26 BRITTANIA CIRCLE - BUILDING JACKET 26 Brittania Cir.
i
\�
' 1
0
...
I
oc JOB SITE COPY
CITY OF SALEM BUILDING
a SALEM, MASSACHUSETTS 01970
PERMIT
'�tanNe,
DATE JULY 25 19 96 PERMIT NO. 416-1996
APPLICANT FAFARD DEVELOPMENT CORP ADDRESS '_90 ELIOT ST 1562
(NO.) (STREET) (CONTRS LICENSE)
CITY ASHLAND - STATE MA ZIPCODE TEL.NO. 508-740-0122
PERMIT TO
NEW BUILDING TWO OR MORE FAMILY NUMBEROF 4
(_)
(TYPE OF IMPROVEMENT) NO. STORY (PROPOSED USE) DWELLING UNITS
NG
AT(LOCATION) 012155 SWAMPSCOTT ROAD [ G .� e.Q3. ZONIIDISTRICT-
(NO.)
CT(NO.) (STREET) - —
BETWEEN AND
(CROSS STREET) (CROSS STREET)
SUBDIVISION MAF, 07 LOT 0L— BLOCK s¢e 36. 54 ACRES
BUILDING 1S TO BE FT.WIDE BY FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION
TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION
��(/J Bf n^;a (TYPE)
REMARKS: BUILD 4 UNIT CONDOMINIUM AS PER PLANS Ij '"�APT BOUNTY CIR (BLDG #150) .
unit4 of=4 Vnits.f Call for Permit to Occupy
AREA OR 333 000 PERMIT
VOLUME ESTIMATED COST FEE 2603. 00
(CUBIC/SQUARE FEET)
OWNER FAFARD R. E. & DEV CORP BUILDING DEPT.
ADDRESS 290 ELIOT ST BY L. E. T
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS
► ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL
AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE-DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE
APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM OFTHREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHEREAPPLICABL'E SEPARATE
REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR
1.FOUNDATIONS OR FOOTINGS. ELECTRICAL,PLUMBING AND
2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS.
MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE.
3.FINAL INSPECTION BEFORE OCCUPANCY.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS
1 / 2U0ti /q/,7 3)
BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSP G APPROVALS
CERTIFICATE OF OCCUPANCX
Issued: i d Permit N: X1 L
Cit of Salem BuildingDP t.
OTHER CITY ENGINEER
WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD
INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE
STAGES OF CONSTRUCTION. AS NOTED ABOVE. OR WRITTEN NOTIFICATION.