14 ALBION ST - BPA-14-99 DBA, 1 STORY ADDITION O\N The Commonwealth of Massachusetts
a,A Board of Building Regulations and Standards CITY OF
k9d Massachusetts State Building Code, 780 CMR SALEM
Revised Mar 2011
Building Permit Application To Construct,Repair,Renovate Or Demolish a
One-or Two-Family Dwelling
- - "- - - This Section For Official Use Only
Building Permit Number: - Date App ' - - -
Building Official(Print Name) - ,_ Signature _ V, Date -
SECTION 1: SITE INFORMATION
1.1 Pt,roperty Address: 1.2 Assessors Map&Parcel Numbers
/7 fll/}0
r2 6
'1"
L la Is this an accepted street?ves_ no Map Number :«,,, Parcel Number
1.3 Zoning Information: 1.4 Property Dimensions:
Zoning District Proposed Use Lot Area(sq ft) Frontage(ft)
1.5 Building Setbacks(ft)
Front Yard Side Yards Rear Yard
Required Provided Required Provided Required Provided
1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System:
Zone: _ Outside Flood Zone?
Public U� Private❑ Check if yes0 Municipal 9-9n site disposal system ❑
.._ SECTION2: PROPERTY OWNERSHIP' -
2.1 Owner`of Rycord:
sn. �fQr1,a a�ea .Sa.�erm 11!/3 fJ/`)'7d
Name(Print) City,State,ZIP
ILI 41 b;un Sf• 97& -z/o-9FzL wtmacGt a)l oe. e_ern
No.and Street Telephone Email Address
SECTION 3-DESCRIPTION OF PROPOSED WORK'(check all that apply) - -
New Construction xisting Building Owner-Occupied ❑ Repairs(s) ❑ Alteration(s) ❑ Addition
Demolition ❑ 1 Accessory Bldg.❑ 1 Number of Units_ Other ❑ Specify:
Brief Description of Proposed Work : �t�t z4f, 4 /,�' r 2-S r 0rn o
yN - / /w
CJ
SECTION 4:ESTIMATED CONSTRUCTION COSTS --- -
a a .
Estimated Costs:
Item Official Use Only
Labor and Materials - -
I.-Building Permit Fee: $ Indicate how fee is determined:
1.Building $ �Z 000
❑Standard City/Town Application Fee _ -
2.Electrical $ - - -
0 ❑Total Project Cost'(Item.6)x multiplier
3.Plumbing $ 00 2. Other Fees: $
4.Mechanical (HVAC) $ List: - -
5.Mechanical (Fire $ - -
Suppression) Total All Fees: $ -
Check No. Check Amount: Cash Amount:
6.Total Project Cost: 0 Paid in Full 0 Outstanding Balance Due:
- -SECTION 5: CONSTRUCTION SERVICES
5.1 Construction Supervisor License(CSL)
License Number Expiration Date
Name of CSL Holder
List CSL Type(see below)
No.and Street Type .. Description
U Unrestricted(Buildings up to 35,000 cu.ft.
R Restricted 1&2 Family Dwelling
City(rown,State,ZIP M Masonry
RC Roofing Covering
WS Window and Siding
SF Solid Fuel Burning Appliances
I Insulation
Telephone Email address D Demolition
5.2 Registered Home Improvement Contractor(HIC)
HIC Registration Number Expiration Date
HIC Company Name or HIC Registrant Name
No.and Street Email address
City/Town,State,ZIP Telephone
III - SECTION'6:�WORKERS'COMPENSATIONINSURANCE AFFIDAVIT(M.G.L.c..152.§ 25C(6)) _
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide
this affidavit will result in the denial of the Issuance of the building permit.
Signed Affidavit Attached? Yes .......... ❑ No...........❑
SECTION 7a:OWNER AUTHORIZATION TO BE.COMPLETED WHEN _
OWNER'S AGENT OR CONTRACTOR.APPLIES FOR
I�.BUILDING-PERMIT
1,as Owner of the subject property,hereby authorize � m H C ar 0.r—h"
to act on my behalf,in all matters relative to work authorized by this building permit application.
Print Owner's Name(Electronic Signature) Date
-" SECTION 7b:OWNER'"OR AUTHORIZED AGENT DECLARATION
By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information
contained in this application/Iis true and accurate to the best of my knowledge and understanding.
L(�0.r-� M0.GYt�(1
Print Owner's or Authorized Agent's Name(Electronic Signature) Date
'- NOTES:.
I. An Owner who obtains a building permit to do his/her own work,or an owner Avho hires an unregistered contractor
(not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration
program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at
www.mass.eov/oca Information on the Construction Supervisor License can be found at www.mass.eov/dns
2. When substantial work is planned provide the information below: ,-.
Total floor area(sq.ft.) //?,_L r� S 1 -zeE(including garage,finished basement/attics,decks or porch)
Gross living area(sq.ft.) 39S i t 2. Habitable room count
Number of fireplaces 0 Number of bedrooms
Number of bathrooms 6 Number of half/baths
Type of heating system ctse.boc-r d au Number of decks/porches 1'
Type of cooling system 6 Enclosed V' Open O
3. "Total Project Square Footage"may be substituted for"Total Project Cost"
u >Ai
J o`�
J CE
N y�H
O w
2 �3
U r 9f
a w�E
❑ ❑ [] ❑ ❑ ❑ ❑ EMN
J
0 o ae
❑ ❑ 0 ❑ ❑ ❑ 0❑❑ ❑❑❑ `
nRIGHT SIDE ELEVATION (1REAR ELEVATION
z
0 F
Q
w ups
J
w Z3
o wS
Zz �<
Qo En wE
RHOUSE
a 2
J� Ow
�u So
00
o� um
❑ ❑ ❑ ❑
EXISTING
L uL Eon.[
� K
3 LEFT SIDE ELEVATION
4 PARTIAL FLOOR PLAN Al
k0ND1T� CITY OF SALENI MASSACHUSETTS
BOARD OF APPEAL
120 WASHING a�u S na.i rr * ti:�i.i=.ni,�AI' u i nAu ��sisres 01970
9���MIN6 Q4Q�,' Tei.r:978-619-5685 Fe\x:978&-740-0404
Kwiq.1u.1-t Diascoi.i.
N1 A)OR
G'7
-4 H .
� m
n ^,
r a
August 28, 2012
�T N
r
Decision n* °D
m D
City of Salem Zoning Board of Appeals s w
Petition of DUARTE MACHADO requesting a Special Permit to expand a nonconforming two-
family home in order to construct a 15'x25' one-story addition on the property located at 14
ALBION STREET(R-1 Zoning District).
A public hearing on the above Petition was opened on August 15, 2012 pursuant to Mass
General Law Ch. 40A, § 11. The hearing was closed on August 15, 2012 with the following
Zoning Board of Appeals members present: Rebecca Curran (Chair), Michael Duffy, Jamie
Metsch, and Bonnie Belair.
Petitioner seeks a Special Permit pursuant to Section 3.3.5 of the City of Salem Zoning
Ordinances.
Statements of fact:
1. In a petition date-stamped June 21, 2012, petitioner requested a Special Permit to
construct a 15'x25' addition on the rear of the existing two-family house at 14 Albion
Street.
2. Petitioner represented himself at the hearing.
3. At the hearing, no one spoke in favor of or in opposition to the project.
The Board of Appeal, after careful consideration of the evidence presented at the public
hearing, and after thorough review of the plans and petition submitted, makes the following
findings:
t
1. Desirable relief maybe granted without detriment to the public good and without
nullifying or substantially derogating from the intent or purpose of the zoning ordinance.
The adverse effects of the proposed use will not outweigh its beneficial impacts to the City
and the neighborhood. The proposed addition merely extends the house back within an
existing nonconforming side setback, and so does not make the structure substantially more
nonconforming. The Board finds that the proposed addition is in keeping with the other
houses in the neighborhood, is not large enough to have a detrimental impact on other
properties or the natural environment, and would not have negative impacts with regard to
traffic, utilities, fire or public services.
2. In permitting such change, the Board of Appeals requires certain appropriate conditions
and safeguards as noted below.
On the basis of the above findings of fact and all evidence presented at the public hearing
including, but not limited to, the Plans, Documents and testimony, the Zoning Board of Appeals
voted four (4) in favor (Curran, Metsch, Belair, and Duffy) and none (0) opposed, to grant the
requested Special Permit. A Special Permit under Section 3.3.5 is granted to allow for the
proposed addition as shown on the submitted plans and elevation drawings.
The Board of Appeals voted to grant petitioner's request for a Special Permit subject to the
following terms, conditions, and safeguards:
1. Petitioner shall comply with all city and state statutes, ordinances, codes and
regulations.
2. All construction shall be done as per the plans and dimensions submitted to and
approved by the Building Commissioner.
3. All requirements of the Salem Fire Department relative to smoke and fire safety
shall be strictly adhered to.
4. Petitioner shall obtain a building permit prior to beginning any construction.
5. Exterior finishes of the new construction shall be in harmony with the existing
structure.
6. A Certificate of Inspection is to be obtained.
7. Petitioner is to obtain approval from any City Board or Commission having
jurisdiction including, but not limited to, the Planning Board.
2_ ,1 � /ff
Michael Duffy, Member
Salem Board of Appeals
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK
Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts
General Laws Chapter 40A, and shall be filed within 20 days of filing of this decision in the office
of the City Clerk. Pursuant to the Massachusetts General Laws Chapter 40A, Section 11, the
Variance or Special Permit granted herein shall not take effect until a copy of the decision
bearing the certificate of the City Clerk has been filed with the Essex South Registry of Deeds.
3