission or its agent.
GENERAL CONDITIONS
1. This Order of Conditions must be recorded in its entirety (all 5 pages)at the Essex County Registry of
Deeds or the Land Court for the district in which the land is located, after the expiration of the 10-day
appeal period and within 30 days of the issuance. A copy of the recording information must be
submitted to the Salem Conservation Commission before any work approved in this Order
commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131, Section 40,Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands
Protection Ordinance,Salem Code Chapter 34, Section 34-1 —34-13.
3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones,other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
4. Prior to any work commencing, a sign shall be displayed showing DEP File#64-448, and not placed on
a living tree.
Attachment to Order of Conditions # 64-448
Page 2of 5
5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
6. With respect to this Order,the Commission designates the Conservation Agent as its agent with powers
to act on its behalf in administering and enforcing this Order.
7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at
any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131,
Section 40,the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
8. The term"Applicant'as used in this Order of Conditions shall refer to the owner,any successor in
interest or successor in control of the property referenced in the Notice of intent, supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816),U.S. Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec. 27(5) of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G. L. Ch. 21A ss7
and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the
septic system within 100 feet of wetlands shall be submitted to the Commission prior to
construction initiation.
(4) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR
744.).
10. If there are conflicting conditions within this Order, the stricter condition(s) shall rule.
11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods
and boundary during construction if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
14. The work shall conform to the following attached plans and special conditions:
Final Approved Plans
Plans to be submitted and approved by the Commission and/or its Agent
(Title)
(Dated)
Attachment to Order of Conditions # 64-448
Page 3of 5
Christopher R.Mello PLS
(Signed and Stamped by)
City of Salem Conservation Commission
(On file with)
15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved
plan(s) shall require the applicant to file a Notice of Project Change with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the
change(s)is substantial enough to require filing a new Notice of Intent or a request to correct or amend
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
16. hi conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued,the applicant or current landowner shall submit to the Commission a statement signed by the
buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
PRIOR TO CONSTRUCTION
17. Prior to the commencement of any activity on this site other than activities listed above,there
project supervisor,the contractor responsible for the
shall be aPre-Construction Meeting between the p � p P
work,and a member of the Conservation Commission or its Administrator to ensure that the
requirements of the Order of Conditions are understood. The staked erosion control line shall be
adjusted,if necessary,during the pre-construction meeting. Please contact the Conservation Commission
Agent at (978) 745-9595 ext 311 at least forty-eight(48) hours prior to any activity to arrange for the
pre-construction meeting.
18. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Administrator shall inspect and approve such installation at the pre-construction
meeting.
19. No clearing of vegetation, including trees, or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
EROSION CONTROL
20. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in the wetland areas and buffer zones. The erosion control
specifications provided in the Notice of Intent and the erosion control provision in the Order will be the
minimum standards for this project; the Commission may require additional measures.
21. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland
resource areas to prevent sediment from entering wetland resource areas.
22. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
23. The area of construction shall remain in a stable condition at the close of each construction day.
Attachment to Order of Conditions # 64-448
Page 4of 5
24. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through hay bale sediment traps, silt filter bags or other means approved by the Commission or its
Administrator.
25. Within thirty (30)days of completion of construction on any given portion of the project, all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas.
26. If soils are to be disturbed for longer that two(2)months, a temporary cover of rye or other grass should
be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,
exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored, to
prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
27. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
28. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
29. All waste products,grubbed stumps, slash;construction materials,etc. shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
30, Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
31. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil
prior to seeding and final stabilization.
32. Immediately following drainage structure installation all inlets shall be protected by silt fence,haybale
barriers and/or silt bags to filter silt from stormwater before it enters the drainage system.
33. There shall be no pumping of water from wetland resource areas.
34. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
35. During construction,all drainage structures shall be inspected regularly and cleaned as necessary.
36. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including,but not limited to,civil administrative
penalties under M.G.L Chapter 21A, section 16.
AFTER CONSTRUCTION
37. Upon completion of construction and final soil stabilization, the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance (COC):
(1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
Attachment to Order of Conditions # 64-448
Page 5of 5
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
(3) An"As-Built" plan signed and stamped by a Registered Professional Engineer or Land Surveyor
showing post-construction conditions within all areas under the jurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at a minimum:
(a) All wetland resource area boundaries with associated buffer zones and regulatory setback
areas taken from the plan(s)approved in this Order of Conditions;
(b) Locations and elevations of all stormwater management conveyances,structures and best
management designs,including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
(c) Distances from any structures constructed under this Order to wetland resource areas-
"structures"include,but are not limited to,all buildings,septic system components,wells,
utility lines,fences,retaining walls,and roads/driveways;
(d) A line delineating the limit of work-"work"includes any filling,excavating and/or
disturbance of soils or vegetation approved under this Order;
38. When issued, the Certificate of Compliance must be recorded at the Essex County Registry of Deeds
and a copy of the recording submitted to the Salem Conservation Commission.
39. If the completed work differs from that in the original plans and conditions,the report must specify how
the work differs; at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission, may the applicant request in writing a Certificate of
Compliance as described above.
40. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Administrator has
authorized their removal.
ADDITIONAL CONDITIONS
41. The applicant shall remove all fill from the site that contains construction debris and properly dispose of
it off site.
42. The applicant shall remove trash and debris located in the wetland and properly dispose of it off site.
43. Updated plans are to be submitted to the Conservation Commission prior to the applicant starting work
on the site. The Conservation Commission approved a 2:1 slope in the rear of the property.
co�M
�v CITY OF SALEM
CONSERVATION COMMISSION
July 29, 2008
Mary Rimmer
30 Green Street
Newburyport, MA 01950
Re: DEP#64-448—Mitigation plantings at 14 Buena Vista Avenue West, Salem,
Massachusetts
Dear Ms. Rimmer:
This letter is to confirm that the mitigation plantings originally required as part of the
Order of Conditions under DEP#64-448 are not necessary if the slope behind the
property at 14 Buena Vista Avenue West remains vegetated and stable.
Based on observations I made during a site visit on July 1, 2008 and your professional
opinion as stated in a letter dated July 23, 2008, the additional plantings do not appear to
be necessary. The purpose of the plantings and installation of the geotextile mat was
going to be to stabilize the slope. However, the seeding of the slope has stabilized the
slope and cutting this vegetation in order to install the plants would be counter
productive. If the slope does become unstable and there are signs of erosion,'the slope
shall be reassessed and a solution such as additional plantings shall be considered and
discussed with the Commission.
Please note that the applicant shall remove the Filtrex silt sock prior requesting a
Certificate of Compliance.
Please contact me at(978)619-5685 if you have any questions.
Sincerely,
Carey D ques
Conservation Agent/Planner
CC: Costa Sideridis
,eKevm Comaccfiio, Conservatioo Commission-Chairman
RE C
q' RIMMER ENVIRONMENTAL CONSULTING, LLC
30 Green Street Newburyport, MA 01950 Tel 978-463.9226 Fax 978.463.8716
July 23, 2008
RECEIVED
JUL 2 4 2008
Carey Duques DEPT.-OF PLANNNJG&
Salem Conservation Commission COM IMITY DEVELOR EW
City Hall
93 Washington Street
Salem, MA 01970
Re: 14 Buena Vista Ave West— Costa Sideridis
DEP 064-0448
Dear Ms. Duques:
This letter is submitted to you to provide the Commission with an update on the status of
the mitigation plantings at 14 Buena Vista Avenue, proposed as part of a plan to rectify
filling and grading which occurred beyond the approved limit of work, and to request a
modification to this mitigation plan in light of current conditions.
In accordance with REC's correspondence to you dated November 20, 2007 that
described proposed mitigation plantings to be installed at the base of the steep slope to
the rear of the property, REC was prepared to install these plantings this summer. The
plants were ordered and delivered. However, upon site inspection, we discovered that the
area proposed for planting has become very densely vegetated on its own as you can see
from the attached photographs. In order to install the 5 trees and 10 shrubs proposed to
be planted, this vegetation would have to be cleared in order to create space for the
nursery stock. This seemed to be an unnecessary additional impact where the buffer zone
has become so densely re-established. We considered planting on the slope itself, but the
poor soil conditions and very steep slopes make conditions very unfavorable for
establishment of new plantings.
In light of these new conditions, we request that the Commission eliminate the
requirement for new plantings. The slope appears to be in stable conditions and was
seeded in the fall of 2007, though the geotextile mat has not yet been installed.
If you have questions or require additional information, please do not hesitate to contact
me.
Very truly,
Mary Ri mer
Principal/Sr. Wetland Scientist
Cc: Costa Sideridis
•y& }:;i \"uY.l } l rx� dx r 4 r��' \o,; �Y �1 y i 'F'" )f
��'�1
e �� Y � 4 �' • •' f'Y,�..-. 11 y ,V� p V� I�1,�r 'fq:\ � �"4r' r k ix�'� y #Y 'y'�.
e �S'� t� al jig CbVd' px; � �P � y .^."p°I�� ✓ s'N '}� ° 4 t r � +
..} 1 fY S 'rq YF ti•.. ",AAWW r; 151�Y J
l+1 A I rXe��`3r ''i��p•Y��.'y� i'f`�� ww„ t.." i � ' �§�V' � �' £ �ra"^r��Vie
✓ 'f", \ + ?J y� 1�A .y.` V�I"�, J �.FJ.',F [ , 1y�f�' k w 1Y 1 Y,1} 7� 6y✓Z n .:
MOW
x -`��}s' fa y�,f ��iJry�Ir'�V ✓jy/1 4 yr
�!t[,R�VJi
.r. l. y Yee ��y � h+`ip\7�
- � 'j ut-, i �•. 1 Yd l 6r >k `� s�i'g�l' '} �'�
� x�i k ..� al , 'x s� •,?r ' 1 i �'����� iy�y��h w�, 4�'W� • ;i
'"S�•`"}2 i h' � x h i,'V, } 'L �1' a V11��3 Jt i{� ytlr +:,' '�i�� `�
liliVmy l' l,
1Ai
py
i is N a r -4R hS �a 4 yiyy� i' ,Sy F^
YA �L•J• i / y,- N i��� � � /Y'�r 'vim 4 VI
Yil N- ■�yI J 1:.J M1 \Y•�� #+T�
o r elf f ��FAJSX �
F I
- s: k
DEC
1� IIj RIMMER ENVIRONMENTAL CONSULTING, LLC
30 Green Street Newburyporr, MA 01950 Tel 978.463.9226 Fax 978-463-8716
November 20, 2007
Carey Duques
Salem Conservation Commission
City Hall
93 Washington Street
Salem, MA 01970
Re: 14 Buena Vista Avenue-Sideridis
DEP 064-0448
Dear Ms. Duques:
As requested by property owner Costa Sideridis, Rimmer Environmental Consulting(REC) inspected the above
referenced property on November 7, 2007 in order to view the condition of the slope at the rear of the site. REC
found there to be no direct alteration of wetland resources from filling or grading,though there appears to have
been some minor cutting of vegetation, including some wetland vegetation, when the erosion control barrier was
installed. It is our opinion that this vegetation will quickly resprout and there will be no lasting impact from this
cutting.
It is also our understanding that the slope, as originally constructed, did not conform to the approved plan for
development of this property. The site was re-graded in early November. Attached,you will find two copies of
an updated plan of the current slope topography, as surveyed by Eastern Land Survey Associates. You will note
that the western portion of the slope is at approximately 2:1 (horizontal:vertical), and the eastern portion is
approximately 1.5:1. In order to maintain the stability of this slope,it will be necessary to install a geotextile
mesh and overseed with an erosion control seed mix spread. However,prior to final stabilization of this slope,
mix,we request that the Salem Conservation Commission approve this grading.
The plan also calls for installation of plantings at the base of the slope. Some minor cutting and clearing of
vegetation,which includes mostly non-native multiflora rose,Asiatic bittersweet and European buckthorn, will
be necessary in order to create space to install these plantings at the base of the slope. A total of 15 trees and
shrubs are proposed to be installed, including:
(5)Eastern white pine/Pinus strobus
(5) silky dogwood/Corpus amomum
(5)Northern Arrow-woodNiburnum recognitum
*Please note that this is a substitute for the witch hazel specified on the plan.
Salem Conservation Commission
Re: DEP 64-448
Page 2
If you should have questions or comments regarding this material,please feel free to contact me. We look
forward to your response regarding the current grading and planting plan.
Very truly,
Tft�
Mary Rimmer,M.A., P.W.S.
Principal/Sr. Wetland Scientist
Cc: Costa Sideridis
RIMMER ENVIRONMENTAL CONSULTING, LLC
Massachusetts Department of Environmental Protection Provided by DER
Bureau of Resource Protection - Wetlands DEPFile Number
WPA Form 3 - Notice of Intent e
"Document Transaction Number
Ll Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
Important•.When filing out A. General Information
forms on the
computer, use 1. Project Location (Note: electronic filers will click on button for GIS locator):
only the tab key t—,f _ ___.., - _
to move your 12 Buena.Vista Ave-(West) -7 Salem 01970
cursor not return
a. Street Address b.City/Town c.Zip Code
use the return Y P
key. Latitude and Longitude: 42-30-41 70-55-32
d.Latitude e. Longitude
1c,9�? �9 —1
(.'Assessors Map/Plat Number g. Parcel/Lot Number
2. Applicant:
Costa Sideridis
a. First Name b.Last Name c.Company
Note: 2 Autumn View
Before d. Mailing Address
completing this Salem MA 01970
form consult
your local e.City/Town f.State g.Zip Code
Conservation 617-510-9335
Commission h. Phone Number i.Fax Number j.Email address
regarding any
municipal bylaw 3. Property owner(if different from applicant): ❑ Check if more than one owner
or ordinance.
Same
a. First Name b. Last Name c.Company
d.Mailing Address
e.City/-own f.State _ g.Zip Code
h.Phone Number i.Fax Number I. Email address
4. Representative (if any):
a. Firm
b.Contact Person First Name c.Contact Person Last Name
d.Mailing Address
e.CitylTown f.State g.Zip Code
h. Phone Number i. Fax Number j.Email address
5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
$500.00 $237.50 $262.50
a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid
6. General Project Description:
Stabilize existing slope install buffer planting and landscape.
wpaform3.doc•rev. 4/12/06 Page 1 of 7
Massachusetts Department of Environmental Protection Provided by DER
Bureau of Resource Protection - Wetlands DEP File Number
Ll
WPA Form 3 — Notice of Intent Document Transacbon Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
A. General Information (continued)
7. Project Type Checklist:
a. ® Single Family Home b. ❑ Residential Subdivision
c. ❑ Limited Project Driveway Crossing d. ❑ Commercial/Industrial
e. ❑ Dock/Pier f. ❑ Utilities
g. ❑ Coastal Engineering Structure h. ❑ Agriculture—cranberries, forestry
i. ❑ Transportation j. ❑ Other
8. Property recorded at the Registry of Deeds for:
Essex So. Dist. 277
a.County b. Page Number
22610
c. Book d.Certificate#(if registered land)
9. Has work been performed on the property under an Order of Resource Area Delineation involving
Simplified Review within 3 years of the date of this application?
a. ❑ Yes b. ® No
If yes, no Notice of Intent or Request for Determination of Applicability may be filed for work within the
50-foot-wide area in the Buffer Zone along the resource area during the three-year term of an Order
of Resource Area Delineation, or any Extended Order, or until the applicant receives a Certificate of
Compliance, whichever is later.
10. Buffer Zone Only- Is the project located only in the Buffer Zone of a bordering vegetated wetland,
inland bank, or coastal resource area?
a. ® Yes-answer 11 below, then skip to Section C.
b. ❑ No-skip to Section B.
11. Buffer Zone Setback—For projects that involve work only in the buffer zone, select the applicable
adjacent resource area (check one):
a. ® BVW b. ❑ inland bank c. ❑ coastal resource area
The distance between the closest project disturbance and the associated resource area is:
2
d. linear feet
wpaformIdoc•rev.4/12106 Page 2 of 7
Massachusetts Department of Environmental Protection Provided by DER
Bureau Of Resource Protection - Wetlands �r ,DEP File Number
WPA Form 3 - Notice of intent
Ll
t Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 " Salem
City/Town
B. Resource Area Effects
1. Inland Resource Areas
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction a. ❑ Bank 1.linear feet 2. linear feet
number b. ❑ Bordering Vegetated
(provided on Wetland 1.square feet 2.square feet
your receipt
page) with all c. ❑ Land Under 1.square feet 2.square feet
supplementary Waterbodies and
information you Waterways 3.cubic yards dredged
submit to the d. ❑ Bordering Land
Department.
Subject to Flooding 1.square feet 2.square feet
3.cubic feet of flood storage lost 4.cubic feet of flood storage replaced
e. ❑ Isolated Land Subject
to Flooding 1.square feet
2.cubic feet of flood storage lost 3.cubic feet of flood storage replaced
❑ For f. ❑ Riverfront area 1.Name of Waterway(if available)
projects
impacted by 1. Width of Riverfront Area (check one):
the riverfront
area and a ❑ 25 ft. - Designated Densely Developed Areas only
buffer zone of
another ❑ 100 ft. - New agricultural projects only
resource
area, add ❑ 200 ft. -All other projects
50% to the
total fee. 2. Total area of Riverfront Area on the site of the proposed project:
Square Feet
3. Proposed alteration of the Riverfront Area:
a.Total Square Feet b.Square Feet within 100 ft. c.Square Feet between 100 ft.and 200 ft.
4. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No
5. Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No
wpaform3.doc•rev.4/12/06 Page 3 of 7
f
Massachusetts Department of Environmental Protection Provided,by DER:
Bureau of Resource Protection -Wetlands ;DEP File Number
WPA Form 3 — Notice of Intent t .
4UDocumentTransaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
B. Resource Area Effects
2. Coastal Resource Areas:
Check all that apply below. Attach narrative and supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
number
(provided on b. ❑ Land Under the Ocean 1.square feet
your receipt
page) with all 2.Cubic yards dredged
supplementary
information you C. Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes
❑submit to the below
Department. d. ❑ Coastal Beaches 1.Square feet 2.Cubic yards beach nourishment
e. ❑ Coastal Dunes 1.Square feet 2.Cubic yards dune nourishment
f. ❑ Coastal Banks 1. Linear feet
g. ❑ Rocky Intertidal Shores 1. Square feet
h. ❑ Salt Marshes 1.Square feet 2.Sq R restoration, rehab., or creation
i. ❑ Land Under Salt Ponds 1.Square feet
2.Cubic yards dredged
j. ❑ Land Containing
Shellfish 1. Square feet 2.Square feet restoration,rehab.
k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1. Cubic yards dredged
i. ❑ Land Subject to Coastal
Storm Flowage 1.Square feet
3. Limited Project:
Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR
10.24 or 310 CMR 10.53?
a. ❑ Yes ® No If yes, describe which limited project applies to this project:
b. Limited Project
wpaform3.doc•rev.4/12/06 Page 4 of 7
L11Massachusetts Department of Environmental Protection Provided by DEP:
Bureau of Resource Protection - Wetlands 'DEP File Number
WPA Form 3 — Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Salem
City/Town
C. Bordering Vegetated Wetland Delineation Methodology
Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary:
Online Users: 1. ❑ Final Order of Resource Area Delineation issued by Conservation Commission or DEP
Include your (attached)
document
transaction 2. ❑ DEP BVW Field Data Form (attached)
number
(provided on 3. ❑ Final Determination of Applicability issued by Conservation Commission or DEP (attached)
your receipt
page)with all 4. ❑ Other Methods for Determining the BVW Boundary(attach documentation):
supplementary
information you a. ® 50%or more wetland indicator plants
submit to the
Department. b. ❑ Saturated/inundated conditions exist
c. ® Groundwater indicators
d. ® Direct observation
For all projects
affecting other e. ® Hydric soil indicators
Resource
Areas, please f. ❑ Credible evidence of conditions prior to disturbance
attach a
narrative 5. Other resource areas delineated:
explaining how D. Other Applicable Standards and Requirements
the resource pp q
area was
delineated. 1. Is any portion of the proposed project located in estimated habitat as indicated on the most recent
Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and
Endangered Species Program?
a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
October 1, 2006 Route 135, North Drive
b. Date of Map Westborough, MA 01581
2. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a. ❑ Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to:
Division of Marine Fisheries -Southeast Marine Fisheries Station
50A Portside Drive
Pocasset, MA 02559
b. ® Not applicable—project is in inland resource area only
3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a. ❑ Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP
Website for ACEC locations). Note: electronic filers click on Website.
b.ACEC
wpaform3.doc•rev.4/12/06 Page 5 of 7
Massachusetts Department of Environmental Protection Providad.by DEP;, _
Bureau of Resource Protection -Wetlands_ DEP File Number
WPA Form 3 - Notice of IntentLl
Doeument Traosactiori Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
D. Other Applicable Standards and Requirements
Online Users: 4. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Include your Restriction Act(M.G.L. c. 131, §40A) or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)?
document
transaction a. ❑ Yes ® No
number
(provided on
your receipt 5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the
page) with all wetlands regulations, 310 CMR 10.00.
supplementary
information you a. ❑ Yes ® No If yes, describe which exemption applies to this project:
submit to the
Department.
b. Exemption
6. Is this project subject to the DEP Stormwater Policy? a. ❑ Yes ® No
If yes, stormwater management measures are required. Applicants should complete the Stormwater
Management Form and submit it with this form.
b. If no, explain why the project is exempt:
Work in connection with single family dwelling.
E. Additional Information
Applicants must include the following with this Notice of Intent(NOI). See instructions for details.
Online Users: Attach the document transaction number(provided on your receipt page) for any of
the following information you submit to the Department.
�. ❑ USGS or other map of the area (along with a narrative description, if necessary)containing
sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. ❑ Plans identifying the location of proposed activities (including activities proposed to serve as
a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative
to the boundaries of each affected resource area.
3. ❑ Other material identifying and explaining the determination of resource area boundaries
shown on plans(e.g., a DEP BVW Field Data Form).
4. ❑ List the titles and dates for all plans and other materials submitted with this NOI.
5. ❑ If there is more than one property owner, please attach a list of these property owners not
listed on this form.
6. ❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
6. ❑ Attach NOI Wetland Fee Transmittal Form
s. ❑ Attach Stormwater Management Form, if needed.
wpaform3.doc•rev.4/12/06 Page 6 of 7
Massachusetts Department of Environmental Protection Provided by DEP:
Bureau of Resource Protection - Wetlands beP File Number '
WPA Form 3 — Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 r Doeume tTransaction Number
Salem
City/Town
F. Fees
The fees for work proposed under each Notice of Intent must be calculated and submitted to the
Conservation Commission and the Department(see Instructions and NOI Wetland Fee Transmittal
Form).
No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth,
federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts
Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland
Fee Transmittal Form) to confirm fee payment:
1.Municipal Check Number 2.Check date
3.State Check Number 4.Check date
5.Payor name on check: First Name 6. Payor name on check: Last Name
G. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying
plans, documents, and supporting data are true and complete to the best of my knowledge. I understand
that the Conservation Commission will place notification of this Notice in a local newspaper at the
expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the
requirements of M.G.L. c. 131, §40. Notice must be made in writing by hand delivery or certified mail
(return receipt requested)to all abutters within 100 feet of the property line of the project location.
Signature of Applicant Date
Signature of Property Owner(if different) Date
Signature of Representative(if any) Date
For Conservation Commission:
Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents; two copies
of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and the city/town fee payment must be sent to the
Conservation Commission by certified mail or hand delivery.
For DEP:
One copy of the completed Notice of Intent(Form 3), including supporting plans and documents; one copy of
pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and a copy of the state fee payment must be sent to
the DEP Regional Office(see Instructions) by certified mail or hand delivery. (E-filers may submit these
electronically.)
Other:
If the applicant has checked the"yes"box in any part of Section D, Item 3, above, refer to that section and the
Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely
manner may result in dismissal of the Notice of Intent.
wpaform3.doc•rev.4112106 Page 7 of 7
L jMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important: A. Applicant Information
When filling out
forms on the 1. Applicant:
computer, use
only the tab Costa Sideridis
key to move a.First Name b. Last Name c.Company
your cursor- 2 Autumn View
do not use the d.Mailing Address
return key. Salem MA 01970
e.City/Town f.State g.Zip Code
617-510-9335
h. Phone Number
a 2. Property Owner(if different):
Same
a.First Name b. Last Name c.Company
d.Mailing Address
e.City/Town f.State g.Zip Code
h.Phone Number
3. Project Location:
12 Buena Vista Ave. West Salem
a.Street Address b.City/Town
To calculate B. Fees
filing fees, refer
to the category Notice of Intent(Form 3) or Abbreviated Notice of Intent(Form 4):
fee list and
examples in the The fee should be calculated usingthe followingsix-step process and worksheet. Please see
filling out WPA
instructions for Instructions before fillingout worksheet. p
Form 3(Notice of
Intent). Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and
bufferzone.
Step 2/Number of Activities: Identify the number of each type of activity.
Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the
instructions.
Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2)times the fee per
category (identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a
Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be
multiplied by 1.5 and then added to the subtotal amount.
Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract
$12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50.
Wpaform3Aoc•N01 Wetland Fee Transmittal Form•rev.311105 Page 1 of 2
Massachusetts Department of Environmental Protection
LlBureau of Resource Protection -Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Fees (continued)
Step Irrype of Activity Step 2/Number Step Step 4/Subtotal Activity
of Activities 3/individual Fee
Activity Fee
2a 1 $500.00 $500.00
Step S/Total Project Fee: $500.00
Step 61Fee Payments:
Total Project Fee: $500.00
a.Total fee from Step 5
State share of filing fee: $237.50
b. 112 total fee less$12.50
City/Town share of filling fee: $262.50
c. 1/2 total fee plus$12.50
C. Submittal Requirements
a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee,
payable to the Commonwealth of Massachusetts.
Department of Environmental Protection
Box 4062
Boston, MA 02211
b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent;
a copy of this form; and the city/town fee payment.
c.) To DEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated
Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of
Intent may submit these electronically.)
Wpaform3.doc•NOI Wetland Fee Transmittal Fan•rev.3/1105 \ Page 2 of 2
r � '6x' ,✓b` >t,a4 .jy.rk„rr°<'�_y _aT f'Y�" ,�q ..S�.irt1B79(-Ay "z tC:;r` t ".i�7�2 gx"2ir3.-&�.gi. y3.5�,4Ja `z k�3x"3 ¢^�`? .M' yY`+r > T\ ,a3
gig •"j"3 ✓ l3" x� "n£,.-.--^, `�'� a`„J T ✓ i hb�� d�v"Y✓ 'Sx 1aj ..0 .-yam ,y�kl lh .F,ss,,�� �+£i i p
f• _..v,''s"-.+i � c �3" �`� -���"� ti wv? �f5 4t�. . t�^cna�� xCv u3�yt3b,.�' s�N �yjf�R�.6�f��" ?�'"Y' 3 '?,}?�e y`w K=Bx'�€("rf'v'�r;!
(� ,.. �r _ (CA 2 t' 'C':C`'o' e.:A v,a xrR°d5 t % =si C` irsa rT"-�£..- vq .r-a'n 3e '°c" 5
'2':": Y #r,tyi Ya'x -'aa gu=k1ro, xh a..;..,.^, S . 'y.'Et K is r�,rr"aa'y,',' .s "� `S?� , '°3R 'y°" .yti*r�'r.?'=`„ " "i'Fra..� J�{✓~ �f/T. '.
E � P , ' a'iy. € ,ri � �. � ���"b � i 3= z�.aY ,�`Y
'O Mi<s �r r y..rs!•, l3"�a<iy is. `' fl �9'.. i •"^3'&:.4.�'� ra $ b
_ e,,,.i <. a',3bm- rs ,gym , c c e 4 .fia ? f ✓✓ i
✓Fi->, :. ? , fa>:°
'sv>b-f
'
.ti' ke R �u�. ,f•,- -i3 y "riV ar' >'s_d.1 .a.,
1
�.�.�.! ,,�'"rr_r^-,,=
e�A,C.d`3" Yv+ Yy".x;•,�q�. Pa,��P J G�., 7 s � ��vA '�+-•X}"'e�,.C,.b .�y 1 s ¢a.,-;e �, r+"iet ,<'ett�",� X, n t+. �.-$- '�
mod, a°•".,� f J��S. .a..v't'�'` _ t +� �a �+.Y !i rs� . t�a8 '"a�i 'F8�'-Z�-' '�'<'.3�F�" "� >�, .,�$^ri - t •4a`'ff t�;,�ke�"<.' �:,�,.e� �°ate `{=4�> .€"� P� „ C�
tio
� ���'� ' �i '-,/>�1 5 � �sP•�°.rs''Pg' Fad ��,�r� v �7� -. .h 5' t.4°°' A'` at-s�x�= .• i � a -
dt� .zt o-, l,_-"_ `�• Ik c ," -Yer g . ea q ,us« r'3 a� cs1.i .,� -r'1`,+�,d ,Ci ;L ua":'s ,,�" &'£` �1
$a , ..�t�F,r
-s' ,s `F� = a
,,''ae' .i "'�s'`+. i ;'%-' •'.�E
<ss ,.z'.F` e°'J.'�. A. y`r{r'. rryf��,,4-' j6-t•-pe'`�t"cu'i'•„r�de s'�P ��... a`f.�S a 4a- i- s. R .� =5� � =w war"="'a ,.. � �:u tr t-.3 =Q.,�:
K v.,,#LLf '�' r` va it $r 4✓€°t,]� ! r ' ar5 .i iJ ' 4 ,F.w.„r e, <°'* s.^ z_.`s"" ' ei s� g
ra'+ :V "'sat`t`.e°r.
k 'y` i✓ yks= T 7/�.' `�9,_'" it fib `-�' a`": �?� 9T� �$�i'yd•{� .n r " 5�-; �.^��' .r«. �' � r�
SPA "Mk
s � .�•r ON, ��
IRON,w'y »a- °
�._a `k.�� "°'�t�. i� 4
.r L�'f9K
� �S :� "'fir•" '� ��� �.� ' a\ 4.,1� ixv a,v,.-fs.n.a-���r��J J T` 'a'"v`�`-fir,-�h�{v w �i� '
"°^"T '`w'li �.,1 v .s m!^ "'•. - .� � 4._x., .�a* .s qa•, v`j t ���Agm
fia •� : '1'M� � ��$' s-a3 r$q, Ws' r acR�^ � 4'-. `9 �
,a .w -4MYY YFx it i . ayk y-w,' .F v R
'�,iG^`mi.J tt} 1`l W.� �. 1'#t, �J .J Pew`. "D, 4 .`�A{'
v. Tt j/ .9a ` '�-P �? rt A s ia.., r$ nm'y�' a" A da�+r �g^E�hgg,
,s~'���- � 3�- ,a r'y r. ! �(!;� ✓9. 't; a.+4r �i r4" x '�' 9 '-*ia 5` .f?, y � ,rr `x4 50, �cwY Cr/
(` y/�yro.ym`* /. `.� L ;...s' - a7r +, � °} 'm a P `! � �, ,r<J�" FF+ '#3€ ^' hvi •+s.3 a'
.i.. °�•rc.-,' i ,�¢}1�yyj f� "4 l t',''.•bq=, gg; wM-"-/y7'"4% 'a„` ea.` d ]a.s-, t -' rks 7�r�'t, �,s r . .:�jn,4 a J
3-WRuj'/, e "° ", q`'L- '� a4t3 ti�tr`
.a . > [,. ..la..^, r
a r 91+'r 7 f.+• - 'fn as
s 1r igR d t y .y�, R ,� 1 ,• � /3£i •s4 � . 4¢. ^:=%.w
,.y� s 'y�i �1.:. �]>t„ri �Yvp'firy,z
�•4 F.c�^�Sy 8=3,'.�j,t i rP ��b G:Ir � t:s: x . .2' ri;��_ '�-'iu 't'�.raa=` �' aa a"'�':.��� �'� -0 'A i7na,iSe �k 4
,r
�'
��-++ �"4�i,,; 'a�w -` - R � 4 'r tB \ d�e,P �S v,?, t,•. �"'tr,.
A� " �`e.'.�,s��d...� c}� « "gP /-.' ..3' .:�. � �, b✓� �`�a1-'+'fli 1 v � x �1 p o 4 '!"<�+�"E„y£
e�'�A"°,s.nflg4 b�Rs'' ....� F,a•..,.+ t �t ? .a. �� J`5
ham„ tL• �..:r3s �"a �, 7y - � ;pr�-elr� a 5r 3 "gym ...'t. 'hs°•. a41'd". �/k'd rS�^ ` 7.E
'.:m.
r
'tom�"f i4 . '^- � �'S~Y,l�.... I , r.:� � '`�td'.`t✓s— Sa-.•
It
k'.
�x�� . _•r'`"�g�' a �>�rs � '_,.� �' �,%' ' / �wm
�;yss. .G } { i+��,y s" aF,�l• .�j �'x 'Fri Jn r� r.+9: „ jay r1""°.,`'g'7"*„w "•t p1.y( �5�'n ''^ :y9�q �+'"$ ' S 44pF'
MIN
)r (�je1`•;,.`6. .`fir ��. d �„`.�'i�� 1��a •F±'� .: 5 V'. '�P\� �7 $'�?'��!•'il
Y i 111
�
_e;..s"�f r m YaT t 1� 1, �t:' i' � ,h¢ p• f � rl �r l`��77� a �.�• �.:,��z `t!'�M3eI�11L �.,�
4rc" ^1 +f �3' `,i y t• "7°
.fie• ���w��` �,+>",,a-�v�,%�7 �R61n+. �^" � 4'� �
IN
�. a �FkSak'ii;�at?l�e,�•F�°W� J� r � s , �„ . � ra �` -
a 4" „�^w.t�r°''a F✓ u ` P3/j 'i - $ `,''d c xi / y�R )YG lflr/.T''�`ai r fJ' "' 'at.i
Rr- *.�''t'^„�i
� J
,C.�y„ , is �e ,, 3 K? x 4�1�/1 `♦'` \ �' iC i^'�s^,''"- .ei � -,�: 7: iv�4,i�� "1
VAT,
E� a •FJ 4gg�� ..r-�F�.,1 �z of r'{ } .� k;. �y,,r m..:+ �f� ry . :L lss'rF+q
M-1
, pljy������ i
"'az,ciYa:/',*fc� e �'^F► F £, "' � ,4t�",� �.y� �S•P„��• �IP �r�a� '�. `•[: 5'�s�4 "�E..k
t ,, a E sy d d r.. � ..�1 ta_ ► dR+ F �f '�..P- `f.... � r.,v .s �`��+c lnr.x,�:c mow.ti e �,�q
� � S.c�r Pe L1 � �� it='...c,.,�' P,�z ,+ C� ,�i �i"�./�� ^t F �'a+, �',� dT'^ r :� , C ,h,�. "�-��•kY£ �' €'h 1,_�,?
1�0&Aa4oaa 2M&
Professional Land Surveyors &Civil Engineers
ESSEX SURVEY SERVICE 1958- 1986
OSBORN PALMER 1911 - 1970
BRADFORD&WEED 1885- 1972
RECEIVED
November 30, 2009 DEC 0 ? 20U9
Ms. Carey R. Duques OFPT N GI ;qPc VG&
Salem Conservation Commission GOj& UrIiTY 004ELOPME"NT
Salem City Hall
120 Washington Street
Salem, MA 01970
RE: F 12526
DEP 064-448
BUENA VISTA AVE
LOT 1
SALEM, MA
Dear Ms. Deques:
Pursuant to Mr. Sideridis request, I have reviewed my file and the As-Built Plan prepared
November 12, 2007.
The slope has been completed in substantial compliance with the Site Development
Permit Plan.
Sincerel
Christopher R. Mello, P.L.S.
President
CRM:lc
cc: Mr. Sideridis
104 LOWELL STREET
PEABODY, MASS. 01960