Loading...
ARCH. FIELD RPT 5/14/2018 the architectural tatteam ARCHITECT'S FIELD REPORT PROJECT NAME: Pequot Highlands Interior Mod-Rehab PROJECT LOCATION: 12 First Street Salem,MA United States ARCHITECT'S PROJECT#: 16068.00 ;'= 00025 DATE: 5/14/2018 WEATHER DESCRIPTION: TIME TEMP WIND SPEED HUMIDITY REMARKS 11:00 AM 57°F 4.6 mph 78% Overcast EST.%COMPLETION&CONFORMANCE WITH SCHEDULE:75%Complete PRESENT ON-SITE: Eric Clory The Silver Street Group,LLC Mike Swiatek Port Harbor Construction,INC. Carpenter,Electricians,Elevator Techs,Landscapers,and Painters Chris Poulin Silver Street Development Michelle King The Silver Street Group,LLC Joan Russell WinnCompanies TOTAL: 6 OBSERVATIONS: ITEM CATEGORY REMARKS PHOTOS 1 Work in Landscaping to clean up construction damage is Progress ongoing. 2 Work in Corridor painting is ongoing.Last floor of 6 story Progress building finishing up this week. 3 Work in Corridor carpet installation is on hold.Waiting for Progress correct carpet to be delivered to the site. 4 Work in Elevator#2&#3 scope of work is ongoing. Progress 5 Work in Existing office area renovation is complete.Office Progress staff will be moving back into the office so that community room and lobby area work can commence. 6 Work in North Building roof replacement is ongoing.98% Progress complete.Parapet installation is beginning. 7 Work in Bridge panel installation is ongoing.Missing area The Architectural Team,Inc. 50 Commandant's Way at Admiral's Hill Chelsea MA 02150 T 617.889.4402 F 617.884.4329 www.archrtecturalteam.com Page 1 of 6 ARCHITECT'S FIELD REPORT DATE: 5/14/2018 FR: 00025 ITEM CATEGORY REMARKS PHOTOS Progress drop closest to south facade of 12 story building. 8 Work in Window installation is ongoing on the 12 story Progress building. 9 Work in Brick demo on north and west facade of 12 story Progress building is ongoing. 10 Work in Pipe staging removal from the east facade of the 12 Progress story building is ongoing. 11 Work in Framing,densglass installation and AVB application Progress on south facade of 12 story building is ongoing. 12 Items to Verify PHC must verify CoGen exhaust location complies with engineer's response to RFI#30. 13 Observations Framing,densglass installation and AVB application on east facade of 12 story building is complete. 14 Observations Photos f use The Architectural Team,Inc. 50 Commandant's Way at Admiral's Hill Chelsea MA 02150 T 617.889.4402 F 617.884.4329 www.archltecturalteam.com Page 2 of 6