Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
205 BRIDGE STREET - BUILDING JACKET
irsupTab. 90%LargerLabelArea /// I S M E A D KEEPING YOU ORGANIZED No. 10301 PAMPOMM 1@LH&YtlID® a.nr�+rs�n POS[�IpQR way WAMI MA GET ORGANM AT SMEAD.COM Citp of *aiem, Alaoncbuottg Public Propertp Mepartment g �3uilbing Mepartment One Apalem Oreen 745-9595 ext. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer July 5, 1989 Mr. Tony Pacitti DeIulis Bros. Construction Co. , Inc. 31 Collins Street Terrace lynn, MA. 01902 RE: S_alem_Housing—Project 667-7B 205 Bridge St . ,_Salem,-MA__ Dear Tony, This letter is to confirm our telephone conversation on July 3, 1989 re- garding occupancy of the above referenced project . It is my understanding that as of July 3, 1989 you have had all final inspections and sign offs except the building department . As of today's date I have all the necessary affidavits from the architects and your company except a copy of the change order to DeIulis Brothers that will authorize you to complete the ventilation of the stair wells. As soon as we recieve the signed off building permits and a copy of change order, the Certificate of Occupancy will be issued. If the building is occupied please keep the stairwells open during the in- stallation of the venting system. It has been a pleasure working with you on this project and if I can be of further assistance please do not hesitate to call. Regards, Stephen W. Santry Assistant Building Inspector SWS/eaf C.C . Elayen M. Hart , Executive Director SHA �l r a Citp of 6atem, AaggacbU!5ettg Public Propertp Department A3uilbing Department One Onlem Green 745-9595 QCxt. 360 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer May 25 , 1989 Mr . Tony Pacitti DeIulis Brothers 31 Collins Terrace Lynn , MA . 01902 RE : Salem Housing Project 667-7B X205 Bridge'Street �Salem,,MA. Dear Tony , On the afternoon of Wednesday , May 24 , 1989 , Mr . Martineau and myself made a site visit to the above referenced project for the purpose of " final inspection . " The following items must be attended to before a final can be completed . I . Unit entrance doors must be numbered . 2 . Stairwell doors must be marked , "stairs" on the corridor side . 3 . Stairwells must be identified as to what floors you are on . 4 . Toilet grab bars are missing in units 11312 and 11212 . 5 . Fire extinguishers must be installed as needed . 6 . All bags must be off the smoke detectors . 7 . Disposal not working in unit 11207 . 8 . Kitchen range exhaust fan not complete , bare wires hanging in unit 11205 . 9 . Please submit a copy of elevator inspection to this office . 10 . Proper emergency lighting of all areas in the basement . 11 . Plastic or cardboard "Exit" signs on all the doors leading from storage area to the corridor in basement . 12 . A safe exitway discharge to Ash Street . 13 . Final sign offs on the permits by electrical , plumbing , board of health , fire , department of public works and gas inspectors are needed before I can sign . ( 2 ) RE : Salem Housing Project 667-7B 205 Bridge Street , Salem, MA . 14 . Individual affidavitts from TAC with the seal and signature of the architect stating that the units have been inspected by him, that they do substantially comply with the Mass State Building Code and all drawings or revisions that have been submitted to this department . 15 . Please seal the opening where the main gas pipe enters the building . 16 . The last bi-weekly report from TAC was on April 21 , 1989 , we need reports for May 2 , 16 , and May 30th . in addition to final reports . 17 . Please paint out the necessary amount of handicapped parking spaces on the hot top and install upright signs as per handi- capped code . 18 . The tops of the sprinkler heads must be between I " and 6" of the bottom of wood floor joists , NFPA - 13 Sect . 4-3 . 5 . 19 . The stairwell pressurizing system has not been installed as shown on the drawings of record . If the item was deleted with- out notifing the fire of building department , please document why . Thank you for your anticipated cooperation on the aforementioned matters . Sincerely , Stephen W . Santry/ Assistant Building Inspector SWS/eaf C . C . Captain Turner - Salem Fire Roger Sheppard - T .A . C . Change Order Commonwealth of Massachusetts Excculive Office of Communities and Development Change Order No. _ Twelve (12) Project Elderly Housing 667-7B Bridge St. Date June 8, 1989 Owner Salem Housing Authority Contract Date April 21, 1988 Contractor_D i alis Brothers Construction Co. Architect The Architects Col > bo at; v� Tnr 31 Collins St. Terrace 46 Bratte Strpat Lynn, MA 01902 Camori(Ige, MA 021 'IR The following change is ordered in accordance with Article•12 of the General and Supplementary Conditions of the Contract: 1. Furnish and install exterior light fixtures above the East and West egress doors all in accordance with your amended letter proposal of 16 March 1989. ADD: $1, 162.00 2. Furnish and install 6" fiberglass insulated stud and plywood enclosure around the air handling unit located in the attic space. Provide a pull chain light fixture in the enclosure, all in accordance with your atrended letter proposal of 10 April 1989. ADD: $1,745.00 3. Furnish and install isolation \aloes on the five heating boilers. ADD: $2,240.00 Delete the two stair pressurization fans called for in Contract Drawings. CREDIT: ($1,170.0( 5. Stbstitute "Ned Force" 22 oz. carpeting in all areas in lieu of specified rraterials. CREDIT: 975.00 ------ -- TOTAL ADD: $S,002.00 Now Ihrrc litre su hiect to conditions herein set forth an equitable adjustment of the contract price and contract time is ,:sutblishcd as follows: (use whole dollars only) A. The original contract sum was $ 2,401,776.00 11. Nct change by previously approved change orders $ 6$, 9 . 0 C. The contract sum prior to this change order was(A+B) S 2,470:0'66':0'0 D. The contract sum will be (increased)(dInUedXXX (K�) by this change order $ 3,002.00 E. The net change by all change orders will now be(B+D) $ 711 20 F. The contract sum will now become(A+E) $ 2,47 068.00 G. The contract time will be ( (unchanged) by —0— days. H. The substantial completion date(is)FaWwWwwl 19. July . 19 R9 The conditions hereinbefore referred to are as follows: - A. The aforementioned change and work affected thereby is subject to all contract stipulations and covenants. B. The rights of the Owner are not prejudiced. C. All claims against the Owner which are incidental to ora consequence of the aforementioned change are satisfied. D. This change order is not valid until approved by the LHA. Architect and EOCD. E. Signature of the Contractor indicates agreement herewith,including adjustment to contract sum and/or contract time. APPROVED: Architect APPROVED: Owner FirmTheThe�Arrc�h—it is Collaborative Inc, Housing Authority Date ,r 1--.a- BY Date APPROVED: Project Represen ove APPROVED:Constnttclto dvl Executive OM6 / tit velopment By By 11�'te' Date ACCEPT Transt'�rtoo'thers APPROVED: Firm eCOnstrtYJtion Co. , IncExecutive Office of Communities and Development by-- By Date Cftp of Oalem, IfIngacbUgettg Public Propertp �Dcpartment �3uitbing mepartment one opatem Green 745-9595 4Cxt. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer June 8, 1989 Mr. Roger Sheppard T.A.C. , Inc. 46 Brattle Street Cambridge, MA. 02138 Re: Salem Housing Authority Project 205 Bridge St. , Salem, MA. Dear Roger: Thank you for your letter of June 5, 1989. In answer to questions raised about the stairwells at Bridge Street, I would agree that you have complied with 513.1.1 and 513.1.2. Upon further discussion with Mr. Munroe concerning 513.1.4, mechanical ventilating systems, we disagree with your response. Section 513.0 governs "Stairways and Exitways" and 513.1.4 specifically addresses venting exitways and corridors. The stairwells are exitways, not shafts, and run from the basement to the third floor or four stories. We do not have a problem with the corridor ventilation as designed. Thank you for your attention to this matter. Sincerely, Stephen W. Santry Assistant Building Inspector SWS/jmh c.c. Captain Turner, Salem Fire Department Received by: Date- Delivered in Hand by: t ' Salem Ft.%e Department Eyre P�Leven t i.on Bureau 48 La4ayette Street Salem, Ma 01970 (617 ) 745-7777 l FIRE DEPARTMENT CERTIFICATE OF APPROVAL FOR BUILDING PERMIT In accordance wi th the provt4ton.6 o4 the Ma,6eachu.6etto State Bu Ltdtng Code and the Salem Ftvte Code, app.P..Lcati.on t-6 hereby made 6or approvat oI6 ptan4 and the 4,"uance o4 a cehti4.Znate o4 approval 4or a buttdi,ng permit by the Salem Ft to Depantment. (Re4. Se.c tion 1 13. 3, Maa.6. State Bldg. Code) Job Location: _ 235 Bridge Street Owner/Occupant: Salem Housing Authority EZectA,icaC ContAaetor: TBA F4,te Supp"-" on Contractor.: TBA S.i,gnatute o4 AppZ.icartt: Phone # 468-4-2-00 Addree4 o4 City or � f Appy ca m' 46 Brattle Street Town: 'j mb it dae. Ma, L7^ [P y. Approval dater April 1, 1988 (J7 Cert,i.4-Lcate o4 approval 4-6 hereby granted, on approved ptan.e or .aubm-itta,l. o4 project detattP6, by the Salem Fierce Department. AZZ ptan.6 ate approved aoZeCy 4on. tdenti4Zca tion o4 type and Zoea tion o4 4iAe protection dev.i.ee.6 and equipment. AZZ plana are 6ubject to approval o4 any other authori-ty having jun.f,6di.ct-ion. Upon compZeti.on, .the app2-icant or Zn,6tatZer(-6) aha.P-1 requ"t an Z"pecti.on and/or teat o4 the ¢ire protection devLce'5 and equipment. ( ** FOR ADDITIONAL REQUIREMENTS , SEE REVERSE SIDE ** 1 New conatruc-t.Lon. Property Zocati.on ha,6 no compZ-i,ance with the psovt,5tone 04 Chapter 148 , Section 26 C/E, M. G. L. retati.ve to the tn.dtatation o4 approved 4-vice alarm dev-Lcee. The ownea o4 th4l,6 property i,6 requt Led to obtain compt-Lance as a condition o4 obtatming a Bu-itding PermZt. Prope,-zty Zocatiton .i.6 to compttance with the provZ,6tona 04 Chapter 148 , Section 26 C/E, M.G. L. ** N01E: See attached letter to Bldg. insp. (, xp4>.a tion date: April 1, 1989 1 ✓ /l S.i,gna tute o4 Fti e 044Zc i.a t Fee due: under 7 , 500 Sq. Ft. - $10. 00 7 , 500 Sq. Ft. or Zarger - $25. 00 Form #81 (Rev. 9/87 ) 'COM, l� of o Salem, � �i5ttc1Tiz5rt� J ire peparl mrnt lqr„�q„nr:cra - 48 3�afgjellF �i1rrvt Joseph F. SullivanAlrm, :r. 01970 Chief April 1, 1988 City of Salem Mr. William H. Munroe, Inspector of Buildings One Salem Green Salem, Ma 01970 Dear Mr. Munroe: I am forwarding to you approved plans for the proposed building at #235 Bridge Street; elderly housing for the Salem Housing Authority. Conditions of approval and/or general comments are as follows: cca :moi :ter r.� 1. Mini-horns, system connected, shall be located within residenf�al s "_ units, as directed by the Salem Fire Department. 2. The number and location of portable fire extinguishers shall 15-67 in accordance with 527 Code of Massachusetts Regulations 10.00:x` 3. The installation of carpeting shall be in accordance with the co provisions of Article 920.7.2 of the Massachusetts State Building Code. 4. The installation of standpipes shall be in accordance with the provisions of N1'PA 14 (Standpipe and Hose Systems). Such standpipe shall be a Class III system, .with 2-1/9- inch National Standard hose threads, and 1-1/2 inch Iron Pipe threads. 5. A fixed temperature (195 degree) heat detector shall be located at the top of the elevator shaft in lieu of a smoke detector. 6. A Knox Rapid Entry Key Box shall be located, as directed, by the Salem Fire Department. 7. Fire alarm box number 2363 will be assigned to this building by the Salem City Electrician. 8. The basement area shall be provided with a system of automatic sprinklers as per Massachusetts State Building Code Article 1202.13 whereas the area of the basement exceeds 2,500 square feet. The installation of the sprinkler system shall be in accordance with the provisions of NFPA 13. Should you have any questions relative to this approval, please contact the Fire Prevention office. Signed, Robert W. Turner, Fire Marshal L7 ws» M C> — Sr (n cn �+ �1 �Ic:�P � � ¢¢ & moclaf¢d Jnc. CONSULTING ENGINEERS March 31, 1988 Mr. Joseph Carroll The Architects Collaborative, Inc. 46 Brattle Street Cambridge, MA 02138 RE: Salem Housing Project D.A. I. Project No. 85323 Dear Joe: Responding to your request , I have reviewed the letter from;u Salem Building Department dated March 17, 1988 -and am replying with the following: Question No. 1: s _v CZIP Provisions of Sprinklers in the basement is a decision that _ authorities having jurisdiction will have to make. Question No. 2: According to our interpretation of the codes, only habitable areas and larger storages are to be provided with the heat detectors. Question N0. 3 : Corridor air supply duct is not provided since the system is less than 2,000 C.F.M. Question No. 4: Smoke evacuation system is not installed since the building in case of fires is provided with stair pressurization fans to keep the stairs clear of smoke and the corridors are pressurized by 0.25 C.F.M. per square foot for same reason. Question No. 11: Heating computations are attached, cooling is not provided. Restfu uy, Michael L. Dee, P.E. President One Eliot Square Cambridge, Massachusetts 02138 . Tel. [617] 661-1465 rf ,, a5 ; MICHAEL E.O'BRIEN �� 9LeONARD F. FEMINO CITY SOLICITOR �'+, o`` ASSISTANT CITY SOLICITOR 93 WASHINGTON STREET 93 WASHINGTON STREET and and 187 FEDERAL STREET CITY OF SALEM 30 MAIN STREET SALEM,MA 01970 MASSACHUSETTS PEABODY.MA 01960 7d5-4311 745-4311 744.3363 531.1701 Please Reply to 187 Federal Street Plecee Reply to 30 Main Street February 14 ; 1986 Elayne M. Hart, Executive Director Salem Housing Authority. 27. Charter Street n ° Salem, .Massachusetts 01970 . Dear Elayne: U, �1- Please be advised the Mayor has asked me to look. intriTth'e waiver of fees he authorized in connection with your `propos"ed-� ' projects. Upon reviewing the applicable law; such fees' maiy` be' waived; but, if so, all fees for other projects must alscPbe ' waived. Accordingly, it would be impractical to waive the fees in this matter: I recognize that on April 2 , 1984 , the Mayor indicated he wished to waive fees for your projects ; However; he did not con- sult with me nor was he aware that other fees would have be be waived. Obviously, this office, as well as all departments in the City, will do all we can to help you in your endeavors: It is regrettable that we cannot help regarding the matter of the fees . ery truly yo s" ael E: 0 r ' City Solicitor n -T7 rn MEO/jp -c Cc: Mayor Anthony V. Salvo Mm ca = William H. Munroe, Building Inspector a m CID ^- mZ. Cn y _ y Q7 JOB STATUS REPORT Salem Elderly Housing, 667-7A;Broad Street` Project No. 85013-A Oliver School Report Date 5/5/89 Project Mgr Richard Sabin Demolition 99% Roofing 25% Site 5% Excavation 99% Sash/Glazing 25% Plumbing 65% Foundation 99% Partitions 85% HVAC 70% Frame 90% Doors/Frames 25% Electric 75% Exterior Walls 90% Finishes 15% Fire Protection 50% Floors/Roof 90% specialities 15% Elevator 60% Comments; Drywallers have taped and sanded. Painters on ceilings and sanding existing trim. Carpenters hanging doors and placing trim. Electrician pulling wires. Plumber completing sprinkler piping in basement and heads in attic. n � Distribution Building Department a R. Sabin TAC R. Peters TAC File mm a m< C3 o rn m m N C.0 Signed---------------/- i= ••------------------------- THE ARCHITECTS COLLABORATIVE INC . 46 BRATTLE STREET CAMBRIDGE MASS . JOB STATUS REPORT Salem Elderly Housing, 667-7A, Broad Street Project No. 85013-A Oliver School Report Date 5/19/89 Project Mgr Richard Sabin Demolition 99% Roofing 50% Site 5% Excavation 99% Sash/Glazing 65% Plumbing 70% Foundation 99% Partitions 95% HVAC 70% Frame 90% Doors/Frames 50% Electric 75% Exterior Wails 90% Finishes 25% Fire Protection 70% Floors/Roof 90% Specialities 15% Elevator 65% Comments; Drywallers completing sanding. Painters on doors and trim. Carpenters and electricians on finishing work. Distribution Building Department R. Sabin TAC R. Peters TAC File Signed-------- - -•---�� ••••-•-•----•-•--------------------------------------------------------••---------- THE ARCHITECTS COLLABORATIVE INC . 46 BRATTLE STREET CAMBRIDGE , MASS . , � VA . e`�j.coNnrt,� &tV of `ttlEm, �rss �I#use##s <o, 01ir ,�;afrm (65rerlt Fire 5 10 fps Ftt C DECISION cc N;55 '�J art O January 27, 1986 e,L SPECIALsPERMII - SITE'PLANtEVIEW r�6 Fedexal Street Development Team c/o %&�ehn le Serafini, Esq. 63 Federal Street Salem, Ma. 01970 On Thursday, December 5, 1985, the Planning Board of the City of Salem held a public hearing regarding the application of The Federal Street Development Team, for a Special Permit under Section R, Site Plan Review of the Salem Zoning Ordinance, with respect to the:construction of sixteen residential dwelling units a[235 Bzidge Street, Salem. At a regularly scheduled meeting of the Planning Board held on Thursday, January 23 , 1986, the Board voted, by a vote of six in favor, none opposed, to grant a Site Plan Review Special Permit for the work shown on a plan entitled, "Rust Street Condominiums", dated 11-18-85, revised 1-21-86, finding that the proposal complied with all requirements of the Site Plan Review requirements as set forth in Section R of said Zoning Ordinance. The approval was granted with the following conditions: 1 . Work shall conform to plan entitled, "Rust St. Condominiums", dated 11-18-85, revised, 1-21-86, except that the location of the building may be moved in a northerly direction subject to the approval of the Planning Board, and except that other conditions specified herein shall be fully complied with. 2. Refuse removal, road and ground maintenance, and snow removal shall be the responsibility of the developer or his/her successor or assigns. A .copy of rubbish removal plans shall be submitted to the Health Department. 3. Prior to issuance of Certificates of Occupancy, proposed dumpster shall be fenced and landscaped subject to the review and approval of the Planning Department. 4. Salt as a de-icing agent shall be prohibited. f t•, Y' Page 2 — 5. All construction shall be conducted in accordance with the following conditions: a. No work shall commence before 7:00 a.m. on weekdays and 8:00 a.m. on Saturdays. Work shall cease.. at 5:00 p.m. No work shall be conducted on Sundays or holidays. Inside work of a quiet nature shall be permitted at other times. b. All reasonable action shall be taken to minimize the negative effects of construction on abutters such as noise, dust, fumes. Advance notice shall be provided to all abutters in writing at least 72 hours .prior to commencement of construction. C. All construction vehicles shall be cleaned in order that they not leave dirt and/or debris on the road as they leave the site. d. All construction shall be carried out in accordance with the Rules and Regulations of the Planning Board. A Clerk of the Works shall be provided by the City at the expense of the developer as is deemed necessary by the Director of Public Works and the City Planner. 6. All landscaping shall be subject to the review and approval of the City Planner prior to issuance of Cetificates of Occupancy. 7 . Off—street lighting shall be installed and maintained in such a manner so as to not reflect or cause glare on abutting or facing residential premises nor to cause glare which adversely affects safe vision of operators of vehicles moving on nearby streets or driveways. Locations and intensities of lighting shall be approved by the City Planner prior to issuance of Certificates of Occupancy. 8. Sloped granite curbing shall be installed in locations to be defined by the City Planner. 9., An acceptable method for dust control and street cleaning shall be 'employed during construction. All construction debris shall be appropriately disposed_ of off—site. 10. Prior to _occupancy, drinking water shall be tested for pressure and bacteria. 11 . All utility tie—ins shall be subject to approval of the Engineering • Department and Plumbing Inspector. 12. Substantial violation of these conditions shall result in revocation of this permit by the Planning Board. I hereby certify that a copy of this decision and plans have been filed with the City Clerk and copies are on file with the Planning Board. — Page 3 — This Special Permit shall not take effect until a copy of the decision bearing the certification of the City Clerk that twenty days have elapsed and no appeal has been filed or that if such appeal has been filed and it has been dismissed or denied, is recorded in the Essex County Registry of deeds and is indexed in the grantor index under the name of the owner of record or is recorded on the owner's certificate of title. The fee for recording or registeirng shall be paid by the owner or applicant. �{{ �C�.XX�v`tY •� ---7 Walter B. Power, IIUI Chairman 1 e� `�� ` (lite of �5,Am, tt tttl usetts e i — "- = ���c�1tTTTlt� ��IIZITI Onr ,'Ftt1rm Grmi FE P, 5 10 U , H 'R5 Ftl c :' DECISION CIT 1' . ...h�i55 January 27, 1986 SPECIAL PERMIT SITE PLAN REVIEW Federal Street- Development Team c/o John R. Serafini, Esq. 63 Federal Street Salem, Ma. 01970 On Thursday, December 5, 1985, the Planning Board of the City of Salem held a public hearing regarding the application of The Federal Street Development Team, for a Special Permit under Section R, Site Plan Review of the Salem Zoning Ordinance, with respect-to -the construction of sixteen residential dwelling units at,.235 Bridge Street, Salem. 'F At a regularly scheduled meeting of the Planning Board held on Thursday, January 23 , 1986, the Board voted, by a vote of six in favor, none opposed, to grant a Site Plan Review Special Permit for the work shown on a plan entitled, "Rust Street Condominiums", dated 11-18-85, revised 1-21-86, finding that the proposal complied with all requirements of the Site Plan Review requirements as set forth in Section R of said Zoning Ordinance. The approval was granted with the following conditions: ,1 : Work shall conform to plan entitled, "Rust St. Condominiums", dated 11-18-85, revised, 1-21-86, except that the location of the building may be moved in a northerly direction subject to the approval of the Planning Board, and except that other conditions specified herein shall be fully complied with. 2. Refuse removal, 'road and ground maintenance,, and snow removal shall be the responsibili,t.y of the developer or his/her successor or assigns. A .copy of rubbish removal plans shall be submitted to the Health .Department. 3 . Prior to issuance of Certificates of Occupancy, proposed dumpster shall be fenced and landscaped subject to the review and approval of the Planning Department. 4. Salt as a de-icing agent shall be prohibited. Page 2 — 5. All construction shall be conducted in accordance with the following conditions: a. No work shall commence before 7:00 a.m. on weekdays and 8:00 a.m. on Saturdays. Work shall cease at 5:00 p.m. No work shall be conducted on Sundays. or holidays. Inside work of a quiet nature shall be permitted at other times. b. All reasonable action shall be taken to minimize the negative effects of construction on abutters such as noise, dust, fumes. Advance notice shall be provided to all abutters in writing at least 72 hours prior to commencement of construction. c. All construction vehicles shall be cleaned in order that they not leave dirt and/or debris ^on the road as they leave the site. d. All construction shall be carried out in accordance with the Rules and Regulations of the Planning Board. A Clerk of the Works shall be provided by the City at the expense of the developer as is deemed necessary by the Director of Public Works and the City Planner. 6. All landscaping shall be subject to the review and approval of the City Planner prior to issuance of Cetificates of Occupancy. . 7. Off—street lighting shall be installed and maintained in such a manner so as to not reflect or cause glare on abutting or facing residential premises nor to cause glare which adversely affects safe vision of operators of vehicles moving on nearby streets or driveways. Locations and intensities of lighting shall be approved by the City Planner prior to issuance of Certificates of Occupancy. 8. Sloped granite curbing shall be installed in locations to be defined by the City Planner. 9. An acceptable method for dust control and street cleaning shall be employed during construction. All construction debris shall be appropriately disposed of off—site. 10. Prior to occupancy, drinking water shall be tested for pressure and bacteria. 11 . All utility tie—ins shall be subject to approval of the Engineering Department and Plumbing Inspector. 12. Substantial violation of these conditions shall result in revocation of this'permit by the Planning Board. I hereby certify that a copy of this decision and plans have been filed with the City Clerk and copies are on file with the Planning Board. — Page 3 — This Special Permit shall not take effect until a copy of the decision bearing the certification of the City Clerk -that twenty days have elapsed and no appeal has been filed or that if such appeal has been filed and it has been dismissed or denied, is recorded in the Essex County Registry of deeds and is indexed in the grantor index under the name of the owner of record or is recorded on the owner's certificate of title. The fee for recording or registeirng shall be paid by the owner or applicant. Walter B. Power, III Chairman MARCH 11, 1981 6 q Ponrh of �fprA DECISION' ON THE PETITION OF SALEM REDEVELOPMENT AUTHORITY (OWNER) AO 5 116ISF 2 :30 SALEM GROUP, INC. (PETITIONER) REQUESTING A VARIANCE FOR A PARCEL OF LAND AT WASHINGTON STREET, BRIDGE STREET AND NORTH WALKWAY, CITY C_i'=?r'� `\:%ICE SHS_ ; A hearing on this Petition was held on March 11, 1981, with the following .Board Members present: "Douglas Hopper, Chairman; Messrs. Hacker, LaBrecque, Feeherry and Piemonte. Notices of the hearing were sent to abutters and others and a notice of the hearing was published in the Salem Evening News on February 25, and March 4, 1981, in accordance with Massachusetts General Laws, Chapter 40A. The Petitioner has requested a variance for the parcel of land at Washington Street, Bridge Street and North Walkway as shown on a plan submitted to the Board, to allow the petitioner to construct ten condominium units at the site with no side yard at the southerly side of the parcel. The property is in a B-5 district where the Wini=um side yard requirement is 30 feet without a variance. The Board of Appeals, after consideration of the evidence presented at the public hearing and after viewing the property makes the following findings of fact: 1. The parcel in question is unique because of (a) its odd configuration, (b) its peculiar location and two intersections and (c) the fact that the property is a vacant piece of-'land in the center of Salem. 2. The proposed use of the property has been approved by the Salem Design Review Board and the Salem Redevelopment Authority, 3. The proposed development will be an attractive addition to the redevelop- ment of the center of Salem. 4. The proposed variance is a minimal deviation from the zoning ordinance but is essential .to the development of this parcel. On the basis of the above findings of fact, and the evidence presented at the public hearing, the Board of Appeals concludes as follows: 1. The property in question has both a peculiar location and an odd configura- tion which makes it unique. 2. The conditions described above especially affect the land in question but do not generally affect the zoning district in which the land is located, , . 3. The conditions described above which affect the land in question, but not the zoning district generally cause the following special hardship: unless the requested variance is granted, this property will not be developed in a manner which is most appropriate for the City of Salem as is outlined in the Salem Urban Renewal Plan and the Petitioner will suffer substantial financial hardship. 4; The desired variance may be granted without substantial detriment to the public good because the proposed use of the property will provide an attractive development in a vacant lot in the center of Salem. The proposed use of the property will thus enhance the appearance of the entire surrounding area. + CHC of Ism, gmiarl izI*#s A71 1' E?F' '�r�. n,E=A' '81 MAR 16 P2 :30 DECISION - SRA-STEP;N TISE - PAGE T1dO (March 11, 1981) F CITY Ci_' . ` .��r ICE Si+l_`c It ' Therefore, the Board of Zoning Appeals unanimously voted in favor of granting the requested relief. The Board grants a variance to the petitioner on the: follow- ing terms and conditions: 1. A variance is granted from the side yard restrictions of the Salem Zoning Ordinance to allow construction on the southerly side of the parcel up to the property line (i.e. , construction will be allowed to a "zero" side yard) . GRANTED Anthony M. Feeherry, Secretary.'' APPEAL FROM THIS DEC1SIOiJ, IF ANY, SHALL BE RADE PUP,SUAV To SECTIOI 17 OF THE mAS3. GENEP.AL �sl.S. C4 Pr:R 503.'AiiO S9A!.L S° Fi:'D .J 1 II1J 2D GAY$ AFTER THE GATE OF FILING OF 74!> u'�u.J'.1 IiJ 'i4E C ICE ^r T r '! CLERK. + 11. +4 ?+A.�C 0� -P,C19.L PERMIT THE *.M, + .N + - • MN TED H'c U;EN FL:D. - - MxT Gr < RUL itEO IS �9rUY, ;F + +•'. ' ' °�-r ? J.J D i .1 tJ.k,'% OF THE O:9NER gjozL> IN THE SOU"li ES a I_u,Caisis RECORDED AND t ac c•_ SCF :.=n JOTtD A 1 Trt OIJrIER S C:RTIF(CATE Dr' LTLE. C pMQ OF APKAL A COPY OF THIS DECISION AND PLANS HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK.. NF-L) &uGLAVO 7E4rPH0uc 4 TEGC&MPI, CO 2100 9p �! �/jSL/Jfi(/7 21.73 _� i. RODlSf7� a all, � . ry P a LwI.J 35.97 \ ! !\ h • i F 3 STOP / APAA'lM1NT t3ulLow& c n (ofFSf7S 70 c6Nct: rr FT ?) (` QIQ 6 >.i EXISTING BIt1c K - zb APR2TMF,U' S r 3#..tb 27.o 27../ 26.51 ' .. iR-I lA-2 �•- PA2cfL R 2 r M _ rAcars f P�07' PZ 19AI 0r L fi Al seg8 • l S>9C� I � � Pr��PAr�a ' Foil S S,.Io 7H£ 19ACPI T(c Ts COLlA8OWI VE, Or 7/,00 scRtF,t"=z-0, , RP2Ic15,lm, 8EV. 0rTal,/fcs, NOg7H SH04£ �0112�4y cr?r�P (� /6! fSS£x 572ft7 SALYM M9• j ]J S CE7`/r / 7i'!i^T` THC' / OU t J��T7o (J OF M 7_N E ��U s A �H AS�Cy oma' fl0B RT Ole- e �o AA ]� C6G7�S7 P/ZpFESS/O d�CONALLANA 236�SfJP-V 110 'fes . - ' /! I I I I THE ARCHITECTS COLLABORATIVE 30 December 1988 Mr. Stephen Santry Salem Building Department One Salem Green Salem, Massachusetts 01970 R�205 Bridge Street Dear Mr. Santry, In accordance with the provisions of Section 127 of the Massachusetts State Building Code, we have completed our inspection of the first and second floors of the new Elderly Housing Project at 205 Bridge Street. From our inspection on this date, as well as the weekly inspections during the course of construction, it is our determination that the first and second floors of the above referenced project are in conformance with the contract documents and are therefore approved by this office for installation of wallboard and ceilings. If you have any questions regarding any areas subject to this approval , please do not hesitate to call . Sincerely, THE �TS OLLAB INC. Joseph Carroll roject Manager cc: Roger Sheppard (TAC) Regie Peters (TAC) File wpjoe.dec29 4 6 B R A T T L E S T R E E T, C A M B R I D G E, M A S S A C H U S E T T S 0 2 1 3 8, U. S. A. T E L E P H 0 N E: (617) .868 - 4200 TELEX: 200165 T A C C A M U R CAB L E. T A C C A M U. S. A. cc; city Clerk p�coron4b� i ;6JI:Lt�,' C 'J't�i Tspector Salem Historical Commission 2 CITY HALL. SALEM. MASS. 01970 KCFIdT0 �O7X �5l� :Ei�, CERTIFICATE OF HARDSHIP It is hereby certified that the Salem Historical Commission has determined that the proposed construction [ ]; reconstruction [x ]; demolition [ ]; moving[ ]; alteration [ ]; painting [ ]; sign or other appurtenant fixture [ ] work as described below in the . . . McIntire Historic District. (NAME OF HISTORIC DISTRICT) Address of Property: 3 Broad Street Name of Record Owner: Salem Housing Authority DESCRIPTION OF WORK PROPOSED: Replacement of existing part slate & part asphalt shingle roof with black asphalt shingle. REASON FOR ISSUANCE OF CERTIFICATE OF HARDSHIP: [ ] 1 . The application affects only the building or structure on which work is to be done and not the historic district in general . [x] 2. The application is approved because it does not cause substantial detriment to the public welfare. [ ] 3. The application is .approved because it does not cause departure from the intent and purposes of the amended historic district act. will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act (Federal Laws, Ch. 40C) and the Salem Historical Commission. Dated: May 18, 1989 SALEM/HISTORICAL COMMISSION BY Chairman THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 02138 27 February 1989 Mr. Stephen W. Santry j Salem Building Departments One Salem Green u ca z Salem, MA 01970 s ,� Amo � o (Re�205 Bridge_Street _ r C H � Dear Mr. Santry, We reply to your letter of 22 February 1989 and our discussion today of the basement sprinklers and the single toilet room in the community area. I have today talked with the sprinkler sub-contractor who confirms that the sprinkler heads will spray up on the wood floor and framing as well as down. The fittings are to be mounted upright as opposed to pendant for this very purpose. The sub-contractor also assures me that he has coordinated the installation in all respects with Capt. Turner of the Fire Prevention section of the Salem Fire Department. The Salem Housing Authority has stated that they will store no hazardous materials in the basement and that it will be monitered by their maintenance department. There are emergency lights and illuminated exit signs for anyone that may be in the basement. Our review of the Plumbing Code today confirms that the requirement of public toilet facilities in this building for assembly use is exempted by Article 2.10,(19), (a),1. since any use of the Community Room would be for less than twenty persons. We established this from the State Building Code Table 606, based on "Assembly without fixed seats, unconcentrated (tables and chairs)" - 15 square feet per occupant. The community room area is 270 sq. ft. divided by 15 is 18. Further reading of the Plumbing Code on my return to our office suggests that the single toilet facility is allowable. This building will be supervised by one person from the Housing Authority staff and Article 210, (f) refers to one (1) water closet and one (1) lavatory for use where only one (1) person is employed or works. This would be a more practical solution than to turn the space into a storage room. Let me have your comments and if there are questions please call. Yours sincerely, THE ARCHITECTS COLLABORATIVE INC. Tog4 Uer Sheppard, Construction Administrator `i 298 CMR: BOARD OF STATE EXAMINERS OF PLUMBERS AND GAS FITTERS 2.10: continued �^% of thirty (30) inches above the base of the machine and shall be not less than one and one-half (1 1/2) inches in diameter. 2. Laundromats (CommerciaD. The minimum size of trap and standpipe or commercia Type automatic clothes washing machines shall be not less than two (2) inches in diameter, that shall connect to a drain of sufficient size to receive the simultaneous discharge of at least 75% of all machines connected thereto. 3. Commercial and Insti otutlonal. The drainage facilities to be pa r commercia an ro /or institutional laundries shall be approved by the Board. (19) Multiple Type Lavatory (Wash Sink). Each twenty (20) inch unit of usable enl ij t —or circ erence of a straight-line or circular multiple use lavatory shall be considered equivalent to one lavatory as it affects the drainage and water supply piping sizes and fixture usage requirements; provided hot and cold or tempered water for handwash- Ing Is available for each twenty (20) inch interval. (15) Garba a Can Washers. Garbage can washers shall be separately trappe T e receptac a receiving the wash from garbage cans shall be provided with a removable basket or strainer to prevent discharge of large particles into the building drainage system. Any water sup- it ply connection shall be protected against backflow by an air gap or an approved backflow prevention device. (16) S ectal Fixtures and S ecialties. Water Connections, Baptistries, ornaments and liTy—pwis, aquaria, ornamental fountain basins and similar constructions, when provided with water supplies, shall be protected from back siphonage. C (17) Sacrariums. The waste material from a Sacrarium shall be con- `- ducte separate y and directly to a drywell in the ground, which shall not be used for any other purpose. In no case shall the waste from a Sacrarium be connected to the building storm, or sanitary waste and sh vent system. The waste from a Sacrarium all not be trapped or vented. (18) Minimum Facilities for Dwellings. Whenever plumbing fixtures are installed, e minimum number of each type of fixture shall comply with the requirements of the State Sanitary Code, Article II, Minimum Standard of Fitness for Human Habitation, 105 CMR 910.00, and shall conform with 298 CMR 2.01(7). (19) Minimum Facilltities for Building Occupancy Other Than Residen- tial. (a) Assembly Occupancy (Other than schools colleges and church- es.). 1. Definition of Place of Assembl Any building designed, construt[e , reconstructe , remo eled, altered, used, or intend- - ed to be used, for twenty or more persons to assemble therein for any of the following: Dance halls; cabarets; restaurants; including the type of restaurant commonly known as a night club; all places in which alcoholic beverages are sold, or offered for sale, to be consumed on the premises; any room or space used for public or private banquets, feasts, dances, socials, - card parties, weddings or religious services except in the case of funerals in private homes; lodge and meeting halls or rooms; skating .rinks; gymnasiums; swimming pools; billiard, pool, bowling, and table tennis rooms; halls or rooms used for public or private catering purposes; funeral parlors; recreation rooms; broadcasting studios; school and college auditoriums, and all ! ... other places of similar occupancy. Nothing In this paragraph f\ shall apply to single or multiple family dwellings, or to a place -- 9/30/80 Vol. 11 - 68 248 CMR: BOARD OF STATE EXAMINERS OF PLUMBERS AND GAS FITTERS 2.10: continued - (e) Other Establishment Occupant Re uirements. In every estab- lishment, e—xce�aus es is ent an establishments where one (1) person is employed or works, plumbing fixtures shall be provided within reasonable access and in accordance with Table 4 in 248 CMR 2.10. Where two (2) or more persons are employed or work, separate waterclosets and lavatories, plainly marked, shall be provided for each sex. The minimum number of plumbing fixtures for each sex shall be determined by the maximum number of persons of that sex which has access to such facilities at any time. TABLE 4 PLUMBING FIXTURES REQUIRED FOR NON-INDUSTRIAL ESTABLISHMENTS WHERE PERSONS ARE EMPLOYED (EXCEPT PLACES OF ASSEMBLY) Persons of Minimum Number Minimum Number Each Sex of Water Closets* of Lavatories 1-15 1 7 16-35 2 2 36-55 3 2 56-80 4 3 81-110 5 3 111-150 6 4 More than 200. One (1) per 40 additional persons. * Note: Where urinals are provided for men and women, one (1) water closet less than the number specified may be provided for each urinal installed, except that the number of water closets in such a case shall not be reduced to less than two-thirds (2/3) of the minimum specified. }} (f) Location of Facilities. In every establishment where only one (1) person iemploye-Tor works, one (1) water closet and one (1) lavatory for use of its tenant shall be provided within a reasonable distance, not to exceed three hundred (300) feet. In all other establishments, toilet facilities shall be located within the premises and shall not be accessible from an adjoining establishment. (g) Minimum Facilities for Accredited Bathing Beaches. The num- ber o p um ing lxtures require or each sex at an accredited bathing beach shall be in compliance with Table 5 in 248 CMR 2.10. TABLE 4A PLUMBING FIXTURES REQUIRED INDUSTRIAL ESTABLISHMENTS Minimum Number Minimum Number Persons of Each Sex of Water Closets Persons of Each Sex of Lavatories 1- 10 1 1- 15 1 It- 25 2 16- 35 2 26- 50 3 36- 60 3 51- 75 4 61- 90 4 76-1005 91-125 5 101-150 7 151-200 8 More than 200 one (1) per 25 More than 125 one (f) per additional persons additional persons *Note - Where urinals are provided, one water closet less than the number t specified may be provided for each urinal installed, except that the number of water closets in such a case shall not be reduced less than two-thirds (2/3) of the minimum specified. 12/31/81 Vol. 11 - 72.1 :, �����° � eltp of ba[em, Aaggaefjugettg _, `� \ ',.o Pubtic Propertp Department 9�'iry�rye°�� Nuitbing Mepartment One opatem preen 745-9595 ext. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer February 22, 1989 Mr. Roger Sheppard T.A.C. Tnc . 46 Brattle Street Cambridge, MA. 02138 re; =205-Bridge"tt, �-1;0em`-MA s Dear Roger, Thank you for your letter of February 14, 1989 in response to our telephone conversation that day. I would offer the following comments regarding the same three subjects. I . It appears your U.L. design of the elevator shaft complies with the State Building Code and hopefully would not raise any objections from the State Rlevator Inspectors . 2. It appears that your route to arrive at the deletion of G.W.B. ceilings in the basement by installing sprinklers does comply with the State Builders Code, however T have some reservations about this. Are the sprinkler heads going to spray up on the wood floor and framing as well as down? What type of storage is planned by the S.R.A. for the basement and how it will be monitored? Are there emergency lights and exit signs for anyone that may be in the basement? Your design may comply but I would like to be on record that I feel the safety of the elderly people living at this proiect is being compromised. 3. The State Plumbing Code does not allow the use of unisex toilets thus requiring male and female toilets which I have communicated to your firm from the start of the project . As they would be available to anyone using the community room they both will he handicapped. In further discussion with the Salem Plumbing Inspector be advises me that two toilets are needed and required. Please keep the bi-weekly reports as required by Section 127 up to date on this project so we will be able to sign off the building cards when requested to do so. Sincerely, Stephen W. Santry Assistant Building Insnector SWS/eaf C.C. Steve Zisson w THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 02138 14 February 1989 n -n rn Mr. Steve Santry K m c Salem Building Department �m o City of Salem Din co Z One Salem Green n Salem, MA 01970Cn ' n, RE:-Sal'em dousing,-205"Bridge Street " 0 y_ Dear Mr. Santry, Further to our discussion today I set down here for the record, answers to the questions you had regarding the project: 1. The elevator shaft wall is a bearing wall constructed of 2 x 4 studs on 16" centers with double 5/8th inch drywall each side to meet U.L. design No. U301. I attach a reprint of that U.L. design. 2. For the deletion of the basement ceiling, we referred to Mass. Building Code Section 905.7 Grade floor protection. With the addition of the sprinklers in the basement it is our interpretation that no further protection of the floor-ceiling assembly and supports below the grade floor is required. The building is of type 4B construction being R-2 use group and less than 8,000 sq.ft. in accordance with Tables 305 and 305.4 3. The single public toilet in the community area is a matter for which we must seek a waiver from the Sanity Code or turn into a storage room. I will keep you abreast of our actions on the third point. If you have questions on anything else please call. Yours sincerely, THE ARCHITECTS COLLABORATIVE INC. � Lr Roger Sheppard, Construction Administrator. encls: U.L. Design U301 cc: AI Ring EOCD Steve Zisson Salem Housing Authority Richard Sabin TAC Reggie Peters TAC ti FIRE RESISTANCE DIRECTORY 736 ------ FIRE RESISTANCE RATINGS (BXUV)-Continued 5. Partite concrete—Minimum 5 in.thick of partite concrete,4 to 6 to it of perlite aggregate' to 94 Ib of portland cement. I} 'Bearing the UL Classification Marking Design,.No;U301 I� =:A� ssembly�in'g=2-Hr. Bearing wen 7 17. Finish Rating-88 Min. li . . .16"O.C. . III f n; i 114,rI II Li I 00 2 1 2 X 4 s f'vestopped 1. Noilheeds—Erpased or covered with joint finisher. 2.Johns,—Exposed or covered with fiber tape and joint finisher.As an alternate, nominal 3/32 in.thick gypsum veneer plaster may be applied to the entire surface of Classified veneer baso- board.Joints reinforced. 8. Nails—Bd cement-coated nails 1-7/8 in.long.0.0915 in.shank diem, 1/4 in.diem heads,and ly. 8d cement-coated nails 2-3/8ym m Iona 0.113 in.shank diem,9/32 m diem heads. 4. Wallboard,G psum'-5/8 thick,two layers applied either horizontally or vertically. Inner layer attached to studs with the 1-7/8 in.nails spaced 6 in 0 C Outer layer attached to studs Ij over inner layer with the 2 3/8 in. Iona nails spaced 8 in. O.C. Vertical joints located over studs.All joints in face layers staggered with joints in base layers and with joints on opposite ! II I side. Canadian Gvpsum Co_Ltd.Types C,SCX,SHX.WRX. Calories Corp.—Type 1 or FRP. N Domtar Gypsum—Type C,4 or 9. old Bond Bulding uctsTypes FSK,FSK-G.-4,FSW, W ed r Solon,n,Gm Indio Type or IVJTRGP-X2.SC%MCSSHX,WXC or WM._ Norwest Gypsum—Type Fire X. I' WrR Pabco Gypsum.A Div.of Pacific Coast Bldg.Products.Inc.—Types PG-2,-3,3W. ype 1. Windom Oyps yp 'Bearing the UL Classification Marking it Design-No:41.1302 ISI Assembly-Rating-=2'Hr. Bearing Wall Finish Rating-59 Min. 16"O.C. *Nominal Dimensions —� 21 4s I 2 3 1-1/4 Illi. 1O-3A4e / �• 4afa Horizontal Section 4 JI l Top o W Bottom of Wall Effectively Firestoppad 1.Wallboard,Gypsum— in.thick, two layers applied either horizontally or vertically. Inner i layer attached to studs with 6d cementcoated nails 1-7/8 in.long,0.0915 in.shank diem and 1/4 in.diem heads spaced 8 in.O.C. Outer layer attached to studs over inner layer with Bd cement-coated nails 23/8 in.long.0.113 in.shank diem and 9/32 in.diem heads,spaced 8 in.O.C.Vertical joints located over studs.Vertical and horizontal joints between inner and out- er layers staggered. Outer layer joints covered with fiber tape and compound,nailheads cov- ered with joint compound.As an alternate.nom 3/32 in.thick gypsum veneer plaster may be _ applied to the endre surface of Classified veneer baseboard.Joints reinforced.Wallboard oth- ar than 48 In.wide must be applied horizontally.--__..-.- -`--"------- Can upon Gypsum Co..Ltd.—Types C,SCX,SHX,WRX. Cajoles Corp.—Type 1,B,C,FRP or SF3. 'I Domtar Gypsum—Type C,4,5 or 9. Georgia-Pacific Corp..Gypsum Dlv.—Types GPFSI.GPFS3,GPFS4. L Gold Bond Building Producte—Type FSW,FSWG or F$X-G. Nonviolent Gypsum—Type Fire X. Politics Gypsum—Types PG-3,PG-4, Republic Gypsum Co.—Type FICA,RG-3,or RG4. Temple-Easter.Inc.—Types.3,VPB-3. LOOK FOR MARK ON PRODUCT JOB STATUS REPORT Salem Elderly Housing 677-713, Bridge St. Contractor: De lulius Bros. Construction Co.,lnc. TAC Report Date 12/2/88 Excavation 95% Sash/Glazing 98% site 25% Foundation 85% Partitions 45% Electric 50% Frame 100% Doors/Frames Plumbing 60% Exterior Walls 85% Finishes Fire Protection 40% Floors/Roof 95% Specialities HVAC 50% Roofing 95% Elevator 50% Comments; Storm drainage underway on the site. Interior partition studding mostly completed. Exterior masonry continuing. Plumbing and electrical roughing continuing. Distribution Building Department R. Sabin TAC J. Carroll TAC R. Peters TAC File Signed ez�,� aL Roger S eppard THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E , M A S S . JOB STATUS REPORT TAC Salem Elderly Housing 677-76, Bridge St. Contractor: De lulius Bros. Construction Co. Inc. Report Date 11/18/88 Excavation 95% Sash/Glazing 100% Site 20% Foundation 90% Partitions 20% Electric 45% Frame 100% Doors/Frames Plumbing 50% Exterior Walls 75% Finishes Fire Protection 30% Floors/Roof 95% Specialities HVAC 35% Roofing 95% Elevator 30% Comments; Site utilities mostly completed. Elevator rails installed. Interior non bearing partition studding continuing. Exterior masonry continuing. Plumbing and electrical roughing continuing. Distribution Building Department R. Sabin TAC J. Carroll TAC R. Peters TAC File Signed jt�� 7iearroll p C THE ARCHITECTS COLLABORATIVE 4 6 BRA T T L E S T R E E T C A M B R I D G E M A S S JOB STATUS REPORT Salem Elderly Housing 677-76, Bride St. TAC Contractor: De Julius Bros. Construction Co. Inc. Report Date 11/4/88 Excavation 95% Sash/Glazing 95% Site 10% Foundation 85% Partitions 10% Electric 40% Frame 100% Doors/Frames Plumbing 40% Exterior Walls 60% Finishes Fire Protection 20% Floors/Roof 95% Specialities HVAC 20% Roofing 90% Elevator 10% Comments; Excavation for site utilities started. Elevator shaft drilled. Non bearing partiton work started. Metal stairs installed. Exterior masonry started. Water main tap in Bridge Street imminant. Distribution Building Department R. Sabin TAC J. Carroll TAC R. Peters TAC File Signed 2' , U; Roger eppard THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E M A S S JOB STATUS REPORT Salem Elderly Housing 677-7B, Bridle St. Contractor: De lulius Bros. Construction Co. Inc. TAC Report Date 10/21/88 Excavation 90% Sash/Glazing 75% Site 10% Foundation 85% Partitions 30% Electric 30% Frame 95% Doors/Frames Plumbing 30% Exterior Walls 60% Finishes Fire Protection 15% Floors/Roof 90% Specialities HVAC 10% Roofing 75% Elevator Comments; Building almost enclosed, Roofing almost complete. Electrical, plumbing and fire protection continuing in Basement. HVAC ductwork continuing from basement. Window installation continuing. Distribution Building Department R. Sabin TAC J. Carroll TAC R. Peters TAC File Si ned J seph arroll THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E , M A S S THE , ARCHITECTS COLLABORATIVE INC. 11 May 1988 --0 -' ett Mr, Stephen W. Santry — Assistant Building Inspector " N . City of Salem CSD One Salem Green -T Salem, MA. 01970 1 rQ Dear Mr. Santry: Please find enclosed one copy of a certified plot plan prepared by North Shore Survey Corporation for the Salem Elderly Housing Project at 205 Bridge Street. I have also enclosed with this plan a copy of the Comprehensive Permit granted by the Salem Zoning Board of Appeals for this parcel allowing a variance from both the side yard and rear yard setback requirements. Please note that this should satisfy Item E of our 5 April letter responding to your comments regarding both the 205 Bridge Stree�3 project and the 3 Broad Street project, I will call later this week in order to clarify the status of the other procedural items such as the completion of the routing slip and delivering copies of the building permits to the Assesor's Department. For your information, a preconstruction conference was held yesterday with people from the Salem Housing Authority, EOCD, DeIulis Brothers, Rene LeMarre and TAC. During that meeting, I listed for the two contractors the items brought up by your department and stated .that these would be reviewed and included unless variances are granted ( such as in the case of the unisex toilet at 205 Bridge Street,) Please also note that we are awaiting the return of the signed contracts from EOCD and expect construction on both projects to begin shortly. Please do not hesitate to call if you have any questions. Sincerely, TH I CTS LLABO INC. J eph. Carroll oject Manager CC: Elayne Hart (SHA) Jim Puri (TAC) 4 6 B R A T T L E S T R E E T C A M B R I D G E , M A S S A C H U S E T T S 0 2 1 3 8 U. S. A. TELEPHONE : (6 1 7) 8 6 8 - 4 2 0 0 T E L E X 9 2 1 4 9 4 T A C C A M C A B L E : T A C C A M U. S. A. '67 FEF 20 p ` ` Citg Of �; Pnxrb of '4peal DECISION ON THE PETITION OF THE SALEii HOUSING AUTHCRITY FOR A�� COMPREHENSIVE PERMIT AI:D VARIANCES AT THE CORNER Or- BRIDGE & ASH STS. (B-5) � A hearing on this petition was held January 14, 1987 with the following Board ` Members present: Edward Luzinski, Vice Chairman; Messrs. , Bencal, Fleming and Strout. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. The petitioners, represented by Attorney William J. Lundregan, are requesting a Comprehensive Permit to allow the construction of thirty five (35) elderly units, in accordance with the provisions of Massachusetts General Laws Chapter 40B, Sections 21 to 23 inclusive, Variances from the rear setback and side yard require- ments of Table III, Section VI of the Zoning Ordinance, and a Variance from the parking requirements of Section VII of the Zoning Ordinance. The locus of the property is in a B-5 district. The Comprehensive Permit and the Variances which have been requested nay be granted upon a finding of the Board that: a. special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structures in the sane district; b. literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioner; and c. desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district or the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented at the hearing, and after viewing the plans, makes the folloxing findings of fact: 1 . No opposition to the petition was presented a;, the hearing; 2. Several City Officials spoke in favor of the petition; 3. The petition has the approval of the Salem Redevelopment Authority and the Salem Planning Department. On the basis of the above findings of fact, and on the evidence presented at the hearing, the Board of Appeal concludes as follows: 1 . Special conditions exist which especially affect the subject property but not the district generally; 2. Literal enforcement of the Ordinance would involve substantial hardship to the petitioner; 3. The relief requested can be granted without substantial detriment to the public good and without nullifying or substantially derogating from ' the intent of the district or the purpose of the Ordinance. {. -^ DECISION ON THE PETITION OF THE SALEM HOUSING AUTHORITY FOR A COMPREHENSIVE PERVIT AND VARIANCES AT THE CORNER OFF BRIDGE & ASH STS. pare two Therefore, the Zoning Board of Appeal voted unanimously, 4-0, to grant the requested Comprehensive Permit and Variances, subject to the following terms and conditions: 1 . That all the requirements of the Salem Redevelopment Authority, design and otherwise, and those of the Salem Planning Department, be complied with by the petitioner; 2. That the building be constructed as per the plans sumitted to the Zoning Board of Appeal; 3. That all the requirements of the Salem Fire Department relative to fire prevention safety be adhered to by the petitioners; 4. That all necessary building permits and a Certificate of Occupancy be obtained. COMPREHENSIVE PERMIT AND VARIANCES GRANTED // 9? ///. /-�aures M. Fleming, Esq. 'Member, Board of Appeal A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK THIS DECISION. IF ANY. SHALL EE MADE PURSUANT TO SECTIO14 17 1, T:" -- �ES L'WS. CHAFTER 806, AND SHALL E`_ FILM WITHIN' 20 DAYS AF EP• TEE 0 0= TH!S DL:ISION IN THE OFFICE OF THE CITY CLERK. P.::'.1: .:iSS. GENERAL L4:73. CH:dTE" C'S, .SECTION I1. THE VAPIAI:CL OR S'E'E: L . ". . ... ..4 cri 1. S5 L'L Y.DT TAI;E EF FEET U:TIL A COPY OF THE rTF_ il,..T 1 1 THE C1•, r�hG THA', .0 ;.:YS HL.� EL:^S i 'P:•i PC 'i P' I:-P'. Oi TH:.T, U SUin A.": APPEAL HAS BEEN FILE, T,-.,'T IT HAS OEE;i OF. :. IS RS;7.;C:0 IN THE SCUaH ESSEX REGISTRY 0; DEEDS AND INDEXED UNDER THE BASE OF 0..'-: _.. OF RECORD OR IS RECORDED AND NOTED ON THE O'ANER'S CERTIFICATE OF TITLE. n 03v BOARD OF APPEAL , rn C C: I'r JOB STATUS REPORT T"Salem Elderly HousingTAC Project f'BridgeStreet Project No. 85013 Report Date 8/19/88 Project Mgr J. Carroll Excavation 75% Sash/Glazing Site Foundation- 85% Partitions Electric Frame , 25% Doors/Frames Pfumbing Exterior Walls 5% Finishes Fire Protectlon Floors/Root 40% Specialities HVAC Roofing Comments; First floor framing and subflooring is complete. Non bearing partition studding has not been started in the basement. Exterior wall framing for the first floor has started. J // �r1 Distribution 4ilding Department R. Sabin TAC �m J. Carroll TAC m R. Peters TAC File Signed J � J N-./ Roger Sheppard THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E M A S S 1 887 FU 20 N '1 ;4 (CitU of �Icm, c4Utt55q.C4U5rt s 4_ Poara of '4real L,nm� DECISION ON THE PETITION OF THE SA .E'1 HOUSING AUTHORITY FOR A _- COMPREHENSIVE P7-R!-:!T AND VARIANCES AT THE CORNER OF BRIDGE & ASH STS. (B-5) A hearing on this petition was held January 14, 1097 with the following Board Members present: Edward Luzinski, Vice Chairman; Messrs. , Bencal, Fleming and Strout. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. The petitioners, represented by Attorney William J. Lundregar., are requesting a Comprehensive Permit to allow the construction of thirty five (35) elderly units, in accordance with the provisions of Massachusetts General Laws Chapter 40B, Sections 21 to 23 inclusive, Variances from the rear setback and side yard require- ments of Table III, Section VI of the Zoning Ordinance, and a Variance from the parking requirements of Section VII of the Zoning Ordinance. The locus of the property is in a B-5 district. The Comprehensive Permit and the Variances which have been requested may be granted upon a finding of the Board that: a. special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structures in the same district; b. literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioner; and c. desirable relief may be granted without substantial detriment to the public good and without nullifying or, substantially derogating from the intent of the district or the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented at the hearing, and after vieving the plans, makes the following findings of fact: 1 . No opposition to the petition was presented at the hearing; 2. Several City Officials spoke in favor of the petition; 3. The petition has the approval of the Salem Redevelopment Authority and the Salem Planning Department. On the basis of the above findings of fact, and on the evidence presented at the hearing, the Board of Appeal concludes as follows: 1 . Special conditions exist which especially affect the subject property but not the district generally; 2. Literal enforcement of the Ordinance would involve substantial hardship to the petitioner; 3. The relief requested can be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district or the purpose of the Ordinance. - y DECISION ON THE PETITION OF THE S..—'UD; HOJSING AUTHDRITY FOE F. CO};?RESENSIVr_ PER!-'7T AND VAP,IA::C=S AT THE CORNER CFF E'r.IDGE L ASH STS. pare two Therefore, the Zoning Board of Appeal voted unanimously, 4-0, to grant the requested Comprehensive Permit and Variances, subject to the following terms and conditions: 1 . That all the requirements of the Salem Redevelopment Authority, design and otherwise, and those of the Salem Planning Department, be complied with by the petitioner; 2. That the building be constructed as per the plans sumitted to the Zoning Board of Appeal; 3. That all the requirements of the Salem Fire Department relative to fire prevention safety be adhered to by the petitioners; 4. That all necessary building permits and a Certificate of Occupancy be obtained. COMPREHENSIVE PERMIT AND VARIANCES GRANTED .4.ames M. Fleming, Esq. `'Member, Board of Appeal A COPY OF THIS DECISION HAS BEE?: FILED WITH THE PLANNING BOARD AND THE CITY CLERK FF,„ THIS OECI::IOH. IF AFJY. SH�U EE L'LDE PURSUANT TO SE-710:: i7 ;F T . S. CHAPTER 86E. AND SHALL E_ hi[ . PFTFI:i 20 DAYS A,-,EP. iFE L -:. 'r :. -- Tq,< r._.;_;SIO} IN THE OFFICE OF TH." CI,' CLERK. CENERiL 7,.'.', CH:..TE^ LS, SCTI^N 11. THE VACIA;:CL C'.' .i-. . .. :.:F'C,S S5; _, he? TAI,E EFiEaT U'.T.L A COPY O: ::n ;H:.T. IF SWri f:!; A?PEAT HAS KEN i:!E T.'T V iiiS D_Ei: D:3r 1uS�L0 fi_:1'r;CEO 1N THE SCUM ESSEX REGISTR7" 0; DEEDS AND INDEXED UNDER THE OF 1,1: C. ... OF RECORD OR IS RECORDED AND NOTED ON THE O:WNER'S CERTIFICATE OF TITLE. n GD _i v BOARD OF APPEAL m ' fJ C _ lJ r- f D E I U L I S BROTHERS 0 �. G ' CONSTRUCTION CO. , INC . m I S 31 COLLINS STREET TERRACE A LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA 01970 10,E m "' r V n O Attention: Bill Munroe s m (0 z Building Inspector no o 0 RE: Salem_Housing,"Project,#667-7B n x 205 Bridge Street N W Salem,MA-01970 `a Gentlemen: Please be advised that the work on the above referenced project has been con- structed in accordance with contract documents and to the best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following, units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 214, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314, and the community areas. Sincerely, Tony Pacitti tp/adi cc: T.A.C. - Roger Sheppard S.H.A. - Elayne Hart s DEIULIS BROTHERS _ im L CONSTRUCTION CO. , INC . , 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201,202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 08, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph DE BROTHERS G L y CONSTRUCTION CO. , INC . 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 09 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph G DEIULIS BROTHERS ` CONSTRUCTION CO. , INC . y 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 'CIN 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph j l jL DEIULIS BROTHERS � '�• CONSTRUCTION CO. , INC . / 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 14 and the community areas. Very truly yours, DeIULLI-SSBBROTHERS CONSTRUCTION CO. , INC. A Tony Pacitti, Project Manager TP/ph DEIULIS BROTHERS jL CONSTRUCTION CO. , INC . 31 COLLINS STREET TERRACE A LYNN, MASSACHUSETTS 01902 (617( 595.8677 A FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 30 , 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULLIIS ' S �BROTHERS CONSTRUCTION CO. , INC. /e--7-� Tony Pacitti, Project Manager TP/ph 1 DEIULIS BROTHERS ` �f G CONSTRUCTION CO. , INC . ' 31 COLLINS STREET TERRACE A LYNN, MASSACHUSETTS 01902 Alft��� (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303,(ID 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph r,Erc,� jML DEIULIS BROTHERSCONSTRUCTION CO. , INC . 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units': 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 2� 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 5, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph jL D E I U L I S BROTHERS M _ CONSTRUCTION CO. , INC . ' 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 026J 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph r DEIULIS . BROTHERS rau�rr��. G C� CONSTRUCTION CO. , INC . 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617( 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, -208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 07 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph 2 t DEIULIS BROTHERS %Eru��� CONSTRUCTION CO. , INC . / 31 COLLINS STREET TERRACE A LYNN, MASSACHUSETTS 01902 jL (617( 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B wt,205'Bridge StYeet� 'CSalem;MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, �108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 'EJ 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIISr BROTHERS CONNSTRUUC.TTIION CO. , INC. Tony Pacitti, Project Manager TP/ph G DEIULIS BROTHERS o�r,Eru��•. CONSTRUCTION CO. , INC . ti 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 AME ' (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, P, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 09, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. ew A Tony Pa , Project Manager TP/ph G DEIULIS BROTHERS �•. CONSTRUCTION CO. , INC . s 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617( 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, ]�10, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 10 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph G DE IULIS BROTHERS m CONSTRUCTION CO. , INC . 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 AMEn�� (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, �, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph iLDEIULIS BROTHERS CONSTRUCTION CO. , INC . ' 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 30 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph DEIULIS BROTHERS G CONSTRUCTION CO. , INC . ' s 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DelULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph G DEIULIS BROTHERS y CONSTRUCTION CO. , INC . !2 ' 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the'Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph .�"<oNd, CtV of $Aom, �fflassa r4usrtts Iluhlic VropertU Pepttrtinent a�9 J^<QIMML�+'tY ill uillntq 3�lepttrtntent (Otte ittlem (6rrru 745-9595 Ext.380 Director of Public Property William H. Monroe April 6, 1988 Mr. Joseph Carroll T.A.0 Inc. 46 Brattle Street Cambridge, MA. 02138 RE: 3 Broad St . , Congregate Housing 205 Bridge St . , Elderly Housing Dear Joe, Pursuant to our recent telephone conversations regarding the above re- ferenced projects, this office knows of no reason at the present time that building permits cannot be issued. We are now in the process of issueing these permits, as there will be sixteen ( 16) permits issued for 3 Broad St. and thirty five (35) permits issued for 205 Bridges street, it will be a few days before they can be picked up. It is our opinion that both buildings will be in Use Group R and de- signated R-2 use, therefore both buildings will have sprinklered basements. I have based my opinion of the R-2 use classification at 3 Broad Street on your code consultants report (Rolf Jensen & Associates, Inc.of June 23, 1987) , and on a copy of code revision proposal (201 .3 General Definations , dwelling unit congregate) that I received from the State Board of Building Regulations and Standards oft December 22, 1987, also on my understanding that all other congregate housing projects in the Commonwealth have been R-2 use classified. I am in receipt of your letter dated April 5, 1988 and realize that there are some procedural matters that will be resolved by you as soon as possible. Please do not hesitate to call if I may be of further assistance. Regards, Stephen W. Santry Assistant Building Inspector C.C. Elaine Hart @ S.H.A Tity of �ziem, as ear usPtt ;l,n.�i Brpttrtment of Public Worke, ry •�i s alrm Curren t N WATER DIVISION GEORGE E. WHITTIE, P. E. CITY OF City Engineer _ Director of Public Services 17�q 19 P- yA `jT.� May 12, 1988 TO: Houb.r ng Au-thon i-ty, Etayne M. Ha t, Exec. Dtn.ec-ton W.i Piiam Munn.oe 9 Pubt c Pnopehty Delueis Bn.otheu Comm. Co., Inc. FROM: Thomab E. BunLke, ADOPS This Ye-tteA Cs to notisy ott coneenned panties that a i ve wateA main is toeated on .the pnopen.ty ob Baidge and Ash S'tree't. Seve+tae yearb ago -there was a break in the water. main caubed by ,a backhoe working on the site that Monency Manor 26 .located on. At that time the Water Department eoutd not obtain a shut down to nepaiA the teak. They had to drive a wooden pPug .into the main and then were able to put a ,tepain sleeve oven the teak. The condition stilt exists and shoutd the cowtieaaton caube damage to the pipe we witt have a very serious pnobtem. Ptease be advised o6 -this condition. Very #tatty youu, Thomab E. Burke Abbistan-t Dih.ec-toh. o{ Pubtie SeAviees TEB/cmc �,�EUMNT Ctu of 'fflassttr4usrtts y Ilublic PrnpertU Peparttnent �A!^<OIMryE��'tY uilbing i9epartntent (�nr �nlem Uirern 745-9595 Ext.380 Director of Public Property William H. Monroe April 6, 1988 Mr. Joseph Carroll T.A.0 Inc. 46 Brattle Street Cambridge, MA. 02138 RE: 3 Broad St . , Congregate Housing 205 Bridge St . , Elderly Housing Dear Joe, Pursuant to our recent telephone conversations regarding the above re- ferenced projects, this office knows of no reason at the present time that building permits cannot be issued. We are now in the process of issueing these permits, as there will be sixteen ( 16) permits issued for 3 Broad St. and thirty five (35) permits issued for 205 Bridges street, it will be a few days before they can be picked up. It is our opinion that both buildings will be in Use Group R and de- signated R-2 use, therefore both buildings will have sprinklered basements. I have based my opinion of the R-2 use classification at 3 Broad Street on your code consultants report (Rolf Jensen & Associates, Inc.of June 23, 1987) , and on a copy of code revision proposal (201 .3 General Definations, dwelling unit congregate) that I received from the State Board of Building Regulations and Standards on December 22, 1987, also on my understanding that all other congregate housing projects in the Commonwealth have been R-2 use classified. I am in receipt of your letter dated April 5, 1988 and realize that there are some procedural matters that will be resolved by you as soon as possible. Please do not hesitate to call if I may be of further assistance. Regards, Stephen W. Santry Assistant Building Inspector C.C. Elaine Hart @ S.H.A S�.Cox f1�tt� of *atrni, Massachusetts Public Property Peparttuettt 1Nuilbing . IrpMrtt rut 4 (one '*alem (Preen 795-0213 William H. Munroe Director of Public Property Maurice M. Martineau, Ass't Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. February 8 , 1988 Mr . Joe Carroll T .A . 0 Inc . 46 Brattle Street Cambridge , MA . 02138 RE : Housing for the Elderly , Ash St . , Salem,MA . Congregate Housing , Broad St . , Salem,MA . Dear Joe , Pursuant to our telephone conversation on February 5 , 1988 re- garding building permits for the above referenced projects , the following steps should be taken . 1 . Submit three sets of drawings to Salem Fire Prevention for approval . 2 . Submit two sets of these approved drawings along with two permit applications to the building department , routing slips should be complete when submitting application to building department . 3 . Construction control forms for each project should be completed , signed and sealed . I have discussed the permitting process with Mr. .Munroe and we would be receptive to issuing the permits when the three conditions above are met , however we would need a State and City of Salem license number from the selected contractor before any work is commenced . . '. • •. .Ichave+aenclosed the . necessary forms for you to complete . If more information is needed please do not hesitate to call me . I look foward to working with you on these projects . Sincerely , A4iz � Stephen W . Santry Assistant Building Inspector SWS/eaf JOB-STATUS REPORT _ Salem Elderly Housing 677-7B, Bridge St.;_-7 Contractor: De lulius Bros. Construction Co.,lnc TAC Report Date 5/5/89 Excavation 100% Sash/Glazing 99% Site 35% Foundation 100% Partitions 99% Electric 95% Frame 100% Doors/Frames 95% Plumbing 95% Exterior Walls 100% Finishes 85% Fire Protection 95% Floors/Roof 100% Specialities 30% HVAC 95% Roofing 100% Elevator 80% Comments; Painting continues. Carpeting completed. Installation of base started. Plumbers and electricians setting fixtures. Carpenters setting kitchen cabinets; installing hardware. Site work getting under way. Distribution Building Department R. Sabin TAC < w C)� o F a R. Peters TAC nm N z File = _ .o —v m a � � m c.o Signed Roger heppard THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E M A S S JOB STATUS REPORT Salem Elderly Housing 677-713, Bridge St. Contractor: De lulius Bros. Construction Co. Inc. TAC Report Date 5/19/89 Excavation 100% Sash/Glazing 99% Site 40% Foundation 100% Partitions 99% Electric 98% Frame 100% Doors/Frames 98% Plumbing 97% Exterior Walls 100% Finishes 90% Fire Protection 98% Floors/Roof 100% Specialities 50% HVAC 98% Roofing 100% Elevator 80% Comments; Painting continues. Installation of base continues. Plumber setting fixtures. Electrician checking systems. Carpenters setting kitchen cabinets. Kitchen appliances started. Parking area rough graded; rip-rap and rear grading under way. Distribution Building Department R. Sabin TAC R. Peters TAC File Signed X Rogell Sheppard THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E , M A S S eftp of ba[em, ,laoubugettg = Public Propertp Mepartment 3suiCDing department One fbalem green 745-9595 ext. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer June 8, 1989 Mr. Roger Sheppard T.A.C. , Inc. 46 Brattle Street Cambridge, MA. 02138 Re: Salem Housing Authority Project 205 Bridge St. , Salm, MA. Dear Roger: Thank you for your letter of June 5, 1989. In answer to questions raised about the stairwells at Bridge Street, I would agree that you have complied with 513.1.1 and 513.1.2. Upon further discussion with Mr. Munroe concerning 513.1.4, mechanical ventilating systems, we disagree with your response. Section 513.0 governs "Stairways and Exitways" and 513.1.4 specifically addresses venting exitways and corridors. The stairwells are exitways, not shafts, and run from the basement to the third floor or four stories. We do not have a problem with the corridor ventilation as designed. Thank you for your attention to this matter. Sincerely, Stephen W. Santry Assistant Building Inspector SWS/jmh c.c. Captain Turner, Salem Fire Department N Received by: Date: Delivered in Hand by: Citp of *a(em, Aaaacbugettg a+lna i9ublic i3ropertp 3Mepartment Nuffbing department One balem Orren 745-9595 ext. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer June 8, 1989 Mr. Roger Sheppard T.A.C. , Inc. 46 Brattle Street Cambridge, MA. 02138 Re: Salem Housing Authority Project 205 Bridge St. , Salem, MA. Dear Roger: Thank you for your letter of June 5, 1989. In answer to questions raised about the stairwells at Bridge Street, I would agree that you have complied with 513.1.1 and 513.1.2. Upon further discussion with Mr. Munroe concerning 513.1.4, mechanical ventilating systems, we disagree with your response. Section 513.0 governs "Stairways and Ecitways" and 513.1.4 specifically addresses venting exitways and corridors. The stairwells are exitways, not shafts, and run fran the basement to the third floor or four stories. PTe do not have a problem with the corridor ventilation as designed. Thank you for your attention to this matter. Sincerely, Stephen W. Santry Assistant Building Inspector SWS/jmh c.c. Captain Turner, Salm Fire Department Received by: Date: Delivered in Hand by: G D E I U L I S BROTHERS °�"` `B• CONSTRUCTION CO. , INC . 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 A FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B X205 Bridge Stieet Saiem;MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pac-tti, Project Manager TP/ph ' a DEIULIS BROTHERSfilm .G L CONSTRUCTION CO. , INC . , 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108 I , 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. �7 � ' Tony Pacitti, Project Manager TP/ph DjLEIULIS BROTHERS �`�%; CONSTRUCTION CO. , INC . 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109 10 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, , 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. ell- A Tony Pacitti, Project Manager TP/ph DEIULIS BROTHERS G L CONSTRUCTION CO. , INC . 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617( 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 3 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph DEIULIS BROTHERS �� G L CONSTRUCTION CO. , INC . ' 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, ,101 , , 102, 103, 104, 105, 106, 107, 108, 109, 110, 2001 0 , 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph DEIULIS BROTHERS oaf. jL CONSTRUCTION CO. , INC . , 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 02 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. A Tony Pacitti, Project Manager TP/ph G L DEIULIS BROTHERS Y CONSTRUCTION CO. , INC . ti ML 31 COLLINS STREET TERRACE A LYNN, MASSACHUSETTS 01902 AME1D��' (617( 595-8677 A FAX (617( 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 03 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 3'0-1' 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. _ A � Tony Pacitti, Project Manager TP/ph DEIULIS BROTHERS iLu CONSTRUCTION CO. , INC . ' 31 COLLINS STREET TERRACE A LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 1Q1� 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 04 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph D E I U L I S BROTHERS G CONSTRUCTION CO. , INC . ' 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 �AllE1�� (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, } , 106, 107, 108, 109, 110, 200, 201, 202, 203, 204,( 05 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph D E I U L I S BROTHERS cE>trc��s in CONSTRUCTION CO. , INC . ' 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 06 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph G D E I U L I S BROTHERS H CONSTRUCTION CO. , INC . y 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 �MErt\ (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 1�6�, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 07 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph jL- DEIULIS BROTHERS CONSTRUCTION CO. , INC . ' 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 1:�Z-205'Bii7dge=Street- Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 2 3, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph !`p cENtr�`o �1 L DEIULIS BROTHERS y �-+ CONSTRUCTION CO. , INC . 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 �AME1n�� (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 10 , 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. 4P' �' .� ' Tony Pacitti, Project Manager TP/ph G DEIULIS BROTHERS CONSTRUCTION CO. , INC . 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-713 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: ' Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104,10` , 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 5, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. A . Tony Pacitti, Project Manager TP/ph uurt� G DEIULIS BROTHERS CONSTRUCTION CO. , INC . ' 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 AYEr�� (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, O6, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 6, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. A Tony Pacitti, Project Manager TP/ph jL DEIULIS BROTHERS CONSTRUCTION CO. , INC . y ' 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101, 102, 103, 104, 105, 106, 07 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, , 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph e DEIULIS BROTHERS o, Yt`ENE�`� CONSTRUCTION CO. , INC . 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 12, 1989 Mr. William Munroe Salem Building Department One Salem Green Salem, MA. 01970 Re'Salem Housing Project 667-7B --i 205 Bridge Street,Salem, Dear Mr. Munroe, All work at referenced project has been completed in accordance with plans by T.A.C. , Inc. and complies with the State Building Code. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph �m OO o Z m "' o O1 H � � �O e r DEIULIS BROTHERS ' CONSTRUCTION CO. , INC . ` ® 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 x (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re:,.Salem Housing - Project,667-7B '205'Bridge_Street 4 Salem-, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100,101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. J/L � . Tony Pacitti, Project Manager TP/ph DEIULIS BROTHERS G L CONSTRUCTION CO. , .INC . 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617( 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: a00, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, , 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph G DEIULIS BROTHERS �� CONSTRUCTION CO. , INC . W ' o. 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, Q, 102, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. A Tony Pacitti, Project Manager TP/ph DE BROTHERS ° SEN G C� N CONSTRUCTION CO. , INC . y 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 A FAX (617( 593-7840 May 1, 1989 City of Salem Building Department One Salem Green Salem, MA. 01970 Attention: Bill Munroe, Building Inspector Re: Salem Housing - Project 667-7B 205 Bridge Street Salem, MA Contractor License Number 108 State Building License Number 039580 Gentlemen: Please be advised that the work on the above referenced project has been constructed in accordance with contract documents and to be best of our knowledge, all work complies with the Massachusetts Building Code. This statement applies to the following units: 100, 101' (0, 103, 104, 105, 106, 107, 108, 109, 110, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 314 and the community areas. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti, Project Manager TP/ph • 6 l JOB STATUS REPORT E24 `'e St. TAC Salem Elderly Housin 677-7B�Bridge St. Contractor: De Julius �ros. Construction Co. Inc. Report Date 12/2/88 Excavation 95% Sash/Glazing 98% Site 25% Foundation 85% Partitions 45% Electric 50% Frame 100% Doors/Frames 10% Plumbing 60% Exterior Walls 85% Finishes Fire Protection 40% Floors/Roof 95% Specialities HVAC 50% Roofing 95% Elevator 50% Comments; Storm drainage underway on the site. Interior partition studding mostly completed. Exterior masonry continuing. Plumbing and electrical roughing continuing. f7 rn < --C r\J G co :c rn co = rn < F a rrI F LD �' xm M Distribution Building Department y m -' R. Sabin TAC R. Peters TAC File Signed '0,, 1�4,—� Roger Sheppard THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E M A S S JOB STATUS REPORT Salem Elderly Housing 677-7B, Bridge St. Contractor: De lulius Bros. Construction Co. Inc. TAC Report Date 12/16/88 Excavation 100% Sash/Glazing 98% site 25% Foundation 100% Partitions 45% Electric 60% Frame 100% Doors/Frames Plumbing 65% Exterior Walls 87% Finishes Fire Protection 40% Floors/Roof 99% Specialities HVAC 60% Roofing 99% Elevator 50% Comments; Concrete ramp and steps formed and poured at east end. Exterior scaffolding wrapped to continue masonry work. Interior insulation on perimeter walls to start. Plumbing and electrical work continuing. < m C -G N rn c�n CO z s-rn n mm o o r m a � m N p Distribution Building Department R. Sabin TAC R. Peters TAC File Signed 2 vn= Roger Sheppard THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E M A S S JOB STATUS REPORT Salem Elderly Housing 677-76, Bridge St. Contractor: De lulius Bros. Construction Co. Inc. TAC Report Date 12/30/88 Excavation 100% Sash/Glazing 98% Site 25% Foundation 100% Partitions 45% Electric 64% Frame 100% Doors/Frames 10% Plumbing 69% Exterior Walls 92% Finishes Fire Protection 40% Floors/Roof 99% Specialities HVAC 69% Roofing 99% Elevator 50% Comments; Masonry continues from wrapped scaffolding. Interior wall insulation on exterior walls completed -cleaning up. Plumbing and electrical work continuing. Building inspected for installation of wallboard and ceilings. �' rn N C CD= rn p Cn c �m CO a m M r n ,r m r o Distribution Building Department R. Sabin TAC y R. Peters TAC File Si ned oseph Chfrcflr THE ARCHITECTS COLLABORATIVE 4 6 B R A T TIL E S T R E E T C A M B R I D G E , M A S S . JOB STATUS REPORT TAC Salem Elderly Housin 677-7B, Bridge St. Contractor: De lulius Housing Construction Co. Inc. Report Date 1/13/89 Excavation 100% Sash/Glazing 98% site 25% Foundation 100% Partitions 45% Electric 70% Frame 100% Doors/Frames 10% Plumbing 70% Exterior Walls 99% Finishes Fire Protection 50% Floors/Roof 99% Specialities HVAC 70% Roofing 99% Elevator 50% Comments; Sheetrock material deliveries and installation under way. Electric and gas services to building. Plumbing and sprinkler progress in basement. Electricians pulling wires. C7 m co ti m � N �!Yt C.; Distribution Building Department �m R. Sabin TAC +� to _ R. Peters TAC File Signed Roger Sheppard r' THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E , M A S S JOB STATUS REPORT TAC Salem Elderly Housin 677-76, Bridge St. Contractor: De lulius Housing Construction Co. Inc. Report Date 1/27/89 Excavation 100% Sash/Glazing 99% site 25% Foundation 100% Partitions 55% Electric 74% Frame 100% Doors/Frames 10% Plumbing 74% Exterior Walls 99% Finishes Fire Protection 60% Floors/Roof 99% Specialities HVAC 74% Roofing 99% Elevator 50% comments; Temporary heat installed. Exterior brickwork finished and washed down. Final caulking underway. Interior sheetrock and insulation continues. Plumbing and electrical work continues. Final trim and soffits at roof eaves being installed. A ca m K N C n- M v n _O rA-M Cc z Distribution Building Department �� = r, R. Sabin TAC �t`o r7 o 3 a M n R. Peters TAC File Signed Roger Sheppard THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E , M A S S JOB STATUS REPORT Salem Elderly Housing 677-7B, Bridge St. Contractor: De lulius Bros. Construction Co. Inc. TAC Report Date 2/10/89 Excavation 100% Sash/Glazing 99% site 25% Foundation 100% Partitions 75% Electric 76% Frame 100% Doors/Frames 10% Plumbing 76% Exterior Walls 100% Finishes Fire Protection 70% Floors/Roof 100% Specialities HVAC 76% Roofing 99% Elevator 50% Comments; Sheetrocking almost completed. Plumbing and electrical continues. n rn 4'+ri ya rf1 V7 Distribution Building Department✓ o, � c� R. Sabin TAC R. Peters TAC File Signed 21 (/X �, Roger 9hepparcl THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E M A S S . *..JOB STATUS REPORT Salem ElcJerly Housing 677=7B;Bridge St,_ Contractor: De Iulius Bros.Construction Co. Inc. TAC Report Date 2/24/89 Excavation 100% Sash/Glazing 99% Site 25% Foundation 100% Partitions 85% Electric 76% Frame 100% Doors/Frames 15% Plumbing 76% Exterior Walls 100% Finishes 2% Fire Protection 75% Floors/Roof 100% Specialities HVAC 76% Roofing 99% Elevator 55% Comments; Taping of sheetrock in full swing. Painters have started following taping with primer. Carpenters have started hanging doors and setting window trim. Sprinkler piping work in attic and basement. —1 -G i= p QJ i= T r*1 O cn� — In rn Z 3� lJl C Distribution Building Department a� m R. Sabin TAC N co R. Peters TAC File Signed Roger Sl%ppard, Corlsfruction Administrator THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E M A S S JOB STATUS REPORT Salem Elderly Housing 677-713, Bridge St. Contractor: De lulius Bros. Construction Co. Inc. TAC Report Date 3/10/89 Excavation 100% Sash/Glazing 99% site 25% Foundation 100% Partitions 95% Electric 80% Frame 100% Doors/Frames 20% Plumbing 76% Exterior Walls 100% Finishes 10% Fire Protection 75% Floors/Roof 100% Specialities HVAC 80% Roofing 99% Elevator 55% Comments; Sanding of sheetrock. Painting of doors and priming of walls where ready. Carpenters hanging doors and setting trim. HVAC setting radiation and completing boiler room work. Distribution Building Department R. Sabin TAC R. Peters TAC File Signed C,4. 6L- /i,�_ Roger S ppard, Cdilstruction Administrator THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E M A S S j4-JOB STATUS REPORT Salem Elderly Hous!ng 177-713, Bridge St. TAC Contractor: De Julius Bros. Construction Co. Inc. Report Date 3/24/89 Excavation 100% Sash/Glazing 99% site 25% Foundation 100% Partitions 97% Electric 82% Frame 100% Doors/Frames 25% Plumbing 80% Exterior Walls 100% Finishes 20% Fire Protection 80% Floors/Roof 100% Specialities HVAC 82% Roofing 99% Elevator 60% Comments; Sanding of sheetrock and trim. Painting of doors and walls where ready. Some second coat on 2nd fl. Carpenters hanging doors and setting trier. HVAC setting radiation. Plumbers have set the first toilet fixture! Electricians still pulling some wires ; fixtures, outlets and switches being set. Ceramic tile started in bathrooms, VCT started also. Distribution Building Department R. Sabin TAC R. Peters TAC File Signed • " Roger Sheppard, Constr6clion Administration THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E , M A S S JOB STATUS REPORT Salem Elderly Housing , Bridge St. TAC Contractor: De Julius Bros.s. Construction Co. Inc. Report Date 4/17/89 Excavation 100% Sash/Glazing 99% site 27% Foundation 100% Partitions 99% Electric 85% Frame 100% Doors/Frames 40% Plumbing 85% Exterior Walls 100% Finishes 35% Fire Protection 85% Floors/Roof 100% Specialities Hvac 85% Roofing 99% Elevator 65% Comments; Painting second coats. Grouting ceramic tile. VCT and sheet vinyl continuing Carpeting started third floor. Plumbers and electrician setting fixtures. Elevator people setting hoistway doors. Concrete poured for exterior ramp and stairs. Distribution Building Department R. Sabin TAC R. Peters TAC File Signed Roger STieppard, Const ction Administrator THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E , M A S S JOB STATUS REPORT Salem Elderly Housing 677-7B, Bridge St. Contractor: De lulius Bros. Construction Co. Inc. TAC Report Date 4/21/89 Excavation 100% Sash/Glazing 99% Site 29% Foundation 100% Partitions 99% Electric 88% Frame 100% Doors/Frames 75% Plumbing 88% Exterior Walls 100% Finishes 75% Fire Protection 88% Floors/Roof 100% Specialities 10% HVAC 88% Roofing 99% Elevator 70% Comments; Painting second coats. Ceramic tile finished. VCT and sheet vinyl finished. Carpeting continuing. Plumbers and electrician setting fixtures. Elevator people wiring Concrete poured for exterior patio. Carpenters setting hardware and starting kitchen cabinets. Distribution Building Department R. Sabin TAC R. Peters TAC File Signed THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E M A S S DATE OF PERMIT PERMIT No. OWNER LOCATION`r SALEM HOUSING AUTHORITY �tef Corner oft Shidge' & Ash B-5 STRUCTURE MATERIAL DIMENSIONS No.OF STORIES No.OF FAMILIES I WARD I COST elderly complex 35 Units have t eir own card by Unit VS BUILDER BOARD OF APPEAL: 1 /14/87 - GRANTED - Comprehensive Permit to allow construction of 3� elderly units and a variance from parking requirements. 'f J MICHAEL E.O'BRIEN '' y LEONARD F. FEMINO CITY SOLICITOR ��'+,,,�M yv`` ASSISTANT CITY SOLICITOR 93 WASHINGTON STREET 93 WASHINGTON STREET and CITY OF SALEM end 30 MAIN STREET 187 FEDERALSTREET MASSACHUSETTS SALEM, MA 01970 PEABODY, MA 01960 745.4311 - 745-4311 744.3363 531.1701 . Please Reply to 187 Federal Street Plecse Reply to 30 Mein Street February 14 ; 1986 Elayne M. Hart, Executive Director Salem Housing Authority. 27. Charter Street Salem, Massachusetts 01970 Dear Elayne: Please be advised the Mayor has asked me to look. into the waiver of fees he authorized in connection with your proposed projects. Upon reviewing the applicable law, such fees may be waived; but, if so, all fees for other projects must also be waived. Accordingly, it would be impractical to waive the fees in this matter. I recognize that on April 2 , 1984 , the Mayor indicated he wished to waive fees for your projects. However, he did not con- sult with me nor was he aware that other fees would have be be waived. Obviously, this office, as well as all departments in the City, will do all we can to help you in your endeavors '. It is regrettable that we cannot help regarding the matter of the fees. ery truly yo s ' ael E. 0 r ' City Solicitor n rn 1 m MEO/Jp Cc: Mayor Anthony V. Salvo G' William H. Munroe, Building Inspector (An CD 7 -m w - v -' N y m • QO w ��coror,4l lnuinv w CITY OF SALEM . MASSACHUSETTS ANTHONY V.SALVO _ PAYOR January 29, 1988 Elayne Hart, Executive Direct--- Salem Housing Authority 27 Charter Street Salem, Massachusetts Dear Mrs. Hart: This is to advise you that I have authorized the following departments to waive the necessary fees relative to the development of 35 units of elderly housing at Bridge ana Ash Street (667) and 16 units of elderly congregate housing at 3 Broad Street (667): 1 . Building Permit Fees 2. Electrical Permit Feed 3. Public Property Fees for Water & Sewer Connections and Inspection 4. Fire Department Fees as Required 5. Plumbing and Gas inspector Fees In addition, I have requestt-; our Zoning Enforcement Officer, William Munroe seek a waiver from the Board of Appeal . Very truly yours, , Anthony V. Salvo Mayor AVS/smc cc: W. Munroe P. Tuttle Capt. Turner r "ONWr CtV of �$ttleni, �fflassar4usjdfs } Ilublic VrupertU Pepartmeut 9 �p aJ���IMML�Y'4V Pnilbina Brpurtntent One Saiem (6rrrn 745-9595 Ext.380 Director of Public Property William H. Monroe l April 6, 1988 Mr. Joseph Carroll T.A.0 Inc. 46 Brattle Street Cambridge, MA. 02138 RE: 3 Broad St ._ , Congregate Housing r 05 Bridge St...,1, Elderly Housing Dear Joe, Pursuant to our recent telephone conversations regarding the above re- ferenced projects, this office knows of no reason at the present time that building permits cannot be issued. We are now in the process of issueing these permits, as there will be sixteen ( 16) permits issued for 3 Broad St . and thirty five (35) permits issued for 205 Bridges street, it will be a few days before they can be picked up. It is our opinion that both buildings will be in Use Group R and de- signated R-2 use, therefore both buildings will have sprinklered basements. I have based my opinion of the R-2 use classification at 3 Broad Street on your code consultants report (Rolf Jensen & Associates, Inc.of June 23, 1987) , and on a copy of code revision proposal (201 .3 General Definations, dwelling unit congregate) that I received from the State Board of Building Regulations and Standards on December 22, 1987, also on my understanding that all other congregate housing projects in the Commonwealth have been R-2 use classified. I am in receipt of your letter dated April 5, 1988 and realize that there are some procedural matters that will be resolved by you as soon as possible. Please do not hesitate to call if I may be of further assistance. Regards, Stephen W. Santry ✓ Assistant Building Inspector C.C. Elaine Hart @ S.H.A D E I U L I S BROTHERS G CONSTRUCTION CO. , INC . 31 COLLINS STREET TERRACE • LYNN, MASSACHUSETTS 01902 (617) 595-8677 • FAX (617) 593-7840 July 3, 1989 n C rn B r O ^C 3s to O n Mr. Steve Santry r C)m -n O City of Salem - Building Department ,n One Salem Greenfir' r �° Salem, MA 01970 n j" cn r co Cn Dear Mr. Santry, Re: 205 Bridge Street, Salem Enclosed is a copy of a change order for, DeIulis Brothers Construction Company to furnish and install fresh air louvers in both of the stairwells at the above referenced project. This work will be done as soon as the material required is received. This will take approximately four to five weeks. The work will be done in only one stairwell at a time so that one stairwell will be completely unobstructed at all times. Very truly yours, DeIULIS BROTHERS CONSTRUCTION CO. , INC. Tony Pacitti TP:pt enclosure C.C. S.H.A. - Steve Zisson E.O.C.D. - Al Ring T.A.C. - Roger Sheppard P .hang* Order :unmaunwcallh of Massachusetts :xtTrutive Office of Communities and Development 'latngc Order No. Fourteen ( 14) roJecSat lem Elderly Housing, Bridge 51,iate 30 June 1989 _ -- - )wner Gal pm Housing Authority :ontructDate April 21, 1988 :onlreclor Dalgl i q Brothers C`nnsgtrxIQJ7JonAQdtttect Tho Architects Collaborative Inc. 31 Collins St. Terrace 46 Brattle Street Lynn, MA 01,902 Cam ri;rtae. J4A .I ' 021_39 . 'tic following change is.ordered In accordance with Article 12 of the General and Supplementary Conditions of the' :ontruct: In accordance with instructions from the Salem building inspectors :. 1. Furnish and install one additional washing machine hookup in the kitchen/laundry area. ADD: $6,730.00 2 . Furnish and install emergency lighting in the mechanical and electrical rooms. ADD: 252 .00 3. Furnish and install transfer grilles and fire. dampers to ventilate stairs Nos. l and 2. ADD: x.,281.00 4 . Furnish and install combustion air ductwork at .boiler ADD: 1, 059 . 00 room, TOTAL ADD: $ , 322.00 Now Ihorernrr aubjoct to conditions herein set forth an equitable adjustment of the contract price and contract time is rxlul)11x114.1 ttx follows: (use whole dollars only) A. The original contract sum was g 21 401, 776.00 It. Not rhange by previously approved change orders C. The contract sum prior to this change order was(A+B) 9 L D, The contract sum will be lincreased)(iEA*AM 9. 322.00 (Si9t)f>ltMM#by this change order 6 E. The net change by all change orders will now be(H+D) 8 86. 059 .00 F. The contract sum will now become(A+E) b c 87 . 8 35. 0 0 O. The contract time will be pkl6 HIU11lf)(unchanged)by H. The substantial completion date(is)(n1 WX4Aft f01 19 Tully 19$9_• The conditions hereinbefore referred to ire as follows: A. The aforementioned change and work affected thereby Is subject to all contract stipulations and covenants. H. The rights of the Owner are not prejudiced, C. All claims against the Owner which are incidental to or.a consequence of the aforementioned change are satisfied. D. This change order Is not valid until approved by the LHA.Architect and EOCD. E. Signature of the Contractor indicates agreement herewith,including adjustment to contract sum and/or contract time. APPRO D: prchlteCt APPROVED: Owner Firm �Fhe ArCriitects Collaborative Inc. Salem Housing Authority ny -- By Date Date APPROVED: Project Representative APPROVER:Construction Advisor Executive Office of Communities and Development lly_._,_,_. By Dale Date ACCEPTED: Contractor APPROVED: Firm ,;eI ul i O B O he)"4 Ori,�t.- �r i rih CO Executive.Otfice of Comniumlles and Development' Date t THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 02138 20 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. William H. Monroe ✓ RE: 205 Bridge Street, Salem Elderly Housing Gentlemen: At Mr. Santry's direction, I am forwarding the enclosed letters referring to all the apartment units at the subject project for your attention. We shall be forwarding two additional change orders as soon as they can be processed. One will cover the installation of an additional clothes washing machine hookup and the other, installation of emergency lighting in the mechanical and electrical rooms in the basement. This additional work had been requested by your inspectors. If you have any questions please call. Yours sincerely, THE ARCHITECTS COLLABORATIVE Inc. Roger Sheppard, Construction Administrator oc: R. Sabin TAC T. Pacitti Delulis F MC .v `•� c� CG y ci) THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 300. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and iQ, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLABOR nc. ARCH/TF @4• D Sq Cj No.2279 ti � CAMBRIDGE. E MASS. N M���r, Richard Sabin, Principal and�o2�fq11H OF Record cc: Steve Zisson, SHA File v THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 301. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 11, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLAB Inc. ARCIII �' l Ol V A No.227, ti � CAMHFI UG'.! W MASS. j oti�FgCTH OF MPSSP�a Richard Sabin, Principal and of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 302. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 12, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLAB Inc. 1F,F ARCH/f� �6 CT No.2279 O CAMBRIDGE. W 3 MASS. y J oy��[)ll OF MPSSP�a Richard Sabin, Principal an of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 303. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 111„ attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLAB Inc. � m No.2279 " CAMBPI 0G5. MASS. 01f of 0PSSP4r Richard Sabin, Principal and of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 304. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 1'✓., attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLL ,VE Inc. vtED ARC it No.2279 CAMBRIDGE. W $� MASS. J [TH OF �PSSpv� Richard Sabin, Principal a ct of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 305. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and lot, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLABO Inc. �ili(iGLGGv� Sgt RE R y�T� C No.2279 ? H � CAMBRIDGE W MASS. j oy��(TH or �PSsp�e Richard Sabin, Principal and .Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 306. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and iZ„ attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLABORATIVE Inc. No.2279 2 N K � CAMBRIDGE y, i y � MASS. J oy� SpV� Richard Sabin, Principal F� rt?9i as of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 307. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 14L„ attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLL E Inc. \S,,EgED ARC/// i A Cl No.2279 H CAMBRIDGE. W 3 Mp55, j oy�fgCTN OF �PSS4v� I Richard Sabin, Principal an ect of Record oc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 308. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 11„ attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLABO Inc. ED A 9m I $ No.2279 z K CAMBRIDGE. . M55. ty, 2� /Jh O � y�Fq� PSSPG Richard Sabin, Principal and THOF MRecord cc: Steve Zisson, SHA File I THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 I ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 309. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 1Z, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLABO TIVE Inc. FRED AR � Cj a a No.2279 " G CAM Brei oc=. W MASS. j Richard Sabin, Principal ay�Fq` PSSP�of Record cc: Steve Zisson, SHA - File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 310. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 1-1, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS C�OLLAB IVE Inc. GRED AR �r i c `a a No.2279 H CA MBP I DGE. W MASS. j Richard Sabin, Principal a�fA�T �PsspG�of Record cc: Steve Zisson, SHA File i THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 314. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 12, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLA E Inc. BRED ARC T { No.2279 z O CAMBRICGE W MN55. j V� o2��gC TN OF N`PSSp Richard Sabin, Principal an of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 200. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and Yb, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. I Yours sincerely, THE ARCHITECTS COLLABORATIVE Inc. q1 No.2279 CA M SR I DG E. i W 3 MASS. J/J Ong JCZ Richard Sabin, Principal �4 PS of Record cc: Steve Zisson, SHA File I i THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 201. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 14, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLAB TIVE Inc. FED,AR �T ��Pa ym No.2279 CANIS RiUGE�W MASS. J Richard Sabin, Principal F r �p t of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing i Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 202. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 1Q„ attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. I Yours sincerely, THE ARCHITECTS COLLABO IVE Inc. SFE AR . No2279 a ` N n � CAM BRI OG E. W 9 y 1 Mp55. J O��f9 PSSP4S Richard Sabin, Principal a of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 203. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 1d, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLA VE Inc. s No.227 z ti CAM BRI UG! W 3 MASS. J ory�f9CTN MPSSPv� Richard Sabin, Principal an OF t of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 204. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 1*1, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLA ATIVE Inc. RED ARC ? Q SPF k�6 No.2279 CAMBNILGE. W MASS. j py��q` �SpVZ Richard Sabin, Principa ct of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 205. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 10L, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLABORATIVE Inc. EO A T a F e � m m No.2279 i. � CAIAiBBiOG E. MASS. oy�f`—/�/per Richard Sabin, Principal a f hft Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 206. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 141, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractors request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COL Inc. v�SStsEDD ARCH/rF�,�. � No.2279 � K 0 CPMBPIBGE. /W MA55. j V� O,��Fq(rH Of �PSgP Richard Sabin, Principal an ct of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 207. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 11, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLAB E Inc. SEpk A H/ � r�ci No.2279 i� 3 CAM BNII. ?� MA55Jy Oy �4 HEq�TH F�PScP Richard Sabin, Principal an of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 208. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinent to Code matters (No's. 2, 8 revised and 11L, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLABOR Inc. ED A cl c, No.2279 a K � CAMBRIDGE W 3 MASS. j Richard Sabin, Principal an oy�fq( �P Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 209. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 111, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLAB Inc. S',,RED AR it No.2279 ` K CAMBRIDGE. W MASS. j oy�F'�[TH OF Richard Sabin, Principal and of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 210. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 11., attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLAB Inc. EKED A M/ No.2279 z ti CAMBRIDGE. W MASS. j P oy fgt'N of V'�SSv Richard Sabin, Principal an of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 214. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 11, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITTEE�CTTS�C�OLLLABOR Inc. No.2279 ' H 7 CA 148R Df6E. W r MASS. h S2 . M�ggP Richard Sabin, Principal and Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 100. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 12, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLA IVE Inc. ED AFHi 0 A, S TFCT 9 No.2279 Mj � CABHIDG E.J W -,3n MASS. J Z \` b�f17'li Or MpS�Po Richard Sabin, Principal d ,9eJx ct of Record cc: Steve Zisson, SHA File t THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 101. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 1Q, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLABORATIVE Inc. zalllvl "` aasy�r v m� No. 3 CAMBRIDGE C 3 MASS. Richard Sabin, Princi �F�` C t of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 102. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 1Q„ attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLABORATIVE Inc. P w �S p Q'..� �,PR .S,q Cl. V B No.2279 z y CAM BPI AGE. W q� MASS. ; y o /a Richard Sabin, Princ yah+ F ct of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 103. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 11, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COL RATIVE Inc. A�L / j S� Ep / c `+� 0 Sid T No.2279 z1 CAMBRIDGE. W MASS. J Oy i�Z Richard Sabin, PrinaPSST itect of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 104. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 111, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS C ATIVE Inc. 00 ARC it e a No.2279 8 CAM Sf?t AGE. W 3� MASS. y�fq�iH Of MPSSPC Richard Sabin, Princi rchitect of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 105. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 14, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COL TIVE Inc. //WU'�Z�'vC SS Tf C� 6 r No.2279 ti CAM BHI DGE. W 3 MASS. Jy oy��q�TN OF MPSSpu Richard Sabin, Principa itect of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 106. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 1Q, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHII/TE�pCTT,S�COLL VE Inc. S�`cPfD A Hr PR S FCl r No.2279 CAMNCIDIG S. (� MASS. 1 J� 0 `r tH OF MPSSP Richard Sabin, Principal a ect of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 107. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 111, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COL TIVE Inc. D A N� c i No.2279 ti 6A 618910GE. W g MASS. 5 J Richard Sabin, PrincipahfA�T F �PSSPect of Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 108. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 12, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLAB VE Inc. S,��RED ARC ,/✓/J_ _ / aD F ii'�/✓Lli-✓ C P No.2279 CAMBRIDGE. W MAS 5. 5 Richard Sabin, Principal ahF9<r" o M"Sof Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 15 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 109. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 1%, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS COLLABOR TIVE Inc. ED AR as L 9A m No'2279 H CAM BRI AGE. K W � MASS. J Z Richard Sabin, Principal ay�Fq� "SSP�oI Record cc: Steve Zisson, SHA File THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 021388 115 June 1989 Salem Building Department One Salem Green Salem, MA 01970 ATTN: Mr. Steve Santry RE: 205 Bridge Street, Salem Elderly Housing Gentlemen, At the request of the Contractor and in accordance with the intent of Section 127 of the State Building Code, we have made a final inspection of unit apartment number 110. From that inspection on 31 May 1989 it is our opinion that, to the best of our knowledge, the areas noted are in substantial conformance with the contract drawings, Change Orders pertinant to Code matters (No's. 2, 8 revised and 10L, attached) and applicable provisions of the Massachusetts State Building Code and that the Contractor's request for a Certificate of Occupancy is in order. Yours sincerely, THE ARCHITECTS/COLLABORATIVE Inc`. �/�KGrGC G{ �IC�GGr.� Richard Sabin, Principal and Architect of Record cc: Steve Zisson, SHA File C I .e�Cwwc4'�1rr IIS 1 Change'.Order C'oniminiwcallh (if Massachusetts Excentive Office of Communities and Development Chang,-Urdu Nu. Project _ _Salem Elderly Housing 667-7B _ Date_ 29 August_ 1988___ _____ Owner .._.__Salem Housing Authority ontract Dale _ ContractorDeIulis Brothers Construction Co. Architect The Architects Collaborative Inc. 31 Collins St. Terrace , 46 Brattle Street Lynn. MA 01902 Cambridge, MA The following change Is ordered in accordance with Article 12 of the General and Supplementary Conditions of the Contract: , Provide complete sprinkler coverage in the basement of the above referenced project, to meet code and the requirements of Salem Fire Dept. See enclosed letters from DeIulis Brothers and New England water specialists and Robert W. Irvine & Sons, Inc. Now ibcn•lore subject to conditions herein set forth an equitable adjustment of the conlrnrt price and contr.0 i bole i, vstablished as follows: (use whole dollars only) A. The original contract sum was $ 2,396,800.00 H. Nrt change by previously approved change orders $ (57,00) C. The contract sum prior to this change order was(A+B) $ _2,_39Fi,743_f10 D. The contract sum will be(Increased)(gig ,�y{. l XWAftAJ9M by this change order $ 16.471 .00 E. The net change by all change orders will now be(B+D) S 16,414-00 F. The contract sum will now become(A+E) S 2+413,214.00 G. The contract time will be(irlt7t036ttd)(unchanged)by days. H. The substantial completion date(is)(tji WkslXXpM* 19 June . 19 89 The conditions hereinbefore referred to are as follows: A. The aforementioned change and work affected thereby Is subject to all contract stipulations and covenants. B. The rights of the Owner are not prejudiced. C. All claims against the Owner which are Incidental to or a consequence of the aforementioned change are satisfied. D. This change order is not valid until approved by the LHA. Architect and EOCD. E. Signature of the Contractor Indicates agreement herewith. Including adjustment to contract sum and/or contract time. APPROV A ch ect APPROVED: Owner Firm Housing Authority By By Date 1t9 Dale APPROVED: Project Representative APPROVED:Construction Advisor— Executive Office of Communities and Development By By Date Dale ACCEPTED: Contractor APPROVED: Firm Executive Office of Communities and Development By 'By Date__ Date _— V' 116 i ' •, wnmonwealth of lrlasaachusette ExcruUrc Office of Communities and"Devdopmatt Change Order No. - Fight (R) Project Salem Elderly Housing 667-76 BridgepJ&. 2 February 1989 Owner Salem Housing Authority ContractDate April 21, 1988 contractor Oelulis Brothers Construction Co. Arewtect The Architects Collaborative_ Inc. ' 31 Collins St Terracp Terra46 Brattle St. Lynn, MA 01902 Cambridge, MA 02138 The following change is ordered in a000rdanoe with Article 12 of the General and Supplementary Conditions of the Contract: Pursuant to your letter proposal of 11 January 1989, furnish and install a dry sprinkler system in the attic, provide access panel and catwalk for servicing the attic located HVAC unit and extend the stairwell walls to the underside of the roof. ADD: $30,566.00 The request for extension of time is to be reviewed separately from this Change Order. \ therefore subject to conditions herein aft forth an equitable adjustment of the contract price and contract time is �Ilsbcd as follows: (ase v%de dollars only) A. The original contract sum was g 2.401 ,776.00 U. Net change by previously approved change orders a 21 .909.00 C. The contract sum prior to this change order was(A+BI a 2-423-685-00 I The contract sum win be(Increased)I ji. aatdl (jWA l M9p*by this change order $ 30,566.00 i. The net change by all chanite onlen will now be(B+D) 8 92,475.nn The contract sum will now become(A+E) g �n ;. The contract time wWbe(WFledYWJdy(ttlitt y reviewed se arately_ dwA. i. The sutwantlal_oompleua,date(is)(n1W#WdbnfW&) 19 June 19 89 'he conditions hereinbefore referred to are as follow&: t. The aforementioned dwW and wank affected thereby Is aubject to all contract stipulations and covenants. i. The rights of the Owner are not preJudfoed. :. All dalms against the Owner which are Incidental toora consequence of the aforementioned change are satisfied. This change order Y not valid until approved by the IIM Architect and EOM. Signature of the Contractor Indicates agreement herewith.Including adjustment to contract sum and/or contract time. PPROVED: Architect APPROVED: Owner 7' 6G ue ' V '' r iV Inc. Salem Housing Authority 3 By lard a SS�� Date a 4 A 4 'PROVED: Project Representative APPROVED:Construction Advisor— Executive Office of Communities and Development By Date PTCq tra£tor APPROVED: UeIull tfrothers Construction Co. nwaecutheOmceofCommunities and Development to Z,L2.,Y, f-'7I Date Salem Xcuoing �kuthvritg BUILDING DEPTDOMINICR. MARRAFFA, Chairman 27 (94ttrter *treet STEPHEN ZISSON,Vice Chairman p tt(ettt, PZtegar4usetts 01970 KATHLEEN F.BANCROFT,Treasurer �¢I¢)1(IOtt¢ 744-4432 WI LIAM J. FARRELL,Asst.Treasurer ,luN 12 3 Dz PM ELAY E M.HARRGE A. T, Member Executie Director , Secretary RECEIVED CITY OF SALEM,MAMhe 12 , 1989 Dennis Ross Plumbing Inspector City of Salem One Salem Green Salem, MA 01970 Dear Mr . Ross: Please consider this letter as an appeal of your ruling requiring that two washers and dryers be installed in the-housing for.,the elderly building at Bridge and Ash Streets While it— "is always the intention of the Salem Housing Authority to comply with all aspects of the building , fire , and sanitary codes of the City of Salem, we feel in this case that an exception should be made , and that the installation of one washer and dryer for the building be allowed and accepted. Because of the state ' s present financial difficulties , we are working with an extremely tight budget ( in fact we are over budget for this project ) , and it is simply a necessity that we incur no additional expense here if at all possible. After construction started, the question of the two washers and dryers came up both as a cost item and a practical experience item. We have found over the years that housing for the elderly building with less than 40 units can easily be serviced by only one washer and dryer . And , it was also felt that if a problem did arise in the new building , tenants could simply use the laundry facilities in the Morency Manor building next door . When this was done we did not know of the code requirement that you have called to our attention for two washers. To make the installation now would be very expensive, require construction changes, and be an extreme hardship for the authority. We respectfully request a waiver of your ruling and ask that you accept the installation as presently constituted . Favorable action on your part would be very much appreciated. Thank you for your consideration in this matter . Very truly yours, PoXn<ltt�i Dominic R. Marraffa Chairman DRM:dt tcca William Munroe THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 02138 9 June 1989 0 � 4> City of Salem, Massachussettes -' Building Departmento T One Salem Green n Salem, MA 01970 Attn: Mr. Stephen W. Santry RE: Salem Housing Authority Project, 667-713 205 Bridge Street Gentlemen, I refer to your letter of 8 June where you point out that Code section 513.1 .4 does apply to the stairwells since the stairways are exitways and therefore must be ventilated. As we pointed out at the meeting today we are painfully concerned about costs and in consultation with our HVAC consultant have developed yet another solution not brought up at the meeting which should meet requirements and not be overly expensive. 513.1.4 requires 1 cfm of fresh air per sq. ft of floor area. Considering the three habitable floors, Stair No. 1 requires 254 cfm and Stair No. 2 requires 371 cfm. We propose transfer grilles with fire dampers of appropriate free area at the first floor from corridor to stairways . This will furnish tempered air to the stairways which will not compromise the fire protection standpipes in the stairwells as outside winter air might do. A similar sized transfer grille in the ceiling of each stairwell will allow the air to flow into the enclosed attic space and out the attic eave or ridge vent. If you and Mr. Monroe find this solution acceptable we will arrange for a Change Order to the contract as soon as possible. Yours sincerely, THE ARCHITECTS COLLABORATIVE Inc. T;� Roger Sheppard, Construction Administrator CC. Richard Sabin TAC R. Turner Salem Fire Dept. Tony Pacitti Delulis Bros. afar t![ommonwra1t4 of Massar4usette DEPARTMENT OF PUBLIC SAFETY DIVISION OF INSPECTION mlo COMMOHwrALTH AVEM bog=. Elevator , CERTIFICATE FOR USE OF ELEVATOR THIS IS TO CERTIFY that permission is hereby granted to operate the above elevator in conformity with provisions of the ELEVATOR Law and Regulations governing elevators. Chapter 145, General Laws, as amended. Maximum Carrying Capaeity,...Z._(1P_d...........Pounds Rata of Tnvd,.,hO._E% ECor Min ................ I Bso `/ (�'. . t f of Iasp o"s Expires I year from above date jJq 091725 In Case of Accident Notify the Chief of Inspections at Once ren ZL4 THE ARCHITECTS COLLABORATIVE INC. 46 BRATTLE STREET CAMBRIDGE, MA 02138 j c 5 June 1989 sm a City of Salem, Massachussettes m� Building Department o Z m One Salem Green m Salem, MA 01970 Attn: Mr. Stephen W. Santry ✓ RE: Salem Housing Authority Project,,667-7B 205 Bridge Street Gentlemen, I refer to your letter of May 30 and your concerns that Code sections 513.1.2 and 513.1.4 should apply to the stairwells. Firstly, concerning light in stairways, there are two paragraphs ; 513.1.1 and 513.1.2 . 513.1.1 states interior stairways shall be provided with windows not less than ten (10) sq. ft.....or with the equiivalent source of light for each story through which the stairway passes. We have provided artificial lighting as the equivalent source. 513.1 .2 infers that a skylight may be an equivalent source when the building is not more than three stories but it is not a mandatory requirement. Secondly, concerning ventilation, the stairways, which are shafts, are regulated by 515 and 910.6, requiring venting for hot air and gases. But in this building, since the stairways do not extend through more than two (2) stories , such venting is not required ( see 515.1). In small buildings of this size we have not been required before to ventilate stairways. Of course as buildings get bigger and higher various fire safety ventilation requirements come into play. With respect to ventilation, Article 5 as a whole addresses ventilation for habitable and occupiable spaces as established in 500.1 , the general scope of the Article. In accordance with your concern of 513.1 .4, we have provided the corridors with not less than one (1) cubic foot of fresh air per sq. ft. of floor with not more than 75% recirculated. We understand the intent of this is to put the corridors under pressure to provide makeup air for apartment toilet exhausts and incidently to prevent apartment odors from seeping into the corridors. Although the mechanical system for this is in the corridors the purpose is to serve the habitable areas, the apartments. Since the stairways are not habitable or occupiable space, it does not seem that 513.1.4 applies to them. S. Santry, 5 June 1989 page 2 I hope this helps to answer the concerns noted in your letter. If you have further questions please call. Your letter also referred to required reports. We had forewarded Job Status Reports for May 5 and 19 previously and enclose a May 30 report herewith. We are assembling final affidavits from our consultants now and will foreward ours to you forthwith. Yours sincerely, THE ARCHITECTS COLLABORATIVE Inc. Roger Sheppard, Construction Administrator CC. Richard Sabin TAC R. Turner Salem Fire Dept. Tony Pecitti Delulis Bros. JOB STATUS REPORT TAC Salem Elderly Housin 677-7B, Bridge St. Contractor: De Julius Housing Construction Co. Inc. Report Date 5/30/89 Excavation 100% Sash/Glazing 99% Site 80% Foundation 100% Partitions 100% Electric 99% Frame 100% Doors/Frames 99% Plumbing 99% Exterior Walla 100% Finishes 90% Fire Protection 99% Floors/Roof 100% Specialities 75% HVAC 99% Roofing 100% Elevator 99% Comments; "Final Inspection" made this date - punch lists developed. Landscaping requires topsoil, mulches and seeding to complete. As-built drawings and maintenance/operating manuals required. Contractor's warranties and releases required together with C of O. Certificates of Completion and other EOCD requirements to follow. Distribution Building Department Vol", R. Sabin TAC R. Peters TAC File Signed THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E , M A S S Citp of harem, Alaggacbuottg ail ins Public propertp Mcpartment AW(bing Mepartment (One *alem Oreen 745-9595 aCxt. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer May 30, 1989 Mr. Roger Sheppard T.A.C. 46 Brattle Street Cambridge, MA. 02138 RE: Salem-Housing Project , 667-7B 205_Bridge-St-reet ,--Salem—, MA� Dear Roger, I am sure that you have recieved a copy of my letter to Mr. Pacitti in regards to the above referenced project . Please note items ll14and # 16 in regards to reports and affidavits from T.A.C. It appears that the stairwell pressurizing system that was shown on drawings to obtain the building permit has been deleted without notice to the fire or building department . I agree that stairwell pressurizing is not needed in buildings three stories and under, but I have concerns that 513. 12 and 513. 1 .4 should spply. Thank you for your attention to these matters. Regards, Stephen W. Santry Assistant Building Inspector SWS/eaf c.c. R. Turner - Salem Fire Tony Pacitti - DeIulis Bros. JOB STATUS REPORT - Salem Elderly Housing TAC Protect Bridge Street 23 Project No. 85013 Report Date 8/12/88 Project Mgr J. Carroll Excavation 75% Sash/Glazing Site Foundation 85% Partitions Electric Y Frame 20% Doors/Frames Plumbing Exterior Walls Finishes Fire Protection Floors/Roof 40% Specialities HVAC Roofing Comments; Excavation for the building complete. Trenching for utilities and site grading remain to be done. Building foundations are complete. Accessory foundations remain to be done. The basement floor slab has been poured. Interior bearing partitions on the basement slab are complete. First floor joists are complete and plywood subflooring has started. 4J Distribution (Building Department' R. Sabin TAC J. Carroll TAC R. Peters TAC File SI ned L Roger Sheppard THE ARCHITECTS COLLABORATIVE 4 6 B R A T T L E S T R E E T C A M B R I D G E M A S S . 'CON 01}4� ai#u of /�ttle�ii, �tts�ttrhusE##s � p� �uhlic �rnpertn �e}�ttrtutelit J�C�IMIME +„4Y 11 uillitlgelattrtnient ODnr §s:drar (kirern 13 WilliamWilliam H. Munroe Director of Public Property Maurice M. Martineau, Asst Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. March 17, 1988 Mr. Joe Carroll T.A.0 Inc. 46 Brattle Street Cambridge, MA. 02138 RE' 235 Bridge Street Dear Joe, Enclosed are the forms to be filled out to obtain, a Building Permit for the above referenced project. 1 . Please complete routing slip. 2. Please complete application for plan examination and Building Permit , with the contractors State and City Licenses number. 3. Please complete Fire Department Certificate of Approval form. 4 . Please complete the construction control form and check the box for the entire project so that we will be working with one person, responsible for the entire project . 5. Please have a Certified Plot Plan prepared showing the proposed foundation and distances from side, front and rear lot lines. Some questions that come to mind are: I . It appears that sprinklers are needed in the basement . 2. Are heat detectors needed in the attic? 3. Are smoke detectors being installed in the corridor air supply ducts? 4 . Is there a smoke evacuation system being installed? (2) 5. It appears that a second toilet is needed for public use at the Community room area, no unisex public toilets as per 210 E of the plumbing code. 6. Please call out the ratings of chase walls, corridor walls, tennant seperation walls and ceilings. 7. All doors to the units are installed in a one hour wall and should comply, "A" doors. 8. "7" doors to the stair wells are in a two hour wall and should comply. 9. Please submit data to verify 1 .5TSF soil bearing pressure. 10. Please submit data to verify how the insulation was specified. 11 . Please submit data to verify how the HVAC systems and sizes were arrived at . Please be aware that we will be looking to the person named on the chapter (1127 form, for bi-weekly reports and copies of all other tests and reports throughout the entire job. Regards; Stephen W. Santry Assistant Building Inspector SWS/eaf enc: Forms �ow171 BOARD OE ASSESSORS 93 WASHINGTON STREET, CITY HALL. SALEM. MASSACHUSETTS 01970 (617) 744-0660 March 10, 1987 >a O� W _ i E .d 7 (i iC (!1 W Mrs. Josephine R. Fusco City Clerk City of Salem Salem, MA 01970 Dear Mrs. Fusco: Please be advised that the new Church Court Condominiums located on Assessors' Parcel 1135-0195, formerly having the address of 235 Bridge Street, have been assigned the new street address of 1 Washington Street. Very trulS%yours, Peter M. Caron Chief Assessor PMC:mjg cc: Kenneth B. Cahill, Postmaster Chief Joseph F. Sullivan, Fire Department Margaret R. Hagerty, Principal Clerk, Water Dept. 7/William H. Munroe, Inspector of Buildings Engineering Dept. , City of Salem John R. Serafini, Sr. , Esquire lk G DeIULIS BROTHERS [�[�4i�[ Q OG �G°�G^aG��GO44G1d CONSTRUCTION CO., INC. 31 COLLINS ST.TERR.LYNN„MA 01902 OPTE JOB NO. (617) 595-8677 �— 3 ATTENTION ,t LLL �• IVNRoE SA-�-M RE TO Tll��D�7/G \cj eI/v2cf{ Ci Co Aa -LML'-tS GENTLEMEN: WE ARE SENDING YOU Attached G Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order T657- COPIES DATE NO. DESCRIPTION I ry ...SRC FaRNT THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑. Resubmit copies for approval ><For your use ❑ Approved as noted ❑ Submit copies for distribution XAs requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO l �� SIGNED:_ X� It enclosures are not as noted, kindly notify us at once. ASTM E 648 FLOORING RADIANT PANEL RECEIVED CLIENT : DIAMOND RUG & CARPET MILLS FEB —21987 TEST NUMBER 1587-6564 DelulisBIos• MATERIAL IDENTIFICATION : SAMPLE 527 FLOORING SYSTEM : DIRECT GLUE—DOWN N ' DATE : 6 AUG 85 TEST RESULTS: Al #2 *3 MAXIMUM BURN DISTANCE (CM) : 36 . 8 36 . 8 39. 1 FLAME OUT (MINUTES) : 49. 1 58. 0 73. 0 CRITICAL RADIANT FLUX: 0. 560. 56 0. 51 AVERAGE CRITICAL RADIANT FLUX = 0. 54 STA14DARD DEVIATION 0. 8240 1 . 2 R " I PANEL TEMPERATURE 500 C A 1 . 0 GAS FLOW 0. 180 NCHH D 0. 9 HIAIR FLOW 690 SCFH 1 0. 8 PANEL PRESS 0. 25 IN WC A TRANSDUCER H 0. 7 MFG MEDTHERM T 0. 6 MODEL . 64-2-26 SERIAL NUMBER 92855 F 8. 5 CAL MEDTHERM 6/12e,84 L 9. 4 CONY. FACTOR 0. 2433 U 0. 3 X 0. 2 8. 1 e 08 DISTANCE (CM) v_ �.i'�}�t+2'Y !E'kS �BEWF..3".'u'e2'?«"4�i'WY:''.fF2t+'(°�1~A.��' �w�CI.K�:l,Q:=cT1xY*, . ..-;-• «. . .i.Ji...:,> f :'.� `rr_ .........s.ncE3.ii. -:;:.•5_.31--a.�:_..',>._.: ..: , ��..r.`sani�6;ir'"rTvZ�c�•.i•�^sa...+ k: 1 • ���N! �� �� o • ■► (� ► i Ice]�m mom i!� t, ■■illi ■ : : i ' � � �� . . t� a I i, � . , sib _(� Oi_ � �. . � 10 . : . m s. ; ' ■ . : �; o iINN . � w" u. 6pel k1d l , � �� .-.. ice,_ .. �- �....•-. r- Q �- �© (il� t� � � / ai:X7 1■i yf.0 F .. THE ARCHITECTS COLLABORATIVE INC. 5 April 1988 Mr. Stephen W. Santry Assistant Building Inspector o City of Salem01 =' (7 1,.17. _ One Salem Green Salem, MA - ID z 1'a Dear Mr. Santry: Vr " G9 "� • C"FJ Following our conversation yesterday, we took the following actions in order to clear up any remaining issues concerning the Salem Housing Projects before the Thursday deadline for State Notice of Award to the low bidders. I. We met with Mr. Turner yesterday afternoon and received approval for the 3 Broad Street project. A letter from Mr. Turner is being forwarded to your office. Mr. Turner has previously reviewed and approved 205 Bridge Street. II. Please refer to your letter of March 17. Our action on the items are listed below: A. Routing Slip 1 . I went to the Assessors Department following our meeting with Mr. Turner yesterday. I was told by that Department that I needed to submit a building permit with a plot plan. Therefore, they would not sign the routing slip. I will submit building permits with plot plans for both buildings when the permit is issued. The Assessors Department also corrected the street address to 205 Bridge Street. 2. The Planning Department has signed the routing slip. 3. Mr. Turner has signed 205 Bridge Street and will sign 3 Broad Street. 4. Department of Public Services — George Whitten has signed 3 Broad Street and will sign 205 Bridge Street when the Salem Redevelopment Authority provides him with the Letter of Agreement that the SRA will use the money from the sale of the land for sidewalk, etc. repair around the site. The letter is available in the Planning Department but the copier was broken yesterday afternoon. 4 6 B R A T T L E S T R E E T C A M B R I D G:E M A S S A C H U S E T T S 0 2 1 3 8 U. S. A. T E L E P H 0 N E: (6 1 7) 8 6 8-4 2 0 0 T E L E X. 2 0 0 1 6 5 T A C C A M U R C A B L E: T A C C A M U. S. A. Letter to Mr. Stephen W. Santry 5 April 1988 Page 2 5. The Water Department did not sign the letter because they only provide up to 1 1/2" meters, ours are larger. However, they did specify the meters would be inspected by that department and must be in cubic feet. B. Plan Examination Application. etc. - The application for plan examination has been submitted previously. It is contained in the specification books for each project. The contractor license numbers are: 1 . DeIulius Bros. (205 Bridge Street) State - 039580 City - 108 2. Rene' LaMarre State - 022065 City - 357 C. Fire Department Certificate of Approval Forms - Complete D. Construction Control Form - Attached E. Certified Plot Plan - As per our Agreement yesterday, this will be prepared and submitted for 205 Bridge Street prior to excavation. F. Responses to Questions from your March 17, 1988 Letter: 1 . Sprinklers in Basement - 205 Bridge Street - Agreed to as per Section 1202.13 of the Mass. State Building Code. 2. Refer to attached letter from M. L. Dee. 3. Refer to attached letter from M. L. Dee. 4. Refer to attached letter from M. L. Dee. 5. We are currently researching this item. As per our. discussion yesterday, if required, we shall apply for a waiver from the State Plumbing Board and will abide by their decision. 6. In Addendum #4 we clarified wall construction - corridor walls and unit separation wall are to be of one hour construction. Stair walls and elevator walls are to be of two hour construction. i Letter to Mr. Stephen W. Santry 5 April 1988 Page 3 7. The door rating for will be "A" rated. 8. "J" doors into stairwell will be two hour. 9. See attached letter from MAI . 10. See Item #11 and back—up. 11 . See attached letter and calculations from M. L. Dee. Please also find attached a copy of the approval letter from The Salem Historical Society which you requested yesterday. As we have discussed today, in order for EOCD to vote to award the contracts on Thursday, a letter from the Salem Building Department stating that the issues raised have been resolved or a course of action agreed to and that the permits are ready to be issued. We also agree to complete all procedural matters discussed previously in this letter in a prompt manner. If there are any questions regarding any of the information above, please do not hesitate to call . Sincerely, TH ClITECTS C:LABO V nc. 10,4E 2a4 J seph Carroll roject Manager cc: Ms. Elayne Hart (SHA) Mr. Paul McPartland (EOCD) Mr. Richard Sabin (TAC) Mr. Jim Puri (TAC) .. �°5�'h•N`12 ��x'.v—.,.rr..n w++.... .k a .a. CITYOFSALEM .. MASSACHUSETTS ANTHONY V.SALVO - MAYOR. - - January 29, 1988 ' Elayne Hart,� Executive Director , Salem Housing Authority 27 Charter Street Salem ,Massachusetts', Dear Mrs. Hart: This is to advise you that I have authorized the following departments to waive the necessary- fees relative to the development of 35 units of elderly . housing at Bridge and Ash Street (667) and 16 units of elderly congregate . . housing at 3 Broad Street (667): 1 : . Building Permit Fees 2. Electrical Permit Fees 3. Public Property Fees for Water & Sewer Connections and Inspection 4. Fire Department Fees as Required 5. Plumbing and Gas inspector Fees In addition, I have requests: our Zoning Enforcement Officer, William Munroe seek a waiver from the Board of Appeal . Very truly yours, , Anthony V. Salvo Mayor AVS/smc cc: W. Munroe P. Tuttle r. . Capt. Turner r y ��,.co.��, MICHAEL E.O'BRIEN y LEONARD F. FEMINO CITY SOLICITOR "+, o`` ASSISTANT CITY SOLICITOR 93 WASHINGTON STREET 93 WASHINGTON STREET and and 187 FEDERAL STREET CITY OF SALEM 30 MAIN STREET SALEM, MA01970 MASSACHUSETTS PEABODY, MA 01960 745.4311 - 745.4311 744.3363 531.1701 Please Reply to 187 Federal Street Please Reply to 30 Main Street February 14 ; 1986 i Elayne M. Hart, Executive Director , Salem Housing Authority. 27, Charter Street f' Salem, Massachusetts 01970 Dear Elayne: . Please be advised the Mayor has asked me to look. into the waiver of fees he authorized in connection with your proposed projects. Upon reviewing the applicable law; such fees may be waived; but, if so, all fees for other projects must also' be waived. Accordingly, it would be impractical to waive the fees in this matter. I recognize that on April 2 , 1984 , the Mayor indicated he wished to waive fees for your projects: However; he did not con- sult with me nor was he aware that other fees would have be be waived. Obviously, this office, as well as all departments in the " City, will do all we can to help you in your endeavors '. It is regrettable that we cannot help regarding the matter of the fees . t ery truly yo s ' ael E.' 0 r ' City Solicitor rn MEO/JP -ic m `- CC : Mayor Anthony V. Salvo M a CO r William H. Munroe, Building Inspector n m CCD M1} Jr N N/F �r J. NEL) £A164.AAJO TEG£PNnut 7UC6RAPil CO. . r DOD M1 1 ZCoO.9p �fjS�J1&t/ T 2/_73 _ l ROD 40 N i 21. I N 2 -7, 1 O a P N 3 5.97 3 S-,NV AAARTNtVT Cu16OW6- Q v t�� � (o►'PSf7S 70 CaNCCt;r� l�J��G�317�7��� r UV EXISTING 8,,Z1CK APH2T 1-iE�TS r Q 36.16 Z7.o Q 27.1 -2(,,,5 PA2C£C RIR-I f 2 IA-Z p- M f�/LEA r 1. I5'7 tAfkLS QQ - - PZ07 )019N 0r LRN13 P2EPA2 £0 Fran 51. o 71.00 THE RRCPMECTS COUR80R19rIV£; ►N4. �- ' � sc�(.E�t"-zo' RP2t�►8,(939, RAY. o�rzl,7tes: NDRTH SNORE lb02L1%V Coad DG Z cc[ 7 dry 7F;•^r- THE 1= u a ,ubf177o J OF Mgss4c /61 ESS£)' ST2fiT-SALfH,1t4. /,S !-0�./'7Z:.(� 0,'J 7-"6r ��AU.V o R06ERT iO/L' tg ® Rolf Jensen &Associates, Inc. -� �`I ' 2 � FIRE PROTECTION ENGINEERS BUILDING CODE CONSULTANTS 4 r u CITY C=' 5J_+:I , REPORT ON AUTOMATIC SPRINKLER REQUIREMENTS FOR THE SALEM ELDERLY HOUSING UNITS Prepared for : THE ARCHITECTS COLLABORATIVE 46 Brattle Street Cambridge, Massachusetts 02138 [?5554 June 23, 1987 TABLE OF CONTENTS PAGE INTRODUCTION 1 BACKGROUND 1 PERTINENT INFORMATION 1 OLIVER SCHOOL - BUILDING 667-7A 2 DESCRIPTION 2 CODE REQUIREMENTS 2 BUILDING 667-7B 3 DESCRIPTION 3 CODE REQUIREMENTS 4 CONCLUSION 4 The Salem Elderly Housing Units Page 1 - W5554 Automatic Sprinkler Requirements June 23, 1987 INTRODUCTION BACKGROUND The Architects Collaborative (Client) is designing the renovation of an existing school and the construction of a new three-story building to provide housing for the elderly. Rolf Jensen & Associates (Consultant ) has been asked by The Architects Collaborative to do research and provide an opinion regarding code requirements for the installation of automatic sprinklers in' either of the buildings . According to the Client , because the Elderly Housing Units will be funded by the State, special requirements are incorporated in the design. The State specifies it will not incorporate into the design anything that the Massachusetts State Code would not require. Therefore, only the requirements of the Massachusetts State Code will apply. PERTINENT INFORMATION The Architects Collaborative has supplied the following information to Rolf Jensen & Associates . This information is assumed to be correct in the findings stated in this report. 1. The applicable code: Massachusetts State Building Code, 4th Edition 2 . Area of each of the buildings 3 . Construction types of each of the buildings 4 . Occupancy type of each of the buildings : R-2 Rolf Jensen & Associates has not been asked to address any other design feature of the building except for the requirements of automatic sprinkler protection. Therefore, it is assumed that all other features of the building comply with P1.1 State and Local requirements . The Salem Elderly Housing Units Page 2 - W5554 Automatic Sprinkler Requirements June 23, 1987 OLIVER SCHOOL - BUILDING 667-7A DESCRIPTION Building 667-7A is an existing building which is two-stories in height . The building will be renovated, however, it will remain two stories in height with an unoccupied basement . The total area will be 11,322 square feet with the area of the largest floor being 3,774 square feet . The building will be Type 4B ( unprotected frame) construction. This building' s occupancy qualified as congregate housing as specified in Section 424, The Massachusetts State Code . There will be a maximum of 16 residents within the building . CODE REQUIREMENTS Article 3, Table 305 of the Code specifies the maximum area and height of all buildings and structures, between exterior walls, as governed by the type of construction and the use-group classification . However, because this building is an existing building and is not increased in height or area, this Table does not apply. Therefore, automatic sprinklers are not required within the existing building to obtain increases in area or height reguirements for the structure. However, the existing building of Type 4B construction would meet the requirements for construction type of a new building with an R-2 Occupancy Type. Section 424 of the Massachusetts State Code, Section on Group Residences, specifies the requirements for this building. Section 424 .2 . 1 allows existing buildings of Type 4B Construction to be converted to group residences regardless of height . This Section does require "fire warning systems" , but not automatic sprinklers. The final section pertaining to the conversion of an existing building is Article 22 of the Massachusetts State Building Code. The provisions of that Article apply to repair , alteration and/or addition to existing buildings . The following has been assumed : 1 . The building has bean lecally cccupied and/or used for a period of at least five _ears. The Salem Elderly Housing Units - Page 3 - W5554 Automatic Sprinkler Requirements June 23, 1987 2 . There are no outstanding notices of violation or other order of the building official which will not be corrected with the proposed work . The alteration of the Oliver School is classified in Article 22 as a changing of use group to a use-group of lesser hazard index number . This applies because the hazard index is reduced by changing from the current A-4 Occupancy ( hazard index = 4 ) to congregate housing (hazard index = 2 ) . Section 2203 of Article 22 contains the requirements for the change to a use-group of equal or lesser hazard. This Section does require the installation of fire alarm systems and several other emergency systems . However, it does not specifically require the installation of automatic sprinklers. Section 2203 .2 of Article 22 states that requirements exceeding those required for new construction may be reduced or removed, in part or completely, if not required by this Code for new construction . Therefore, the partially sprinklered portions of the building may have the sprinklers removed provided they are not within storage and workshop areas of the building or within the cellar or basement . Storage and workshop areas or sprinklered cellars or basements are required to remain sprinklered if they are currently sprinklered, because these areas in new buildings are required to be sprinklered by Section 1202 . 12 and 1202 . 13 . However , individual storage or workshop areas located entirely within the dwelling unit are not required to remain sprinklered. BUILDING 667-7B DESCRIPTION Building 667-7B is three stories in height with an unoccupied basement . The total area of the building is 31,245 square feet with an area of 7,811 square feet per floor . The building will be of Type 4A protected frame construction. width of firo separtion adjacent to the exterior wall is greater than 30 feet . The Salem Elderly Housing Units Page 4 - W5554 Automatic Sprinkler Requirements June 23, 1987 CODE REQUIREMENTS Table 305 of the Massachusetts State Code specifies the maximum area and height of all buildings and structures as governed by the type of construction and the use-group classification. For an R-2 Occupancy of Type 4A construction the height of the building is limited to three stories and 40 feet, and the area of the building is limited to 10,200 square feet per floor. Because the building is greater than one story in height, this area must be reduced by 20 percent . Therefore, the maximum area per floor for a three-story R-2 Occupancy of Type 4A Construction is 8, 160 square feet per floor . Because Building 667-7B is only 7, 811 square feet per floor and is not greater than three stories in height , automatic sprinklers are not required to obtain the allowable area and height increases due to automatic fire suppression installation. Article 12 of the Massachusetts State Building Code details the requirements for Fire Protection Systems . Section 1202 of this Article states where fire protection systems are required. No requirements are specified for complete automatic sprinkler installation of R-2 (Residential ) occupancies. However, requirements are stated for storage and workshop areas within these buildings which are not entirely located within a dwelling unit . Also, requirements are stated for the installation of automatic sprinklers in cellars or basements which exceed 2 ,500 square feet in area. CONCLUSION The Massachusetts State Building Code contains no requirements for the installation of automatic sprinklers throughout R-2 Occupancies. Certain areas within these structures may require the installation of automatic sprinklers, however , the entire structure is not required to be sprinklered by the Massachusetts State Building Code. Prepared by: Eric R. Rosenbaum Reviewed by : Dale R . Wheeler , P. E . Associate Manager 1797R 3 a Public VropertV Pepnrtment J�eOiMn+e O°"�4� �Iuilbiug 3Drpartntent Air ,Sealem (6reen 745-0213 William H. Munroe Director of Public Property Maurice M. Martineau, Ass't Inspector Inspector of Buildings Edgar J. Paquin, Asst Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. February 8 , 1988 Mr . Joe Carroll I .A . C Inc .' 46 Brattle Street Cambridge , MA . 02138 RE : Housing for the Elderly , Ash St . , Salem,MA . Congregate Housing , Broad St . , Salem,MA . Dear Joe , Pursuant to our telephone conversation on February 5 , 1988 re- garding building permits for the above referenced projects , the following steps should be taken . 1 . Submit three sets of drawings to Salem Fire Prevention for approval . 2 . Submit two sets of these approved drawings along with two permit applications to the building department , routing slips should be complete when submitting application to building department . 3 . Construction control forms for each project should be completed , signed and sealed . I have discussed the permitting process with Mr. Munroe and we would be receptive to issuing the permits when the three conditions above are met , however we would need a State and City of Salem license number from the selected contractor before any work is commenced . I have enclosed the necessary forms for you to complete . If more information is needed please do not hesitate to call me . I look foward to working with you on these projects . Si/ncccerrely , ea Stephen W . Santry Assistant Building Inspector SWS/eaf CONSTRUCTION CONTROL PROJECT NUMBER: 667-7B PROJECT TITLE: SHeiflrESder TyrHo(is Ing PROJECT LOCATION: 235 Bridge Street NAME OF BUILDING: NATURE OF PROJECT: 35 Units of Elderly Housing and associated Community Spaces IN ACCORDANCE WITH SECTION 127.0 OF THE MASSACHUSETTS STATE BUILDING CODE, I, RIct-t-A&P A4 SA61M Registration No. 22--79 BEING A REGISTERED PROFESSIONAL ARCHITECT HEREBY CERTIFY THAT I, OR MY PREDECESSOR, ALSO A REGISTERED PROFESSIONAL ARCHITECT, HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERAING:,,=. ENTIRE PROJECT ARCHITECTURAL x STRUCTURAL K t, FIRE PROTECTION ELECTRICAL MECHANICAL OTHER (specify) m c x [.r FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEDGE, SUC&PLANS, 4; COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE UASSAGH`USETTS STATE BUILDING CODE, ALL ACCEPTABLE ARCHITECTURAL PRACTICES AND APPLIC�bLE AWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I, OR MY DESIGNATED REPRESENTATIVE, SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND"BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 127.2.2: 1. Review of shop drawings, samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit, and approval for conformance to the design concept. 2. Review the approval of the quality control procedures for all code-required controlled materials. 3. Special architectural professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards listed in Appendix B. PURSUANT TO SECTION 127.2.3, I SHALL SUBMIT PERIODICALLY, A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE STATE BUILDING INSPECTOR. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY. .X/ I NATURE �SUBSCRIBJED AND TO BEFORE ME THIS ZZ DAY OF 19 MAY COMMISSION EXPIRES ZaJ NOTARY PUBLIC �,U�LY,EN M�P'�IU.Et�t March 31, 1988 The Architects Collaborative, Inc. 46 Brattle Street Cambridge, MA 02138 ~� a Attn: Mr. Joseph Carroll �^ m CSD Re: Salem Housing a 235 Bridge Street c =z= Dear Joe: =x" c� 9 In response to Item No. g of the comments submitted by the City of Salem Building Department on March 17, 1988, we submit the following data: The basis for the 1. 5 TSF assumed value for the allowable bearing pressure is our interpretation of the soil borings taken at the site by New England test Boring Corporation in January of 1980. At the proposed bottom of footing elevation for the new building, the existing soil strata is composed of fine yellow sand with traces of inorganic silt. The standard penetration resistance of the soil was found to be approximately 16 blows per 6 inches at the bottom of footing level. A layer of fine grey sand and clay exists at approximately 32 feet below the existing ground. Standard penetration resistance of this soil was found to be 2 to 4 blows per 6 inches. It is our determination that considering the depth of the weaker substrata, an allowable bearing capacity of 1. 5 TSF is appropriate based on presumptive bearing capacities for the soil type. All miscellaneous fill material should be excavated, as necessary, such that the foundation wall footings bear in the fine yellow sand layer or on compacted structural fill. If you should require further information, please do not hesitate to contact our office. Very truly yours, MISTRY ASrOCIATES, INC. Ste hen Desc�, P.E. Project Engineer S*Vtj1fjAi*r4P1esAPs TRANSMITTAL TO DATE 23 February 1988 Salem Fire Department JOB NO. 85013 Fire Prevention Bureau 48 Lafayette Street Salem, MA. 01970 ATTN: Mr. Robert Turner PROJECT Salem Elderly Housing 667-7A & 667-7B Gentlemen: We are sending you the following items [ attached ❑ under separate cover via_ [ prints ❑ copy of letter ❑ shop drawings E� specifications ❑ original drawings ❑ samples Copies Date or No. Description 3 sets 23 December 1987 Bid Documents - 667-7A - Oliver School 1 set Specifications and Addendums - 667-7A 3 sets Bid Documents - 667-7B - 235 Bridge Street 1 set Specifications and Addendums - 667-7B 1 each - Routing Slips 1 each - Application for Plan Examination and Building, Permit 5 each - Construction Control forms ❑ Approved as submitted ❑ Resubmit copies for approval ❑ Approved as noted ❑ Return corrected prints ❑ For your information ❑ Submit copies for distribution ❑ Disapproved [ For your approval Remarks Mr. Sant made no mention of specifications in his letter. I have included one se for each job pleas if. you require additional copies. Also included or ch is the ensive Permit issued for each job by the ZBA, SIGNED. seph Carroll cc: Salem Housing Authority, EOCD, TAC Field Supervision w attachments THE. ARCHITECTS COLLABORATIVE INC . 4 6 / B R A T T L E S T R E E T C A M B R I D G E, M A S S 0 2 1 3 a A-4 l/ Salem F-ih.e Department F,xe P-,ceven t i on Bwceau 48 La4ayette Street Salem, Ma 01970 (617 ) 745-7777 FIRE DEPARTMENT CERTIFICATE OF APPROVAL FOR BUILDING .PERMIT In accordance wi th. the p4ov.-6Zon6 o4 the Ma,6.6achu,6ett6 State Su.i,Cd ing Code and the Salem FtAe Code, appZdcation t.6 hereby made 4or apptovaC o4 plan- and the ti 6.6uance o4 a ce+rt-i.4.i.cate o4 approval 4or a bu42d Lng permit by the Salem FtjLe Department. (Re4. Seet.i.on 113. 3, Ma.6.6. State BZdg. Code) Job Location: 235 Bridge Street Owners/Occupant: Salem Housing Authority EZect,%,Lcal Contractor: F4, a Supp4e.a. Zon Contvracto4: Stgnatu,te o4 ApptZcan t: Phone #: Add,te.6.6 o4 Ctty 03 AppZ.i.ca.nt: Town: Approval date: March 4, 1988 Ce tt i.4,Lcate n. .6ubm.i tta.E 04 p4oject d n.e approved zoZely 40r 4 :Zon dev.i.eee and equtpmen . autho& ty hay.i.ng 9 uA,i,4 1-e-%(a) 6haU requeot an 4 :" and 'equ.i.pment. Please complete & return to Fire Prevention. DE :: ) Capt. Turner w.iro-i.on,e o4 the owner. o4 L,6 a P4operty Zoc ,tion tz Zn compZtan.ce with the prov-( ton,6 04 Chapter 148 , Sec ton 26 C/E, M. G. L. * See attached letter to Inspector of Buildings dated 3/4/88. i. xp'"ca't on date: March 4, 1989 St_9nature o4 F-iAe 044.1 ce Fee due: under 7 , 500 Sq. Ft. - $10. 00 7 , 500 Sq. Ft. o4 Zcvcger - $25. 00 Form #81 (Rev. 9/87 ) ee & 6dociaEe4 Ac. CONSULTING ENGINEERS March 31, 1988 Mr. Joseph Carroll _- The Architects Collaborative, Inc. ^- - 46 Brattle Street -- Cambridge, MA 02138 = RE: Salem Housing Project D.A. I . Project No. 85323 " J� Dear Joe: Responding to your request , I have reviewed the letter from Salem Building Department dated March 17, 1988 and am replying with the following: Question No. 1: Provisions of Sprinklers in the basement is a decision that authorities having jurisdiction will have to make. Question No. 2: According to our interpretation of the codes , only habitable areas and larger storages are to be provided with the heat detectors. Question N0. 3: Corridor air supply duct is not provided since the system is less than 2,000 C.F.M. Question No. 4: Smoke evacuation system is not installed since the building in case of fires is provided with stair pressurization fans to keep the stairs clear of smoke and the corridors are pressurized by 0. 25 C.F.M. per square foot for same reason. Question No. 11: Heating computations are attached, cooling is not provided. Re �yctfu y J. Michael L. Dee, P.E. President One Eliot Square . Cambridge, Massachusetts 02138 • Tel. [617] 661.1465 �t Chi# ofttlem, �5ttchu�e## re's +• .er' Aire Pepartmeut 3&a6guarlera 48 3:d4gette ,'�trert Joseph F. Sullivan *Lrm, Ott. 01970 Chief March 4, 1988 City of Salem ` Mr. William H. Munroe, f rr rig iv '. Inspector of Buildings One Salem Green Salem, Ma 01970 77 _ cn ,. Dear Mr. Munroe: N I am forwarding to you approved plans for the proposed building at *=35 Bridge Street; elderly housing for the Salem Housing Authority. -Conditions 'ofY a pproval and/or general comments are as follows: 1. Mini-horns, system connected, shall be located within residential units, as directed by the Salem Fire Department. 2. The number and location of portable fire extinguishers shall be in accordance with 527 Code of Massachusetts Regulations 10.00. 3. The installation of carpeting shall be in accordance with the provisions of Article 920.7.2 of the Massachusetts State Building Code. 4. The installation of standpipes shall be in accordance with the provisions of NFPA 14 (Standpipe and Hose.Systems). Such standpipe shall be a Class III system, with 2-1/2 inch National Standard hose threads, and 1-1/2 inch Iron Pipe threads. 5. A fixed temperature (195 degree) heat detector shall be located at the top of the elevator shaft in lieu of a smoke detector. 6. A Knox Rapid Entry Key Box shall be located, as directed, by the Salem Fire Department. 7. Fire alarm box number 2363 will be assigned to this building by the Salem City Electrician. Should you have any questions relative to this approval, please contact the Fire Prevention office. Signed, Robert W. Turner, Fire Marshal A -t Ctv of Attssttr4us is Public Propertg Peparttueut J��'o�Hn+i o��rty �lti(liva �epttrtntent ODne 3�alrm (brren 7.13-0213 William H. Munroe Director of' Public Property Maurice M. Martineau, Asst Inspector Inspector of Buildings Edgar J. Paquin, Asst Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. March 17, 1988 Mr. Joe Carroll T:A.0 Inc. 46 Brattle Street Cambridge, MA. 02138 RE: `235 Bridge Street Dear Joe, Enclosed are the forms to be filled out to obtain a Building Permit for the above referenced project. I . Please complete routing slip. 2. Please complete application for plan examination and Building Permit , with the contractors State and City Licenses number. 3. Please complete Fire Department Certificate of Approval form. 4 . Please complete the construction control form and check the box for the entire project so that we will be working with one person, responsible for the entire project . 5. Please have a Certified Plot Plan prepared showing the proposed foundation and distances from side, front and rear lot lines. Some questions that come to mind are: 1 . It appears that sprinklers are needed in the basement . 2. Are heat detectors needed in the attic? 3. Are smoke detectors being installed in the corridor air supply ducts? 4. Is there a smoke evacuation system being installed? i (2) 5. It appears that a second toilet is needed for public use at the Community room area, no unisex public toilets as per 210 E of the plumbing code. 6. Please call out the ratings of chase walls, corridor walls, tennant seperation walls and ceilings. 7. All doors to the units are installed in a one hour wall and should comply, "A" doors. 8. "J" doors to the stair wells are in a two hour wall and should comply. 9. Please submit data to verify 1 .5TSF soil bearing pressure. 10. Please submit data to verify how the insulation was specified. ll . Please submit data to verify how the HVAC systems and sizes were arrived at . Please be aware that we will be looking to the person named on the chapter # 127 form, for bi-weekly reports and copies of all other tests and reports throughout the entire job. Regards; tephen W. Sa/ntry Assistant Building Inspector SWS/eaf enc: Forms (9Mn=nfVwft4 of Auzzacfptsetts DEPARTMENT OF PUBLIC SAFETY ELEVATOR DIVISION ONE ASHBURTON PLACE, BOSTON 04108 Elevator No. e' - CERTIFICATE FOR USE OF ELEVATOR Chapter 143, General Laws,as amended. Capacity -4200 0 ��.. . Pounds Speed/Oa Feel Per Min. Date issued Inspector Chief of I pections Expires 1 year from above date In Case of Accident Notify the Chief of Inspections et Once rs.�,ea ss.neat � - i RECEIVED MAY 25 DeIuUz Bros. The Commonwealth of Massachusetts Q ' Department of Public Safety w 'Jj�r Massachusetts State Building Code(780 CMR) Building Permit Application for any Building other than a One-or Two-Family Dwelling t (This Section For Official Use Only) Building Permit Number: Date Applied: Building Official: _ g" SECTION 1:LOCATION Please indicate Block#and Lot#for locations for which a street address is not available) 205 - 01970 2416M g.:I Qvy,* No.and Street City/Town Zip Code Name of Building(if applicable) SECTION 2:PROPOSED WORK Edition of MA State Code used�4k If New Construction check here❑or check all that apply in the two rows below Existing BuildingK( Repair❑ 1 Alteration )d I Addition❑ 1 Demolition ❑ (Please fill out and submit Appendix 1) Change of Use ❑ Change of Occupancy ❑ Other ❑ Specify: Are building plans and/or construction documents being supplied as part of this permit application? Yes )' No ❑ Is an Independent Structural Engmee . g Peer Review required? I Yes ❑ No)' fBV'B feD f script' of Proposed Work: OY� k he(4lu f 0 al oN Il AN i rg19 O ^N " )J LUM f.2P' I ra._ I v eaa SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Investigation and Evaluation is enclosed (See 780 CMR 34) ❑ Existing Use Group(s): Proposed Use Group(s):_ � SECTION 4:BUILDING HEIGHT AND AREA Existing Proposed No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.) 2 Ll 1742- Total Area(sq.ft.)and Total Height(ft.) (0']0 1 r rI Z. r I It SECTION 5:USE GROUP(Check as applicable) A: Assembly A-1 ❑ A-2❑ Nightclub ❑ A-3 ❑ A4❑ A-5❑ _. B: Business ❑ E: Educational ❑ F: Facto F-1❑ F2❑ 1 H: High Hazard H-1 ❑ H-2❑ H-3 ❑ H-4❑ H-5❑ 1: Institutional I-1 ❑ I-2❑ I-3❑ I4❑ M: Mercantile❑ R: Residential R-113 R-2)ir R-3❑ R-4❑ S: Storage S-1 ❑ S-2❑ U. Utility❑ Special Use❑and please describe below: Special Use: SECTION 6:CONSTRUCTION TYPE(Check as applicable) IA IB ❑ IIA 11 IIB 11 IIIA ❑ IIIB ❑ IV ❑ VA VB ❑ SECTION 7:SITE INFORMATION(refer to 780 CMR 111.0 for details on each item) Water Supply: Flood Zone Information: Sewage Disposal: Trench Permit: Debris Removal: Public❑ Check if outside Flood Zone❑ Indicate municipal❑ A trench will not be Licensed Disposal Site❑ Private❑ or indentify Zone: or on site system❑ required ❑or trench or specify: permit is enclosed❑ Railroad right-o£-way: Hazards to Air Navigation: MA Historic Conmussion Review Process: Not Applicable)( Is Structure within airport approach area? Is their review completed? or Consent to Build enclosed❑ Yes❑ or No bf Yes❑ No ❑ SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Code: Use Group(s): Type of Construction: Occupant Load per Floor: Does the building contain an Sprinkler System?: Special Stipulations: l b Mf31LCy;' -JD G ,C. , 1 , 606 • x 17 + 666 - 0 - 0 * G 66 •0 •0 • G r SECTION 9: PROPERTY OWNER AUTHORIZATION Name and Address of Property Owner �Cple,, (Ifi 27 c ln,r,lMj� 6970 Name(Print) o.and Street City/Town Zip o. Property Owner Contact Information: l)•bOA"7;a_ p,y, af• iew�irw D;ta + �L ` y3lK 115 8� -5rtluc 1�� ke��Ea1en+{+a. rnQ3 Title Telephone No.(business) Telephone No. (cell) e-mail address If applicable,the property owner hereby authorizes I1 FAOC21 rp Name Street Address (�ify/Town State Zip to act on the property owner's behalf,in all matters relative to work authorized by this building permit application. SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 2) Of building is less than 35,000 cu.ft.of enclosed space and/or not under Construction Control then check here❑and skip Section 10.1 10.1 Registered Professional Responsible for Construction Control Nama: Tele ho No. e-mail address Regis u I p1�2'� G2� C6 z Street Address City/Town State Zip Dis ' ti • l: 10.2 General Contractor r Y[y+ Company Name Name of Person Responsible for Construction License No. and Type if Applicable Street Address City/Town State Zip L Telephone No.(business) Telephone No. cell e-mail address SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.15Z§251 6) A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Is a signed Affidavit submitted with this application? Yes❑ No ❑ SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE Item Estimated Costs:(Labor and Materials) Total Construction Cost(from Item 6)_$ 1.Building $ Building Permit Fee=Total Construction Cost x (Insert here 2.Electrical $ appropriate municipal factor)_$ 3.Plumbing $ 4.Mechanical (HVAC) $ Note:Minimum fee-$ (contact municipality) 5.Mechanical (Other) $ Enclose check payable to 6.Total Cost $ 1 (contact municipality)and write check number here SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to th no and 6lcrst EAW E. a1�t.t — B1.U3. I ao 6074114. Please print and sign name �a Title Telephone No. Date PEDp.TN� �bapecr( FpntaL"LAS.C. F'em�xoke a23s9 S et Addr s City/Town State Zip .O 2 Municipal Inspector to fill out this section upon application approval: Name Date i jEXIST. BRICK MASONRY EXIST. BRICK MASONRY EXIST. TJI EXIST. 2x6 STUD WALL EXIST. TJI EXIST. 2x6 STUD WALL 6x6 @ 16" O. C.— \ (TO REMAIN) (TO REMAIN) EXIST. SILL EXIST. SILL EXIST. 12" HIGH CAST EXIST. 12' HIGH CAST EXIST. 12' HIGH CAST STONE BAND STONE BAND STONE BAND (TO REMAIN) (TO REMAIN) (TO REMAIN) C7x12.25 EXIST. RIM W4 -------- (TO REMAIN) i EXIST. TJI ' PL 5" WIDE p i U-HEAD (TO REMAIN) ; EXIST. SILL. 2-2x6 •p --------' - -='= (TO REMAIN) EXIST. CONCRETE FOUNDATION 2-13/'x91/2" MICROLLAii-1S o. ° Oti 0' . 10 TON SCREW JACK o 0 ° EXIST. CONCRETE FOUNDATION a EXIST. CONCRETE FOUNDATION O .0 .o' EXIST. BRICK MASONRY �•, EXIST. PRICK MASONRY EXIST. BRICK MASONRY 0 0 o ' •• EXIST. 8" EXIST. 8" REINFORCED REINFORCED EXIST. 8' REINFORCED CONCRETE FDN CONCRETE FDN CONCRETE FDN Cy . 0 . 0. o, . 2- 2x8 - EXIST. SLAB �' Q' EXIST. SLAB �' o EXIST. SLAB 0 0 C o EXISTING WALL SECTION SECTION - TEMPORARY SHORING SE"I'I0N - TEMPORARY SHORING C. L. TEMP POST C.;L. OF LOUVER C.;L. TEMP POST END OF MICROLt_AMS C. L. OF LOUVER ENO OF MICROI_LAMS_:_ E, 8• 293/4, y 293 " tet. $° -1 8, 293 . i 2934• 8. I ! i i NEW LOUVERDI i , 36"i HIGH x 52' WIDE j . I - C.;L. OF LOUVER i I EXIST. TJI ! i NEW LOUVER, 36' HGH x 52' WIDE i (TO REMAIN) i 8• 293 ' ' 293/' 8" -- ' PROPOSED OPENIN� , 39Y2" x 55,/2" ADD 2x AT FERIMETEh + 1/4- CLEARANCE I i _ i i i i I I -- I NEW LOUVER 36" HGH x 52" WIDE i ! i �-2 - 9Y2' MICROLLAMS LVL—tom - EXIST. CAST STONE BAND 0 0 - -- ° EXIST. VERTICAL JOINT - 0 0 o 'o °0 o0 o o °° 00 ________________________ ___ ___ _____-_______- o ° °L 0 _____________ _ -------- 0 a ° ° o o 0 0 0 ° - ' °EXI.T. DOUBLE SILL ..- - -'---'-'-'-'-'--... ---------1-----'--------------- -'--'-'---. 1 ----------------I ------ I r------------_---------- ---------------- - ------- ----------------- ASSUMED --------------- ------ i �\------ r------------ --- \ ASSUMED LOCATION OF Ti, _________ I. C7x12.25 + PL — \ I PROPOSED QPENING I SAWCUT JOINT x 2" DEEP • � PROPOSED; OPENING �/' j ; I \ /' I 1 - i I � i \\ ; / I /a" STAINLESS STEEL TYPE 316) THREADED ROD 3' EMBEDMENT, W 3x:1 WASHER, IN VERTICAL JOINT - \%' 10 TON SCREW JACK j \\ i /' r EXTERIOR ELEVATION - TEMPORARY SH0RZi G 1 10 TON 5EfEW JACK i I /�' ! ���\ I ' I / ii ADDED NOTES I ! • ' N0. DATE REVISIONS 1 0 .�.• • 0 ,4. 0,4, '. • ! 01 ,0.•• 0 .�. ., o 0 0 o SALEM HOUSING AUTHORITY i 1/. BASE PL, 6"x6" i i ' ; JAMES DALTON RESIDENCF. 4-16d x 21/2' FOUNDA11ON WALL WALL OPENING FOR LOUVERS 2- 2x8 ; FLOOR SLAB NOTES: ' ! ! 1. ALL ASPECTS, INCLUDING THE STRUCTURAL DESIGN Ali,) DETAILING TEMPORARY SHORING DETAILS z Ii I ! ! OF ALL REQUIRED TEMPORARY SHORING AND BRACING FLOOR SLAB ��t of y A & Di WF.I.11ING COMPANY — ARE DELEGATED TO THE GENERAL CONTRACTOR. o� WEYMOUTH, MA' i 0 ,0, 0,0 ; .. ..i,' 0 ,0• , . ,0, 10 . . O,o . . ' 0,0 ' . .• : O ,o, . . ,0, 0 : 0 .� 2. FLASHING AND SEALING SHALL BE CLOSED CELL PVC COMPRESSION o y PA;D 0 �' FW ! ! o GASKETS TO ENSURE LEAK TIGHT CONNECTIONS. No 2s3o5 A INC. 0 0 ' o o o o 0 0 0 ®�7� 90 40PJQ� tRPlCONE RRS, INTERIOR ELEVATION - TEMPORARY SHORING BEARING INTERIOR ELEVATION - TEMPORARY SHORING - GABLE 3. ALL CAULKING AND SEALANTS SHALL CONFORM TO SPECIFICATION P��F9FO/STEPtD�' PEMBROKE MA 02359 781.335.1880 -0' 1' = 1'-0" SECTION 06200. �S/ONAL EN�N DRAWN By cs0 3DATE 21/16 APPROVED BY PED 3/21/16 DATE, DRAWING YD. Paul E. Donahue, P. E March 21, 2016 s-1 Or `2 - APPROVED BY p 4'-1111/z" • ! GENERAL NOTES : 293/" i 293/' 3" 12" 1 2" 12" NEW LOUVER, 36' HIPH x 52" WIDE ! GENERAL: � T 3��o CP-1 ' 1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE AND END PL, EP-1 1/" DIAx31/z°-�� END PL, EP-1 B-1 HSS 8x8x5/g+ PL%'x10";+ PL3/9'x6" CP-I PL Yis"x6" REPORT ANY DISCREPANCY TO THE ENGINEER. . �. . . . . . . . . . . . . . . W/WASHER _ _._._._._. _. 2. ALL METHODS OF CONSTRUCTION AND NOTES INDICATED ON DRAWINGS ARE TO BE F - - - - - - - - - - - - - - - - - - - - - - - - i ..r -- - --b- - -- -- - - ------ i '0---- - 0-.--.-0- _ ,; :•_ _._._.............................E._._._._._._._._._. _._._._._._.___: _. C0 i /8 '- CONSIDERED TYPICAL FOR ALL SIMILAR CONDITIONS. " ` " " " ' " " " "" " i. . . . . . . . . . . . . . . . . . . . . . . ... ........_•� ! 3. ALL WORK SHALL CONFORM TO THE MASSACHUSETTS STATE BUILDING CODE. EP-1 PL 3/s' x734' x7 3/' 4. UNDER NO CIRCUMSTANCES SHALL THE CONSTRUCTION LOAD ON NEW STRUCTURES TOP - LINTEL BEAM 1/2' DIA HOLES CP - 1 ELEVATION s CLIP PL, CP 1 EP -1 ELEVATION EXCEED THE DESIGN LOAD WITHOUT SPECIFIC WRITTEN PERMISSION. 1' = 1'-0' 1" = 1'-0' 1" = V-0" DESIGN LOADS: 2 REQUIRED 2 REGUIRED 1. LIVE LOADS- THE VARIOUS PORTIONS OF DESIGNED TO CARRY THE FOLLOWING LIVE LOADS: PLATFORM 75 PSF 2. DEAD LOADS 4'-1111/2' LP-1 PL %°x10" - WEIGHT OF BUILDING COMPONENTS 293/• 293/' - m NEW LOUVER, 36' HIGH x 52" WIDE CODES AND STANDARDS 1. THE MASSACHUSETTS STATE BUILDING CODE- NINTH EDITION. B-1 HSS 8x8x5/s+ PL3/e'x10'i+ PL3/s°x6' 4 LP-1 PL %'x10' 2. MANUAL OF STEEL CONSTRUCTION - ALLOWABLE STRESS DESIGN, AMERICAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LP - 1 ELEVATION INSTITUTE OF STEEL CONSTRUCTION (AISC) 9th EDITION. .• 3. STRUCTURAL WELDING CODE-STEEL - AMERICAN WELDING SOCIETY-AWS 01.1-92. 0 .0 . o- a: ,,s.--- -- -- ----- - -- -r ---- --- ----- -._._._._._._:;�.ti, - 1 . O.o. 1' = 1 -0• 2 REQUIRED I' •• . . . . . .. . . . . . . . . . . . . . . . . . . . . . .•. . . 4. SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS, AISC-1992. , wfr LL FF F r----- ------------T------------------R Z ROUGH CARPENTRY r-----------------------------------1 !! J p •. i ! i !! • j ! LL ----------------------------------,! fI 0 1. ALL STRUCTURAL LUMBER SHALL CARRY THE GRADE AND TRADEMARK OF AN OFFICIALLY i 1 N W ¢ CIE RECOGNIZED ASSOCIATION PLYWOOD SHALL CONFORM TO U.S. PRODUCT STANDARDS PSI-66 ! --------------------------------- p d i iii i o AND .SHALL BE BRANDED OR .STAMPED WITH TYPE AND GRADE. 4 i i ________________ • ii 1 - 5/g' DIA HOLLOW BOLT i oo ' I r----------------i- ~ il ! I 2. ALL STRUCTURAL LUMBER SHALL CONFORM TO THE LATEST EDITION OF THE NFPA • I, o ' i - ----------------I------------------i .1 ! M "NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION" AND SUPPLEMENT, ! ii r - 'DES?"N VALUES FOR WOOD CONSTRUCTION'. ---------------- ------------------ N I i • I j II �' f i i i in 3. ALL LUMBER SHALL BE SPRUCE-PINE-FIR NO. 2 OR BETTER, WITH A o ! --------------------------------j __-- !! CAP PL CAP-1 PL1 I/'x7/" ; MAXIMUM MOISTURE CONTENT OF 19%. I !! I ! r p i _- J ! �' " LOUVER C O N N E C T I O N DETAIL A T HEAD 4. ALL WOJD EXPOSED TO WEATHER SHALL BE PRESERVATIVE PRESSURE TREATED. 1.,_s-------------- • 1 i o -7-------------- I II O - � I ! 16 , I II O• L------------------ -------------------11' _ 1" DIA HOLES FOR 3/41 DIA STRUCTURAL STEEL FF HILTI EPDXY ANCHORS ! il) 1. DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE 0 ,0. 0 ,0. . . ; Oi,o, 0 ,0. . . 0 .�. 678' MIN. EMBEDMENT ! o ASD 9TH EDITION. F.46 FFN AIS," MANUAL OF STEEL CONSTRUCTION', 0 o i ' o 0 o C7x12.25 i LL 2. STRUCTURAL STEEL SHALL BE NEW STEEL CONFORMING TO THE FOLLOWING: 0 iv voi STR';CTURAL SHAPES, PLATES, AND BARS ASTM A572, GRADE 50, UNLESS NOTED. BASE PL BPA PL'/4'x7/4" j w o 0 INTERIOR ELEVATION - TEMPORARY SHORING - " Brl STRUCTURAL TUBING ASTM A500 GR B. 3/' NON-BRINK GROUT I � ~ 0D •� cv m STEEL PIPE ASTM A53 GR B HIGi STRENGTH BOLTS ASTM A325, / DIA. IF 11 NEW LOUVER, 36" HIGH x 52" WIDE 5/a" DIA STAINLESS STEEL j ' !___; ADHESIVE ANCHOR, W/WASHER '1 ' `�' ANCHOR BOLTS ASTM A307, %4" DIA. 6� :o WELDING ELECTRODE E70XX NUTS ALL S. S. W EMBEDMENT 4 d +' ' 3. ANCHOR BOLTS, LEVELING PLATES, OR BEARING PLATES SHALL BE LOCATED AND BUILT INTO o a •d CONNECTING WORK. ALL PLATES SHAL BE SET IN %4" NON-SHRINK GROUT. 4. ALL R"AMING CONNECTIONS NOT FULLY DETAILED ON THE DRAWINGS SHALL BE DESIGNED BY THE CONTRACTOR AS SIMPLE CONNECTIONS, TYPE 2. CONNECTIONS SHALL BE DETAILED IN LOUVER CONNECTION DETAIL AT BASE ACCORDANCE WITH AISC REQUIREMENTS. SUBMIT TYPICAL DETAILS AND CALCULATIONS TO 1' = 1'-0" THE ENGINNER FOR APPROVAL. 4" 5. ALL BRACING CONNECTIONS NOT FULLY DETAILED ON THE DRAWINGS AND ALL FRAMING 1/n %2' PL CONNECTIONS PARTICIPATING IN THE LATERAL LOAD DISTRIBUTION SYSTEM SHALL BE BY THE CONTRACTOR FOR THE LOADS INDICATED ON THE FRAMING PLANS. THE SHEAR AND 3/' DIA HOLE AXIAL LOAD SHALL BE APPLIED CONCURRENTLY. NO ALLOWABLE STRESS INCREASE SHALL BE n USED FOR CONNECTION DESIGN. SUBMIT TYPICAL DESIGNS AND CALCULATIONS FOR APPROVAL. 7. BOLTED CONNECTION ADDITIONAL REQUIREMENTS: MINIMUM BOLT DIAMETER - %". SHEAR CONNECTIONS FOR MEMBERS WITH SLOTTED OR OVERSIZE HOLES IN THE LINE OF BASE PLATE CAP PLATE SIMILAR FC RCE TO FACILITATE ERECTION - SLIP CRITICAL TYPE HIGH STRENGTH BOLTS WITH 1' APPROPRIATE SURFACE PREPARATION. = 1'-0' 7%z'x4'xl/2' BASE PL W/5/s' DIA ADHESIVE ANCHOR, S.S. 9. SHEAR CONNECTIONS FOR OTHER MEMBERS - SNUG TIGHT TYPE HIGH STRENGTH BOLTS. ALL ANCHOR RODS, WASHERS AND NUTS TO BE STAINLESS STEEL. MIN. EMBEDMENT SHALL BE 50. ROUGH OPENING 293 1 5/I0/I6 ADDED NOTES WEB + END PL C7 1-" NO. I DATE REVISIONS SALEM HOUSING AUTHORITY ROUGH OPENING WIDTH 1/' SPACE 1/4' JAMES DALTON RESIDENCE LOUVER 53'; . LOUVER _ _ _ 26" LOUVER WIDTH RO = 59.5' = 4'-11%2• NOTES: WALL OPENING FOR LOUVERS ROUGH OPENING DEPTH ------------------F--- 1. ALL ASPECTS, INCLUDING THE STRUCTURAL DESIGN AND DETAILING TEMPORARY SHORING DETAILS LOUVER 36"; RO = 3'-63/" ------------------ - -'-'-'-" OF ALL REQUIRED TEMPORARY SHORING AND BRACING `SH OF Mq A & M WELDING COMPANY A ARE DELEGATED TO THE GENERAL CONTRACTOR. o� ,g WEYMOUTH, MA 2. FLASHING AND SEALING SHALL BE CLOSED CELL PVC COMPRESSION o GASKETS TO ENSURE LEAK TIGHT CONNECTIONS. 29305 y PEI INC. LOUVER CONNECTION DETAIL JAMB °F9F�TSTEe�° ��Q ®G°ffiBD0Y0� 3. ALL CAULKING AND SEALANTS SHALL CONFORM TO SPECIFICATION FSSONAENDO PEMBROKE MA 02359 781.335.1880 SECTION 06200. L DATE DRAWNED 6Y CSO 3/21/16 APPROV6Y PEO 3/21/16 DATE. rMAWING NO. Paul E. Donahue. P. E pppgpyEO 6Y March 21, 2016 ry-`l of 2 LEGEND ABBREVIATIONS BRANCH CIRCUIT AND Commonwealth of Massachusetts ^ AMPERE FEEDER SCHEDULE PANELBOARD AC AIR CONDITIONER ® AF AMPERE FRAME INDICATES NOMINAL AMPACITY AFF ABOVE FINISHED FLOORINDICATES QUANTITY OF PHASE � T .`, ATS X No. Date Description DEPARTMENT OF 'HOUSING�J AUTOMATIC TRANSFER SWITCH ATG ABOVE FINISHED GRADE AND OR NEUTRAL CONDUCTORS AT AMPERE TRIP NOM. QTY, OF PHASE AND/OR NEUTRAL RACEWAY SIZE REVISIONS ENGINE GENERATOR ATS AUTOMATIC TRANSFER SWITCH AMPACITY COND. CONDUCTORS AND GROUND EMT RGS G AWG AMERICAN WIRE GAUGE SEAL C CONDUIT 2 (2)#12 & 1#12 GND. 3/4' 3/4- �y�SHOF�r._ Y DEVELOPMENT GB CIRCUIT BREAKER 20 3 3 12 & 1 12 'GND. 3 4" 3 4" o� GARY P.& OMMUNITBLOCK HEATER CKT CIRCUIT " " � NANGLE m i DIST DISTRIBUTION 4 (4)#12 & 1#12 GND. 3/4 3/4 �o » , J ELECTRICAL , BC BATTERY CHARGER DN DOWN 2 2 10 & 1#10 GND. 3/4- 3/4- No.35871 DWG DRAWING 30 3 3 10 & 1#10 GND. 3/4- 3/4- Charlie 4"Charlie Baker Jr., Governor e Karyn Polito, Lt. Governor ® Chrystal Kornegay, UndersecretaryEMT ELECTRIC METALLIC TUBING �►� s0'NAL RA REMOTE ANNUNCIATOR, FLUSH ETR EXISTING TO REMAIN 4 4 10 & 1#10 GND. 3/4" 3/4" FA FIRE ALARM 2 (2)#8 & 1#10 GND. 3/4% 3/4- "VVV CP CONTROL PANEL FLR FLOOR 40 3 (3)#8 & 1#10 GND. 3/4- 3/4" G. GND GROUND 4 (4)#8 & 1#10 GND. 3/4- 3 4" 7A710 • EMERGENCY STOP, TAMPERPROOF TYPE GF GROUND FAULT INTERRUPTING T NO , 258096 H HIGH 2 2 8 & 1 10 GND. 3 4" 3/4- HP DHCD PROJEC n O JUNCTION BOX JB JUNCTION WBOX 50 3 3 8 & 1 10 GND. 3 4w 3 4 1000 CIRCULAR MILS 4 (4)#8 & 1 10 GND. 3 4 3/4- KCMIL S 20 AMPERE, 120/277 VOLT, SINGLE POLE SWITCH KV KILOVOLT 2 (2)#6 & 1#10 GND. 3/4" 3/4` KVA KILOVOLT-AMPERE 60 3 (3)#6 & 1#10 GND. 3/4" 3/4* GRFTTCNUGF' DENOTES GENERATOR INITIATIVE GROUND FAULT CIRCUIT INTERRUPTING KW KILOWATT MCB MAN CIRCUIT BREAKER 4 (4)#6 & 1#10 GND. 1. 1" MD MOTORIZED DAMPER 2 (2)#4 & 1#8 GND. 1" 1" O SMOKE DETECTOR, PHOTOELECTRIC. TIE INTO EXISTING MEC MASSACHUSETTS ELECTRICAL CODE 70 3 (3)#4 & 1#8 GND. 1" 1" MIN MINIMUM ANDBY GENERATOR CIRCUIT. 4 (4)#4 & 1#8 GND. 1 1/4- 1 1/4- STMLO MAIN LUG ONLY NTS NOT TO SCALE 2 (2)#3 & 1#8 GND. 1" 1" R S�� HOMERUN TO PANEL "SP" OC ON CENTER 100 3 (3)#3 & 1#8 GND. 1" 1` JAMES DALTON '1'\.E'ESIDEN_ CE, � � � �L PH POLE HASE4 (4)#3 & 1#6 GND. 1 1 4" 1 1 4"FEEDER AND BRANCH CIRCUIT WIRING RA REMOTE ANNUNCIATOR 3 (3)#1 & 1#6 GND. 1 1/4- 1 1 4" RGS RIGID GALVANIZED STEEL CONDUIT 4 (4)#1 & 1#6 GND. 1 1/2- 1 1/2" SIZED AS INDICATED TBR TO BE REMOVED 125 ® 1) 3 (3)#1/0 & 1#6 GND. 1 1/2- 1 1/4- prepared for: 1 CIRCUIT BREAKER, ETR GP UNTYPICAL DERGROUND150 4 (4)#1/0 & 1#6 GND. 1 1/2" 1 1 1/2" I LINO UNLESS NOTED OTHERWISE 3 (3)#2/0 & 1#6 GND. 1 1/2" 1 1/2- V • FUSED DISCONNECT SWITCH, ETR V VOLT 175 " » Salem-- HousingAuthorityW VOLT-AMPERE4 (4) 2 0 & 1#6 GND. 2 2 GROUNDING ELECTRODE W WIRE, WIDE 200 3 (3)#3/0 & 1#6 GND. 2" 2" 1- WP WEATHERPROOF 4 (4)#3/0 & 1#6 GND. 2 2" FEEDER TAG, "X(#)" DENOTES MULTIPLE CIRCUITS, 3 (3)#4/0 & 1#4 GND. 2" 2" 27 Charter Street X QUANTITY (#) AS INDICATED. CONDUIT WITH MORE 225 4 (4)#4 0 & 1 J4 GND. 2 1/2" 2 1/2" X(#) eTHAN THREE CURRENT CARRYING CONDUCTORS SHALL 3 (3)-250 KCMIL & 1#4 GND. 2" 2" BE SIZED IN ACCORDANCE WITH THE MEC AND 250 CONDUCTORS SHALL BE DERATED PER THE MEC. 4 (4)-250 KCMIL & 1#4 GND. 2 1/2" 2 1/2" 1970 300 3 (3)-350 KCMIL & 1#4 GND. 2 1 2" 2 1 2"Salem, Massachusetts 0 LINE WEIGHT DENOTES EXISTING 4 (4)-350 KCMIL & 1#4 GND, 2 1/2" 3" GENERAL NOTES 350 3 (3)-500 KCMIL & 1#3 GND. 2 1/2" 3" LINE WEIGHT DENOTES PROPOSED 1. ALL WORK SHALL COMPLY COMPLETELY WITH THE MASSACHUSETTS 4 (4)-500 KCMIL & 1#3 GND. 3" 3" Board of Commissioners ELECTRICAL CODE, AND ALL LOCAL ORDINANCES AND REQUIREMENTS. 3 (3)-500 KCMIL & 1#3 GND. 2 1/2- 3" 2. THE DRAWINGS ARE GENERALLY DIAGRAMMATIC. PROVIDE ALL 400 4 (4)-500 KCMIL & 1#3 GND. 3` 3" MATERIAL, LABOR AND EQUIPMENT FOR COMPLETE AND OPERATIONAL GAS GAS METER SYSTEMS. 500 3 (6)-250 KCMIL & 2#1/0 GND. (2)2 1/2- (2)2 1/2- John A. Boris Chairman GAS VALVE 3. APPLY FOR AND OBTAIN ALL REQUIRED PERMITS. REQUEST, 4 8)-250 KCMIL & 2#1/0 GND. 2 2 1 2" 2 2 1 2" SCHEDULE, AND ATTEND ALL REQUIRED INSPECTIONS BY THE LOCAL 3 (6)-350 KCMIL & 2#2/0 GND. (2)2 1/2" (2)2 1/2" AUTHORITY HAVING JURISDICTION. 600 4. REFER TO DRAWINGS AND CONFIRM EQUIPMENT LOCATIONS PRIOR TO 4 (8)-350 KCMIL & 2#2/0 GND. (2)2 1/2- 2 3" AS-BUILT CERTIFICATION Peter K. Strout Vice Chairman TES TELEPHONE INTERFACE, ETR ROUGH-IN. ADJUST ELECTRICAL WORK AS REQUIRED BASED ON 3 (6)-500 KCMIL & 2#2/0 GND. 2 3" 2 3" TO BE COMPLETED BY CONTRACTOR AT COMPLETION EQUIPMENT PURCHASED/INSTALLED. 800 4 . . (8)-500 KCMIL & 2#2/0 GND. 2 3" 2 3 1/20 I PRINCIPAL OF y� 5. PROVIDE A ONE YEAR MATERIAL AND LABOR GUARANTY AGAINST Frank J. Milo Second Vice Chairman DEFECTS MATERIAL AND WORKMANSHIP. 3 (9)-400 KCMIL & 3#3/0 GND. 33 1/2- 3 3" CERTIFYTHAT THESE DRAWINGS ARE COMPLETE 6.""ALL MATERIAL INCORPORATED IN THE WORK SHALL BE LISTED FOR 1000 4 (12)-400 KCMIL & 3#3/0 GN (3 3" 3 3" CORRECT AND REFLECT THE WORK "AS-BUH.T" i a THE INTENDED USE. 3 9)-600 KCMIL & 3#250 GND. 3 3" 3 3" SIGNATURE DATE w 7. VISIT THE SITE PRIOR TO SUBMITTING BID TO REVIEW SCOPE OF 1200 Maureen Ca Treasurer DEMOLITION, AND CONDITIONS UNDER WHICH NEN! WORK MUST BE 4 12)-600 KCMIL & 3#250 GND 3 3 1 2" 3 3 1 2" o INSTALLED. CL/ENT." 8. EXISTING UNDERGROUND UTILITIES ARE SHOWN FOR INFORMATIONAL 1600 3 (12)-600 KCMIL & 4#300 GND 4 3 4 3 1 2 " William E . Luster Assistant Treasurer PURPOSES ONLY. PRIOR TO ANY EXCAVATION, THE CONTRACTOR 4 (16)-600 KCMIL & 4#300 GND (4)3 1/2" 4 3 1/2" SALEM HOUSING AUTHORITY a SHALL CONFIRM LOCATIONS OF EXISTING UNDERGROUND UTILITIES VIA NOTES - • THE SERVICES OF A PRIVATE UNDERGROUND UTILITIES LOCATING 1. RACEWAY SIZE BASED ON EMT/RGS TYPE THWN COPPER CONDUCTORS. 27 CHARTER STREET SERVICE. ADJUST WORK AS REQUIRED BASED ON RESULTS OF ADJUST AS REQUIRED FOR OTHER RACEWAY OR CONDUCTOR TYPES. Executive Staff UNDERGROUND UTILITIES LOCATING. IDENTIFY ADJUSTMENTS ON 2. BASED ON 75'C TERMINATIONS ADJUST FOR OTHER TERMINATION SALEM, MA 01970 o - AS-BUILT DRAWINGS. TEMPERATURE LIMITATIONS AS REQUIRED. 0 ND 0 1. PROVIDE (3)#14AWG TYPE MC CABLE FROM STANDBY ATS TO PHP✓ECT. Carol Mac Own, Executive Director ELEVATOR CONTROLLER. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION ON ELEVATOR PRE-TRANSFER SIGNAL WORK. GENERATOR INITIATIVE - Debra A. Tucker, Asst. Executive DirectorSTANDBY GENERATOR JAMES DALTON RESIDENCE _ °ATE.- 7/17/15 List of Drawings BRIDGE STREET SCALE- AS SHOWN N E/M- 1 Title, Legend, Notes and Diagram 01?4WNBY.• CWN E/1VI-2 Basement Partial Plan and Details °HE�KE°B►- GPN S- 1 Structural Lintel Beams at Two New N A\N GL]E Louver Wall Openings ACNeE w ENGINEERING o I I Or r4) 0LLJ INC�]�I�MA\TEV o I I TO TENANTPROPOM--� 32 Prince Street v MODULAR SED o i I METERING = GENERATOR Danvers, MA 01923 —ROOM Tel. (978) 777-7650 ZN I #14/3 TYPE MC I I PANEL MDP 4 www.nangleengineering.com 0 208Y ,120V I SEE NOTE 1. I I I °HAl40NGT/TLE GENRATOR I I PANE PANEL 300 N G 30�A , , 1 .� ! ! 4 2" 05 BRIDGE STREET TITLE , LEGEND, = 300A 0 ETR ! 2 00�3P 20�A/3P ! STATS S � NOTES A N D 0 TO IRA ANDN HP1-10 STANDBY ATS & E CN RO ER -- TO UTILITY ONE-LINE DIAGRAM v I ETRR ETR I -------ETR ` GENERATOR ROOM ELEVATOR ROOM ELECTRIC ROOM TBR I °HAW/NGNUMBEf� PROPOSED ONE—LINE DIAGRAM a NO SCALE KEY PLAN 0 NO SCALE E/M - 1 N Z L NEW 36h"X52w" EXHAUST LOWER & DAMPER. TOP OF PLUG VALVE/GAS COCK or LOWTESTT ER NOT LESS THEN WITH SNPT PLUGGED 36" BELOW WINDOW RETAINING WALL GAUGE TAPPING. No. Date Description HIGH PRESSURE GAS LINE, ABOVE. SEE DRAWING 11 - S-1 FOR OPENING GROUND REVISIONS REGULATOR/METER, BY SECURE DUCT/PLENUM TO UTILITY. SEE NOTE 7. DETAILS. J JOINT UNION FRAME &XAAAA� J SIDES WITTH SSHHEETT METAL SEAL SUPPLY PIPING FROM GAS LOUVER SCREWS AT 3" O.C. SEAL 2y�'� tH OF WATER-TIGHT ALL AROUND GARY P U RAVP DOWN WITH SILICONE CAULKING. NANGLE mE z INSECT SCREEN h ` a 4 WELDED STEEL ENGINE ,� ELECTRICAL �. SEE NOTE 8 (TYPICAL). " � No.35671 2" SCHEDULE 40 GAS PIPING. EXHAUST PIPING, WITH DAMPER SPRING OPEN SEE NOTE 6 AND GAS GAS POWER CLOSE . .� CLEARANCES PER NEPA 37 ONAL � SUPPLY PIPING CONNECTION CONNECTION ..VT.. DETAIL, THIS DRAWING. _ 4" WELDED STEEL INSULATED TO GENERATOR 6" MIN - - - ENGINE EXHAUST UP SIDE 7/17/f5 AND JUST BEYOND CORNER SLOPE BOTTOM UP EXHAUST DUCTWORK. ETR 3 EBU OF BUILDING. SEE NOTE 2. SEDIMENT TRAP (/ TURN AND RISE UP TO MD LOUVER BLADE. SECURE OVER SHEET MEET DAMPER AT NEW I FLOOR CAP 6" MIN METAL AT 30 D.C. SEAL WALL OPENING. A M I UH, ETR � WATER-TIGHT SWITH SILICONE CAULKING (n 4" CRITICAL BUILDING WALL O SILENCER NEW 36h"X52w" INTAKE LOWER & DAMPER. SEE A A DRAWING S-1 FOR \ OPENING DETAILS. \ CP LOUVER CONNECTION DETAIL HAND RE-GRADE THIS AREA TO GA's SUPPLY CONNECTION DETAIL _ 1 WI EIRE MAINTAIN SLOPE AWAY NO SCALE A� G GAS LO - NO SCALE C RAW L S PAC E EXISTING TELEPHONE I I FROM BUILDING INTERFACE AND ! BACKBOARD, ETR. I I ETR 44 (MIN) AM ETR ETR DISCONNECT, ETR 300 CONTROL, RA HOUSE POWER MAIN DISCONNECT, ETR i4 WIRING IN 1"C REM 208Y/12OV GENERATOR REINSTALL EXISTING 400 PROPOSED 80KW __ TEMPORARILY REMOVE AND SEEOTE ON CONCRETE PAD TELEPHONE STATION CABLES 4 AND CONDUIT TO ALLOW INSTALLATIOSHEETROCKNCEILING ON OF NEW METERING 1 TENANTMETERING AND ELECTRIC RESILIENT CHANNEL MAIN, ETR STORAGE ROOM PANEL MDP, ETR____�v PANEL HP2, ETR ELEVATOR STAR PAN SEE NEL O ET3. CONTROLLER, ETR • STORAGE STORAGE BOILER ROOM CP 1 ELEVATOR #14/3 MC CABLE. SEE NOTE 5. CHINE ROOM a v 0 L n o CL/ENT.- SALEM HOUSING AUTHORITY CORRIDOR tll 27 CHARTER STREET 0 SALEM, MA 01970 o ' PHO✓ECT. NOTES: PROVIDE SUPPLEMENTAL WOOD STRAPPING ON JOIST WEBS AS PROPOSED BASEMENT PARTIAL PLAN 1. REFER TO DRAWING E/M-1 FOR LEGEND AND GENERAL NOTES. REQUIRED TO ALLOW TERMINATION OF RESILIANT CHANNEL AT GENERATOR INITIATIVE - 2. TERMINATE EXHAUST PIPING 8' AFG OR 3 ABOVE NEAREST AIR JOISTS WHERE EMT CONDUIT IS ATTACHED TO BOTTOM OF JOIST. SCALE:1/4 =1 -IO INTAKE, WHICHEVER IS GREATER. PROVIDE ELBOW CUT OFF AT PROVIDE MUD RINGS FOR •EXISTING OUTLET BOXES. TAPE, JOINT, STANDBY GENERATOR 45 DEGREES. SUPPORT STACK TO SIDE: OF BUILDING EVERY 4 PRIME AND PAINT WITH WHITE CEILING PAINT. o � 12. PROVIDE NEW 1 HOUR FIRE RATED WALL SEGMENT WITH 1 JAMES DALTON RESIDENCE ° 3. PROVIDE (2)2OA/1P CIRCUIT BREAKERS IN PANEL HP1 TO HOUR DOOR, FRAME AND HARDWARE. CONFORM TO UL DESIGN c 3- SERVE BATTERY CHARGER AND DAMPER OPERATORS. CIRCUIT U419 OR EQUIVALENT FOP. 1 HOUR FIRE RATING. m R DUCTWORK. TURN AND 13. NEW SURFACES TO BE: BREAKERS TO BE LISTED COMPATIBLE WITH EXISTING SIEMENS DATE.• 7/17/15 RISE-UP TO MEET 13.1. PRIMED: LATEX WALL-BOARD FOR GYPSUM PANELS, 4'-6" DAMPER AT WALL ITE PNELBOARD. a METAL PRIMER FOR DOORS AND FRAMES SCALE. AS SHOWN SEE NOTE 11 (MIN) UH, ETR RADIATOR 4. PROVIDE SIGNAGE G REQUIRED BY M FROM 702.7. 13.2. PAINTED; (2) COATS FINISH PAINT, SHERWIN WILLIAMS, o FLANGE 5. PROVIDE (3) 14AWG TYPE MC CABLE FROM STANDBY ATS TO "PROMAR 200 LATEX% PRATT & LAMBERT, 'PRO-HIDE 0R,4W9V,6 • CWN N ELEVATOR CONTROLLER. REFER TO SPECIFICATIONS FOR CHECKEDBY. GPN SEE NOTE 14 ADDITIONAL INFORMATION ON ELEVATOR PRE-TRANSFER SIGNAL INTERIOR LATEX', PITTSBURGH PAINTS, 'PURE PERFORMANCE 9-110', OR APPROVED EQUAL. z ____________ WORK. 13.3. CEILINGS TO BE PRIMED AS ABOVE, AND PAINTED 1 6. PROVIDE SHUT OFF VALVE AT NEW METER. RUN GAS PIPING TO ( ) I GENERATOR. PROVIDE ALL REQUIRED FITTINGS, SUPPORTS, SHUT COAT BRIGHT WHITE LATEX CEILING PAINT. „ T�,\ T,�•��� i 4 -6" (MIN) OFF VALVES AND FLEXIBLE CONNECTOR AT GENERATOR. PAINT 14. PROVIDE 6 HIGH REINFORCED CONCRETE HOUSEKEEPING PAD, ®`+lf� EXPOSED PIPING WITH TWO COATS OF GRAY ENAMEL. CORE 6" GREATER THAN OUTLINE OF ENGINE-GENERATOR ALL E IT WALL TO ALLOW GAS SERVICE THROUGH WALL PROVIDE AROUND. ENGINEERING N EXISTING TELEPHONE-/" LINK-SEAL MECHANICAL SEAL. 14.1. CONCRETE TO BE 3,000 PSI AT 28 DAYS, FULLY CURED 1� Jl l� l� INTERFACE AND ENGINE-GENERATOR 7. NEW GAS SERVICE METER & REGULATOR BY GAS UTILITY BEFORE GENERATOR IS SET IN PLACE. n BACKBOARD, ETR. NATIONAL GRID). COORDINATE INSTALLATION WITH GAS COMPANY, 14.2. PAD REINFORCING TO BE 2 LAYERS 10 GAUGE, PLAIN, ��\T /nl� lt�1 A �I��� ETR [NOTE 10 3' (MIN) SEE NOTE 12-\ AND PROVIDE ALL WORK AS REQUIRED. 6x6 WELDED WIRE MESH SHEETS, TIED TO DOWELS. j\ gm" �% n\ ` ( ) 8. PROVIDE LIGHT FIXTURES AS SHOWN AND SPECIFIED. CONNECT::71ROLLED MESH is NOT ACCEPTABLE. o ETR ETR NEW LIGHTING TO EXISTING AREA LIGHTING CIRCUIT. 14.3. PAD TO BE DOWELED TO EXISTING SLAB WITH (10) #5 9. REMOTE ANNUNCIATOR TO BE LOCATED ON FLOOR ABOVE, RE-BAR PINS DRILLED IN MIN. 40, SPACED EVENLY. 32 Prince Street oFLUSH, IN CORRIDOR. CONFIRM FINAL LOCATION WITH OWNER. SCARIFY FLOOR BELOW PAD, AND APPLY BONDING AGENT. Danvers, MA 01923 FLEXIBLE COUPLING 10. OVERLAY EXISTING STUD AND GYPSUM WALL WITH I• TYPE X 14.4. ALL EDGES AND CORNERS OF PAD TO HAVE 1", 45 o GYPSUM BOARD. PROVIDE MUD RINGS FOR EXISTING BOXES. DEGREE CHAMFER. SLAB TO HAVE LIGHT BROOM FINISH. Tel. (978) 777-7650 TAPE, JOINT, PRIME AND PAINT. 14.5. SLAB TO BE COATED WITH 2 LAYERS CLEAR SEALER WWW.nongleengineering.com 1 11. PROVIDE NEW Is TYPE X GYPSUM BOARD CEILING. SUPPORT PRIOR TO SETTING GENERATOR. DUCT CONNECTION DETAIL CONFORM0 CEILING OTOXULIDESGNNG °L570 FOD I R 1 HOURFIRERATING.SILIANT ORAWINGT/TLE V NO SCALE BASEMENT PROPOSED GENERATOR ROOM PARTIAL PLAN N SCALE:1/4"=,'-D" PARTIAL PLANS 0 a m DAMPER SEQUENCE: AND DETAILS too DAMPERS SHALL BE SPRING OPEN, POWERED CLOSED. w 2. WITH ENGINE GENERATOR OFF, DAMPERS SHALL BE POWERED -- CLOSED. UPONOR4Gt�/NGNUMBEFI m 3. UPON ENGINE START SIGNAL, LOWERS SHALL BE ALLOWED TO ° SPRING OPEN. 0 2 4 8 a 4. UPON ENGINE STOP, DAMPERS SHALL BE POWERED CLOSED. E/M 0 z SCALE: 1/4"=V-0" '-0"