Loading...
15 BRITTANIA CIRCLE - BUILDING JACKET 15 BRITTANIA *CIRCLE IJ BUILDING DEPT. OCT 2 7 43 GM '97 RECEIVED CITY OF SALEM,MASS. August 26, 1997 Mr. Leo Tremblay Salem Building Commissioner Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Leo: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy. be issued for 15 Brittania Circle, Salem, Massachusetts,OUnit 145 A.— I thank you for your cooperation. �; 'KL u A Y�,7, Sincerely, RE No. 40 3' BERLIN., MASS.. s� ay A. Renzoni \�4'rW of MW egistered Architect NCARB/ASID Main Office Architectural Innovations ■ 44 Central St. ■ Berlin, MA 01503 ■ (508) 838-2976 ■ 19 South St. ■ Berlin, MA 01503 FILE/C. O. COPY ILIS �A 6 SU.1TA ��. ��, CfRTIOF OCCIIP NC CITY OF SALEM i p � SALEM, MASSACHUSETTS 01970 Ci of Salem Buildin Oept. DATE JANUARY 27 19 97 PERMIT NO. 54-1997 APPLICANT FAI-ARD DEVELOPMENT CORP ADDRESS 290 ELIOT ST 1561 (NO.) (STREET) (CONTR'S LICENSE) CITY ASHLAND STATE MA ZIPCODE TEL.NO. ALTERATION ONE FAMILY NUMBER OF 1 PERMIT TO ( ) STORY DWELLING UNITS (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) AT(LOCATION) 0055 SWAMPSCOTT ROAD ZDTCT ONING (NO.) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) LOT SUBDIVISION MAP 07 LOT 1-O'+" BLOCK SIZE 36. 54 ACRES BUILDING IS TO BE FT.WIDE BY FT.LONG BY FT,IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: BUILD 4 UNIT CONDOMINIUM AS PER PLANS: UNIT 1 , OF 4 (d,�15-Brittania Ci'Cie. AREA OR -EjB, QIQI QI FEEPERMIT2304. 1210 VOLUME ESTIMATED COST (CUBIC/SQUARE FEET) OWNER FAFARD DEVELOPMENT CORP ADDRESS 290 ELIOT S I ASHLAND MA BUILDING DEPT. L. E. T THIO PERMITlaMvFvc nin ^••^• ^-^^^- •^ ----- -�•-�.wanor rHFpFf1F EITHER TFMPORARIIYDR PFRMCnIFNTIv TiiS SITE C�IpY � . BUILDING It y� CITY SALEM B U 1 LD 1 N G SALEM, MASSACHUSETTS 01970 PERMIT ?��/MINE 09 DATE 'jANLi C=1 R ;=•7 19 97 _ PERMIT NO. J.9-S7 APPLICANT 1-AFAIRD DE'VEI OP11MENT CORFU ADDRESS '__S•ID ELTOT Sl 1.1E1 (NO) (STREET) (CONTR'S LICENSE) CITY ASHLAND STATE iMA ZIP CODE TEL NO. ALTER TION ONE FAM11—Y NUMBER OF PERMIT TO (_) STORY DWELLING UNITS (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) 1DID55 SinIAI*1F'S COT ( ROAl ZONING AT(LOCATION) DISTRICT (N0.) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) MiIP 07 1-7)0 3 LOT 36. 54 ACRES SUBDIVISION LOT BLOCK SIZE BUILDING IS TO BE FT.WIDE BY FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: BUILD 4 UNIT CONDOMINIUM AS 1-,ER RLANS: UI.IIT 1' OF 4 @ 15 Brittania Circle. sA j AREA OR �.1(.715 u%• ' " ` 1.'� Lj' - - 1 -y PERMIT VOLUME ESTIMATEDCOST$ `'`y`�" �1�1" FEE @ - 'i14'° IL`IDI (CUBICISQUARE FEET) OWNER I'AFARD DEVELOF,MENT CORFU ADDRESS 0 EL_IOT Sl ASHL..AND MA BY ` _BY DEPT. L. E. T THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL ELECTRICAL,PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS f PLUMBING INSPECTION APPROVALS ELECTRICAL INSPE TION APPROVALS , J �{ 0 e� Ot 7 /CK9 7 —1116 2 �.l•N 4 1. Q 2 �� 2 DI/ F 4.-x'/L { BOARD OF HEALTH GAS INSPECTION APPFJOYA61, FIRE EPT.INSPECTING AP OVALS 4� OTHER CITY ENGINEER 2 2 c� � L2A7 WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. AS NOTED ABOVE. OR WRITTEN NOTIFICATION.