Loading...
12 BARCELONA AVE -SOLAR PERMIT The Commonwealth of Massachusetts ' Board of Building Regulations and Standards CITY OF Massachusetts State Building Code,780 CMR SALEM Revised Mar 2011 Building Permit Application To Construct,Repair,Renovate Or Demolish a (1/1 One-or Two-Family Dwelling U This Section For Official Use Only Building Permit Number: Date Applied: 1. Q Building Official(PrintName) Signature vrate SECTION 1:SITE INFoRmFTION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 12. '6ancalora Avenue L la Is this an accepted street?yes t/ no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: Outside Flood Zone? Municipal❑ On site disposal system ❑ Check if yes❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: 3e-CV R;iy SoAe_uA AMA O14=�o Name(Print) City,State,ZIP 12 1�arce-torso kvenue R7fb. 2fi3.74 - No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction❑ Existing Building Ef Owner-Occupied ❑ 1 Repairs(s) ❑ 1 Alteration(s) Addition ❑ Demolition ❑ Accessory Bldg.❑ Number of Units I Other ❑ Specify: Brief Description of Proposed Work : --TrusWta+ion cplP a 1, .46o y-W rDa4yp salnr 0.YfW.1 v SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only Labor and Materials 1.Building $ 5b31 1. Building Permit Fee:S Indicate how fee is determined: ❑Standard City/Town Application Fee 2.Electrical $ 55-51 ❑Total Project Costs(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $ Su ression Total All Fees:$ - 6.Total Project Cost: $ I{1 l0102 Check No._Check Amount: Cash Amount: ❑Paid in Full ❑Outstanding Balance Due: SECTIONS: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) 3b to. fr• 14 QbY a-t(\ cS1r ectaA, License Number Expiration Date Name of CSL Holder to C.Iwrctritil i lac¢ List CSL Type(see below) u No.and Street Type Description U Umeskricted(Buildings u to 35,000 cu.ft.) �.MII�Y\ I/vV1 0(902 R Res tri to l&2 FamilyDwelling City ,State,ZIP M Maso RC Roos Covering WS Wind w and Siding 1�,� SF Solid ue .�VI Burning Appliances .4fo2.$-4OZ Q1r5UA#btbhXy-5 &ir,tA.S I Insul Lion Telephone Email address D I Demc lition 5.2 Registered Home Improvement Contractor(IOC) l rQ b -1.2�. 14 bms m SDbt! C MA*I-,W HIC Registration.Number Expiration Date HIC Company Name or HIC Registrant Name to Cht.xraA(LI PUW CL net 5 .0 No.and Street Email address L!r >D,n tnnR OlRot �f31.4(02. 2 Citycon State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)),, Workers Compensation Insurance affidavit must be completed and submitted with 's application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes.......... No...........❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMP ETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR B DING PERMIT I,as Owner of the subject property,hereby authorize Q(J I- A we to act on my behalf,in all matters relative to work authorized by this building permil application. JeXF- Tow l o• ¢• 1 2 Print Owner's Name(Electronic Signature) Date SECTION 7b:OWNER!OR AUTHORIZED AGENT DE LARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and ut derstanding. 1'QoV•.L0.in n -ecka.! to, 4-.t 2- Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner ho hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not ave access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information§n the HIC Program can be found at www.mass.eov/oca Information on the Construction Supervisor License can be found at mDLmass.eov/lips 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room ount Number of fireplaces Number of bedr mins Number of bathrooms Number of haW 3aths Type of heating system Number of dec. .porches Type of cooling system Enclosed Open + 3. "Total Project Square Footage"may be substituted for"Total Project Cost" 1 l Jeff Fox Solar Installation 12 Barcelona Avenue Salem, MA 01970 Page 2 1.0 existing condition(Warm Roof) Design Snow Loads: 28 PSF(Existing—Unobstructed Warm Roof) 25.15 PSF(New Condition—Slippery Surface on Cold Roof) Basic Wind Speed: 100 MPH From Table R301.2(4) Importance Factor: 1.0 Exposure: B Analysis Results: General Considerations ➢ The proposed solar panels impose a total weight of approximately 3 pounds per square foot(PSF) on the roof surface. From a practical standpoint,the International Residential Code allows up to 2 roof coverings on a residential dwelling. Each layer of roofing imposes a net load of about 2.5 to 3.0 PSF on the roof. From this perspective, since the existing roof will have only a single layer of shingles, a second layer is allowed to be added by the code without analysis. This 2"d layer of shingles essentially weighs the same as the proposed solar panels that will be added instead. ➢ Materials such as metal roofs or solar panels are considered a slippery surface. Since the solar panels are mounted slightly above the roof line, it would be conservative to consider a thermal factor, Ct of 1.1,treating the panel surface as a cold roof,rather than a warm roof. Based on the roof slope,the snow load is reduced by 10%compared with the snow loading directly on the existing shingled roof surface. This reduction equates to approximately 2.85 PSF which partially offsets the weight of the panels. Gravity Loading: Given the size,spacing and configuration of the existing roof framing,we have determined that the existing framing is adequate to support the additional loading from the solar-electric system, including the panels,and all connections without the need for any strengthening. It is our understanding that the panels will be installed using Zep racking with leveling feet at a spacing of approximately 32 inches on center(e.g., every other rafter). The leveling feet will be fastened directly into the existing joists with 5/16"diameter by 4" long lag screws. In addition, it is important that the leveling feet support locations be staggered between adjacent panels so that no single rafter supports more load than under the existing conditions. Wind Loading: Based on our calculations,the net wind loads imposed on the roof framing with an attachment spacing as indicated above will be less than the current loading on the rafters. In addition,provided that the leveling feet are attached to the roof in a typical staggered fashion, the overall wind loading imposed on the structure and the individual framing members will not be impacted to any great extent. Conclusions: Our evaluation of the proposed solar-electric installation has established that the framing is adequate to Page 2 Jeff Fox Solar Installation 12 Barcelona Avenue Salem,MA 01970 Page 3 support the proposed solar panels without the need for any strengthening as discussed herein. If you have any questions regarding this matter,please feel free to contact my office at 609-489-5511. We appreciate the opportunity to assist you with this evaluation. Sincerely, MPP SH 0 �o ASHUIGo < N CI y N0. 35 C' A MA Pro MbtifsN .48235 Page 3