30 BROAD ST - BPA-12-456 REMOVE SHED DORMER 7 I'he C'onuno"wealth of Massachusetts
i� Board of luiding Regulations and Standards C[TY OF
'r ,i, Massachusetts State Building Code, 730 CN1R SALEkf
Building Permit Application To Construct. Repair, Renovate Or Demolish u
(Are-or Two4lvnih Duelling
This Section For Official Use O
Building Permit Number: Date Applied: ( 7 I
one)1, l
ttwldmg Olticial(Print Mane) Siynat Dute
SECTION I:SITE INFORMATION
1.1,PProperty-Address-. 1.2 Assessors Itlap 8r Parcel Numbers
CC�� �jj )r.
I.la Is this an accepted street?yes_ no Map Number Parcel Number
1.3 Zoning Information: 1.4 Property Dimensions:
Zoning District Proposed Use Lot Area(sq R) Frontage(Il)
1.5 Building Setbacks(R)
Front Yard Side Yards Rear Yard
Required Provided Required Provided Required Provided
1.6 Water Supply:(M.G.I.c. 40,§54) 1.7 Flood Zone Information: 1.9 Sewage Disposal System:
Public Private❑ Zone: _ Outside Flood Zone? (/
Check if c Municipal In site disposal system ❑
SECTION2: PROPERTY OWNERSHIP'
2.1 Qwger�gf Record; go
S
N;une(Pnnl) City. tate.LIP ( -
:�q 6 m s v� e.� C/7� 7Ce7�y1S w vv r oss 9`j
No. and Street (/at do.cow
Telephone Email Addre s
SECTION 3: DESCRIPTION OF PROPOSED WORK'(check all that apply)
New Construction❑ Existing Building❑ Owner•Occupied ❑ Repairs(s) ❑ Alteration(s) Mt Addition Cl
Demolition ❑ accessory Bldg.Cl Number of Units_ Other ❑ Specify:
Brief Description ofProposed %Vgr: 2vn-tOv2 ,e t 3r, (p r- 5
0. vt�el GC r.l'-k cNVvlp��
SECTION 4; ESTIMATED CONSTRUCTION COSTS
Item Estimated Costs:
(Labor and .Materials) Official Use Only
I. Building S f 4i 000 1. Building Permit Fee: S Indicate how fee is determined:
I 2. Electrical S 2000 ❑Standard City Town Application Fee
❑Total Project Cost'(Item 6)s multiplier _ _ .r
i. Plumbing S —
2 U U p '_. Other Fees: S
a. Mechanical tI ICA('I S 2 rC)0 0 List:_
I ;, llcchanical IFirc __ ----_..------ --
Su>>rtssionl S Total :\II Fees: S -- - --------- -'
o. Total Project Cost: S Z,6 0w Check No. ----('heck Amount: _ __-- Cash :\mount:
i ❑Paid in Full 0 Outstanding Balance Due:
SECTION 5: CONSTRUCTION SERVICES
5.1 Construction Supervisor License(C'SL)
Nantc of CSI. IInIJcr
License Number ---- � - Pspiration Date
List('St.l)pc(.,cc below)
PC Description
No. and Street
U l inresuicted I Ihlildin�s to nt 35,000 cu. Il.l
R Restricted I&I Famil l M%ellin
Mason
RC Rtwtin,Cuverin
A Window;md Siding
SF Solid Fuel Burning Appliances
I Insulation
. "fete hone Email)dares D Demolition
5.2 Registered Home Improvement Contractor(HIC)
I IIC Registration Number Expiration Date
I IIC C'ompan) Name or I IIC Registrunt Name
No. ;md Street Email address
City/Town. State,ZIP rele hone
SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L,c. 152.1 25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide
this affidavit will result in the denial of the Issuance of the building permit.
Signed Affidavit Attached? Yes .......... 13 No........... ❑
SECTION 79: OWNER AUTHORIZATION TO BE COMPLETED WHEN
OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
I, as Owner of the subject property, hereby authorize
to Jact on my behalf,in all matters relative to work authorized by this building permit application.
Print Owner's Nwne(Electronic Signature) Date
SECTION 7b:OWNER' OR AUTHORIZED AGENT DECLARATION
By entering my name below, I hereby attest under the pains and penalties of perjury that all of the information
contained in this application is true and accurate to the best of my knowledge and understanding.
Print Oencr's ur Authorised Agent's Name 11[Iceuuoic Signature) Date
NOTES:
1. .\n Owner who ublains a building permit to do his.her own work,or an owner who hires an unregistered contractor
(nut registered in the Hume Improvement Contractor(HIC) Program).will nu have access to the arbitration
program or guar;mty rued under NI.G.L.c. h 42A.Other important information on the HIC Program can be found at
watt 01,111.�; ,t ,y.i Information on the Construction Supervisor License can be found at y)tlt iue>:�A ,I(h
? \Then substantial work is planned, provide the information below:
Total floor area uq. ft.) _ (including garage. Iinished basement attics,decks or porch)
Gross lining area I sq. It.) __ , Habitable rount count
Numberoffireplaces_ --. _ ..._ Numberul'bedrooms
it
Number ofbathrooms - _ Number u(half,hadu
I\lie of heating s)stem .. ._ . _- -- Numbcr of decks, porches .. _
1\Ile of cooling Sy ileln - I�ncloxd (Open
1. "I*ohtl Project Square Footage-maN be substituted lilr ,I otal Project Cost"
�P+ a 1 'Sr�.� � " Vt s i'"is t+FT ( i ait • ,� '
41
13,
_ < 2
��y9 s [
4
tr
114
Ell
ze
t`•Y\ g � ¢F t ..
Framing Gable and Shed Dormers http://www.toolsofthetrade.net/industry-news.asp?sectionID=O&articl...
After the walls,ridge,and common rafters are set,I overlay the valley framing on top of the main roof
sheathing to save from cutting a true valley.The roofing material will need to be stripped back for this step.
SHED DORMERS
Framing a shed dormer is a simpler process than building a gable
dormer.The end wall of a shed dormer carries the load rather than the a +° -
sidewalls.There is generally no load-bearing issue when the end wall is s
framed directly over the exterior wall of the first floor.But if the dormer
wall is positioned in from the exterior wall,the floor joists bearing the f^'
load must be adequate to carry the weight.The joists may need to be I I s
doubled-up to provide the support or engineered beams such as LVLsmay need to be inserted to carry header loads transferred to the floor
system. . ,
fTolo:Rick Scheolsky
I start by determining where Shod dormers are easier to build and are
sm rnm ae `;'
A i-kw...rau the top of the dormer
less costry than gable dormers.
rafters will intersect with the
! main roof.They can either meet the main ridge or intersect with
osllnta'n " the existing roof below the ridge.When the intersection is below
the ridge,a header needs to be inserted to support the dormer
"rafters. I double or triple the common roof rafters on either side
r of the dormer opening and insert a header between them at the
,.` intersection point.The header must be sired to carry the tail
`F joists that fill between the header and the ridge and carry the
t .r dormer rafters.
r�uo.uk.rtwr
r?J Then I determine the height for the end wall that provides a
rafter slope of at least 4 in 12 and allows for adequate
headroom in the dormer.To minimize open time that the roof is
r
exposed to the elements during the framing process, Ipre-out
r the dormer rafters and header(if needed)and frame up the end
{kusheows:Chuck kockhert wall.Once the ebsling roof is cut out,I can raise the wall,set
the rafters,and sheathe the tlormer in a matter of hours ready
to dry-in with sheathng and paper.
The sidewalls of a shed dormer don't carry any load,so they I
can either rest on the floor or the roof rafters with no additional r-nu.,aaa.
framing.Rather than pre-cutting studs beforehand,I frame s,
sidewalls after the new dormer rafters are set. kM.Mme.,PR _
No matter whether I'm framing a gable or a shed dormer,I like .t
to do as much planning and pre-cutting before opening up the "
roof.The shorter the time the roof is open before the new roof 'f+
is tied into the old,the less time I haw to spend keeping the
house weather-tight.In=at cases,I cut a root open ant
frame up to a 12-foot-wide gable dormer or a 20-foot-wide
shed dormer to the point of being dried-in,in less than two tlays t
with just one other worker,and very often in just one day,
-Mike Guertin is a home builder and remodeler in East ""
Greenwich,R.l.,and is a member of the JLC Livel and The rwa:..aw.1 Y
Remodeling Show construction demonstration teams.
Iluwo.n.'.Chuck Lockhart
Guidelines for posting on TOOLS OF THE TRADE
Post your comment below.
Please read our Con nt Gnidctiues before posting:
Learn more about our commenting policy by clicldng here
Like In and 2 others liked this.
SHOWING 3 COMMENTS
San bby,Pop.liu.w j I` Subscnbe by email ® Subscribe by R$S
l J&S construction 4 months ago
build up the back of it so that the new addition drains water properly
/► t_Ike lReply y;
I! Jasongemma 4 months ago
You win add donners to any pitch mof
(Like" Reply
2 of 11/7/2011 8:50 AM
L
yc „
9@�r4fINBW
Salem Historical Commission
120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970
(978)619-5685 FAX (978)740-0404
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
Construction ❑ Moving ❑ Reconstruction
Alteration ❑ Demolition ❑ Painting
❑ Signage ❑ Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set
forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property- 30 Broad Street
Name of Record Owner: William M. Ross, Abigail B. Ross
Description of Work Proposed:
Re-point deteriorated chimney mortar joints, conditional that the mason match the sand in the mortar mix to the
existing sand Installation of chimney capper photograph submitted 47 x 52 x 10, painted powder black.
Installation of white ogee profile aluminum gutters on front and rear of house and option for either rectangular
or fluted downspouts to run along the corner boards. Existing gate on right side of house to be moved forward
with option to either reduce it in height to match the lower height of the fence... or...to raise a section of the
lower fence to meet the higher,fence and moving the transition section. Install Mitsubishi air conditioning
system with one compressor mounted on ground behind relocated gate and one mounted on the left side of
house behind the existing bulkhead concealed with evergreen or conifer shrubbery. Mechanical wiring/tubing
that runs from the compressor up each end of the building to the rooms to be painted the color of the surface
they are on. Demolish and reconstruct existing dormer in rear and install new shed dormer per photos
provided with wood siding, clapboards, trim and paint to match the existing house.
PVindow portion of application continued to the meeting of November 16, 2011.
Dated: _November 7, 2011 ?1atesto
ITC�MISSJON
The homeowner has the option not to commence the work (unless itving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.