43 BAY VIEW AVE - BPA-12-778 REMOVE/REPLACE ADDITION + The Commonwealth of Massachusetts
OF
Board of Building Regulations and Standards CITY M
ul!
'P I Massachusetts State Building Code,780 CMR SdMar/ Revised Mar 201 �
Building Permit Application To Construct, Repair, Renovate Or Demolish a
One-or Two-Family Dwelling
This Section For Official Use Only
Building Permit Number: Date Applied:
I�
3
Zp/f1C•Wo�tLC� (� Trz'Z�f
Building Offcial(Print Name) Sign a Date
SECTION 1: SITE INFORMATION
1.1 Property Address: 1.2 Assessors Map& Parcel V mbers
Lla Is this an accepted street?yes no Map Number Parcel Number
1.3 Zoning Information: 1.4 Property Dimensions:
Zoning District Proposed Use Lot Area(sq ft) Frontage(ft)
1.5 Building Setbacks(ft)
Front Yard Side Yards Rear Yard
Required Provided Required Provided Required Provided
1.6 Water Supply: (M.G.L c.40, §54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System:
Public❑. Private❑ Zone: _ Outside Flood Zone? Municipal❑ On site disposal system ❑
Check if yes❑
SECTION 2: PROPERTY OWNERSHIP'
2.1 Owner'of R cord:
rnc� k�_I N S ( trn A e s i
Name(Print) City,State,ZI
�theW J4
A -_
d Street Telephone Email Address
SECTION 3: DESCRIPTION OF PROPOSED WORK'(check all that apply) ,
New Construction❑ Existing Building BI-, Owner-Occupied j, Repairs(s) ❑ 1 Alteration(s),. Addition
Demolition Accessory Bldg. ❑ Number of Units_ Other ❑ Specify:
Brief Description of Proposed I Wo k2:
5 r
a4-dd4 fi n 5 ) et sQaLQ cr�rtn
SECTION 4: ESTIMATED CONSTRUCTION COSTS
Item Estimated Costs: Official Use Only
Labor and Materials
1.Building $ 3 3 f � I. Building Permit Fee: $ Indicate how fee is determined:
❑ Standard City/Town Application Fee
2.Electrical $ OtN s `
❑Total Project Cost (Item 6)z multiplier x
3, Plumbing $ JS Duv 2. Other Fees: $
4.Mechanical (HVAC) $ 30 dvU List:
5.Mechanical (Fire $
Suppression) Total All Fees: $
Check No. Check Amount: Cash Amount:
6.Total Project Cost: $ C-JLC� M.) ❑Paid in Full ❑Outstanding Balance Due:
�j 1 �
SECTION'5: CONSTRUCTION SERVICES
5.1�C s r/rulct�on Sup^erv\isor Li/tense(CSL) C e. I^y4 ( -�� 12-
Th I-�O"UG Y1 C/ License NumTber Expiration Date
Name of CSL H Ider
qq coList CSL Type(see below)
and
S.�
Noo..and Street Type ' Description �
t'> G � �+ U Unrestricted(Buildings u to 35,000 cu.ft.
7�JOCl is !KA Restricted 1&2 Family Dwelling
City/Town, M Masonry
RC Roofing Covering
/ / // /j� WS Window and Siding
`TC70U 4 c,t @ g gprneo ,CrrA� SF Solid Fuel Burning Appliances
6 �'ZI Z-SSh / I Insulation
Telephone Email address D Demolition
5.2 Registered Home Improvement 0trovement Contractor(HIC) to y 99$ '(G
I�tCx?r-v Gtrnst�oc lL
HIC Registration Number Expiration Date
FCC ComRany Name or HIC R istrant Name /
yZ ,S'r,nr�/ISCD �9 �orGh e-4y t'�ovzumeo .
No an Street mm a dress
ctv, AIA M ly �V 3 3 S
Ci /-State,ZIP Telephone
SECTION 6„WORKERS' COMPENSATION INSURANCE-AFFIDAV
IT(M.G.L.c. 152;§ 25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide , .
this affidavit will result in the denial of the Issuance of the building permit.
Signed Affidavit Attached? Yes .......... Pr- No ........... ❑
SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN
OWNER'S AGENT OR CONTRACTOR APPLIES//FOR BUILDING PERMIT -
I,as Owner of the subject property,hereby authorize G 1'OUYyI Cr1a S'h/u e�y-
to act on my behalf, in all matters relati too work authorized by this building permit application.
JG tti'tc s het rJ
Print Owner's Name(El ro ,e Sign re Date
r
SECTION 7b: OWNER' OR AUTHORIZED AGENT DECLARATION
By entering my name below,I hereby a under the pains and penalties of perjury that all of the information
contained in this application is tru orate to the be of my knowledge and understanding.
3-V; Z-
Print Owner'k or Auth rized A nt s a e(EI ronic ignature) Date
NOTES:
1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor
(not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration
program or guaranty fund under M.G.L. c. 142A. Other important information on the HIC Program can be found at
www.mass.eov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dps
2. When substantial work is planned,provide the information below:
Total floor area(sq.ft.) �:5. �G (including garage,finished basement/attics,decks or porch)
Gross living area(sq.ft.)S_6:11/ Habitable room count /U
Number of fireplaces ( Number of bedrooms I/
Number of bathrooms 5 Number of half/baths 2
Type of heating system /{% Number of decks/porches s{
Type of cooling system /{uz(� Enclosed Z._ Open IL
3. "Total Project Square Footage"may be substituted for"Total Project Cost"
osolrlA CITY OF S CHUSFrTs ALEM, MASSA
BOARD OF APPEAL IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
120 WASHINGTON STREET, 3RO FLOOR
7 SALEM, MASSACHUSETTS 01970 2012022700043 B01113 Pg;438
� TELEPHONE: 978-745-9595 02/27/2012 09:08 PERMIT Ps 1/3 n
FAX: 978-740-9846
KIMBERLEY DRISCOLL 'MAYOR 10i3! FEB I A 0 I b
CITY CLERK SALEM. MASS:
February 1, 2012
Y
Decision
City of Salem Zoning Board of Appeals
Petition of 1AMES & KATHERINE KLEIN requesting a Special Permit under Sec. 3.3.5 of
the Salem Zoning Ordinance to expand a nonconforming single-family home on the
property located at 43 BAY VIEW AVE (R-1 Zoning District).
A public hearing on the above Petition was opened on January 18, 2012 pursuant to
Mass General Law Ch. 40A, § 11. The hearing was closed on January 18, 2012 with the
following Zoning Board of Appeals members present: Annie Harris (acting as chair),
Richard Dionne, Jamie Metsch,JimmyTsitsinos and Bonnie Belair.
Petitioner seeks a Special Permit pursuant to Section 3.3.5 of the City of Salem Zoning
Ordinances.
Statements of fact:
1. Attorney Scott Grover represented the petitioner at the hearing.
2. In a petition date-stamped November 28, 2011, petitioner requested a Special
Permit to allow expansion of the existing, nonconforming single-family house on
the property located at 43 Bay View Avenue.
3. At the hearing, numerous residents spoke in support of the project. No one
spoke in opposition.
The Board of Appeal, after careful consideration of the evidence presented at the public
hearing, and after thorough review of the plans and petition submitted, makes the
following findings:
1. Desirable relief may be granted, since the project would not be
substantially more detrimental than the existing nonconforming
structure to the neighborhood.
�J O 2. In permitting such change, the Board of Ap
peals requires certain
appropriate conditions and safeguards as noted below. ^
On the basis of the above findings of fact and all evidence presented at the public
hearing including, but not limited to, the Plans, Documents and testimony, the Zoning
Board of Appeals concludes:
1. A Special Permit under Section 3.3.5 is granted to construct the addition
to the property as shown on the submitted plans.
In consideration of the above, the Salem Board of Appeals voted, five (5) in favor (Harris,
Metsch, Dionne, Belair and Tsitsinos) and none (0) opposed, to grant petitioner's
request for a Variance and Special Permit subject to the following terms, conditions,
and safeguards:
1. Petitioner shall comply with all city and state statutes, ordinances, codes
and regulations.
2. All construction shall be done as per the plans and dimensions submitted
to and approved by the Building Commissioner.
3. All requirements of the Salem Fire Department relative to smoke and fire
safety shall be strictly adhered to.
4. Petitioner shall obtain a building permit prior to beginning any
construction.
5. Exterior finishes of the new construction shall be in harmony with the
existing structure.
6. A Certificate of Occupancy is to be obtained.
7. Petitioner is to obtain approval from any City Board or Commission
having jurisdiction including, but not limited to, the Planning Board.
8. Unless this Decision expressly provides otherwise, any zoning relief
granted does not empower or authorize the Petitioner to demolish or
reconstruct the structure(s) located on the subject property to an extent
of more than fifty percent (50%) of its floor area or more than fifty
percent (50%) of its replacement cost at the time of destruction. If the
structure is demolished by any means to an extent of more than fifty
percent (50%) of its replacement cost or more than fifty percent (50%) of
its floor area at the time of destruction, it shall not be reconstructed
except in conformity with the provisions of the Ordinance.
Annie Harris,
Salem Board of Appeals
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY
CLERK
Appeal from this decision, if any, shall be made pursuant to Section 17 of the
Massachusetts General Laws Chapter 40A, and shall be filed within 20 days of filing of
this decision in the office of the City Clerk. Pursuant to the Massachusetts General Laws
Chapter 40A,Section 11, the Variance or Special Permit granted herein shall not take
effect until a copy of the decision bearing the certificate of the City Clerk has been filed
with the Essex South Registry of Deeds.
FEB 2 2 2012
Date
1 heretry eeeltty that 20 da1.�hewn eRpbad'fnotr.
the dale this llnslrumen: .Jn:: re-;.r:s d, and that
NO APPEAL has br..rrt ?;Alr o 'ce.
A True COPY
ATTEST: Ci i VIFLIERK, Cialain Mass.