51 CANAL STREET PROJECT CONDITIONS LETTER �4 11 CITY OF SALEM, MASSACHUSETTS
BOARD OF HEALTH
98 WASHINGTON STREET,31,D FLOOR
Public Health
SALEM,'n f A 01970 Prevent.Promote.Protect.
TEL. (9718v)1L7�41-181o0
KIMBERLEY DRISCOLL health�7ag.salem.com DAVID GREENBAUM,RS
MAYOR HEALTH AGENT
January 9, 2020
Ben Anderson, Chairman
Salem Planning Board
98 Washington Street
Salem, Massachusetts 01970
Dear Mr. Anderson:
On behalf of the Salem Board of Health I have reviewed the Site Plan Review and Flood
Hazard District Special Permit for The Salem Car Wash, LLC, 51 Canal Street. The Board of
Health places the following conditions on this project:
1. The individual presenting the plan to the Board of Health must notify the Health Agent of
the name, address, and telephone number of the project (site) manager who will be on
site and directly responsible for the construction of the project.
2. If a DEP tracking number is issued for this site under the Massachusetts Contingency
Plan, no structure shall be constructed until the Licensed Site Professional responsible for
the site meets MA DEP standards for the proposed use.
3. A copy of the Licensed Asbestos Inspector's Report must be sent to the Health Agent.
4. A copy of the Demolition Notice sent to MA DEP, Form BWPA06, must be sent to the
Health Agent.
5. The developer shall adhere to a drainage plan as approved by the City Engineer.
6. The developer shall employ a licensed pesticide applicator to exterminate the area prior to
construction, demolition, and/or blasting and shall send a copy of the exterminator's
invoice to the Health Agent.
7. The developer shall maintain the area free from rodents throughout construction.
8. The developer shall submit to the Health Agent a written plan for dust control and street
sweeping which will occur during demolition and construction.
9. The developer shall submit to the Health Agent a written plan for containment and
removal of debris, vegetative waste, and unacceptable excavation material generated
during demolition and/or construction.
10. The Fire Department must approve the plan regarding access for firefighting.
11. Noise levels from the resultant,establishment(s) generated by operations, including but
not limited to refrigeration and heating, shall not increase the broadband sound level by
more than 10 dB(A) above the ambient levels measured at the property line.
12. The developer shall disclose in writing to the Health Agent the origin of any fill material
needed for the project.
13. The resultant establishment shall dispose of all waste materials resulting from its
operation in an environmentally sound manner as described to the Board of health.
14. The developer shall notify the Health Agent when the project is complete for final
inspection and confirmation that above conditions have been met.
If I may be of any assistance to your Board, please feel free to call me.
Sincerely yoqf s,
For the Bqard of Health,
avid Greenbaum
Health Agent
Cc: Salem Board of Health