34 AMERICA WAY - BPA-14-611 U5,3,1 RPR FIRE DAMAGE ZOO
The Commonwealth of Massachusetts
Department of Public Safety
Massachusetts State Building Code(780 CMR)
Building Permit Application for any Building other than a One-or Two-Family Dwelling
(This Section For Official Use Only)
Building Permit Number: I Date Applied: Building Official:
SECTION 1:LOCATION(Please indicate Block#and Lot#for locations for which a street address is not available)
34 America Way Salem, MA 01970
(� No.and Street City/Town Zip Code Name of Building(if applicable)
�C SECTION 2:PROPOSED WORK
Edition of MA State Code used_ If New Construction check here❑or check all that apply in the two rows below
Existing Building❑ Repair❑ 1 Alteration ❑ 1 Addition 13 1 Demolition O (Please fill out and submit Appendix 1)
Change of Use ❑ Change of Occupancy ❑ 1 Other 0 Specify:
Are building plans and/or construction documents being supplied as part of this permit application? Yes ❑ No 0
Is an Independent Structural Enginee . Peer Review required? ^� Yes ❑ No 0
Brief Description of Proposed Work: LI �1 SL00a' fW "A4- -tZ.
�,aslc wore irctucLer �hao_tryt.�-, tvicxtct,hct�, -Fivznn� t �r.�t_,v�t
_Q2rY1h �'Y.t'Ic_ 0-I'h 5
J
SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR-
CHANGE IN USE OR OCCUPANCY -
Check here if an Existing Building Investigation and Evaluation is enclosed(See 780 CMR 34) ❑
Existing Use Group(s): Proposed Use Group(s):
SECTION 4:BUILDING HEIGHT AND AREA
Existing Proposed
No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.)
Total Area(sq.ft.)and Total Height(ft.)
-,. SECTION 5:USE GROUP(Check as applicable)
A: Assembly A-1❑ A-2❑ Nightclub ❑ A-3 ❑ A4❑ A-5❑ B: Business ❑ E: Educational ❑
T.-Factory F-1❑ F2❑ I H. Hi Hazard H-1❑ H-2❑ H-3 ❑ H-4 Cl H-5❑
I: Institutional I-1❑ I-2❑ I-3❑ I-4❑ M: Mercantile❑ R: Residential R-10 R-2❑ R3❑ R4 IT
S: Storage S-1❑ S-2❑ U: Utility❑ Special Use❑and please describe below:
Special Use:
"* SECTION 6:CONSTRUCTION TYPE(Check as applicable)
IA O IB ❑ IIA 0 IIB O IIIA ❑ HIB 13 IV 13 1 VA O VB ❑
r' SECTION 7:SITE INFORMATION(refer to 780 CMR 111.0 for details on each item),
Water Supply: Flood Zone Information Sewage Disposal: Trench Permit: Debris Removal:
Public❑ Check if outside Flood Zone❑ Indicate municipal❑ A trench will not be Licensed Disposal Site❑
Private❑ or indentify Zone: or on site system❑ required❑or trench or specify:
permit is enclosed❑
Railroad right-of-way: Hazards to Air Navigation: MA Historic Commission Review Process:
Not Applicable❑ Is Structure within airport approach area? Is their review completed?
or Consent to Build enclosed❑ Yes❑ or No❑ Yes❑ No 0
SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY
-
Edition of Code: Use Group(s): Type of Construction: Occupant Load per Floor:
Does the building contain an Sprinkler System?: Special Stipulations:
SECTION 9: PROPERTY OWNER AUTHORIZATION _
Name and Address of Property Owner -
wbObrl DI a momhwmT=IC0/EeStGOBatP^9 400 Highland Ave,Suite 11 Salem MA 01970
Name(Print) No.and Street City/Town Zip
Property Owner Contact Information:
Cyndy Anselmo 978.741 _2003 __ eastcoastpro@aol.com
Title Telephone No.(business) Telephone No. (cell) e-mail address
If applicable,the property owner hereby authorizes
Environmental Restorations, Inc 25 Spaulding Road,Suite 17-2 Fremont NH 03044
Name Street Address City/Town State Zip
to act on the property owner's behalf,in all matters relative to work authorized by this building permit application.
SECTION 10,CONSTRUCTION CONTROL(Please fill out Appendix 2)
building is less than 35,000 cu.ft.of enclosed space and/or not under Construction Control then check here G and skip Section 10.1 4.
10.1 Registered Professional Responsible for Construction Control .
Name(Registrant) Telephone No. e-mail address. Registration Number
Street Address City/Town State Zip Discipline Expiration Date
10.2 General Contractor W
Environmental Restorations,Inc
Company Name
Charles Minasalli HIC- 117430 CSL-071077
Name of Person Responsible for Construction License No. and Type if Applicable
25 Spaulding Road,Suite 17-2 Fremont NH 03044
Street Address City/Town State Zip
IdY, T4DD Ce03- 23q- qq—1 Cminasalli@gmail.com
Telephone No.(business) Telephone No. cell e-mail address
" SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT .G.L.c.152.§25C 6 -
A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and
submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit.
Is a signed Affidavit submitted with this application? Yes 0 No 0
`t; SECTION 12 CONSTRUCTION COSTS AND PERMIT FEE 5
Item Estimated Costs:(Labor
and Materials) Total Construction Cost(from Item 6)=$
1.Building $ 140,382.99 Building Permit Fee=Total Construction Cost x_(Insert here
2.Electrical $ appropriate municipal factor)_$
3.Plumbing $ 4500.00
4.Mechanical (HVAC) $ Note:Minimum fee=$ (contact municipality)
5.Mechanical Other $ Enclose check payable to // <Aq_,n 3
6.Total Cost $ 144,882.99 (contact municipality)and write check num-er here
SECTION 13.SIGNATURE OF BUILDING PERMIT APPLICANT
By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this
application is true and accurate to the best of my knowledge and understanding.
Charles Minasalli V President _ _ pLmo j3 H
Please print and sign name Title Telephone No. Date
25 Spaulding Road,Suite 17-2 Fremont NH 03044
Street Address City/Town State Zip
Municipal Inspector to fill out this section upon application approval: / "� �_ /9L1
Name, Date
Appendix 1
For the demolition of structures the building permit applicant shall attest that utility and other
service connections are properly addressed to ensure for public safety.
Please fill in the information below and submit this appendix with the building permit
application. The building permit applicant attests under the pains and penalties of perjury that
the following is true and accurate.
Property Location (Please indicate Block#and Lot#for locations for which a street address is not
available)
No. and Street City/Town Zip Name of Building(if applicable)
For the above described property the following action was taken:
Water Shut Off? Yes ❑ No ❑ Provider notified and Release obtained? Yes ❑ No ❑
Gas Shut Off? Yes ❑ No ❑ Provider notified and Release obtained? Yes ❑ No ❑
Electricity Shut Off? Yes ❑ No ❑ Provider notified and Release obtained? Yes ❑ No ❑
Yes ❑ No ❑ Provider notified and Release obtained? Yes ❑ No ❑
Other (if applicable)
Yes ❑ No ❑ Provider notified and Release obtained? Yes ❑ No ❑
Other (if applicable)
Appendix 2
Construction Documents are required for structures that must comply with 780 CMR 107.The
checklist below is a compilation of the documents that may be required for this.The applicant
shall fill out the checklist and provide the contact information of the registered professionals
responsible for the documents. This appendix is to be submitted with the building permit
application.
Checklist for Construction Documents*
Mark"x"where applicable
No. Item Submitted Incomplete Not Re uir
1 Architectural
2 Foundation
3 Structural
4 Fire Suppression
5 Fire Alarm(may require repeaters)
6 HVAC
7 Electrical
8 Plumbing include local connections
9 Gas(Natural,Propane,Medical or other
10 Surveyed Site Plan(Utilities,Wetland,etc.
11 Specifications
12 Structural Peer Review
13 Structural Tests&Inspections Program
14 Fire Protection Narrative Report
15 Existing Building Survey/Investigation
16 Energy Conservation Report
17 Architectural Access Review 521 CMR
18 Workers Com ensation Insurance
19 Hazudous Material Mitigation Documentation
20 Other(Specify)
21 Other(Specify)
22 Other(Specify)
*Areas of Design or Construction for which plans me not complete at the time of application submittal must be identified herein.Work
so identified must not be commenced until this application has been amended and the proposed construction document amendment
has been approved by the authority having jurisdiction.Work started prior to approval may be subjected to triple the original permit
fee.
Registered Professional Contact Information
Name(Registrant) Telephone No. e-mail address Registration Number
Street Address City/Town State Zip Discipline Expiration Date
Name(Registrant) Telephone No. e-mail address Registration Number
Street Address City/Town State zip Discipline Expiration Date
Name(Registrant) Telephone No. e-mail address Registration Number
Street Address City/Town State Zi Discipline Expiration Date
The Commonwealth of Massachusetts
Department of IndustrialAccidents
Office of Investigations
1 Congress Street, Suite 100
r' Boston,MA 02114-2017
www mass.gov/dia
Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Legibly
Name (Business/Organizationandividuaq: Environmental Restorations, Inc
Address:25 Spaulding Road, Suite 17-2
City/State/Zip: Fremont, NH 03044 Phone#:603-695-0400
Are you an employer? Check the appropriate box: Type of project(required):
1.9 I am a employer with 15 4. ❑ I am a general contractor and I
employees(full and/or part-time)." have hired the sub-contractors 6. ❑New construction2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑Remodeling
ship and have no employees These sub-contractors have g, ❑Demolition
working for me in any capacity. employees and have workers'
[No workers' comp. insurance comp. insurance.:
9. ❑Building addition
required.] 5. ❑ We are a corporation and its 10.❑Electrical repairs or additions
3.❑ 1 am a homeowner doing all work officers have exercised their 1 L❑Plumbing repairs or additions
myself. [No workers' comp. right of exemption per MGL 12.❑Roof repairs
insurance required.]t c. 152,§1(4),and we have no Flood Damage Repair
employees. [No workers' 11 Other 9 P
comp. insurance required.]
'My applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
t Homeowners who submit this affidavit indicating they are doing all work and than hire outside contractors must submit a new affidavit indicating such.
:Contractors that check this box most attached an additional sheet showing the name of the sub-contractors and state wbether or not those entities have
employees. If the sub-contractors have employees,they most provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name:Commerce & Industry Ins. Co.
Policy#or Self-ins. Lic.#:W C00603167 Expiration Date:8/1/14
Job Site Address: 34 America Way City/State/Zip:Salem, MA 01970
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certify under the pains and penalties ofperjury that the information provided above is true and correct
Sipnature777 Date:
2/18/14
Phone#: 603895-0400
Official use only. Do not write in this area,to be completed by city or town official.
City or Town: Permit(License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector
6.Other
Contact Person: Phone#:
' I '
Office ofConsu Consumer Af�usiness Regulation License or registration valid for individul use only
OME IMPROVEMENT CONTRACTOR before the expiration date. If found return to:
Registration: ,y*17430 Type: Office of Consumer Affairs and Business Regulation
. Expiration_ -1d7>3/2014 Private Corporation 10 Park Plaza-Suite 5170
1i
Boston,MA 02116fEN ONMENTAIC� `_ )INC
yx ;kCHARLES MINIS .= 3 10 HAZEL DR
HAMPSTEAD NH 03ff41 Undersecretary Not Not valid without signature
Massachusetts -Department of Public Safety
_ Board of Building Regulations and Standards
Construction Super%iyor V",
License: CS-071077 `00 k'
CIIARLES J MIN95ALLI— t'
25 SPAULDING T) k
SUITE 17-2
Fremont NH 03044 ,
i
Expiration
Commissioner 07/25/2015
L�
i
34 America Way
Salem, MA
2/14/14
1
Environmental Restorations, Inc.
A professional approach to quality service
TASK MATERIALS&LABOR
QTY UNIT COST TOTAL
Attn:Cvndv Anselmo-East Coast Properties
Unit#5
Entryway(101x61211011011)
Supply&Install Baseboard 27 LF $ 3.50 $94.50
Clean Tile 62 SF $ 0.35 $21.70
Repair Back Door 4 MH $ 45.00 $180.00
Paint walls 312 SF $ 1.00 $312.00
Living Room(13'6"x19'51'x9'10")
Supply&Install Hardwood Flooring(Includes sand/finish) 264 SF $ 10.75 $2,838.00
Supply&Install baseboard 66 LF $ 3.50 $231.00
Sanitize all exposed wood 264 SF $ 0.35 $92.40
Paint Walls 644 SF $ 1.00 $644.00
Hallway(12'x3'6"x9'10")
Supply&Install Hardwood Flooring(Includes sand/finish) 42 SF $ 10.75 $451.50
Supply&Install baseboard 24 LF $ 3.50 $84.00
Sanitize all exposed wood 42 SF $ 0.35 $14.70
Paint Walls 234 SF $ 1.00 $234.00
Hallway Closet(2'11"x4'9"x9'10")
Supply&Install Hardwood Flooring(includes sand/finish) 15 SF $ 10.75 $161.25
Supply&Install baseboard I I LF $ 3.50 $38.50
Reinstall bifold Doors 2 EA $ 25.00 $50.00
Clean&Paint Doors 2 EA $ 30.00 $60.00
Sanitize all exposed wood 15 SF $ 0.35 $5.25
Paint Walls 107 SF $ 1.00 $107.00
Dining Room(11'61'x13'10"x8')
Supply&Install Hardwood Flooring(Includes sand/finish) 161 JSF $ 10.75 $1,730.75
Supply&Install baseboard 51 $ 3.50 $178.50
Sanitize all exposed wood 161 $ 0.35 $56.35Paint Walls 408 $ 1.00 $408.00
Kitchen(11'3"x9'10"x8')
Environmental Restorations, Inc
25 Spaulding Road,Suite 17-2,Fremont, NH 03044
Tel:603-895-400 Fax:603-895-0445
34 America Way
Salem, MA
2/14/14
2
Clean cabinets&appliances 6 MH $ 35.00 $210.00
Paint walls 260 SF $ 1.00 $260.00
HaHwa 2(19'2"x3'4"x8')+Closet(1'7"xl'll")
Supply&Install Hardwood Flooring(Includes sand/finish) 71 SF $ 10.75 $763.25
Supply&Install baseboard 52 LF $ 3.50 $182.00
Reinstall door at closet 1 EA $ 25.00 $25.00
Clean&Paint Doors 1 EA $ 30.00 $30.00
Sanitize all exposed wood 71 SF $ 0.35 $24.85
Treat&Seal Water damaged Subfloor by kitchen closet 71 SF $ 1.25 $88.75
Paint walls 416 SF $ 1.00 S416.00
Laundry Room(6'1"x3'1"x8')
Clean Tile Floor 19 SF $ 0.35 $6.65
Reinstall bifold doors 2 EA $ 25.00 $50.00
Clean&Paint Doors 2 EA $ 30.00 $60.00
Supply&Install casing at door 1 EA $ 50.00 $50.00
Supply&Install Access Panel at ceiling 1 EA $ 325.00 $325.00
Paint walls 96 SF $ 1.00 $96.00
Bedroom I (14'11"x13'5"x9'10")
Supply&Install sheetrock at 2 walls 228 SF $ 2.75 $627.00
Supply&Install sheetrock at ceiling(5/8") 202 SF $ 3.00 $606.00
Supply&Install popcorn texture at ceiling 202 SF $ 1.00 $202.00
Sup ly&Install Insulation 322 SF $ 1.25 $402.50
Supply&Install Carpet&pad($25/SY Allowance) 24 SY $ 25.00 $600.00
Supply&Install baseboard 57 LF $ 3.50 $199.50
Clean&Paint Doors 3 EA $ 30.00 $90.00
Reinstall Doors 3 EA $ 25.00 $75.00
Supply fan(Fixture Allowance of$ 250) 1 EA $ 250.00 $250.00
Sanitize all exposed wood 632 SF $ 0.35 $221.20
Treat&Seal Water damaged Soffit and wall where pipe broke 165 SF $ 1.25 $206.25
Paint Walls 757 SF $ 1.00 $757.00
Bedroom Closet 1 (6'10"x6'x9'10")
Supply&Install sheetrock 255 SF $ 2.75 $701.25
Supply&Install sheetrock at ceiling(5/8") 41 SF $ 3.00 $123.00
Supply&Install po com texture at ceiling 41 SF $ 1.00 $41.00
Supply&Install Insulation at ceiling 41 SF $ 1.25 $51.25
Supply&Install Carpet&pad($25/SYAllowance) 5 SY $ 25.00 $125.00
Supply&Install baseboard 26 LF $ 3.50 $91.00
Supply light(Fixture Allowance of$100) 1 EA $ 100.00 $100.00
Sanitize all exposed wood 281 SF $ 0.35 $98.35
Environmental Restorations, Inc
25 Spaulding Road,Suite 17-2, Fremont, NH 03044
Tel:603-895-400 Fax: 603-895-0445
34 America Way
Salem, MA
2/14/14
3
Paint Walls 296 SF $ 1.00 $296.00
Bedroom Closet 2(2'3"x4'6"x9'10")
Supply&Install Carpet&pad($25/SY Allowance) 2 SY $ 25.00 $50.00
Supply&Install baseboard 11 LF $ 3.50 $38.50
Supply&Install Built Closet shelving 1 EA $ 850.00 $850.00
Sanitize all exposed wood 11 SF $ 0.35 $3.85
Paint Walls 107 SF $ 1.00 $107.00
Bedroom 1 Bathroom(4'11"x10'5"x9')
Clean Fixtures(sink/vanity,toilet,tub,shower door) 4 EA $ 25.00 $100.00
Clean Tile Floor 53 SF $ 0.35 $18.55
Paint Walls 279 SF $ 1.00 $0.00
Bedroom 2(13'11"x10'9"x8')
Supply&Install Carpet&pad($25/SY Allowance) 17 SY $ 25.00 $425.00
Supply&Install baseboard 50 LF $ 3.50 $175.00
Supply fan(Fixture Allowance of$150) 1 EA $ 150.00 $150.00
Clean&Paint Doors 2 EA $ 30.00 $60.00
Reinstall Doors 2 EA $ 25.00 $50.00
Sanitize all exposed wood 151 SF $ 0.35 $52.85
Paint Walls 400 SF $ 1.00 $400.00
Bathroom(7'2"x5'111Ix8')
Clean Fixtures 4 EA $ 25.00 $100.00
Clean Tile Floor 53 SF $ 0.35 $18.55
Paint Walls 212 SF $ 1.00 $212.00
Unit 3
Entryway(10'x6'2"x8')
Supply&Install sheetrock at ceiling(5/8") 62 SF $ 3.00 $186.00
Supply&Install popcom texture at ceiling 62 SF $ 1.00 $62.00
Supply&Install Insulation 62 SF $ 1.25 $77.50
Supply light fixture I EA $ 75.00 $75.00
Supply&Install Hardwood 62 SF $ 10.75 $666.50
Supply&Install Baseboard 20 LF $ 3.50 $70.00
Sanitize all exposed wood 124 SF $ 0.35 $43.40
Paint Ceiling&Walls 222 SF $ 1.00 $222.00
Living Room(13'6"x19'5"x8')
Supply&Install Insulation 264 SF $ 1.25 $330.00
Supply&Install Sheetmck @ 1 wall 108 SF $ 2.75 $297.00
Su ly&Install sheetrock at ceiling(5/8") 264 SF $ 3.00 $0.00
Environmental Restorations,Inc
25 Spaulding Road,Suite 17-2, Fremont,NH 03044
Tel:603-895-400 Fax:603-895-0445
34 America Way
Salem, MA
2/14/14
4
Supply&Install popcorn texture at ceiling 264 SF $ 1.00 $264.00
Supply&Install Hardwood Flooring(Includes sand/finish) 264 SF $ 10.75 $2,838.00
Supply&Install baseboard 66 LF $ 3.50 $231.00
Sanitize all exposed wood 636 SF $ 0.35 $222.60
Supply&Install Door Hardware at rear door 1 EA $ 250.00 $250.00
Paint Ceiling&Walls 792 SF $ 1.00 $792.00
Hallway(12101611x8')
Supply&Install Insulation 42 SF $ 1.25 $52.50
Supply&Install Sheetrock @ 1 wall 96 SF $ 2.75 $264.00
Supply&Install sheetmck at ceiling(5/8") 42 SF $ 3.00 $0.00
Supply&Install popcorn texture at ceiling 42 SF $ 1.00 $42.00
Supply&Install Hardwood Flooring(Includes sand/finish) 42 SF $ 10.75 $451.50
Supply&Install baseboard 24 LF $ 3.50 $84.00
Sanitize all exposed wood 180 SF $ 0.35 $63.00
Paint Ceiling&Walls 234 SF $ 1.00 $234.00
Hallway Closet(2'11"x4'9"x9'10")
Supply&Install Hardwood Flooring(Includes sand/finish) 15 SF $ 10.75 $161.25
Supply&Install baseboard 11 LF $ 3.50 $38.50
Clean&Paint bifold Doors 2 EA $ 30.00 $60.00
Reinstall bifold Doors 2 EA $ 25.00 $50.00
Supply&Install closet shelving 11 LF $ 15.00 $165.00
Sanitize all exposed wood 15 SF $ 0.35 $5.25
Paint Ceiling&Walls 139 SF $ 1.00 $139.00
Dining Room(11'6"x13'10"x8')
Supply&Install Insulation 161 SF $ 1.25 $201.25
Supply&Install sheetrock at ceiling(5/8") 161 SF $ 3.00 $483.00
Supply&Install popcorn texture at ceiling 161 SF $ 1.00 $161.00
Supply&Install Hardwood Flooring(Includes sand/finish) 161 SF $ 10.75 $1,730.75
Supply&Install baseboard 51 LF $ 3.50 $178.50
Supply Light Fixture 1 EA $ 100.00 $100.00
Sanitize all exposed wood 322 SF $ 0.35 $112.70
Paint Ceiling&Walls 569 SF $ 1.00 $569.00
Kitchen(11'31lx9'10"x8')+Closet(2'x3'x8')
Remove&reset glass shelves 5 EA $ 15.00 $75.00
Remove Sheetrock at closet ceiling 6 SF $ 0.75 S4.50
Remove&Reset Farmers Sink&Faucet I EA $ 350.00 $350.00
Remove Granite from cabinets 32 MH $ 45.00 $1,440.00
Remove Base Cabinets 8 MH $ 45.00 1 $360.00
Remove Flooring under cabinets 1 MH $ 45.00 1 $45.00
Environmental Restorations, Inc
25 Spaulding Road,Suite 17-2,Fremont, NH 03044
Tel:603-895-400 Fax:603-895-0445
34 America Way
Salem, MA
2/14/14
5
Supply&Install Insulation 116 SF $ 1.25 $145.00
Supply&Install sheetrock at ceiling(5/8") 116 SF $ 3.00 %348.00
Supply&Install popcorn texture at ceiling 116 SF $ 1.00 $116.00
Reset Granite 16 MH $ 45.00 $720.00
Reset Base Cabinets 8 MH $ 45.00 $360.00
Reinstall Drop in range 1 EA $ 75.00 $75.00
Clean Cabinets&Shelves 8 MH $ 35.00 $280.00
Supply Light in closet 1 EA $ 100.00 $100.00
Supply&Install Hardwood Flooring(Includes sand/finish) 116 SF $ 10.75 $1,247.00
Supply&Install baseboard 22 LF $ 3.50 $77.00
Supply&Install Closet door casing 1 EA $ 50.00 $50.00
Supply&Install Closet door slab(chipped on bottom-full glass door) 1 EA $ 325.00 $325.00
Sanitize all exposed wood 232 SF $ 0.35 $81.20
Paint Ceiling&Walls 286 SF $ 1.00 $286.00
Hallway 2(19'2"x3'4"x8')+Closet(1'7"x11ll")
Supply&Install Insulation 71 SF $ 1.25 $88.75
Supply&Install sheetrock at ceiling(5/8") 71 SF $ 3.00 $213.00
Supply&Install popcorn texture at ceiling 71 SF $ 1.00 $71.00
Supply&Install Hardwood Flooring(Includes sand/fmish) 71 SF $ 10.75 $763.25
Supply&Install baseboard 52 LF $ 3.50 $182.00
Supply&Install door at closet 1 EA $ 250.00 $250.00
Sanitize all exposed wood 142 SF $ 0.35 $49.70
Paint Ceiling&Walls 391 SF $ 1.00 $391.00
Laundry Room(611"x3'1"x8')
Supply&Install Insulation 19 SF $ 1.25 $23.75
Supply&Install sheetrock at ceiling(5/8") 19 SF $ 3.00 $57.00
Supply&Install popcom texture at ceiling 19 SF $ 1.00 $19.00
Clean Tile Floor 19 SF $ 0.35 $6.65
Supply&Install bifold doors 1 EA $ 250.00 $250.00
Supply&Install casing at door 1 EA $ 50.00 $50.00
Supply&Install baseboard 13 LF $ 3.50 $45.50
Sanitize all exposed wood 19 SF $ 0.35 $6.65
Paint Ceiling&Walls 123 SF $ 1.00 $123.00
Bedroom 1(14'11"x13'5"x8')+(6'1"x6'4"x9'10"')
Supply&Install Insulation 189 SF $ 1.25 $236.25
Supply&Install sheetrock at ceiling 5/8" 189 SF $ 3.00 $567.O11
Supply&Install popcorn texture at ceiling 189 SF $ 1.00 $189.00
Supply&Install Hardwood Flooring Includes sand/finish) 189 SF $ 10.75 $2,031.75
Supply&Install baseboard 57 LF $ 3.50 $199.50
Clean&Paint Doors 3 EA $ 30.00 1 $90.00
Environmental Restorations, Inc
25 Spaulding Road,Suite 17-2, Fremont, NH 03044
Tel:603-895-400 Fax:603-895-0445
34America Way
Salem, MA
2/14/14
6
Reinstall Doors 3 EA $ 25.00 $75.00
Supply&Install fan(Fixture Allowance of$250) 1 EA $ 250.00 $250.00
Sanitize all exposed wood 189 SF $ 0.35 $66.15
Treat&Seal Water damaged Soffit and wall under where pipe broke 165 Sf $ 1.25 $206.25
Paint Ceiling&Walls 645 SF $ 1.00 $645.00
Bedroom Closed (6'10"x6'x9'10")
Supply
&Installlnsulation 41 SF $ 1.25 $51.25
Supply&Install sheetrock at ceiling(5/8") 41 SF $ 3.00 $123.00
Supply&Install popoom texture at ceiling 41 SF $ 1.00 $41.00
Supply&Install Access Panel at ceiling 1 EA $ 325.00 $325.00
Supply&Install Hardwood Flooring(Includes sand/finish) 41 SF $ 10.75 $440.75
Supply&Install baseboard 26 LF $ 3.50 $91.00
Supply light(Fixture Allowance of$100) 1 EA $ 100.00 $100.00
Sanitize all exposed wood 41 SF $ 0.35 $14.35
Paint Ceiling&Walls 249 SF $ 1.00 $249.00
Bedroom 1 Closet 2(2'31lx4'61Ix8')
Supply&Install Insulation 11 SF $ 1.25 $13.75
Supply&Install sheetrock at ceiling(5/8") 11 SF $ 3.00 $33.00
Supply&Install popcorn texture at ceiling 11 SF $ 1.00 $11.00 j
Supply&Install Hardwood Flooring(Includes sand/finish) 11 SF $ 10.75 $118.25
Supply&Install baseboard 11 LF $ 3.50 $38.50
Sanitize all exposed wood 22 SF $ 0.35 $7.70
Paint Ceiling&Walls 110 SF $ 1.00 $110.00
Bedroom 1 Bathroom(4'11"x10'5"x9')
Clean Fixtures(sink/vanity,toilet,tub,shower door) 4 EA $ 25.00 $100.00
Clean Tile Floor 42 SF $ 0.35 $14.70
Bedroom 2(13'11"x10'9"x8')
Supply&Install Insulation 151 SF $ 1.25 $188.75
Supply&Install sheetrock at ceiling(5/8") 151 SF $ 3.00 $453.00
Supply&Install popcorn texture at ceiling 151 SF $ 1.00 $151.00
Supply&Install Hardwood Flooring(Includes sand/finish) 151 SF $ 10.75 $1,623.25
Supply&Install baseboard 50 LF $ 3.50 $175.00
Clean&Paint Doors 2 EA $ 30.00 $60.00
Reinstall Doors 2 EA $ 25.00 $50.00
Supply&Install door casing 1 EA $ 50.00 $50.00
Sanitize all exposed wood 302 SF $ 0.35 $105.70
Paint Ceiling&Walls 551 SF $ 1.00 $551.00
Bathroom(7'21'x5'111'x8')
Environmental Restorations, Inc
25 Spaulding Road,Suite 17-2,Fremont, NH 03044
Tel:603-895-400 Fax:603-895-0445
34 America Way
Salem, MA
2/14/14
7
Clean Fixtures(sink/vanity,toilet,tub) 3 EA $ 25.00 $75.00
Clean Tile Floor 44 SF $ 0.35 $15.40
Unit 1
Entryway(51x5'x81)+Closet(41x81x81)
Supply&Install sheetrock at ceiling(5/8") 57 SF $ 3.00 $171.00
Supply&Install popcorn texture at ceiling 57 SF $ 1.00 $57.00
Su ply&Install Insulation 57 SF $ 1.25 $71.25
'Supply light fixture 1 EA $ 75.00 $75.00
Prep floor for Hardwood 57 SF $ 1.00 $57.00
Supply&Install glue down hardwood Flooring 57 SF $ 8.25 S470.25
Supply&Install Baseboard 34 LF $ 3.50 $119.00
Sanitize all exposed wood 57 SF $ 0.35 $19.95
Treat&Seal Water damaged wood 57 SF $ 1.25 $71.25
Paint Ceiling&Walls 329 SF $ 1.00 $329.00
Living Room(2618"x13'8"x8')
Supply&Install Insulation 665 SF $ 1.25 $831.25
Supply&Install Sheetrock at walls 648 SF $ 2.75 $1,782.00
Supply&Install sheetrock at ceiling(5/8") 341 SF $ 3.00 $0.00
Supply&Install popoorn texture at ceiling 341 SF $ 1.00 $341.00
Supply light 1 EA $ 75.00 $75.00
Prep floor for Hardwood 341 SF $ 1.00 $341.00
Supply&Install glue down hardwood Flooring 341 SF $ 8.25 $2,813.25
Supply&Install baseboard 81 LF $ 3.50 $283.50
Materials to rebuild built in shelving 1 EA $ 600.00 $600.00
Labor to rebuild built in shelving 32 MH $ 45.00 $1,440.00
Sanitize all exposed wood 989 SF $ 0.35 $346.15
Treat&Seal Water damaged wood 989 SF $ 1.25 $1,236.25
Paint Ceiling&Walls 989 SF $ 1.00 $989.00
Hallway(17'3"x3'6"x8')
Supply&Install Insulation 61 SF $ 1.25 $76.25
Supply&Install Sheetrock at walls 138 SF $ 2.75 $379.50
Supply&Install sheetrock at ceiling(5/8") 61 SF $ 3.00 $183.00
Supply&Install popeorn texture at ceiling 61 SF $ 1.00 $61.00
Prep floor for Hardwood 61 SF $ 1.00 $61.00
Supply&Install glue down hardwood Flooring 61 SF $ 8.25 $503.25
Supply&Install baseboard 35 LF $ 3.50 $122.50
Sanitize all exposed wood 199 SF $ 0.35 $69.65
Treat&Seal Water damaged wood 32 SF S 1.25 $40.00
Paint Ceiling&Walls 341 SF $ 1.00 $341.00
Environmental Restorations, Inc
25 Spaulding Road,Suite 17-2, Fremont,NH 03044
Tel:603-895-400 Fax:603-895-0445
34America Way
Salem, MA
2/14/14
8
Kitchen(11'3"x9'10"x8')+Closet(1'x2'x8')
Supply&Install Insulation 285 SF $ 1.25 $356.25
Supply&Install Sheetrock @ walls(Double 5/8"at side wall) 424 SF $ 2.75 $1,166.00
Supply&Install sheetrock at ceiling(5/8") 112 SF $ 3.00 $336.00
Supply&Install popcom texture at ceiling 112 SF $ 1.00 $112.00
Supply&Install Linoleum Flooring 112 SF $ 4.25 $476.00
Supply&Install baseboard 43 LF $ 3.50 $150.50
Supply&Install Cabinets 1 EA $ 3,850.00 $3,850.00
Supply&Install Countertops 1 EA $ 975.00 $975.00
Supply sink&Faucet 1 EA $ 175.00 $175.00
Supply Garbage Disposal 1 EA $ 150.00 $150.00
Supply&Install Range(allowance) 1 EA $ 750.00 $750.00
Supply&Install Refrigerator(allowance) I EA $ 750.00 $750.00
Supply&Install Microwave(Allowance) I EA $ 325.00 $325.00
Supply&Install Dishwasher) 1 EA $ 650.00 $650.00
Sanitize all exposed wood 446 SF $ 0.35 $156.10
Treat&Seal Water damaged wood 446 SF $ 1.25 $557.50
Paint Ceiling&Walls 446 SF $ 1.00 $446.00
Laundry Room(6'111x3'111x8')
Supply&Install Insulation 20 SF $ 1.25 $25.00
Supply&Install Sheetrock at walls 104 SF $ 2.75 $286.00
Supply&Install sheetrock at ceiling(5/8") 20 SF $ 3.00 $60.00
Supply&Install linoleum 20 SF $ 4.25 $85.00
Supply&Install bifold doors 1 EA $ 250.00 $250.00
Supply&Install casing at door 1 EA $ 50.00 $50.00
Supply&Install baseboard 13 LF $ 3.50 $45.50
Supply light(Fixture Allowance of$100) 1 EA $ 100.00 $100.00
Sanitize all exposed wood 124 SF $ 0.35 $43.40
Treat&Seal Water damaged wood 124 SF $ 1.25 $155.00
Supply&Install Access Panel at ceiling 1 EA $ 325.00 $325.00
Paint Ceiling&Walls 124 SF $ 1.00 $124.00
Bedroom 1 (10'6"x12'3"x8')
Supply&Install Insulation 131 SF $ L $163.75
Supply&Install sheetrock at ceiling(5/8") 131 SF $ 3.00 $393.00
Supply&Install popcorn texture at ceiling 131 SF $ 1.00 $131.00
Supply&Install glue down Pad&Carpet($25/SYAllowance) 15 SY $ 25.00 $375.00
Supply&Install baseboard 46 LF $ 3.50 $161.00
Supply light(Fixture Allowance of$75) 1 EA $ 75.00 $75.00
Sanitize all exposed wood 131 SF $ 0.35 $45.85
Materials to Rebuild Built in Shelving/desk 1 EA $ 670.00 $670.00
Labor to Rebuild Built in Shelving/desk 48 MH $ 45.00 $2,160.00
Environmental Restorations, Inc
25 Spaulding Road,Suite 17-2, Fremont, NH 03044
Tel:603-895-400 Fax:603-895-0445
34America Way
Salem, MA
2/14/14
9
Treat&Seal Water damaged wood 131 SF $ 1.25 $163.75
Paint Ceiling&Walls 495 SF $ 1.00 $495.00
Bedroom Closet I (5'x5'11"x8')
Supply&Install Insulation 30 SF $ 1.25 $37.50
Supply&Install sheetrock at ceiling(5/8") 30 SF $ 3.00 $90.00
Pup ply&Install sheetrock at wall 24 SF $ 2.75 $66.00
Supply&Install popcorn texture at ceiling 30 SF $ 1.00 $30.00
Supply&Install glue down Pad&Carpet($25/SYAllowance) 4 SY $ 25.00 $100.00
Supply&Install baseboard 22 LF $ 3.50 $77.00
Supply light(Fixture Allowance of$100) 1 EA $ 100.00 $100.00
Clean&Paint Doors 1 EA $ 30.00 $30.00
Reinstall Doors I EA $ 25.00 $25.00
Supply&Install Shelves 22 LF $ 15.00 $330.00
Sanitize all exposed wood 54 SF $ 0.35 $18.90
Treat&Seal Water damaged wood 54 SF $ 1.25 $67.50
Paint Ceiling&Walls 206 SF $ 1.00 $206.00
Bathroom(41I1"x1015'x9')
Reset toilet&replace flange 4 MH $ 65.00 $260.00
Chip&Replace concrete for access to Flange 6 ME $ 45.00 $270.00
Remove surrounding tiles,replace and re out 6 MH $ 45.00 $270.00
Supply&Install Insulation 53 SF $ 1.25 $66.25
Supply&Install sheetrock at ceiling(5/8") 53 SF $ 3.00 $159.00
Supply&Install popcorn texture at ceiling 53 SF $ 1.00 $53.00
Clean Vanity&Sink 1 EA $ 25.00 $25.00
Clean Tile Floor 53 SF $ 0.35 $18.55
Sanitize all exposed wood 53 SF $ 0.35 $18.55
Treat&Seal Water damaged wood 53 SF $ 1.25 $66.25
Paint Ceiling&Walls 301 SF $ 1.00 $301.00
Bedroom 2(15'x12'4"x8')
Supply&Install Insulation 188 SF $ 1.25 $235.00
Supply&Install sheetrock at ceiling(5/8") 188 SF $ 3.00 $564.00
Supply&Install popcorn texture at ceiling 188 SF $ 1.00 $188.00
Supply&Install glue down Pad&Carpet($25/SYAllowance) 21 SY $ 25.00 $525.00
Supply&Install baseboard 55 LF $ 3.50 $192.50
Sanitize all exposed wood 188 SF $ 0.35 $65.80
Treat&Seal Water damaged wood 188 SF $ 1.25 $235.00
Paint Ceiling&Walls 628 SF $ 1.00 $628.00
Bedroom 2 Closet&Hallway(8'6"x6'6"x8')
Supply&Install Insulation 23 SF $ 1.25 $28.75
Environmental Restorations, Inc
25 Spaulding Road,Suite 17-2, Fremont, NH 03044
Tel:603-895-400 Fax:603-895-0445
34America Way
Salem, MA
2/14/14
10
Supply&Install sheetrock at ceiling in hallway(5/8") 23 SF $ 3.00 $69.00
Supply&Install popcorn texture at ceiling 23 SF $ 1.00 $23.00
Supply&Install glue down Pad&Carpet($25/SYAllowance) 7 SY $ 25.00 $175.00
Supply&Install baseboard 37 LF $ 3.50 $129.50
Supply light(Fixture Allowance of$100) 1 EA $ 100.00 $100.00
Clean&Paint Doors 2 EA $ 30.00 $60.00
Sanitize all exposed wood 23 SF $ 0.35 $8.05
Treat&Seal Water damaged wood 23 SF $ 1.25 $28.75
Paint Ceiling&Walls 319 SF $ 1.00 $319.00
Bathroom(5'5"x8'5"x8')
Clean Tile Floor 47 SF $ 0.35 $16.45
Clean Fixtures(Vanity,Sinks,Toilet,Shower) 4 EA $ 25.00 $100.00
Common HaHwa s
1st to 2nd Floor(25'x7'10"x18'9")
Patch ceiling 5 MH $ 45.00 $225.00
Texture ceiling at patch 1 EA $ 150.00 $150.00
Supply&Install Wallpaper at all walls(Includes Prep) 1238 SF $ 4.75 $5,880.50
Supply&Install carpet at stairs 15 SY $ 35.00 $525.00
Supply&Install carpet at hallways 21 SY $ 35.00 $735.00
Sand&refinish Railings/ends of treads 12 MH $ 45.00 $540.00
Paint Balusters 8 MH $ 45.00 $360.00
Repair Crown Molding 4 MH $ 45.00 $180.00
1st to Basement(2510'10%81)
Supply&Install Wallpaper at all walls(Includes Pre ) 528 SF $ 4.75 $2,508.00
Supply&Install carpet at stairs 15 SY $ 35.00 $525.00
Supply&Install carpet at hallways 21 SY $ 35.00 $735.00
Sand&refinish Railings/ends of treads 12 MH $ 45.00 $540.00
Paint Ballusters 8 MH $ 45.00 $360.00
Supply&Install Trim at stringer 14 LF $ 3.75 $52.50
Install light fixture 1 EA $ 75.00 $75.00
Storage Areas(2)(5'51lx3'9"x8')
Supply&Install Insulation 42 SF $ 1.25 $52.50
Supply&Install Sheetrock @ ceiling 42 SF $ 3.00 $126.00
Supply&Install popcorn texture at ceiling 42 SF $ 1.00 $0.00
Paint Concrete Floor 42 SF $ 1.25 $52.50
Stora a Hall(3'S'x7'x8')
Suppl &Install Insulation 25 SF $ 1.25 $31.25
Supply&Install Sheetrock @ ceiling25 SF $ 3.00 $75.00
Environmental Restorations, Inc
25 Spaulding Road,Suite 17-2, Fremont,NH 03044
Tel:603-895-400 Fax:603-895-0445
34America Way
Salem, MA
2/14/14
11
Supply&Install popcorn texture at ceiling 25 SF $ 1.00 $0.00
Paint Concrete Floor 25 SF $ 1.25 $31.25
Rear Common Hallway Stairs
(3rd Ff.Landing 7'5"x3'01lx8')+Stairs(3'5"x12'9"x12')
(2nd Ff.Landing 7'51lx3'0"x14'6")+Stairs(3'5"x4'x8')
(1st Ff.Landing 7'5"x3'0"x8')(4'x3'411x8')+Stairs(3'5"x10'xl2')
(Base Landing 7'5"x3'5"x8')+Stairs(3'5"x8'xg')
(Closet 315"x4'11"x8')
Supply&Install carpet($25/SYAllowance) 48 SY $ 25.00 $1,200.00
Supply&Install baseboard 92 LF $ 3.50 $322.00
Paint walls 2079 SF $ 1.00 $2,079.00
General
Plumbing Allowance(Unit 34-3 kitchen,Unit 34-1 Kitchen and bathroom 1 EA $ 4,500.00 $4,500.00
Sheetrock repair allowance(where baseboard is being laced) 16 MH $ 45.00 $720.00
Remove Insulation left in ceilings/walls 24 MH $ 35.00 $840.00
Metal Channel Repair Allowance 1 EA $ 850.00 $850.00
Disposal 2 EA $ 600.00 $1,200.00
Final Clean at Units&Common Hallways 5 EA $ 400.00 $2,000.00
Air Duct Cleaning&Sanitization(includes filter replacement in furnaces) 3 EA $ 850.00 $2,550.00
Subtotal $118,756.55
20% Overhead & Profit $23,751.31
Permits $2,375.13
Total Price 1 $144,882.99
*** Please note that fire alarm contractor is being handled directly through Management company***
*** Please note that electrical proposal is being submitted directly to the Insurance Company***
Environmental Restorations, Inc
25 Spaulding Road,Suite 17-2, Fremont,NH 03044
Tel:603-895-400 Fax:603-895-0445
JI, j)')
34 AMERICA WAY 611-14
eisa. ilsso _ COMMONWEALTH OF MASSACHUSETTS
Map: , 21
,Block:• CITY OF SALEM
blot 0235-919 '
;Category: REPAIRWPLACE '
�permit# 611.14 BUILDING PERMIT
Project# JS-2014-001535
Est Cost $144,882.99
Fee Charged: $1,556.00
Balance Due: $.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: J - VI Contractor: License: Expires:
Use Group: Charles Minasalli CONSTRUCTIO SUPERVISOR-71077
Lot Srze(sq. ft.): 0• ' Owner: GILLER RALPH M, GILLER MARY A
Zoning'.
Units Gamed: ,0--jc Applicant: weatherly drive condo trust
Units Lost: AT: 34 AMERICA WAY
,Dig Safe#i �
JSSUED ON. 20-Feb-2014 AMENDED ON. EXPIRES ON. 20-Aug-2014
t
TO PERFORM THE FOLLOWING WORK.
***34 AMERIC A WAY UNITS 5, 3, 1***FLOOD DAMAGE REPAIRS*** BASIC WORK INCLUDES SHEETROCK,
.•>INSULATION,FLOORING,&PAINT. DEMO WORK COMPLETED BY OTHERS.
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Electric Gas Plumbing Building
Underground: Underground: Underground: Excavation:
Service: Meter: Footings:
Rough: Rough: Rough: Foundation:
Final: Final: Final: Rough Frame:
Fireplacc/Chimncy:
D.P.W. Fire Health
Insulation:
Meter: Oil:
Final:
House# Smoke:
• Treasury:
Alarm: Assessor
`ISewero. Sprinklers: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VI ATION OF ANY OF ITS
RULES AND REGULATIONS. _
Signature: y e,
Fee Type: Receipt No: Date Paid: Check No: Amount:
BUILDING REC-2014-001541 20-Feb-I4 10167 S1,556,00
IMPORTANT:OWNER OR CONTPACTOR MI1ST
�GeoTMS®2014 Des Lauriers Municipal Solutions,In ARRANGE FOR PERIODIC INSPECTIONS DURING
P QC .NSTRUCTION.SEE CURRENT BUILDING CODE
CHAPTER 1 FOR LIST OF REQUIRED INSPECTION&
CALL 978-619-5641 TO SCHEDULE AN INSPECTION
.�OND1Tq�
Z
V3QVE AD
CITY OF SALEM
34 AMERICA WAY 611-14
'GIS#: !11550 COMMONWEALTH OF MASSACHUSETTS
Map. _ 121
Black: CITY OF SALEM
Lot: - 10235-919
Category: REPAIR/REPLACE
Permit# 611-14 BUILDING PERMIT
Project# IJS-2014-001535
Est. Cost: $144,882.99
e Charged: $1,556.00
Balance Due: I$.00 PERMISSION IS HEREBY GRANTED TO:
�Covst Class: " " Contractor: License: Expires:
Use Group: _ _ ;Charles Minasalli CONSTRUCTIO SUPERVISOR-71077
Lot Size(sq.ft�0
i — —
Zoning: Owner: GILLER RALPH M, GILLER MARY A
. �
Units Gained: ]Applicant: weatherly drive condo trust
lUnits Lost: _JAT." 34 AMERICA WAY �.
Dig Safe#:_ —
ISSUED ON: 20-Feb-2014 AMENDED ON: EXPIRES ON.• 20-Aug-2014 TO PERFORM THE FOLLOWING WORK.
***34 AMERICA WAY UNITS 5,3, 1***FLOOD DAMAGE REPAIRS*** BASIC WORK INCLUDES SHEETROCK,
INSULATION,FLOORING, &PAINT. DEMO WORK COMPLETED BY OTHERS.
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
' Electric Gas Plumbing Building .,
Underground: Underground: Underground: Excavation:
Service: Meter: - Footings:
Rough: Rough: Rough: Foundation:
Final: Final: Final: Rough Frame:
Fireplace/Chimney:- -^ —^^'^'
D.P.W. Fire Health
Insulation:
Meter: Oil:
Final:
House# Smoke:
Treasury:
Water: Alarm: Assessor
Sewer: Sprinklers: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS
RULES AND REGULATIONS.
Signature:
Fee Type: Receipt No: Date Paid: Check No: Amount: __.�...,.
1 BUILDING REC-2014-001541 20-Feb-14 �. 10167 $1,556.00
GeoTMSaO 2014 Des Lauriers Municipal Solutions,Inc.