30 BRITTANIA CIRCLE - BUILDING JACKET 30 Brittania Circle ,
i
0019
JOB SITE COPY
BUILDING
v � CITY OF SALEM
PERMIT
�l'. . �g SALEM, MASSACHUSETTS 01970
DATE JULY 25 i9 96 PERMIT NO. 416-1996
APPLICANT FAFARD DEVELOPMENT CORP ADDRESS 290 ELIOT ST 1562
(NO.) (STREET) (CONTR'S LICENSE)
CITY ASHLAND STATEMA ZIPCODE TEL.NO. 508-740-0122
NEW BUILDING TWO OR MORE FAMILY NUMBEROF 4
PERMIT TO - (_) STORY- - DWELLING UNITS - - -
(TYPE OFIMPROVEMENT)�NO._ (PROPOSED USE)
AT(LOCATION) 0055_SWAMPSCOTT-ROAD) DISTRICT
(NO.) (STREET)
BETWEEN AND
-
(GROSS STREET) (CROSS STREET)
MAP 07 1043 LOT 36. 54 ACRES
SUBDIVISION LOT BLOCK SIZE
BUILDING IS 70 BE FT.WIDE BY FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION
TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION
(TYPE)
REMARKS: BUILD 4 UNIT CONDOMINIUM AS FUER PLANS @3�.,APT--BetWT-Y--CIR (BLDG #150) . L
Unit #3 of 4 units. Call for Permit to Occupy go all+f6 VL;6L c, r.
AREA OR �• 333 000 PERMIT 2603. 00
VOLUME ESTIMATED COS7.p + FEE
(CUBIpSOUARE FEET)
OWNER FAFARD R. E. R DEV CORP
c90 ELI0T ST BUILDING DEPT.
ADDRESS BY L. E. T
THIS PERMIT CONVEYS NO RIGHT TOOCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS
ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL
AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE
APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE
REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR
1.FOUNDATIONS OR FOOTINGS. ELECTRICAL,PLUMBING AND
2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS.
MEMBERS(READY TO LATH). I NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE.
3.FINAL INSPECTION BEFORE OCCUPANCY.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTION APPROVALS PLUMBING WIRECTION APPROVALS// ELECTRICAL INSPECTION APPROVALS
-L7-0
2 ! 62,
BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSP TING APPROVALS/ i
B
OTHER CITY ENGINEER 2 2
CERTifi AT Of OCCUPANC
Issued:ERT( i bPermit
City of Salem Building Dept. -�
WORK SHALL NOT PROCEEO UNTIL THE [PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD
INSPECTOR HAS APPROVED THE VARIOUS OT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BV TELEPHONE
STAGES OF CONSTRUCTION. S NOTED ABOVE. OR WRITTEN NOTIFICATION.