40 BOW ST - BPA-15-903 f
1 RECEIVED
The Commonwealth of Massachusetts S R VICES
Board of Building Regulations Viand Standards CrrY OF
SALEM
Massachusetts State Building Code,780 CMR 12015 AUG !¢e k(1
Building Permit Application To Construct,Repair,Renovate Or lish a
1 \ One-or YW-Family Dwelling rm
This Section For Official Use Only
Building Permit Number: I D Applied:
n
l-1 ' Building Official(Pont Name) Signatum Date
1 SECTION 1:SITE INFORMATION
1.1 Property Address: - 1.2 Assessors Map&Pat cel Numbers
40 Bow Street
].la 1a this an accepted atreet7 yes_ no Map Nmb- Panel Number
13 Zoning Information: 1.4 Property Dimensions:
residence t
Zoning District Proposed Use Lot Area(sq ft). Frontage(it)
1.5 Building Setbacks(ft)
Froat Yard Sid.Yards I hear Yard
Required Provided Required l Provided Provided
1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 S wage Disposal.System:
Public❑ Private❑ Zone: outside Outside Flood Zone?Check if. es❑ Muni ipal❑ On site disposal system ❑
SECTION 2: PROPERTY OWNERSHIPt
2.1 Owner'of Record: I
Graeme Marcoux Salem MA 01970
Name(Print) City,State,ZIP
40 Bow Street 508 7826-2638
No.and Street Telephone Bmeil Address
SECTION 3:DESCRIPTION OF PROPOSED WORK=(chec4 all that apply)
New Construction❑ Existing Building p Owner-Occupied ❑ Repairs(s) ❑ 11 Alteration(s) ❑ Addition ❑ .
Demolition ❑ Accessory Bldg.❑ Number of Units) Other ® �pecify: solar
Brief Description of Proposed Word; -1
Installation of a 5.32 kw(19 panels) rooftop solar array
i
SECTION 4:ESTIMATED CONSTRUCTION CO 3TS -
item Estimated Costs: ! Official Use Only
bor and Materials I
1.Building $ 7,000 1. Building PermitPee:$ Indicate how fee is determined:
❑Standard City/rows AppBca'on Fee
2.Electricals $ 17,799 ❑Total Pmjeet Cost'(Item 6)x�multiplier x. .
3.Phanbing $ 2. Other Fees: $ L/ h
4.Mechanical (HVAC) $ Liat:. ( I �
5.Mechanical (Fire Suppression) $ - Total All Fees:$ .
-
Check No. Check Amoufit: Cash Amount:
6.Total Project Cost: $ 24,966 ❑Paid in Full ❑Outatwding Balance Due: .
ilk ;
i
I
SECTION 5: CONSTRUCTION SERVICES
5.1 Construction Supervisor License(CSL) 096385 10/8/2016
Romain Strecker License Number I Expiration Date
Name of CSL Holder ee IIb`_ U
List CSL Type(s low)
55 Sixth Road - Type
Description
No.and Street
U !L iricted to 35.000 cu.fl.)
Woburn MA 01801 R Restr l&2 Family Dwelling
City/rown,State,ZlP M Maso
RC RoofiOg Covering
WS window and S'
SF Solid duel Bunning Appliances
781-462-8702 Permits@bostonsolarus I tins
Telephone - Email address D Demdlition
52 Registered Home Improvement Contractor(HIC) 169698 7/27/2017
Boston Solar TUC Re ' [ration Number Expiration Date
HIC5S Name"INCRegistrum Name
55Sixtiri Road emits@bostonsolar.us
xo�o�u'rn MA 01801 781-462-8702 Email address
Ci W/I'owu State ZIP Tel hone
SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVTF'(M.G.L a 152.§25C(6));
Workers Compensation Insurance affidavit must be completed and submitted with 's application. Failure to provide
this affidavit will result in the denial of the Issuance of the building permit.
Signed Affidavit Attached? Yes..........® No...........O
.SECTION 7a:OWNER AUTHORIZATION TO BE COMP ETED WHEN
OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUiING PERMIT
I,as Owner of the subject property,hereby authorize Romain Strecker
to act on my beba.14 in all matters relative to work authorized by this building permit;application.
Graeme Marcoux 8/24/2015
Print Owner's Name(Electronic Signature) Date
SECTION 7b:OWNER[OR AUTHORIZED AGENT DECLARATION
By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information
contained in this application is true and accurate to the best of my knowledge and or derstanding.
Romain Strecker 8/24/2015
Print Owner's or Authorized Agent's Name(Electronic Signature) Date
NOTES:
1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor
(not registered in the Home Improvement Contractor(16C)Program),will lipt have access to the arbitration
program or guaranty fund under M.G.L.c.142A.Other important information n the HIC Program can be found at
www.mass.¢ov/oca Information on the Construction Supervisor License can be found at www.mass.aov/dos
2. When substantial work is planned,provide the information below:
Total floor area(sq.R) _ (including garage,finished basement(attics,decks or porch)
Gross living area(sq.ft.) Habitable room tint
Number of fueplaces Number of brim
Number of bathrooms NumberofliallYwhs
Type of heating system Number of dec porches
Type of cooling system Enclosed Open
3. Total Project Square Footage"may be substituted for"Total Project Cost"
i
JIAMES A. C LANCY
PROFESSIONAL ENGINEER
601 ASBURY AVENUE
NATIONAL PARK, NJ 08063
(856) 358-1125 FAX: (856) 358-1511
Date: April 30, 2015
Re: Structural Roof Certification
Subj: Graeme Marcoux Residence,40 Bow Street,Salem MA 01970
We have provided a review of the house roof construction of the above named property in regards to
verifying the capacity of the existing roof for installation of a new Solar Panel Array.
We have found the residence roof to be of wood frame construction bearing walls with Roof 1 is
framed of 2x6 @ 28" o.c. rafters with lx6 collar ties @ 28"o.c. and is sheathed with 3/4" ext-ply
decking and a single layer of composite shingle roofing.
The wood framed roof structure bears directly upon the framed exterior wall system. The existing
rafters as installed meet the required (MA 780 CMR) IRC-2009 table 802 design span ratings with
sufficient capacity to carry the 2.89#/sf additional load imposed by the proposed solar array per the
details below.
Installation of solar rack systems shall be as follows:
Each panel row shall be supported upon 2 mounting rails. Rails shall be screw anchored
through roof and directly to rafters or purlins below. Rail attachment points to rafters shall be
staggered each row with exception to the first fastener row from the gable end which is
attached to two adjacent rafters/trusses with Stainless Steel fasteners.
Rail attachment to roof shall be fastened 16-32"o.c. at corners and 48" o.c. through the field.
Rails are to be placed at 24-48"o.c. on the roof.
When installed per the above specifications the system shall meet the required 100 MPH wind load and
40 PSF ground snow load requirements.
Should you have any further question or comment please feel free to contact our office.
Respectfully,
SNOF4We_
"9'Cy
AMES A.
CLANCY
u o.46775 m
James A. Clancy Fp�ST
Professional Engineer ONALE��R�
MA License#46775
BOSTON SOLAR
•`,1'-- q r- � nnnwaronmeaue I k�6aa�u+snacua
55 6N RoeE
-. Fx WM.,MA OIWI
Pl .:(617)858-1615
North Haven ORke
Y J 9 3555H. .CT RE-Un#30
OW
PW.:(860)38475503
MA Ebc#ice10cwM 12659A
i h• ��� ® " APPLICABLECODES:
' \ CMR 78051.0
IRC 2009
NEC 2014
J..A.
L1. M.A.P
Llwnse ES A.
The Marcoux Residence A� FQt
Grid-tied 5. 32 kW PV System °
ceAeal
Notes:
Project Data
Codes MA CMR 780 51.00
IRC-2009,ASCE 7-05
2005 Nos,NEC-2014
ElSolar Array CNENTINFORMATION:
Graeme Marcoux
Inverter (19)Enphase M-250 40 BOW Street
PV Panel:. (19)Hyundai HiSM280RG
Salem, MA 01970
Racking: Ironddge--Flush to Roof @ 44e 508-826-2638
System Rating: 5,320 Watts DC-STC Dre VNo. CooerPa,
Dare Au ust 21,2015
Dmv by ARC
Design Factors Checkeeby JAC
Gmund Snow Load 40 psf PV Equipment Main Service Panel REV# - or
Wind speed 100 mph PV- 1.0
Scab ASNo(ed
M cro Inverters
Ur der Modules
15 1d 6 5
Micro Inverters fs 13 7 d MARoAA.C1, �HUF
Under Modules emnw
SA.
17 12 8 3 N
Soled k
13
Roof 1 to 11 9 z Gin
Azimuth:Azimuth: 179'N Tiff.,44' 3 tOMAL�4
0
Shade: 18% 1s fo 1
23 Panels- 1.15
BOSTON SOLAR
PV AC Subpanel Utility Meter
Production Meter Utility Disconnect
Dr rp Nerve Site Plan
De(e Au ,W21,2015
CVENT/NF RMAMN. DMM by ARC
Graeme Marcoux D�mny SAC
40 Bow Street REV# o1
DrivewaySalem, MA 01970 PV- 2.0
508-826-2638 Sim
33B
259"
6' 6
I u II I i
1� II I•
I I� 11 II II II I. II
N1P 11
IP
;i
C P 1. PII
N
ii
N II II R Im.,mwxRloo
R9p
� IrMMpe AlunNlum L{XM
C_
EwFAM sXiipbe MLar Pm6b MbuN
Nit H HCMryofle$Mrgbf
�{ PIen4 RmlLFckpp
C {i iA "6'f 5'S.S.U,861
ry ii RAW
MOUNTING DETAIL
James A.CI HOF�
MAPmh
Lbense
94
SA.
N
4235J
Rao/s'Specs 9lC
- Array Specs Rafter Size: 2x6' Qr
DULES Rafter Specing:. 28'OC
Rafter Span: 10'fi'/4'4i'
Ridge beam: N/A
za CollarTie: ix6'@28'OC
Raoi Pifrh: 04° BOSTONL(OI Ap
Lo^°s Sheathing: 3/4"Plank IJWIo I I
R.mxr.lM.aws 1e Rao/MafenaC Com sdeShin les 0
w i "rIM4b wl pogNmberoiFborsr 2
M.0 p.fR !z1 .,n..msmnmler ua Wocf)Wsa'.
Army wepM z4.W Dm ng Name LayoW
k.,Am r4 I4A Date Au uM 21,2015
mmy N.eI. ,el u,%I CL,ENTINFORMATON: D..by 'ARC
;W1ofw�..nGraeme Marcoux Checkedby JAC
40 Bow Street REva o1 Salem, MA 01970 PV- 3.1
508-826-2638 scab 3116'=r
Module Electrical Specs Inverter Specs Design Conditions
(23)Hyundai HiS280RG Enphase M•250 Annual extreme high temperature:93.2°F(34°C)
Short Circuit Current(Isc):9.4A Rated Watts:25OW Average high temperature:73.4°F(23°C)
Open Circuit Voltage(Voc):38.5V AC Operating Voltage:240V Annual extreme low temperature:-11.2°F(-24°C)
Operating Current(IMPP):8.8A Max AC Operating Current.,1A
Operating Voltage(VMPP):31.7V Inverter Efficiency:96.5%
Max Series Fuse Rating:15A
STC Rating:28OW
CEC PTC Rating:251.1 W q°.tE"""'
u 13san"N
#13&4N30
O
(3jb IfM14N.1 us.
9 MBdufesSut,,@fAAtugles=9 Amp ldadSMng qs iEHwx"# �x Nsv
9 Amp x 1.25 Cmd Duty=11.25 Amps(Wire Ampac#y On.) R
2IV11.25A@ 50'using 010 AWD=0.70%drep Oa OnIeePVAC ��TM1LiF3
EQA RWd4 CACW RB 1HW141 QwM
SURPemI f•EM/fmyA
f1NNW
Bus
fag L 9UG
4
AIY
SOMLbckF E
Thm h GEC
OuuM AC
ReKnuB9,Me6ve Oamrrstl Ero
Mmlb,Fq SyBbm WA31W EbGOW
10 Afotluks/SYdrg@ 1Mlbduks=10Amp loedSbiig
0A fimtlf
10 Amp x 1.25 Curl Duly-f2.5 Amps(Wire Angacify Mn.)
2<OV f25A@W'using#10 AWG=0.70%dvp fxl ErpMse Erxvp Gdb (N gfBRMN1
InrorereeG�,m qa lrraR-1 cram
f'EM/LotluP '`
BOSTON SOLAR
xxw.msmnade,ue I bkCitol .,.
Dnaxirp Name Line Diagram
Deb Au usf21,2015
GJENTINMRMATION: D s.by ARC
Graeme Marcoux cn«#edey JAC
40 Bow Street REV# 01
Salem, MA 01970 PV- 4.0
508-826-2638 s ala As NuW
ALL LABELS SHALL BE OUTDOOR RATED WEATHER
RESISTANT.UV AND WATER RESISTANT BASE SHEET,INKS, CAUTION
ANDADHESIVES. SOLAR ELECTRIC a PV SYSTEM O
ALL LABELTERING aRovL BE A RED BACKGROUND WITH WHITE SYSTEM CONNECTED GENERATIONMETER
ALL LABELS SHALL BE REFLECTIVE MATERIAL LETTERING.
PHOTOVOLTAIC SYSTEM WARNING DANGER
DISCONNECT FOR ELECTRIC SHOCK HAZARD!
O O O OO�TURNOFF
FfiOTO ECTUOLTAC OISCOI O O
UTILITY OPERATION O SON SO UCHT A10 L LS URNOFF PHOTOVOLTACOSCON£CT
TERMINALS ONBOTHLIN O LOADSIDES SWITCH PRIOR TO SERVING
MAYBE ENERGIZED INTHEOPENPoSITION
/ WARNING
ELECTRIC
SHOCK HAZARD I
DO NOT TOUCH IERMMALS TERMMALSON WARNING WARNING
BOTH NEUI-SAND LOAD SIDESMAYBE
ENERGZED IN ME OPEN POSITM O ELECTRIC SHOCK HAZARD 1 O O BREAKPVDISER
ONNOT REMOVE
O
BREAKER DO NOT REMOVE OR
� INTERACTIVE SOLAR PV SYSTEM RATAVG IFAGROUND FAULT IS MOICATEO, RELOCATE
CONTINUOUS OUTPUT CIFYSNT 1B AMP NORMALLYUNGROUNDEDCOMD TORS
MAYBE GROUNDED AND EN¢RG
NORMAL OPERATING AC VOLTAGEJ 210V -
SMMMINSTALLek
FORS WCECALL
U77LITY DISCONNECT WARNING LABEL CAUTION WARNING
0 O THIS METER IS ALSO
SOLAR ELECTRIC SYSTEM SERVED BYA
CONNECTED PHOTOVOLTAIC SYSTEM
WARNING
DC SOLAR CIRCUIT WARNING WARNING
DC CIRCUIT LABEL ELECTRIC SHOCK HAZARD 1 INVERTER OUTPUT
mnecrounrsex.c�mv,rcane:�onxrx CONNECTION
.m O.ev e�reu.veE DO NOT RELOCATE THIS
nesecrro eeovn vve m .rer"ne OVERCURRENT DEVICE
.wwaay.rovro.
DC WARNING LABEL UTILITY DISCONNECT LABEL
PV SYSTEM DISCONNECT
FOR UTILITY OPERATION Q
BOSTONSOLAR out•
..bosWsdeeuu i keode sem..ve
D.WW N. Labels PaBa
Deb Au us(21.2015
CUENTINFORMATION D.py ARC
Graeme Marcoux cie ke by ,AC
40 Bow Street REV# 01
Salem, MA 01970 PV- 5.0
508-826-2638 sAb AsNobd