Loading...
40 BOW ST - BPA-15-903 f 1 RECEIVED The Commonwealth of Massachusetts S R VICES Board of Building Regulations Viand Standards CrrY OF SALEM Massachusetts State Building Code,780 CMR 12015 AUG !¢e k(1 Building Permit Application To Construct,Repair,Renovate Or lish a 1 \ One-or YW-Family Dwelling rm This Section For Official Use Only Building Permit Number: I D Applied: n l-1 ' Building Official(Pont Name) Signatum Date 1 SECTION 1:SITE INFORMATION 1.1 Property Address: - 1.2 Assessors Map&Pat cel Numbers 40 Bow Street ].la 1a this an accepted atreet7 yes_ no Map Nmb- Panel Number 13 Zoning Information: 1.4 Property Dimensions: residence t Zoning District Proposed Use Lot Area(sq ft). Frontage(it) 1.5 Building Setbacks(ft) Froat Yard Sid.Yards I hear Yard Required Provided Required l Provided Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 S wage Disposal.System: Public❑ Private❑ Zone: outside Outside Flood Zone?Check if. es❑ Muni ipal❑ On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIPt 2.1 Owner'of Record: I Graeme Marcoux Salem MA 01970 Name(Print) City,State,ZIP 40 Bow Street 508 7826-2638 No.and Street Telephone Bmeil Address SECTION 3:DESCRIPTION OF PROPOSED WORK=(chec4 all that apply) New Construction❑ Existing Building p Owner-Occupied ❑ Repairs(s) ❑ 11 Alteration(s) ❑ Addition ❑ . Demolition ❑ Accessory Bldg.❑ Number of Units) Other ® �pecify: solar Brief Description of Proposed Word; -1 Installation of a 5.32 kw(19 panels) rooftop solar array i SECTION 4:ESTIMATED CONSTRUCTION CO 3TS - item Estimated Costs: ! Official Use Only bor and Materials I 1.Building $ 7,000 1. Building PermitPee:$ Indicate how fee is determined: ❑Standard City/rows AppBca'on Fee 2.Electricals $ 17,799 ❑Total Pmjeet Cost'(Item 6)x�multiplier x. . 3.Phanbing $ 2. Other Fees: $ L/ h 4.Mechanical (HVAC) $ Liat:. ( I � 5.Mechanical (Fire Suppression) $ - Total All Fees:$ . - Check No. Check Amoufit: Cash Amount: 6.Total Project Cost: $ 24,966 ❑Paid in Full ❑Outatwding Balance Due: . ilk ; i I SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) 096385 10/8/2016 Romain Strecker License Number I Expiration Date Name of CSL Holder ee IIb`_ U List CSL Type(s low) 55 Sixth Road - Type Description No.and Street U !L iricted to 35.000 cu.fl.) Woburn MA 01801 R Restr l&2 Family Dwelling City/rown,State,ZlP M Maso RC RoofiOg Covering WS window and S' SF Solid duel Bunning Appliances 781-462-8702 Permits@bostonsolarus I tins Telephone - Email address D Demdlition 52 Registered Home Improvement Contractor(HIC) 169698 7/27/2017 Boston Solar TUC Re ' [ration Number Expiration Date HIC5S Name"INCRegistrum Name 55Sixtiri Road emits@bostonsolar.us xo�o�u'rn MA 01801 781-462-8702 Email address Ci W/I'owu State ZIP Tel hone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVTF'(M.G.L a 152.§25C(6)); Workers Compensation Insurance affidavit must be completed and submitted with 's application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes..........® No...........O .SECTION 7a:OWNER AUTHORIZATION TO BE COMP ETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUiING PERMIT I,as Owner of the subject property,hereby authorize Romain Strecker to act on my beba.14 in all matters relative to work authorized by this building permit;application. Graeme Marcoux 8/24/2015 Print Owner's Name(Electronic Signature) Date SECTION 7b:OWNER[OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and or derstanding. Romain Strecker 8/24/2015 Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(16C)Program),will lipt have access to the arbitration program or guaranty fund under M.G.L.c.142A.Other important information n the HIC Program can be found at www.mass.¢ov/oca Information on the Construction Supervisor License can be found at www.mass.aov/dos 2. When substantial work is planned,provide the information below: Total floor area(sq.R) _ (including garage,finished basement(attics,decks or porch) Gross living area(sq.ft.) Habitable room tint Number of fueplaces Number of brim Number of bathrooms NumberofliallYwhs Type of heating system Number of dec porches Type of cooling system Enclosed Open 3. Total Project Square Footage"may be substituted for"Total Project Cost" i JIAMES A. C LANCY PROFESSIONAL ENGINEER 601 ASBURY AVENUE NATIONAL PARK, NJ 08063 (856) 358-1125 FAX: (856) 358-1511 Date: April 30, 2015 Re: Structural Roof Certification Subj: Graeme Marcoux Residence,40 Bow Street,Salem MA 01970 We have provided a review of the house roof construction of the above named property in regards to verifying the capacity of the existing roof for installation of a new Solar Panel Array. We have found the residence roof to be of wood frame construction bearing walls with Roof 1 is framed of 2x6 @ 28" o.c. rafters with lx6 collar ties @ 28"o.c. and is sheathed with 3/4" ext-ply decking and a single layer of composite shingle roofing. The wood framed roof structure bears directly upon the framed exterior wall system. The existing rafters as installed meet the required (MA 780 CMR) IRC-2009 table 802 design span ratings with sufficient capacity to carry the 2.89#/sf additional load imposed by the proposed solar array per the details below. Installation of solar rack systems shall be as follows: Each panel row shall be supported upon 2 mounting rails. Rails shall be screw anchored through roof and directly to rafters or purlins below. Rail attachment points to rafters shall be staggered each row with exception to the first fastener row from the gable end which is attached to two adjacent rafters/trusses with Stainless Steel fasteners. Rail attachment to roof shall be fastened 16-32"o.c. at corners and 48" o.c. through the field. Rails are to be placed at 24-48"o.c. on the roof. When installed per the above specifications the system shall meet the required 100 MPH wind load and 40 PSF ground snow load requirements. Should you have any further question or comment please feel free to contact our office. Respectfully, SNOF4We_ "9'Cy AMES A. CLANCY u o.46775 m James A. Clancy Fp�ST Professional Engineer ONALE��R� MA License#46775 BOSTON SOLAR •`,1'-- q r- � nnnwaronmeaue I k�6aa�u+snacua 55 6N RoeE -. Fx WM.,MA OIWI Pl .:(617)858-1615 North Haven ORke Y J 9 3555H. .CT RE-Un#30 OW PW.:(860)38475503 MA Ebc#ice10cwM 12659A i h• ��� ® " APPLICABLECODES: ' \ CMR 78051.0 IRC 2009 NEC 2014 J..A. L1. M.A.P Llwnse ES A. The Marcoux Residence A� FQt Grid-tied 5. 32 kW PV System ° ceAeal Notes: Project Data Codes MA CMR 780 51.00 IRC-2009,ASCE 7-05 2005 Nos,NEC-2014 ElSolar Array CNENTINFORMATION: Graeme Marcoux Inverter (19)Enphase M-250 40 BOW Street PV Panel:. (19)Hyundai HiSM280RG Salem, MA 01970 Racking: Ironddge--Flush to Roof @ 44e 508-826-2638 System Rating: 5,320 Watts DC-STC Dre VNo. CooerPa, Dare Au ust 21,2015 Dmv by ARC Design Factors Checkeeby JAC Gmund Snow Load 40 psf PV Equipment Main Service Panel REV# - or Wind speed 100 mph PV- 1.0 Scab ASNo(ed M cro Inverters Ur der Modules 15 1d 6 5 Micro Inverters fs 13 7 d MARoAA.C1, �HUF Under Modules emnw SA. 17 12 8 3 N Soled k 13 Roof 1 to 11 9 z Gin Azimuth:Azimuth: 179'N Tiff.,44' 3 tOMAL�4 0 Shade: 18% 1s fo 1 23 Panels- 1.15 BOSTON SOLAR PV AC Subpanel Utility Meter Production Meter Utility Disconnect Dr rp Nerve Site Plan De(e Au ,W21,2015 CVENT/NF RMAMN. DMM by ARC Graeme Marcoux D�mny SAC 40 Bow Street REV# o1 DrivewaySalem, MA 01970 PV- 2.0 508-826-2638 Sim 33B 259" 6' 6 I u II I i 1� II I• I I� 11 II II II I. II N1P 11 IP ;i C P 1. PII N ii N II II R Im.,mwxRloo R9p � IrMMpe AlunNlum L{XM C_ EwFAM sXiipbe MLar Pm6b MbuN Nit H HCMryofle$Mrgbf �{ PIen4 RmlLFckpp C {i iA "6'f 5'S.S.U,861 ry ii RAW MOUNTING DETAIL James A.CI HOF� MAPmh Lbense 94 SA. N 4235J Rao/s'Specs 9lC - Array Specs Rafter Size: 2x6' Qr DULES Rafter Specing:. 28'OC Rafter Span: 10'fi'/4'4i' Ridge beam: N/A za CollarTie: ix6'@28'OC Raoi Pifrh: 04° BOSTONL(OI Ap Lo^°s Sheathing: 3/4"Plank IJWIo I I R.mxr.lM.aws 1e Rao/MafenaC Com sdeShin les 0 w i "rIM4b wl pogNmberoiFborsr 2 M.0 p.fR !z1 .,n..msmnmler ua Wocf)Wsa'. Army wepM z4.W Dm ng Name LayoW k.,Am r4 I4A Date Au uM 21,2015 mmy N.eI. ,el u,%I CL,ENTINFORMATON: D..by 'ARC ;W1ofw�..nGraeme Marcoux Checkedby JAC 40 Bow Street REva o1 Salem, MA 01970 PV- 3.1 508-826-2638 scab 3116'=r Module Electrical Specs Inverter Specs Design Conditions (23)Hyundai HiS280RG Enphase M•250 Annual extreme high temperature:93.2°F(34°C) Short Circuit Current(Isc):9.4A Rated Watts:25OW Average high temperature:73.4°F(23°C) Open Circuit Voltage(Voc):38.5V AC Operating Voltage:240V Annual extreme low temperature:-11.2°F(-24°C) Operating Current(IMPP):8.8A Max AC Operating Current.,1A Operating Voltage(VMPP):31.7V Inverter Efficiency:96.5% Max Series Fuse Rating:15A STC Rating:28OW CEC PTC Rating:251.1 W q°.tE"""' u 13san"N #13&4N30 O (3jb IfM14N.1 us. 9 MBdufesSut,,@fAAtugles=9 Amp ldadSMng qs iEHwx"# �x Nsv 9 Amp x 1.25 Cmd Duty=11.25 Amps(Wire Ampac#y On.) R 2IV11.25A@ 50'using 010 AWD=0.70%drep Oa OnIeePVAC ��TM1LiF3 EQA RWd4 CACW RB 1HW141 QwM SURPemI f•EM/fmyA f1NNW Bus fag L 9UG 4 AIY SOMLbckF E Thm h GEC OuuM AC ReKnuB9,Me6ve Oamrrstl Ero Mmlb,Fq SyBbm WA31W EbGOW 10 Afotluks/SYdrg@ 1Mlbduks=10Amp loedSbiig 0A fimtlf 10 Amp x 1.25 Curl Duly-f2.5 Amps(Wire Angacify Mn.) 2<OV f25A@W'using#10 AWG=0.70%dvp fxl ErpMse Erxvp Gdb (N gfBRMN1 InrorereeG�,m qa lrraR-1 cram f'EM/LotluP '` BOSTON SOLAR xxw.msmnade,ue I bkCitol .,. Dnaxirp Name Line Diagram Deb Au usf21,2015 GJENTINMRMATION: D s.by ARC Graeme Marcoux cn«#edey JAC 40 Bow Street REV# 01 Salem, MA 01970 PV- 4.0 508-826-2638 s ala As NuW ALL LABELS SHALL BE OUTDOOR RATED WEATHER RESISTANT.UV AND WATER RESISTANT BASE SHEET,INKS, CAUTION ANDADHESIVES. SOLAR ELECTRIC a PV SYSTEM O ALL LABELTERING aRovL BE A RED BACKGROUND WITH WHITE SYSTEM CONNECTED GENERATIONMETER ALL LABELS SHALL BE REFLECTIVE MATERIAL LETTERING. PHOTOVOLTAIC SYSTEM WARNING DANGER DISCONNECT FOR ELECTRIC SHOCK HAZARD! O O O OO�TURNOFF FfiOTO ECTUOLTAC OISCOI O O UTILITY OPERATION O SON SO UCHT A10 L LS URNOFF PHOTOVOLTACOSCON£CT TERMINALS ONBOTHLIN O LOADSIDES SWITCH PRIOR TO SERVING MAYBE ENERGIZED INTHEOPENPoSITION / WARNING ELECTRIC SHOCK HAZARD I DO NOT TOUCH IERMMALS TERMMALSON WARNING WARNING BOTH NEUI-SAND LOAD SIDESMAYBE ENERGZED IN ME OPEN POSITM O ELECTRIC SHOCK HAZARD 1 O O BREAKPVDISER ONNOT REMOVE O BREAKER DO NOT REMOVE OR � INTERACTIVE SOLAR PV SYSTEM RATAVG IFAGROUND FAULT IS MOICATEO, RELOCATE CONTINUOUS OUTPUT CIFYSNT 1B AMP NORMALLYUNGROUNDEDCOMD TORS MAYBE GROUNDED AND EN¢RG NORMAL OPERATING AC VOLTAGEJ 210V - SMMMINSTALLek FORS WCECALL U77LITY DISCONNECT WARNING LABEL CAUTION WARNING 0 O THIS METER IS ALSO SOLAR ELECTRIC SYSTEM SERVED BYA CONNECTED PHOTOVOLTAIC SYSTEM WARNING DC SOLAR CIRCUIT WARNING WARNING DC CIRCUIT LABEL ELECTRIC SHOCK HAZARD 1 INVERTER OUTPUT mnecrounrsex.c�mv,rcane:�onxrx CONNECTION .m O.ev e�reu.veE DO NOT RELOCATE THIS nesecrro eeovn vve m .rer"ne OVERCURRENT DEVICE .wwaay.rovro. DC WARNING LABEL UTILITY DISCONNECT LABEL PV SYSTEM DISCONNECT FOR UTILITY OPERATION Q BOSTONSOLAR out• ..bosWsdeeuu i keode sem..ve D.WW N. Labels PaBa Deb Au us(21.2015 CUENTINFORMATION D.py ARC Graeme Marcoux cie ke by ,AC 40 Bow Street REV# 01 Salem, MA 01970 PV- 5.0 508-826-2638 sAb AsNobd