Loading...
61 BRIDGE STREET - BUILDING JACKET 61 ♦BRIDGE STREET !` `o g CITY OF SALEM, MASSACHUSEM 3,, . yR BUILDING DEPARTMENT 120 WASHINGTON STREET,3RD FLOOR cam' TEL: 978-745-9595 KItMERLEY DRISCOLL FAx: 978-740-9846 MAYOR THOMAS ST.PIERRE DIRECTOR OF PUBLIC PROPERTIES/BUILDING COMMISSIONER April 19, 2012 City of Salem Collector's Office 93 Washington Street - Room 4 Salem, MA 01970 RE: Violation of Ordinance Ticket#1238 To Whom It May Concern, Please rescind the above referenced ticket#1238 (see attached), issued to 61 Bridge Street of Salem, Massachusetts, and dated April 4, 2012 for non-compliance with Required Inspection request via the Massachusetts state Building Code, 8"' Edition. The ticketed party has complied with this Departments request and is no longer in violation. Thank you in advance for your cooperation. If you have any question please feel free to contact the Building Inspectoor'ss Office. Respectfully, Michael E. Lutrzykowski Assistant building Inspector Cc: file + c CM OPSALEM .MONTH... QAV YEAR MME •MME OONIfW1iWW r S7a 1 AICD � � � sf-/'! '" d r•, `> s k, a.. .�e. }'t { ` NHME OF OFFENDER AOORE99 [I haretry acknowledge receipt of the foregoing citation z . ` �. l e [ ]UnaMeto obtain signature of offenders [ ]Date Mailed a, .r n Y` f[ I Posting AdvertisemeMe;Notices on Clry Property BCD 4-2 a [ J Illegal Signs- " Vlaiaoon o1 State Building Code �,°�, 5a i o SCO 4-39 and 4-47 `. 'SC012-1 r (,]Removal of Unsighty CondRions ." `[]Viohoon of BOCA Nat Fire Prov.Coda`-a ^yP •� - c ,er ' '" e - • SCO 12-56 - :-: SCO20-111 '- ['j keeping of Trailers,Comm.and Red Vehicles;etc - -.BCD 24-21.1 : r _ [.]Removal of SnouvACe from Sidewalks SCO 38-13 amI 38-14 .> ._. [ ]Zoning Ordinance- .. a. x - ,1�. d.' - ,. 'SZO I IOtharh� .1 j Signature of Enf eljg Person Department' _ „ - J" 'Anhount of Finen, Warning . ;[752500 -"[ 1$5000 ;��.k•""„=.,> o- -dr � _ 'A. ..« 1$700 00,; [ 1$200 00 I-].$300 00 •[ ]Other You have the following alternatives in this matter with1 1 days of the ate. this notice:.., [ J 60ase to Day the fine within 21 days of the date of this notice _'Enclose a checkening or money order City Clerk's to the e, of Salem and return 0 in this t,Salope'Sv or by 970.If d buerin to the City urase,e Office, ho Hall,93 Washington Street;Salem a `MA01970.If tlalivedng.la hantl please;note•tha hours o(Ciry Hall operation;Monday Z-through Wednesday from 8:00am to 4.00 p.m Thursday from g00am to 7:00 p.m.an i,,; T Friday irom800 a.mao 12:00Dm choose to contest this matter within 21 days of the date 61 this notice and request in writing' r a noncriminal hearing. '�'3 �•� i Enclose a cagy of this cda'don and mall N to the Clerk Magistrate;Salem District Court65 u., Washing ton Street Salem; -and 0 it eCourt vnli 'Ivlgileaheadng FAILURET60BEY THIS NOTICE WITHIN21 DAYS OF THE DATE OF THIS NOTICE WILL Vp. RESULT IN-THE CITY'OF SALEMrAPPLYING FOR THE:ISSUANCE OF A CRIMINAL COMPLAINTAGAINST:YOU-AWTHE DENIAL OR REVOCATION OF ANY CITY OF t. - SALEM PERMITS OR LICENSES YOU APPLY FOR OR THAT YOU HAVE,BEEN GRANTED, ° �•_�t r r INCLUDING BUILDING PERMITS ': ' -:;. ,r- , �e«r ', " s City of Salem,City Clerks Office 93 Washington Street,�Salem MA01970` (978)745-9595;ext 5610 ;j f :y r ;;, ^ t A - - x , _SEE OTHER SIDE FOR FURTHER INSTRUCTIONS ENcLOSEPAYMENT INTHIS ENVELDPE;;PEEL NDS 's . - , `•. n+. "°L - - i .4 u v t ♦ r ,,, >c0 e 4 ' >'a 3'. 3yy c"i; y. k} r 'Cra a �;r k t 4 w •. y^ i y} , Y p Y #T J G r' '�i .t. ,ki D•� T •y R r � CITY OF SALEM PUBLIC PROPERTY n DEPARTMENT KINMERLEYDR[SOOLL MAYOR 120 WASHINGTON STREET♦ SALEM,MASSACHUSETTS 01970 TEL:978-745-9595 ♦FAx:978-740-9846 REQUIRED INSPECTION 61 BRIDGE STREET March 2,2012 Josif Bigiku 61 Bridge Street Trust 1393 Broadway Saugus,Massachusetts 01906 The above referenced property has come to the attention of this department for the following reason(s): A report has been made to this office that there has been unpermitted construction work completed in the in the above referenced property and access to the utilities on the property have been made inaccessible from portions of the building by said work Under the provisions of 780 CMR, Section 115.6,the State Building Code, access to this property must be granted for the purposes of this inspection. Please call this office upon receipt of this letter to schedule this required inspection. If this property has rental units, these tenants must be notified in advance of this inspection, so that access to these spaces may also be accomplished. This inspection must be completed on or before March 14,2012; failure to respond to this notification will be construed as non- compliance, and as such an Administrative Search Warrant will be sought, so as to allow the lawful inspection of this property. If you have any further questions regarding this letter,please call this office at(978)-745- 9595, extension 5648. Sincerely, Michael Lutrzykowski Assistant Building Inspector CC: file, Health Dept.,Fire Prevention, Jason Siva, r � ' �i and Donahue; CIngool .., ;.E,`e...KR 239 Commercial St., West Lynn, Mass., 01905 ONTRACT 187ABLISHZD 1938 TORS G�{eS March 1, 1977 Building Department City of Salem Re: Structural Survey and I Salem Green Report - "Swede's Barn" Salem, Mass. 01970 61 Bridge Street, Salem, Mass, d ' Att: Mr. John Powers d' Building Inspector Gentlemen: Pursuant to your request and the request of Mr. Chester. Szczawinski, owner of the above subject property, the undersigned made a visual in- spection of the above subject structure for structural ,adequacy and " compliance with public safety and welfare and conformance with the Uniform Building Code - Article #7 with respect to the original con- struction and such. new construction and renovations which were neces- siGated by damages sustained by the facility in a recent past fire. The .csrpenter/contractor, Mr. Charles Brewster, of Lynn, Mass. accom- panied this writer on the facility inspection and the following recd- mmendations ,and/or corrections were brought to his -attention during the . , survey and are herein listed for your advice and information. A) First Floor Area 1. All wood columns, pott3r-and braces which support upper framing and/or are used for architectural effect should be adequately , pegged, nailed or lagged with clip angles to cause positive securement and preclude any future shifting and misalignment . 2. The second floor framing is supported by wood beams #which are trussed with (2) 3/4" diam, steel tension bars. '' The center beam about mid depth of building and spanning North to South has a misaligned tension plate at midspan at the bottom of the beam. The plate should be realigned and the truss bar centered in the respective groove provided for same. 3. Second floor joists above the bar and lounge area are 2 x 10 r wood, some of which are new and others were original construc- tion, Floor joists do not appear to have any bridging between between spans and bridging should be added not in excess of 8'-0" from joist supports. Some old floor joists are fire charred and should be sprayed with lime whitewash or other coating to preclude the possibility of objectionable fire odor. (next page) Iit Conti and Donahue, Inc. 592-6236 y 14 �flffdnfl- uu birl; iffla AYg] tCOI4EH8L19ASI Y : 0�'tC! W.z2slJl enns(J fav�d� e.12 1661sr"Moa OUC .�. Jt ,.1..'R ax-i• .. �. : . ..T �. y> .r y,..r �]a^' ,:. i:r' .: '< p•`� n.T .tea. � --Ti P-f q4 - -L: { ,%�;' :.$ .t:r r . 9. . C;:J y _ t>X ay- 'r] 3• '£ ` {- ,'C, tri' . ... 4 _ ' L.7 ya}.. . A • .M. n }.+. ??1,w .)' 1' y ..'t JA, _ ov. r.xd f14 U$, n. +.: aa- ... tr.) 1. .,.ia, ^3."#�" ',t:• ,,,+� .,� .. :'�y y. 6° -T. ej • .. - T.e+,. xrr." n.,r,d-`., � _. Ja p'e;.. ^ a trd^:'3 - i ' ' ..,y .4- � :. '.`id , .''-.4 r•'. i l.'. t:5' y g :•phi.. a .s: ht> 'T' T y ;,, � 4�1`.: r ..�..y�i Y: �.i .,..�.,. ,.� i `1: a' ♦=yet mak . .a 4 .0 a< .. .,. y^ e . ..} .ti' •! S ^,'^1M1 •..sf ti ,•F r [a's ♦ r7.. . y na,.' f C I. ,:aLa •'S, < < _ ,9 �`1 'py !^ar « l.. - °gW7 .tom .- r•,,. - .-..-t ::}� f a � - -. •r_ � � t ..: �.: 's.i . .. .� ' yfL e• 41'l' rif'i 2: •I r .. ai�iY.. e• �a'i'{: a' :3� • d..'.tip . l Sl. , .• "s,. .;'r!,x 1:� �- ..,2^, _ .. LE�.t>•�4L ,:,nl eudunoa bno iMo 'anti ands Donahue Inc. EN '1 ♦'•..., OM 239 Commercial St., West Lynn, Mass., 01905 CONTRAS RS [ R37ABLmaID 1933 C f TOR S March 1, 1977 Building Dept. City of Salem Salem, Mass. Att: Mr. John Powers One or two joists have been previously cut through: extensively to allow roof rain leader piping enough so as to make their struc- tural integrity questionable and such joists should be doubled or replaced: F 4. Roof drain and rain leader piping should be replaced and repaired i in accordance with code.. S. The (1) one story section of .building has its roof framed with. 2 x 8's approximately 12" o.c. Due to the heavy snow loads which can develop on this flat roof, `it is recommended that the joist trimmer or ribbon.which is. side nailed to wood studs of 2nd story- receive supplimentary support by way of cripple studs (2 x 4) extending from under trimmer to top of steel beam below. : Cripple studs should be placed under every 3rd joist. - These low roof joists are also installed without bridging and if solid bridging cannot be added without difficulty, a continuous 1 x 3 strap should be nailed to bottom of joists at mid span for lateral support. Towards .the front�of' the building the roof joists frame .the opposite } wiry and the joist or joists acting as a trimmer joist should be doubled and be continuous-to the above mentioned steel beam and stud wall support. 6. The most rear wood antique column (approx. 8" x 8") is acting as a structural support, however, the top of the column under the wood beam isnot cut square or uniform to provide equal bearing. The wood column should be cut for uniform bearing and shimmed up , as required. B) Basement Area 1. At the rear basement area (approximately under toilet areas) a wood sill beam resting on masonry wall is extensively rotted at a point where a wood floor beam frames into this rotted section. A new supplimental pipe column should be added next I; to masonry wall to provide new support for wood floor beam. (next page) Conti and Donahue. Inc. 592.6296 Flunti and Donahue, Inc.. $N Gl C N U19�5 O N TRA$RS ISTAsusasD 1933 239 Commercial St., West Lynn, Mass., AC OR S March 1, 1977 Building Dept, City of Salem Salem, Mass, Att: Mr. John Powers `3) 2. The one (1) story section of building has no basement but only a crawl space." The wood floor framing over this crawl space is supported by masonry piers which need some attention as to alignment, centering and being plumbed for adequate support, NOTE: It would also be 'advisable to provide some ventilation and air movement within this crawl space if none exists. C) Second (2nd) Floor Area 1. The second floor area had not yet been renovated at the time of writers visit. There was considerable charring from fire damage and should be corrected as previously noted in this report. Otherwise; framing and structure seemed sound, 2. Old vent piping connections to chimney flues should be removed . and properly sealed, 3, hoof drain and pipe leader should be made tight in accordance with code and. accepted practice. 4. The south side stud wadi (exterior) is ballon framed to steel beam,below and should be fire-stopped adequately at the floor ' level. 5. . Excess dividing partitions and cumbersome or redundant dropped ceilings should be demolished and a light weight suspended ceiling .provided in accordance with Owner's needs. D) EXTERIOR 1. The vertical siding joint halfway up the rear exterior wall is sprung open and as such is vulnerable to leaking which could cause considerable damage and should be corrected. (next page) ' Conti and Donahue. Inc. 592.6236 Eonti and 1"nahue, ins. N(, E B C 0 O •o;;; 01905 . NTRAE RS 6S7ABLISHBD 1933 ' 239 Commercial St., West Lynn, Mass., C TOR S March: l, 1977 Building'Dept. City of Salem . Salem, Mass. Att: Mr. John Powers (4) CONCLUSION - In conclusion, it is this writer's opinion that when the previous stated improvements are made the subject facility will conform to the basic code for its proposed use and occupancy. ' If you have any questions or need of any further information, please do not hesitate to •calland if you deem it necessary, I would be pleased to meet you at subject facility to review or examine anything further in this matter. Yours very truly, E. YiFes Ryan, P. E C.C. Mr. Chester Szczawinski C.C. Mr. Walter Bencal C.C. Mr. Charles Brewster a. ._ � •s�tH�F MASS N EJR:tc 1y�_ RYAN 11393 bo w iO90�G�5'C�p. FFSSIOftAI EAG } Conti and Donahue, Inc. 5926236 ENiJ ING DEPT Emil' and ®�flae, Inc. o i fi C X 239 Commercial St., West Lynn, Mass., 01905 N SR� Rf a� '� ESTABLISHED 1933 R cI [0 CITY OF SA A,RtsS. March 1, 1977 Building Department City of Salem Re: Structural Survey and 1 Salem Green Report - "Swede's Barn" Salem, Mass. 01970 61 Bridge 'Street, Salem, Mass. Att: Mr. John Powers Building Inspector Gentlemen: Pursuant to your request and the request of Mr. Chester Szczawinski, owner of the above subject property, the undersigned made a visual in- spection of the above subject structure for structural adequacy and compliance with public safety and welfare and conformance with the Uniform Building Code - Article #7 with respect to the original con- struction and such new construction and renovations which were neces- sitated by damages sustained by the facility in a recent past fire. The carpenter/contractor, Mr. Charles Brewster, of Lynn, Mass. accom- panied this writer on the facility inspection and the following reco- mmendations and/or corrections were brought to his attention during the survey and are herein listed for your advice and information. A) First Floor Area 1. All wood columns, posts and braces which support upper framing and/or are used for-architectural effect should be adequately pegged, nailed or lagged with clip angles to cause positive securement and preclude any future shifting and misalignment of members. 2. The second floor framing is supported by wood beams which are trussed with (2) 3/4" diam, steel tension bars. The center beam about mid depth of building and spanning North to South has a misaligned tension plate at midspan at the bottom of the beam. The plate should be realigned and the truss bar centered in the respective groove provided for same. 3. Second floor joists above the bar and lounge area are 2 x 10 wood, some of which are new and others were original construc- tion. Floor joists do not appear to have any bridging between between spans and bridging should be added not in excess of V-011 from joist supports. Some old floor joists are fire charred and should be sprayed with lime whitewash or other coating to preclude the possibility of objectionable fire odor. (next page) Conti and Donahue. Inc. 592-6236 � 4 E DtI "nah e, Inc. B N C'I oy... C O N TR $Rg &STAHLISHRD 1933 n 239 Commercial St., West Lynn, Mass., 01905 AC TQ Rg March 1, 1977 Building Dept. City of Salem Salem, Mass, Att: Mr. John Powers (2) one or two joists have been previously cut through extensively to allow roof rain leader piping enough so as to make their struc- tural integrity questionable and such joists should be doubled or replaced. 4. Roof drain and rain leader piping should be replaced and repaired in accordance with code. 5. The (1) one story section of building has its roof framed with 2 x 8's approximately 12" o.c. Due to the heavy snow loads which can develop on this flat roof, it is recommended that the joist trimmer or ribbon which is side nailed to wood studs of 2nd story receive supplimentary support by way of cripple studs (2 x 4) extending from under trimmer to top of steel beam below. Cripple studs should be placed under every 3rd joist. These low roof joists are also installed without bridging and if solid bridging cannot be added without difficulty, a continuous 1 x 3 strap should be nailed to bottom of joists at mid span for lateral support. Towards the front of the building the roof joists frame the opposite way and the joist or joists acting as a trimmer joist should be doubled and be continuous to the above mentioned steel beam and stud wall support. 6. The most rear wood antique column (approx. 8" x 8") is acting as a structural support, however, the top of the column under the wood beam is not cut square or uniform to provide equal bearing. The wood column should be cut for uniform bearing and shimmed up as required. B) Basement Area 1. At the rear basement area (approximately under toilet areas) a wood sill beam resting on masonry wall is extensively rotted at a point where a wood floor beam frames into this rotted section. A new supplimental pipe column should be added next to masonry wall to provide new support for wood floor beam. (next page) Confi and Donahue. Inc. 592-6236 Jr: and ®n ne Inc. CN GIN Rm' ON EE �•,,. 239 Commercial St., West Lynn, Mass., 01905 TRACKS ESTABLISHED 1933 TO Rs March 1, 1977 Building Dept. City of Salem Salem, Mass, Att : Mr. John Powers (3) 2. The one (1) story section of building has no basement but only a crawl space. The wood floor framing. over this crawl space is supported by masonry piers which need some attention as to alignment, centering and being plumbed for adequate support. NOTE: It would also be advisable to provide some ventilation and air movement within this crawl space if none exists. C) Second (2nd) Floor Area 1. The second floor area had not yet been renovated at the time of writers visit. There was considerable charring from fire damage and should be corrected as previously noted in this report. Otherwise, framing and structure seemed sound. 2. Old vent piping connections to chimney flues should be removed and properly sealed. 3. Roof drain and pipe leader should be made tight in accordance with code and accepted practice. 4. The south side stud wall (exterior) is ballon framed to steel beam below and should be fire stopped adequately at the floor level. 5. Excess dividing partitions and cumbersome or redundant dropped ceilings should be demolished and a light weight suspended ceiling provided in accordance with Owner's needs. D) EXTERIOR 1. The vertical siding joint halfway up the rear exterior wall is sprung open and as such is vulnerable to leaking which could cause considerable damage and should be corrected. (next page) Conti and Donahue. Inc. 592-6236 Gi Corti and uIfla�1 ne, Inc. C0 N ... 239 Commercial St., West Lynn, Mass., 01905 N TRACTTS ESTABLISHED 3933 0 R9 March 1, 1977 Building Dept, City of Salem Salem, Mass, Att: Mr. John Powers (4) CONCLUSION - In conclusion, it is this writer's opinion that when the previous stated improvements are made the subject facility will conform to the basic code for its proposed use and occupancy. If you have any questions or need of any further information, please do not hesitate to call and if you deem it necessary, I would be pleased to meet you at subject facility to review or examine anything further in this matter. Yours very truly, OtOW42-00 4 L E; Ja s Ryan, P, E. C.C. Mr. Chester Szczawinski C.C. Mr. Walter Bencal C.C. Mr. Charles Brewster . � E.J E5 RYAN N EJR:tc ��' 21393 o z •�9lip FOi 57EP. \�4, Conti and Donahue. Inc. 592.6236 The Commonwealth of Massachusetts w ARCHITECTURAL ACCESS BOARD s o One Ashburton Place - Room 1310 Boston, Massachusetts 02108 ARGEO PAUL CELLUCCI (617) 727-0660 GOVERNOR 1-800-828-7222 JANE SWIFT Voice and TDD LT.GOVERNOR Fax: (617) 727-0665 www.state.m a.us/aab DEBORAH A. RYAN EXECUTIVE DIRECTOR Arthur Daignault ILCNSCA 27 Congress Street Salem, MA 01970 COMPLAINT DISMISSAL RE: 61 Bridge Street, 61 Bridge Street, Salem On 10/8/99 you filed a complaint with this office regarding the above premises. After reviewing all the information submitted, the Board must dismiss your complaint for the following reason: Work that was performed on 61 Bridge Street did not exceed 30% of the assessed value of the building, triggering the requirement that all public entrances shall be accessible. In addition the building inspector for the city of Salem, Mr. Thomas St. Pierre has confirmed that no work was performed on the step at the street side entrance. (Complaint # 99 - 180) Any person aggrieved by the above decision may request an adjudicatory hearing before the Board within 30 days of receipt of this decision by filing the attached request for adjudicatory hearing form. If after 30 days, a request for an adjudicatory hearing is not received, the above decision becomes a final order and the appeal process is through Superior Court. Date: February 10, 2000 ARCHITECTURAL ACCESS BOARD e� / /Chairpenson cc: Local Building Inspector Independent Living Center Disability Commission ie Citp of 6alem, '41aq'qaCbU5ett!5 ` T 2 Public Propertp Department a Nuilbing Department One fealem Oreen (97S) 745-9595 C xt. 3S0 Peter Strout Director of Public Property Inspector of Buildings Zoning Enforcement Officer September 28, 1999 Art Daignault Independent Living Center 27 Congress Street Suite 107 Salem, Ma. 01970 Re: 61 Bridge Street Dear Mr. Daignault Regarding your concerns about 61 Bridge Street and the 521 CMR compliance issues. The architect, Richard Griffin , has indicated that he felt his plan complied with the intent of 521 CMR. This project did not trigger the 30 % figure, but they did make handicap accommodations both in a rami at the rear of the building and in both sets of bathrooms. My approval of the project was based on these factors. The plans for this project are available in this office. Sincerely, Thomas St. Pierre Assistant Building Inspector COND7T� CERTIFICATE Of OCCUPANCY n � CITY OF SALEM Issued. is /5 Permit#: 11-q.j SALEM, MASSACHUSETTS 01970 i City Of Salem Buildin Dept. 9�cinnne e'�H DATE v}rYC`.Ilii-1 Ry V+6 t9_ 99 PERMIT NO. APPLICANT ('1:i_CI"IAEL HILI- _._,_-,,ADDRESS _ 41 flL._L.:l:!'.:iN (-1VEE f•11Ji 1"71c: jNO.j (STREET) (CONTR'SLICENSE) ST ONEI IA1'I f IA C11I' '3 Cl - CI7Y_._. _.__._. _ STATE_ ZIP CODE _." TEL NO ----- '[U NUMBEROF PERMtTTO - 1 `IT J.0 1� (�._) STORY CI� Fit-1{ -" OOSE!'_E=:'il�.?�_i� l 1:(-�L.DWELLING UNITS, (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) ATjLocnnoN)_g10E 7. fif2f.D8L EiJREEIT _ , oOilRtcr F., \, IND) (STREET) L_ v(CROSS STREET) _ (CROSSSTR£ET) SUBDIVISION__ ill(a1-' ..5 tLOT_�I 'hBLOCK— BUILDING IS TO BE FL WIDE BY` FT.LONG BY---FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TOTYPE__ USEGROUP BASEMENT WALLS OR FOUNDATION__ TYPE) REMARKS:_,FLF{G ` I-L.C)OR IREIhiOVA'I ICINS TO CREA"FE '1-111[1_ !<EFAIL. ;S"F6: R S. -I . J. i'S. ADDITIONAL WORK TO PERMIT 1112-99 9/19/99 est. 5,000 fee 55.00 B.J.S. AREA OR INSTALL NEW BATHROOM VOLUME , ESTIMATED COST� 50. 000 FEE MtT$ 'fi V,D. it Q) (CUNCISQUABE FEET) - - OWNER CAERNE:VALE ROCKEY A _ ADDRESS 9it1 KE ADDRESS AVE BUILDING DEPT. BY_ ..i.. J. s, t u Wyl\IC.D l cl 111l"" Citp of 6a(em, ;fflaggacbu9ett9 A�YP/tryg�Nr t C ,"444 44 . ° DATE FILED Typd�::�NCW Expiration Date ? ? ❑ Renewal, no change Number 96-113 Cl Renewal with change In conformity with the provisions of Chapter one hundred and ten, Section five of the Massachusetts General Laws, as amende , the undersigned hereby declare(s) that a business is conducted under the title of: Brl ��c S �" S,O�✓'fS at. e} '( � D�r S f l--7 a/q 70 type of business �fl�� ( r ✓q '�S �j isS�ys f /74� ts� by the following named person(s): (Include corporate name and title if corporate officer) )Full Name Residence Si natures ----------------------------------------------------- ----------------------------------------------------- on 5---2- 19-L6-the above named person(s) personally appeared before me and made an oath that the foregoing statement is true. ----------------------------------------------------- ----------------------------------------------------- CITY CLERK Notary Public (seal) Date Commission Expires Identification Presented State Tax I.D. # S.S. # O 12- YL -7 3 S// (if available) In accordance with the provision of Chapter 337 of the Acts of 1985 and Chapter 110, Section 5, of Mass. General Laws, business certificates shall be in effect for four(4) years from the date of issue and shall be renewed each four years thereafter. A statement under oath must be filed with the town clerk upon discontinuing, retiring, or withdrawing from.such business or partnership. Copies of such certificates shall be available at the address at which such business is conducted and shall be furnished on request during regular business hours to any person who has purchased goods or services from such business. Violations are subject to a fine of not more than three hundred dollars ($300.00) for each month during which such violation continues. � . c �,� L INDEPENDENT LIVING CENTER of the North Shore and Cape Ann, Inc. 27 CONGRESS STREET, SUITE 107 • SALEM, MA 01970 LAM (978) 741-0077 v/TTY • (978) 741-1133 FAx August 30, 1999 SERVING: Beverly Mr. Tom St. Pierre Danvers Building Inspector's Office Essex One Salem Green Salem, MA 01970 Gloucester Hamilton Dear Mr. St. Pierre: Ipswich In my last correspondence, dated June 16,1999, RE: the renovation project at 61 Lynn Bridge Street, Salem, I informed you of 521 CMR compliance concerns. Lynnfield I am now writing to make you aware of 521 CMR Sections 3.3.1 & 3.3.1a as the Manchester full and fair cash value was not 30% or more at 61 Bridge Street in Salem. By-The-Sea In 521 CMR, Sections 3.3.1 & 3.3.1a — Jurisdiction, it states the following: "If the Marblehead work being performed amounts to less than 30% of the full and fair cash value Nahant of the building and if the work costs less than $100,000, then only the work being performed is required to comply with 521 CMR." Peabody Rockport At 61 Bridge Street in Salem, the front entrance was renovated. In my opinion, the owner should apply for a variance to the front entrance. In the variance Rowley application, the owner must explain why a ramp is not feasible to construct at Salem the front entrance. Saugus I look forward to receiving a reply from you with regard to this matter by Swampscott September 14, 1999. Topsfield Sincerely, r� Wenham C4��'(- az;` Arthur Daignault Access Specialist CC: Beth Rennard, City of Salem ADA Coordinator; Jack Harris, Co-Chair of the Salem Commission on Disabilities; Mary Margaret Moore, Executive Director of the ILCNSCA; File "OUR GREATEST NEED AS HUMAN BEINGS IS THE FREEDOM TO PURSUE OUR DREAMS" r 52I CMR: ARCHITECTURAL ACCESS BOARD JURISDICTION d, Work relating to septic system repairs,(including Title V,3I0 CMR 15.00,improvements) site utilities and landscaping. 3.3.3 Alterations by a tenant do not trigger the requirements of 521 CMA 33.16 and 33.2 for other tenants. However,alterations, reconstruction, remodeling,repairs, construction, and changes in use falling within 521 CMR 33.16 and 33.2,will trigger compliance with 521 CMR in areas of public use,for the owner of the building. 3.3.4 No alteration shall be undertaken which decreases or has the effect of decreasing accessibility or usability of a building or facility below the requirements for new construction. 3.3.5 If alterations of single elements,when considered together,amount to an alteration of a room or space in a building orfacility,that space shall be made accessible. 33.3.6 No alteration of an existing element,space,or area of a building or facility shall impose a requirement for greater accessibility than that which would be required for new construction. 3.4 CHANGE IN USE When the use of a building changes from a private use to one that is open to and used by the public, an accessible entrance must be provided,even if no work is being perforated. When a portion of a building changes use from a private use to one that is open to an used by the public,then an accessible route must be provided from an accessible entrance even if no work is being performed 3.4.1 RESERVED FOR FUTURE ACTION: Changes in use,from private to public,in private residential homes where no work is being performed. 3.5 WORK PERFORMED OVER TIME When the work performed on a building is divided into separate phases or projects or is under separate building permits, the total cost of such work in any 36 mouth period shall be added together in applying 521 CMR 33,Existing Buildings, 3.6 MULTIPLE USES When a building is occupied by two or more uses,the Regulations which apply to each use shall apply to such parts of the building within that use. 3.6.1 521 CMR 33,Existing Buildings shall apply based upon each use and not on the entire building. Example: If a three story building valued at$300,000 has one floor of retail use and two floors of residential use,the full and fair cash value of the retail portion shall be 1/3 of the total value which would be$100,000. 3.7 PARTIAL APPLICATION When only a portion of a building is subject to 521 CMR,the full and fair cash value shall be prorated by the ratio of the square footage of that portion to the square footage of the whole building. Example:Where the whole building is 100,000 square feet,the full and fair cash value is$1,000,000, and the pact subject to 521 CMR is 10,000 square feet{one-tenth of the total},then the fill and fair cash value of the part subject to 521 CMR would be one-tenth of$1,000,000 or$100,000. 3.7.1 If the Board determines that such proration would cause an inequitable result, the Board may otherwise calculate thefull and fair cash value of the portion of the building. . 316198 521 CMR-8 J. 521 CMR: ARCHITECTURAL ACCESS BOARD JURISDICTION 3.1 SCOPE All work performed on public buildings or facilities (see definition), including construction, reconstruction, alterations,remodeling, additions,and changes of use shall conform to 521 CMR.. 3.1.1 To determine the scope of compliance,refer to 521 CMR 32,New Construction and 521 CMR 3.3, Existing Buildings. In the absence of jurisdiction by 521 CMR,780 CMR: the State Building Code may apply. 3.2 NEW CONSTRUCTION All new construction of public buildings shall comply fully with 521 CMR- 3.3 MR3.3 EXISTING BUILDINGS All additions to,reconstruction, remodeling,and alterations or repairs of existing public buildings or facilities,which require a building permit or which are so defined by a state or local inspector,shall be governed by all applicable subsections in 521 CMR 3,JURISDICTION. For specific applicability of 521 CMR to existing multiple dwellings undergoing renovations,see 521 CMR 9.2.1. 3.3.1 If the work being performed amounts to less than 30%of the full and fair cash value of the building and a. if the work costs less than$100,000,then only the work being performed is required to comply with 521 CMR or b. if the work costs$100,000 or more,then the work being performed is required to comply with 521 CMR In addition,an accessible public entrance and an accessible toilet room,telephone, drinking fountain (if toilets, telephones and drinking fountains are provided) shall also be provided in compliance with 521 CMR Exceptions: Whether performed alone or in combination with each other,the following types of alterations are not subject to 521 CMR 33.1.(When performing exempted work,a memo stating the exempted work and its costs must be filed with the permit application or a separate building permit must be obtained.) General maintenance and on-going upkeep of existing,underground transit facilities will not trigger the requirement for an accessible entrance and toilet unless the cost of the work exceeds$500,000 or unless work is being performed on the entrance or toilet. 3.3.2 If the work performed amounts to 30%or more of the full and fair cash value of the building the entire building is required to comply with 521 CMR- a. MRa. Where the cost of constructing an addition to a building amounts to 30%or more of the full and fair cash value of the existing building,both the addition and the existing building must be fully accessible. a. Curb Cuts: The construction of curb cuts shall comply with 521 CMR 21. b. Alteration work which is limited solely to electrical mechanical,or plumbing systems;to abatement of hazardous materials;to retrofit of automatic sprinklers and does not involve the alteration of any elements or spaces required to be accessible under 521 CMR Where electrical outlets and controls are altered,they must comply with 521 CMR. c. Roof repair or replacement,window repair or replacement,repointing and masonry repair work. 316198 521 CMR-7 INDEPENDENT LIVING CENTER IT M of the North Shore and Cape Ann, Inc . 27 CONGRESS STREET, SUITE 107 • SALEM, MA 01970 (978) 741-0077 v/TTY • (978) 741-1133 FAx October 7, 1999 SERVING: Beverly Mr. Tom Hopkins Compliance Officer Danvers Architectural Access Board Essex One Ashburton Place, Room 1310 Boston, MA 02108 Gloucester Hamilton Dear Mr. Hopkins: Ipswich The Independent Living Center of the North Shore & Cape Ann (ILCNSCA) is filing a complaint against Michael Hill, owner of the property at 61 Bridge Street in Salem for Lynn violating 521 CMR Section 25.1 & 25.2 - entrances. Enclosed is a photograph of the Lynnfield front entrance of 61 Bridge Street, Salem (enclosure 1). Both doors enter into one room. The front entrance has been renovated with the new doors. No ramp has been Manchester constructed and therefore it remains non-accessible. By-The-Sea Marblehead In addition, under the jurisdiction of 521 CMR, Section 3.3.1 & 3.3.1.a: "If the work Nahant being performed amounts to less than 30% of the full and fair cash value of the building and if the work costs less than $100,000, then only the work being performed Peabody is required to comply with 521 CMR." Tom St. Pierre, Salem Assistant Building Rockport Inspector, agrees that the work performed amounted to less than 30% of the full and fair value of the property. According to Mr. St. Pierre letter to us (enclosure 2) the Rowley architect, Richard Griffin, believes that his plan complied with the intent of 521 CMR Salem and Mr. St. Pierre agreed. Saugus Please keep me informed of all developments regarding this complaint. Thank you for Swampscott your time and consideration to this issue. Topsfield Sincerely, X 00 Wenham Art Daignault, Access Specialist CC: Beth Rennard, Salem ADA Coordinator; Tom St. Pierre, Salem Assistant Building Inspector; Jack Harris, Co-Chair Salem Commission on Disabilities; Michael Hill, Owner of the Property; Richard Griffin, Architect for the Project; Mary Margaret Moore, Executive Director of the ILCNSCA; File Enclosures: 2 "OUR GREATEST NEED AS HUMAN BEINGS IS THE FREEDOM TO PURSUE OUR DREAMS" •N Decenber 21 , 1977 Mr. Laurent J. Bedard Sp}cial Investigator Salem Licensing Board -- City Hall Annex One Salem Green Salem, Massachusetts 01970 REs The Blue Barn 61 Bridge Street Dear Larry, Please be advised that The Blue Barn, located at 61 Bridge Street, is in the process of remodeling under building permit #$2. Upon complotion of construction, a Certificate of Inspection will be issued for this property, Very truly yours, JOHN Be POWERS Superintendent of Public Property, Inspector of Buildings JBP/mlr P16 7188788 RECEIPT FOR CERTIFIED MAIL NO INSURANCE COVERAGE PROVIDED— NOT FOR INTERNATIONAL MAIL (See Reverse) SENTTO . Mr, Walter Bencal STREET AND NO. 468 Lafayette Street P.O.,STATE AND ZIP CODE Salem, MA 01970 POSTAGE dsS CERTIFIED FEE p ¢ OV w SPECIAL DELIVERY ¢ RESTRICTED-DELIVERY ¢ 0 w w SHOW TO WHOM AND ¢ �+ DATE DELIVERED a W S f y D IDOF PATE. ANADDRESS y AND ADDRESSESS OF ¢ g a _ DELIVERY o w SHOW TO WHOM ANO DATE _y DELIVEREDWITHRESTRICTE ¢ i o s DELIVERY U SHOW TO WHOM,DATE AND ADDRESS OF DELIVERY WITH ¢ �p flESTRCTED DELIVERY a TOTAL POSTAGE AND FEES 5 /i a POSTMARK OR DATE (/ Q 8 AV. 6// qt_.� O 4 STICK POSTAGE STAMPS TO ARTICLE TO COVER FIRST CLASS POSTAGE, CERTIFIED MAIL FEE,AND CHARGES FOR ANY SELECTED OPTIONAL SERVICES.(see f4d) 1. If you want this receipt postmarked,stick the gummed stub on the left portion of the address Side of the article,leaving the receipt attached,and present the article at a post office service windo skin hand it to your rural carrier.(no extra charge) - 2. If you do not want this receipt postmarked,stick the gummed stub on the lett portion of the ress side of the article,date,detach and retain the receipt,and mail the article. 3. If you want a return receipt,write the certified-mail number and your name and address on Peturn receipt card,Form 3811,and attach it to the front of the article by means of the gummed ends'if space permits.Otherwise,affix to hack of article.Endorse front of article RETURN RECEIPT REQUESTED adjacent to the number. ;.-,) 4. If.you want delivery restricted to the addressee,or to an authorized agent of the addressee, .` endorse RESTRICTED DELIVERY on the front of the article. 4,'titR 5. Enter fees for the services requested in the appropriate spaces on the front of this receipt.IVreturn receipt is requested,check the applicable blocks in Item 1 of Form 3811. 6. Save this receipt and present it if you make inquiry. ,cvo:1979 0-299-363 r� PJ speCZ�id� COMMONWEALTH OF MASSACHUSETTS CITY/TOW-N OF S A L E M u , APPLICATION FOR CERTIFICATE OF INSPECTION 4r Date // -7 JKIT e) Fee Required (Amounts ( ) No Fee Required In accordance with the provisions of the Massachusetts State Building Code , Section 108 ,15 , I hereby apply for a Certificate of Inspection for the below-named premises located at the following address : Street and Number 61 Bridge Street Name of Premises e—BEWn Purpose for Which Premises is Used Restaurant License( s ) or Permit ( s ) Required for the Premises by Other Governmental Agencies : License or Permit Agency Common Victualer - If Il /dc�, L City of Salem 4-...,..r nen ems' A Certificate to be Issued to Choester Szczawinski Address 120 Willow ?-%. Nahant, Mass Owner of Record of Building Address Name of Present Holder of Certificate Name of Agent , if any Owner SIGNATURE OF PERSON TO WHOM TITLE CERTIFICATE IS ISSUED OR HIS AUTHORIZED AGENT ;2 9 — 7 7 DATE INSTRUCTIONS : 1) Make check payable to : CITY OF SALEM 2) Return this application with your check to : John B. Powers, Inspector of Buildings, City Hall Annex, One Salem Green Salem Mass, 01970 PLEASE NOTE : 1 ) Application form with accompanying fee must be submitted for each build- ing or structure or part thereof to be certified . 2) Application and fee must be received before the certificate will be issued . 3 ) The building official shall be notified within ten (10) days of any change in the above information. CERTIFICATE # EXPIRATION DATE : FORM SBCC-3-74 a-ryZo Respectfully submitted, SALEM LICENSING BOARD r Y Richard E . Savoy Chairman RES : aml CC : Board members Special Investigator file C� t . �� l� \� � F d -,� j� v (pity of 0alem, Massar4usetts �Ta.•= �leareanra' (�ifcr,��b{t�ju�Ialtl51 P� ,82 RECrlVEA O ClTYSALEM,MASS. November 24, 1982 Mr. Richard T. McIntosh Inspector of Buildings City of Salem Salem, MA 01970 Re: Property at 61 Bridge Street, Salem Dear Inspector McIntosh: An extensive fire apparently occurred at the above property in 1971. During the years of 1976-1977, it is believed extensive re- habilitation took place. Could you inform us of the monetary and physical extent of any construction that may have taken place during this or any other recent time. Your assistance will assist us in our duties. Respectfully yours, Edmund S. Balboni Chairman ESB:mjg i, y 'nil u�� Otu of '�$ttlPm, Aassar4u Qftf .. Public 'Prapertg Department sRecib.s�"`� �nil�Ing �PjIt[rtmEY[t Richard T. McIntosh One--Salem'Green 745-13213 i, December 7, 1982 Mr. Edward Balboni Chief Assessor City of Salem . Salem, Massachusetts RE: 61 Bridge Street i Dear Ed: i In response to your letter dated November 24, 1982, the above referenced property had work done on it in 1976 and 1977 under permits numbered 474 and 52 respectively. 1 The estimated cost of said work was $5,000 in 1976 (dk474) , this work included repairing the roof, gutting the upstairs, and repairing a floor. In 1977 (#52) renovations included drop ceilings, sheetrock, new i doors, windows, stairways and bar, at an estimated cost of $14,000. 1 I hope this answers your questions. If I can be of any further assistance please feel free to contact me. Very truly yours, "Richard T. cIntosh Inspector of Buildings RTM:bms Ii I I I I � i i 0 BRAKE & CLUTCH , INC . 63 BRIDGE STREET, SALEM, MA 01970 a so$R' (617) 745-2500 DISTRIBUTOR OF QUALITY TRUCK EQUIPMENT SNOW PLOWS BEDLINERS Duraliner Penda-Liner Vitaliner BUMPERS-STEP & TOW Hercules Westin CAR CARRIERS Holmes May 23, 1989 CARGO VAN BODIES & CHILLERS Supreme CARSTART SYSTEMS Goodall Office of Building Inspector CRANES Venturo One Salem Green DUMP BODIES Salem, Mass. 01970 Steelfab GENERATORS Gentlemen: HOISTS Goodall We have noticed extensive renovations, Venco Henderson being performed next door at 61 Bridge St. LOAD COVERS & TARPS Naturally, we are concerned as to the Donovan anticipated use of the building after these PICK-UP renovations are complete. NG Vanguardrd Reading ing PINTLE HOOKS In the past, the tenants have made Holland Kerins changes without proper licenses or inspec- PLATFORM & RACK BODIES tions, and we do not look forward to any Reading further surprises. REEFERS Temp-Con We would appreciate your assurance RUNNING BOARDS that the work is being done in accordance Dee zee Westin with city regulations, and that we will be SANDERS apprised of any new license requests or Torwell Fisher Morrison zoning changes. SERVICE BODIES Morrison SNOW PLOW DISTRIBUTOR Very truly yours, Fisher Plows Air Rams _ TAILGATES-HYDRAULIC Venco Tommy Gate Todco Del America Frank J. Li as Jr. TOOLBOXES - Morrison Delta 2X4 CONVERSION KITS _ Doug Nash WINCHES Warn Rule Ramsey - t? WRECKERS Holmes VAN RACKING - Reading Morrison tarry rn< r-a n us —� s� cv� APPLICAM COPY Ze THIS PERMIT NOT VALID UNLESS y CITY OF SALEM BUILDING PROPERLY RECEIPTED BY CASHIER ,a SALEM, MASSACHUSETTS 01970 PERMIT VALIDATION �E .,,.I�r DATE Au • 27P v19, 91 PERMIT NO, 397-91 'tn APPLICANT +�'Ak Carnevale ADDRESS R0 •EV'rrAve.. 13myp `IVn 910 _ pLOWcr �x 1X0.1 ISTRECI) ICOAT9'S LICENSE) PERMIT TO 1J'ZMAA' (_I STORY Cr4' TAT, NUMBER UNITS IIYPE OF IMPROVEMENTI NO. IPROPOSED USE) Cl 'ptt = 'f+Tl r SC RT) Iff�q•N ZONING 1T (LOCATION) Vl GSi�d.LhA6F ?3.fV*Ya. ECTY 11 !.SEPI DISTRICT a INO.1 )STREET) BETWEEN AND (CROS: STREET) - ICROSS STREET) LOT SUB61VISION LOT BLOCK SIZE BUILDING IS TO BE FT. WIDE BY FT, LONG BY FT. IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION ITVPEI TffA1 FIRE REMARKS: FT4IEI, PWIlTla;r EQIN[M 6 DOOR F04 COMMrRCIAL USED FURMURE CALL FOR PERMIT TO OCCUPY 745-9595 AREA.OR 1010 0100 FEE S [15.00 VOLUME ESTIMATED COST Fl:,l tTFI yE.,. ',CUBIC/SOUCRE FEET; � 3� OWNER � Cameyale E ADDRESS �Cj R�„L' YIW AVP,.Rr BXeP-'I A. �� 1 R_'F{• NSPECTOR OF )BUILDINGS YOUR SPECIAL ATTENTION is tadlurl to this Gdlowinc: This permit is grunted on the express cond itioh that the said construction shall, in all respects,conform to the Ordinances of this jurisdiction including the Zoning Ordinance, regul�ting the construction anduse of buildings, and may be revoked at any time upon violation of any provisions of said ordinances. ltualilerproof pliu:ud given at the time permit is issued must be displayed un premises. 11te department must to notified and incpcctiun intuit, of prior coostru;tion work its requested on weather card. All new buildings and additions :ind .ilterA icas to existing buildings ruquim a minimum of three call inspections, namely, (1) Footings, - drain tile x)atems, foundation and basement walls, when walls are at lent two feet high, but before back filling the wall and before pmoeeding with the suf,erstructurea. (Y) Framing prior to lathing and plastering,duct work, fire .slopping and other equipment before it is e.mceal nl. (3) Final inspection when building or structure is con, plelcd. On jobs involving reinforced concrete work, inspection must be made after steel is in place and before concrete is poured. The Department reserves the right to reject any work which has been concealed or completed without first having bi en inspootod :md :ggrtovod by the lk partment in to cord;mre with the requirements of the various codes. .Any deviation from th.- appro%ed pl;m= must be nuthoriz.•d by the approval of revised plans subject to the same procedure establi.sho,i for Ule exarnination of the originid plans. An additional permit fee is also charged predicated on the extent of the ;v...tion from the original plwis. Permits we not v:dci if construction work iv not started within six months from date permit is issued. Request for Final Inspection should br made b postcard or phone call to this department when the construction work is completed and heating apparatus has hi-en instilled. Painting or decorating is not required before the Final Building Inspection. Final Inspection and corlil t rite of occupanev must be obtained befure cooupying building. v>Sn •,.r 9M... ' i7,YA :ePa, IY•9Yv.,'{vN G' . .�,-Vd•:", if i is( yr.-. s � .',S ::i..'r�t, •;ti'rir 1 . "'m`tr4 ' a' BUILDING PERMIT Aug, (l JOB WEATHER CARD /Y ^"^ �_ DATE `RA'g27P 19 / 91 PERMIT NO# 3JJ7791 —W j5j7r�APPLICANT Rete CLQ ADDRESS nwAP myerly, 910" 1 p����99�S�ry; (X0.)'�5��• (STREET) ICONTR'S LICENIEI PERMIT TO AE'NYntXoN I_1 STORY SrL - NUMBER OF DWELLING UNITS 1 (TYPE OF yIMPpR�O VyF M�E.MOiYI ��y�y., M0, pw�Ly� �,y� PROPOSED 09E1 61 {iaiAA.yW GiTPMr TYsiFSY 1YNW ZONING }� AT (LOCATION) DISTRICT "" 4 • (X0,) '^- ^^ (9TREETI BETWEEN AND !(CROSY STREET) (CROSS STREET) LOT SUBDIVISION LOT BLOCK SIZE BUILDING IS TO BE - FT, WIDE By FT. LONG BY FT. IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION - TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPEI I� FTY2E SiN�A PAECi`Tfi=y 4IOMM A D0C7Ei POR.COMMERC7,AL USED PURNUURE REMARKS: - CALL VOR PERMST TO OCCUPY 745-9595 AREA OR ESTIMATED COST C PERMIT c LL 0 VOLUME lt}�000.00 FEE c tlSR�Q CUBIC 90ULRE FEET) 'VollkyCal'7WW® 4 O- . OWNER _ VU BUILDING CEPT, AOORE55 t�i:51 v�� '�9 BY + AoHc — INSPECTOR 57 BUILDINGS THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOB, EITHER TEMPORARILY OR PERMANENTLY, ENCROACHMENTS ON PUBLIC PROPERTY. NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE AP- IF R,YED BY THE'JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED --- FROM-THE-DEPARTMENT OF PDBUC WORKS. THE 135UAN'CE OF-THIS"PERMIT DOES NOT ROLE ASE THE'4P.PLIC ANT-E-ROM T'H E-CONDITIONS OF ANY APPLIC4BLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL APPROVED PLANS MUST BE RETAINED ON JOB AND THIS WHERE APPLICABLE SEPARATE. INSPECTIONS REQUIRED FOR CARD KEPT POSTED UNTIL FINAL INSPECTION HAS BEEN PERMITS ARE REQUIRED FOR ALL CONSTRUCTION WORK: _ELEC,TRICAL, PLUMBING AND 1. FOUNDATIONS OR FOOTINGS. MADE. WHERE A CERTIFICATE OF OCCUPANCY 15 RE MECHANICAL INSTALLATIONS. 2. PRIOR TO COv ERING STRUCTURAL OUIREO,SVCH BUILDING SHALLNOTBE OCCUPIED UNTIL MIRE TO LATH(. FINAL INSPECTION HAS BEEN MADE. 3. FININAALL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS z z z F_i / P.OARD CF HEALTH GAS INSPECTION APPROVALS FIRE DEPT. INSPECTING APPROVALS 1 OTHER CITY ENGINEER Z p WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION INSPECTIONS INDICATED ON THIS CARD INSPEC'OR HAS APPROVED THE VARIOUS WORK IS NOT STARTED WITHIN SIX MONTHS OF DATE THE CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. PERMIT IS ISSUED AS NOTED ABOVE. OR WRITTEN NOTIFICATION. ., .. h �� _ ,.. r. ���de✓ �� . . 0 SENDER.Complete items 1,2,and 3. Add your address in the "RETURN TO space on 3 reverse. 1. The following service is requested(check one). on X1 Show to whom and date delivered... .... ... 45 6 ❑ Show to whom,date,and address of delivery. .-0 ❑ RESTRICTED DELIVERY Show to whom and date delivered.... . . .. . .. 6 ❑ RESTRICTED DELIVERY x Show to whom,date,and address of delivery.S_ m C (CONSULT POSTMASTER FOR FEES) Z 2. ARTICLE ADDRESSED TO: n Mr. Walter Bencal In 4;68 Lafayette St. 'v Salem MA 01920 3. ARTICLE DESCRIPTION: m REGISTERED NO. CERTIFIED NO. INSURED NO. 7188788 IT (Always obtain signature of addressee or agent) PIT I have received the article described above. SIGNATURE ❑ Addressee ❑ rized:agent .Apfho m 4. � D DATE OFD VE Y ( '.y "y aw- s; Zto C � c 0 5. ADDRESSfComplete only it requested) In T_ IT 6. UNABLE TO DELIVER BECAUSE: CLERK'S INITIALS 3 D r G 9- { GPO:1977-0-249595 `I UNITED STATES POSTAL SERVICE r OFFICIAL BUSINESS 999 SENDER INSTRUCTIONS PENALTY POR PRIVATE Print your name,items 1, USE TO AVOID PAYMENT and ZIP CODE in the space below. , Complete items 1,2,and 3 on the reverse OF POSTAGE $300 •Moisten gummed ends and attach to front of article if space U.SMAIL p¢rmits.Otherwise affil to back of article. •Endorse article "Return Receipt Requested adjacent to number. RETURN TO David Mitchell, Plumbing Inspector (Name of Sender) + One Salem Green (Street or PO. Box) Salem, MA 01970 (City, State, and ZIP Code) MORTGAGE INSPECTION BAY STATE SURVEYING SERVICE INC. 234 CABOT ST, BEVERLY, MA. LOCATION S/7.��/� lvlf�SS- NOTES: f �• SCALE : I" _ ?J FT. DATE ___ zi � ? • This is a Mortgage Inspection survey and no, an instrument survey,therefore this plot plan is for REFERENCE �. ... -:........... mortgage inspection purposes only. �s-�/___ Q._ `i• - _- ..• ••--.__ • This survey is based on survey marks of others. -• _ ..._ __ __ _ __ .. . . ... .... . . .. .. . ... .... • Bushes, shrubs, fences and tree lines do not To ESL �J necessarily indicate property lines. . • In my professional opinion the building(s) are not I hereby certify that I have examined the premises and that the located in the special flood hazard zone, as defined building(s) shown on this plan are located on the ground as by H.U.D. shown and that they conformed to the zoning setbacks of the • Whenever an offset is 1'± or less, an instrument ---- -- --. when constructed. survey is recommended to determine prop. lines. L0T S0, 7 i S In. No. 2Eip'44 o `��Y �1•{GS CDN • �f,�;C � ,/ Citp of '*alem' f a!5garbU!5ettg Vublic Propertp Department jSuilbing -Department One Salem Oreen (978) 745-9595 Cxt. 360 Peter Strout Director of Public Property Inspector of Buildings Zoning Enforcement Officer August 25, 1999 Salem Head Start Program Sandy Waddell 30 Tozer Road Beverly, Ma. 01915 RE: 61 Bridge Street Dear Sandy: We wish to inform you that the building at 61 Bridge Street is not in compliance with the Massachusetts State Building Code 780 CMR, for an educational use group. The owners permit was for renovation of the existing business use group only. In order for you to occupy this space, the building would have to meet the proper separations as required by the State Building Code and possibly the Board of Appeals due to the number of parking spaces required. If you have any questions, please do not hesitate to contact our office. Sincere y, Kevin G.Goggin Assistant Building Inspector cc: Fire Department I` Health Department C itp of 6alem, 41aggarbugett5 k Public 3propertp Mepartment �3uilbing Mepartment One balem Oreen (978) 745-9595 tax[. 380 Peter Strout Director of Public Property Inspector of Buildings Zoning Enforcement Officer CY a paw S/0a-6-e,s ' Skndrq J "dde// b; rec4v r Sa ie /Y) Michael D. Hill 6 Albion Avenue Stoneham, Massachusetts 02180 781-279-2323 October 19, 1999 Attn: Garry Rhodes, Chairperson Commonwealth of Massachusetts Architectural Access Board One Ashburton Place - Room 1310 Boston, Massachusetts 02108 Re: 61 Bridge Street, Salem Dear Mr. Rhodes, I am responding to your letter of October 12, 1999, regarding 61 Bridge Street, Salem. This letter is to address the reported violation of Section 25.1 of CMR 521, that the front entrance was renovated and is not accessible. As the attached letter from the City of Salem Building Department states, both my-architect.and>the City of Salem Building Department agreed the project complied with the intent of 521 CMR. The front entrance directly abuts the City of:Salem's''sidewalkand"the'fif§t'fldo"r'is`15"`above'the:sidewalk' Massive" structural renovations would have been required to accommodate a ramp to reach the first floor level. The cost of building this ramp would have been as much•as the cost of the rest of the renovations. I have installed a handicap ramp at the rear of the building and two handicap bathrooms. Per Section 25.6 of 521 CMR I am installing a sign indicating the location of the new exterior accessible ramp constructed at the rear entrances. I hope you will find my efforts are sufficient to meet the intent of 521 CMR. Please call me if you have any questions regarding the project. Sincerely,M Michael Hill z cc Thomas St: Pierre;Assistant B,uilding'lnspector, City of Salem;'Building Dept n v.i msofface/winword/properties/bridge/handicapdoc'I Citp of Gpalem, 1Ca55arbu5ett5 B, Y S Publtc Property -Bepartment -Suilbing Department One baltm Srrm (976) 745.9695 C.V. 360 'OpPeter Strout y Director of Public Property Inspector of Buildings Zoning Enforcement Officer September 28, 1999 Art Daignault Independent Living Center 27 Congress Street Suite 107 Salem, Ma. 01970 Re: 61 Bridge Street Dear Mr. Daignault: Regarding your concerns about 61 Bridge Street and the 521 CMR compliance issues. The architect, Richard Griffin , has indicated that he felt his plan complied with the intent of 521 CMR, This project did not trigger the 30 % figure, but they did make handicap accommodations both in a ramp at the rear of the building and in both sets of bathrooms. My approval of the project was based on these factors. The plans for this project are available in this office. Sincerely, Thomas St. Pierre Assistant Building Inspector 521 CMR: ARCHITECTURAL.ACCESS BOARD Max predominant Direction of Traffic 7th"i ' Section through Grating tarp denension P.Pan+sun c sarei ' I r � i f � i t/2' mai to tn' mae FIT iiUhli'afl� Grates and Mete Figure 25c 25.5 PROTRUDING OBJECTS Objects that protrude into entranceways,(suspended fights, signs,fiuurns,door closets,etc.)shalt comply with 521 CMR 26.6,Protruding Objects, 25.6 SIGNAGE Any entrance/edt of a faciliry not accessibk by persons in wheelchairs shat3 have a sign dearly indicating the lowion of the acce=bk enmmcelexit. 2193196 521 CMR-98 � The Commonwealth of Massachusetts ARCHITECTURAL ACCESS BOARD One Ashburton Place - Room 1310 Boston, Massachusetts 02108 ARGEO PAUL CELLUCCI (617) 727-0660 GOVERNOR 1-800-828-7222 JANE SWIFT Voice and TDD LT. GOVERNOR Fax: (617) 727-0665 DEBORAH A. RYAN . EXECUTIVE DIRECTOR TO: Local Building Inspector Independent Living Center Local Commission on Disability Complainant FROM: /Architectural Access Board J� RE: �( f DATE: Enclosed please find a copy of the following material regarding the above location: _Application for Variance Decision of the Board _Notice of Hearing ✓ Correspondence _Letter of Meeting The purpose of this memo is to advise you of action taken or to be taken by this Board. If you have any information which would assist the Board in making a decision on this case, you may call this office, or you may submit your comments in writing to the above address. Thank you for your assistance. C,7 , Michael D. Hill 6 Albion Avenue Stoneham, Massachusetts 02180 781-279-2323 October 19, 1999 Attn: Garry Rhodes, Chairperson Commonwealth of Massachusetts Architectural Access Board One Ashburton Place - Room 1310 Boston, Massachusetts 02108 Re: 61 Bridge Street, Salem Dear Mr. Rhodes, I am responding to your letter of October 12, 1999, regarding 61 Bridge Street, Salem. This letter is to address the reported violation of Section 25.1 of CMR 521, that the front entrance was renovated and is not accessible. As the attached letter from the City of Salem Building Department states, both my architect and the City of Salem Building Department agreed the project complied with the intent of 521 CMR. The front entrance directly abuts the City of Salem's sidewalk and the first floor is 15" above the sidewalk. Massive structural renovations would have been required to accommodate a ramp to reach the first floor level. The cost of building this ramp would have been as much as the cost of the rest of the renovations. I have installed a handicap ramp at the rear of the building and two handicap bathrooms. Per Section 25.6 of 521 CMR I am installing a sign indicating the location of the new exterior accessible ramp constructed at the rear entrances. I hope you will find my efforts are sufficient to meet the intent of 521 CMR. Please call me if you have any questions regarding the project. Sincerely, Michael Hill cc: Thomas St. Pierre, Assistant Building Inspector, City of Salem, Building Dept msoffice/wi nword/properties/bridgelhand icap.d oc Cl ftp of palem, 'fa55at�ju5Ett5 leo Public Prnpertp Bepartment Nuilbing Bepartment m� One Salem &rrrn (975) 745.9595 tftt. 3S0 Peter Strout ,COPY Director of Public Property +++�++ Inspector of Buildings Zoning Enforcement Officer September 2S, 1999 .Azt Daignault Independent Living Center 27 Congress Street Suite 107 Salem, Ma. 01970 Re: 61 Bridge Street Dear Mr. Daignault Regarding your concerns about 61 Bridge Street and the 521 CMR compliance issues. The architect, Richard Griffin , has indicated that he felt his plan complied with the intent of 521 CMR. This project did not trigger the 30 % figure, but they did make handicap accommodations both in a ramp at the rear of the building and in both sets of bathrooms. My approval of the project was based on these factors. The plans for this project are available in this office. Sincerely, Thomas St. Pierre Assistant Building Inspector 521 CMR: ARCHITECTURAL ACCESS BOARD Nola 1 �c7.1_2' Max pr♦domlnsnt ohectlon of Ttefllc ' Section through Grating tong dinaubn ' o.v.mtomarsw to ram of t r I � t Ir i 112' max 12 f J 1 � �iI111111�IIIV 11'1• mac t3 ���IIIIIII!I.I�� r Graters randYea~ Figure 25c 25.5 PROTRUDING OBJECTS Objects that protrude mto ens-droeways, (suspeaded lights,signs,femurs,door closers, etc.)Shall comply with 521 CMR 20.6,Protruding Objects. 25.6 SIGNAGE Any v=rince1cx:t of a facibry not arcr=hle by persons in wheelchairs shall have a sign clearly indicating the location of the accessible cnvmcdcAt Zr 3195 521 CMR-98 r 61 BRIDGE STREET 07-11 COMMONWEALTH OF MASSACHUSETTS CITY OF SALEM GIS#:g 11174 Map: 36 Block: — g SIGN PERMIT Perrnit: Sign Category: SIGN Permit# 07-11 PERMISSION IS HEREBY GRANTED TO: Project# JS 2011-000006 Est. Cost: $900.00 Contractor: License: Expires Fee Charged:$0.00 Concept Signs Balance Due:$.00 Owner: 61 BRIDGE STREET LLC j#of Fixtures: '..Applicant: Concept Signs DigSafe# AT: 61 BRIDGE STREET UseGroup ConstClass ISSUED ON. 06-Jul-2010 AMENDED ON. EXPIRES ON. 06-Jan-2011 TO PERFORM THE FOLLOWING WORK: SIGN PERMIT AS APPROVED FOR(TRUE GOSPEL BAPTIST CHURCH) THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: Fee Type: Receipt No: Date Paid: Check No: Amount: SIGN REC-2011-000009 06-Jul-10 x $0.00 GeoTMS8.2010 Des Lauriers Municipal Solutions,Inc. Q .� ; ► The Commonwealth of Massachusetts Department of Public Safety \lasachusvty,State Building Code 1780 C NIR)Seventh Edition i City of Salem 1 Building Permit Application for any Building other than a I-of 2-Famil 1 (this Section For Official Use Only) Budding Permit Number: Date Applied: ' 7 67 I Building Inspectur: r SECTION 1: LOCATION (Please indicate Block a and Lot a for locations for which a fitreetaddress is not available) Nu. and Street City /Town Zip Code Name of Building lit applicable) SECTION 2:PROPOSED WORK If New Construction check here❑or check all that apply in the two rows below Existing Building O Repair❑ 1 Alteration ❑ Addition ❑ Demolition O (Please fill out and submit Appendix 1) Change of Use Change of Occupancy ❑ Other ❑ Specify: Are building pl.insand/urconstruction documents being supplied as part of this permit application? Yes ❑ No O Is an Independent Structural Engineering Peer Review required? Yes ❑ No O Brief Description of Proposed Work: �CYYt.S,E 60GUIO/.YrlliNZW SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Evaluation is enclosed(See 780 CMR 3402.0) ❑ Existing Use Group(s): Proposed Use Group(s): r Existing Hazard Index 780 CMR 34: Proposed Hazard Index 780 CMR 34: SECTION 4:BUILDING HEIGHT AND AREA Existing Proposed No.of Flours/Stories(include basement levels)&Area Per Floor(sq. ft.) Total Area (sq.ft.)and Total Height(ft.) SECTION 5:USE GROUP(Check as a licable) A: Assembly A-1 ❑ A-2r ❑ A-2nc O A-3 A-4❑ A-5❑ B: Business O. E: Educational ❑ F: Facto F-1 ❑ F2❑ H: Hierc Hazard H-1 ❑ H-2 O H-3 ❑ H-4❑ H-5❑ I: Institutional 1-1 ❑ 1-2❑ 1-3❑ 1-4❑ M: Mantile O R: Residential R-1❑ R-2 O R-3❑ R4❑ S: Storage 5-1 0 5.2 ❑ U: Utility❑ Special Use O and please describe below: Special Use: SECTION 6:CONSTRUCTION TYPE(Check as applicable) IA IBO IIAO 1100 IIIAO 11180 IV VA Cl VB ❑ SECTION 7: SITE INFORMATION(refer to 780 CMR 111.0 for details on each item) Water Supply: Flood Zone Information: Sewage Disposal: Trench Permit: 'Debris Removal: ('ubl,c ❑ Check it outade Pluud Gunn❑ Indicate municipal ❑ A trench will not be Licen.ed Di.p,+il Site❑ required❑ortrvnch or.pucu\: I'nvaly❑ or mdcnufy Zone: or un air w.trm❑ .permit i,vnclo. d ❑ Railroad right-of-way: Hazards to Air.Navigation: \I:\ I l,.la•n. l ,•m nu..,,-n It.�,m,. 1•r. \ol :\I•pbc.,bly❑ I.Strurlun•,c shin anpurt.ipl,noch.""I L Ihuir re%ianv c,n ipicted.' r t m.cnt to, Build vnclo, •d ❑ Nv,❑ or.\n❑ 1"e,❑ \n ❑ SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY I�ditiun .a Code, L.v Gn,tipi.i: ra pv ut Construction: Occupant Load I,vr I lonr: I ha•, the budding coni.un.,n Sprinkler Sa.Icm'. Special Stipulation.: SECTION 9: PROPERTY OWNER AUTHORIZATION �} .Name and Address of Pruperty Owner Name(Print) .No.and Straet 010 Town Zip 11roper1r0%cner Contact Inlormation: Title Telephone No. (business) Telephone Nu. (cell) a-mad addry�s I(applicable, the property owner herebv authorizes Name Street Address Cily/Town State Zip to act tin the •ru+eriv owner',behalf, in all matters relative to work authorized by this buddin • •ermtt a • •bcatiun. SECTION 10:CONSTRUCTION CONTROL (Please fill out Appendix 2) (I(l•uJdin is larox than 15,tW cu. tt.of endo.aJ ace and/ur not under Caa truction Contnil then check hear Oandllup Section III.1) 10.1 Re istercd Professional Responsible for Construction Control Name(Registrant) Telephone No. e-mail address Registration Number Street Address City/Town State Zip Discipline Expiration Date 10.2 General Contractor Company Name: Name of Person Responsible for Construction License No. and Type if Applicable Street Address City/Town State Zip Telephone No.(business) Telephone No.(cell) e-mail address SECTION 11:WO KERN COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.I 25C(6)) A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Is a signed Affidavit submitted with this application? Yes O No O SECTION 12.•CONSTRUCTION COSTS AND PERMIT FEE Item Estimated Costs: (Labor and Materials) Total Construction Cost(from Item 6) =S 1. Building S Building Permit Fee-Total Construction Cost x_(Insert here 2. Electrical S appropriate mum pal pal factor)-$ . 3. Plumbing 3 4. Mechanical (HVACj S Note: Minimum fee=-Foe; (contact municipality) 5. Mechanical (Other) S Enclose check payable to 6. Total Cost S (contact municipality)and write check number here SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT Be entering my name below, I hereby attest Under the pains and penalties of perjury that all of the information contained in this Application is true and occur to the best oF� knosvlet gv and understanding. Lis C _ k � ` rL to I•I •a a print and sign name Title Telephone No. Dale i t (PM - <trccl .1dJre.. City/Town < Zip �^ Municipal Inspector to fill out This section upon application approval: o Og me Date v. ,., • CITY OF SALEM, MASSACHUSETTS BUILDING DEPARTMENT k ;r 120 WASHINGTON STREET,3RD FLOOR TEL: 978-745-9595 KIMBERLEY DRISCOLL FAX: 978-740-9846 MAYOR THOMAS ST.PIERRE DIRECTOR OF PUBLIC PROPERTIES/BUILDING COMMISSIONER • October 1, 2019, 61 Bridge Street Salem Ma. 01970 To Whom It May Concern This letter is in regards to the installation of a fire suppression system at 61 Bridge St. Under the Building Code any new building with more than two units an automatic fire suppression must be installed. However under the Existing Building Code any level 2 or 3 renovation also requires the installation of an automatic fire suppression system needs to be installed in any building that has more than two units. Due to the fact that you have exceeded a level 2 renovation and an automatic fire suppression system is required to be installed. If you don't agree with my opinion than you should consult a design professional for a full code review. • Stephen Cummings Local Building Inspector (9780-619-5643 (-;-„,...i2t-t,..:, CITY OF SALEM, MASSACHUSETTS ww- 41,"*`, BUILDING DEPARTMENT k=v y 120 WASHINGTON STREET, 3RD FLOOR 78-745-9 TEL: 9 595 KIMBERLEY DRISCOLL FAX: 978-740-9846 MAYOR THOMAS ST.PIERRE DIRECTOR OF PUBLIC PROPERTIES/BUILDING COMMISSIONER December 12, 2019, 61 Bridge Street Salem Ma. 01970 Dear Mr. Polansky . I am rejecting your Building permit application because there were no sprinkler plans submitted with the building plans. Being a mixed use building a fire suppression system must be installed. Due to the amount of work being done on the property including the reframing of the roof you have triggered a level two Alteration according to the International Existing Building Code section 504. This level of Alteration requires the building to have a fire suppression system installed. If you feel aggrieved by my interpretation of the code you can appeal my decision to the Department of Building Regulations and Standards in Boston Stephen Cummings Local Building Inspector (9780-619-5643