38 BOARDMAN STREET - BUILDING JACKET 3 0 1�o�exj M A 1�1 5!
s
rsperTab®
Oversized-Tab Folders
90%Larger Label Area
SM9EA®
KEEPING YOU ORGANIZED
No. 10301
PATENTPENDING
FORESTRY
SUSTAINABLE MIN.RECYCLED
l INITIATIVE CONTENTIOY1
ceels.ampsw0r. POSTCONSUMER
m C,pmarsrrara
iP011iJ
MADE IN USA
GET ORGANIZED AT SMEAD.COM
38 Boardman Street Salem, Massachusetts
PERMIT DRAWINGS/SMOKE DETECTOR SET
�NPROVED 7 S 712
SubjecE to`a�iprovr�l.by any otiber
authority'.hiy jty-is diction.
Cimbf sFME .arr .
By-
PLA ERPPROVEDSOLELYFORIDMlf-,CAT3NCF
TY ATIq LOCATION OF""pt PSMJLcGTt4.W ''ViM.
R MIJ.'fROTECTION.DEVICES.".PE•LU Z'CT f( A
FINALT STANDIHSPECTION,FORCOMFL:TECOkIOU-
MCE WITH THE FIRE CODE.
Sara Castle del Rio, AIA
w Ly 2(C, ZOOS
DRAWING LIST
SUPPLEMENT TO PERMIT DWGS
EC-B BASEMENT PLAN
A-1 FIRST FLOOR PLAN (DESIGN DRAWINGS)
A-2 SECOND FLOOR PLAN
A-3 THIRD FLOOR PLAN
A-8 SECTION @ THIRD FLOOR
A-9 DETAILS
JULY 26 FIRE DETECTOR PLANS
E-B BASEMENT ELECTRICAL RC PLAN
E-1 FIRST FLOOR ELECTRICAL RC PLAN
E-2 SECOND FLOOR ELECTRICAL RC PLAN
E-3 THIRD FLOOR ELECTRICAL RC PLAN
Supplement to Permit Drawings
38 Boardman Street,Salem
131uly 05
General Notes to Contractors
1. Codes: Comply with applicable codes and regulations. Present copies of
inspection reports
2. Dimensions: Verify existing conditions and dimensions indicated on drawings
with field dimensions before fabrication or ordering of materials. Do not scale
drawings.
3. Permits, Fees, And Notices: Please include in the estimate and pay for the
building permit, governmental fees, and any other fees anticipated in the project.
4. Clean up: Keep premises and surrounding area free from accumulation of debris
and rubbish. At the end of the project, remove all project waste materials and
rubbish and extra materials from the site.
5. Other Interior Work:
A. Insulate third floor walls and any walls that have been gutted
B. Provide 5/8 GWB for ceilings separating units but decision as to
the necessity of this is made by the Building Inspector.
C. Kitchen Cabinet drawings will be provided by Home Depot
6. Exterior Work:
A. Bolt rear decks into house and fill in behind brick steps
B. Paint all exterior word work and shutters
C. Provide new black storms and screens for all windows, new and
old
D. Repair existing windows as needed
E. Provide for all new wood Brosco triple track windows on the
third floor
7. Schedule: Our goal is to get the units on the market in September so please
Keep the work progressing in a timely fashion.
38 Boardman Street, Salem
Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005
PERMIT SET/FIRE DECTECTOR PLANS
EXISTING COLUMNS
31/2"Lolly Columns
with 20"Square X 12"deep footing
15'-0" 12'-61/4
-_ -' �-- ------ I---- -- --
- -------------— {T ------------ j ----------
I
6-111/2" 8'-51/2" 9'-31/2" 7-31/2"
EXISITNG STAIR
(NTS)
—— UP
i
[ —! �sementP1ancale4 =1 -0"DRAWN BYSCdR
Walls Exisitng To Remain 38 Boardman Street, Salem
— New Walls Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005
PERMIT SET/FIRE DECTECTOR PLANS
TBDI ALL DIMENSIONS ARE FINISHED DIMENSIONS
Fridge
36"Wide Dw— ------- Ven
Space
DEC
Install New
15'-6"VIF o q Gas
-7
lattice U I CL..—- i, .
Slide in Firepla e LIVING ROOM 102
30"Space O I DINING AREA 101
KITCHEN 100
(See Home Depot Plan)
�.ow wAI,
IJ
New Floor Existing Floor
I
4'-2 I/4"VIF 2'-6" 6" 13'-31/4"Outside of Structure
New PNL xew PNt YI New cased opening
WD New PNL WD New Jack Studs to support 2nd Floor opening 4
Door � Cabinet Door Cabinet I I New PNL I
New PNL WD
11 DWODor Door I
New PNL Install �r
HALL 108
IBUI EXISITNG STAIR N ATH 104 or
new metal ro Clgset New 1
10
(NITS) 104 1 SIM and shelving 17A � A9 SIM
HW Floor A9
Refinish Exist.Tr. UP
L Tub MASTER BEDROOM 106 _—-i
Ljp B�EQ �tDN EQ BEDROOM 107
EQ EQ
New PNL
WD Clo$et
r A Install EXISITNG STAIR Fill crack between
106 new metal rod stair and wall
LL
and shelving (NTS)
New Wood Window
� A-1 First Floor Plan
Scale 1 4"=1'-0"DRAWN BY SCdR
—Walls Exisitng To Remain 38 Boardman Street, Salem
— New Walls Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005
PERMIT SET/FIRE DECTECTOR PLANS
TBDI ALL DIMENSIONS ARE FINISHED DIMENSIONS
Ca Fridge _ I_ _ Ven
)ECK
Spaceide DW
Install
lattice New
is II
15'-6"VIF U ° SITTING AREA 201 CL — -\' —
g
Slide in Firepla e - LIVING ROOM 202
O y I
30"Space 0
KITCHEN 200
II
1I.OW WAL
O
r � II
New Floor Existing Floor New cased opening
13'-31/4"Outside of Structure
New rNti New Jack Studs to support 1 SIM
N.rNc — (2)14"LVL's above -4
Cabinet mO Cabinet ¢ ( A9
D�� —— _ ........
EXISITNG STA Base and — HALL 208
eihead Cab.-
203 Formica To 3/ " 11'-6" Sand and finish
(NTS) BATH 204 g1-0" treads
HD Floor 8 DN Refinish Ex.Tread Fur out around 1
New Railin New WD PNL
B existing pipes D"ur STUD /GUESTROOM 207
DN and ducts A9
UP LAUN RY New Wood/Glass
205 French Doors
DINING ROOM 206
5'-0"
WD
EXISITNG STAIR
VIF VIF (NTS)
LI
15'-7'— New Wood Window
A-2 Second Floor Plan
Scale 1 4"=I' 0"DRAWN EY SCdR
ellitngTDRemain
N
— NewwWalls 38 Boardman Street Salem
ALL DIMENSIONS ARE FINISHED DIMENSIONS
Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005 ALL THIRD FLOOR WINDOWS TO BE REPLACED New Roof Below PERMIT SET/FIRE DECTECTOR PLANS
WITH BROSCO WOOD TRIPLE TRACK
CL0
:. ::.: :.....::: . ::::::•.
T-l"
I
—Existing Dormer
. Above
Roof �.�., Wrap chimney
Below w/BB&Plaster
WD if d q q L———— MASTER) EDROOM 302
BEDROOM 300 Door d — New
BEDROOM 301 Roof Below
E4 EQ
C
I
New PNL [.y
R R WD Bi(old W
Door �GUNNew PNL 2'JlWD
—_ EXISITNG STAIR HALL 306 wo PNL
(NTS)New WD Railing ASE WALL 1'-2"' 2'-6" 3'-T' �p DRESSINV AREA 303
M
..... New PNL
New WD 7
Door :.. ... Ne PNL 2'-6e 2y_6" TYPICAL CLOSET
Roof ;........ •:....... •.. Door
••••••••••• r Floor: Exisiting Refin.
Below C1 Ceiling:BB and Plaster
DN •::o::, ••.•o••'••• New O erable Walls:BB and Plaster w/
\\��%� oc
f° STER BATH 304 •••• New PNL New PNL WD Base
U ?; _ D euom Skyllgh Above
wn W.1d stall new MTL Rod and
R BATH 305 p� n j Dom
Shelving
New Opera§le ——
�:
Skylight Abpve.........::::. .:::.�: :::.:�� 'i 1 I I 1 I I I I I I IIS L'� ;t:.:�..••I•. �: •JI.�:::.•:. .::•• ��I'� �:.
> nWDSheV
q Open Wood Shelv' CLOSET 303A
N Exisitng Sewer Vent ET 303B
....; a� : CLOS
PLENUM FOR PLU BING,ELECTRICAL AND HVAC :•^"'''' r'•'•^^^^T`N
�. :.:...............
15-7 I 11' 91/4" o
I
A-3 Third Floor Plan
Scale 1/4"=1'-0"DRAWN BY SUR
38 Boardman Street, Salem
Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005
PERMIT SET/FIRE DECTECTOR PLANS
RIDGE VENT
HVAC PLENUM
Insulate Ceffing.:�7 Pull Down Stair
New Operable
Skylight
MASTER
BATH 304
n �
STAIR HALL BEDROOM 301 \
F + 306
w
Wood
c Shelving
Third Floor N
A-8 Section (cry Third Floor
Scale 1 4"=1'-0"DRAWN BY SCdR
EXISTING 2X3 STUDS 38 Boardman Street, Salem
Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005
PERMIT SET/FIRE DECTECTOR PLANS
NEW 2X4 JACK STUDS
— WOOD BASE
NEW CASING
EXISITING FLOOR JOISTS
Plan at Jack Studs OWN MLDG TBD
Scale: 1 1/2"= 1'-0" NE
w 14°tv[
CASING HEIGHT TO MATCH THAT OF EXISTING WINDOWS
Section at LVL
Scale: 11/2'1= it-Oil A-9 Details
Match Existing Windows Scalel. 1/2' = 1'-0"DRAWN BY SCdR
HARDWIRED HEAT DETECTORS 38 Boardman Street Salem
Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005
HARD WIRED SMOKE DECTECTORS PERMIT SET/FIRE DECTECTOR PLANS
WASHER DRYER BELOW
I
r'
NEW FURNACE BELOW
i
.. _...
r I —
i .....
(STAIR
(NTS)
i I ii
i
WASHER DRYER BELOW
E-B ;Basement Electrical RC an
Scale 1/4"=P-0"DRAWN BYSCdR
HARD WIRED HEAT DETECTORS 38 Boardman Street Salem
I
Lyn Ann Gehnas Sara Castle del Rio 26JULY 2005
HARD WIRED SMOKE DECTECTORS { PERMIT SET/FIRE DECTECTOR PLANS
i
DJ
LIVING ROOM 102
DINING AREA 101
KITCHEN 100
(See Home Denot Plan)
i
1
i
..........
\i r- i......i 1
i
IFLLJ
STIBULE EXISI STAIR U BATH 104 NEW
HALL 1
/ ,\
i
S
to � i
r7 1 1 1 1
MASTER BEDROQ 106
BEDROOM 107
i I
L
i1 I
E-1 First Floor Electrical RC Plait
Scale 1/4"=P-0" DRAWN BY SUR
HARD WIRED HEAT DETECTORS 38 Boardman Street, Salem
Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005
HARD WID SMOKE DECI'ECTORS
PERMIT SET/FIRE DECTECTOR PLANS
RE -
_ ..
:
I SITTING AREA 201
LIVING ROOM 202
KITCHEN 200
it
!
,
EXISITNG STA -, ! HALL 20
203
(NTS) S -11204
....._ \ S
TH 204 1
1 STUDY/GUESTROOM 207 ........
........... i
._ f _.....
LAUN RY y, :.
205 ..�.
- .. DINING ROOM 206
.. ..... .... ...
...._'.
� o I
E-2 Second Floor Electrical RC Pt
Scale 1/41"=P-0" DRAWN BYSCdR
...........
38 Boardman Street, Salem
HARD WIRED HEAT DETECTORS
Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005
HARD WIRED SMOKE DECTECTORS PERMIT SET/FIRE DECTECTOR PLANS
I
it
!
!
i
I
MASTER BEDROOM 302
BEDROOM 300
BEDROOM 301
itSis
i
1
r � i
!
I
EXISITNG STAIR HALL 306
(NTS)New WD Railing S
DRESSINQ AREA 303
05; r-r'
I MASTER BATH 304!
11 1
1 7 1 BATH 305 .....
I
! ..
!
.-
i
1 E-3 Third Floor Electrical RC Plan
Scale 1/4"=1'-0" DRAWN BY SUR
j
38 Boardman Street Salem, Massachusetts
Demolition Set 28 June 05
Lyn Ann Gelinas Sara Castle del Rio
• , I
Supplement to Demolition Drawings
38 Boardman Street,Salem
28June 05
General Notes
b
1.. Demo: Kitchen and Baths to studs. Refer to DWGS for wall info.
2. Remove: All existing cabinetry, shelving, plumbing fixtures, appliances, flat
panel hollow doors and any exterior debris along side of house. 14" Fj-IA;A7 t^ awihw/P*Y
3. Preserve all original moldings,trim, casings, hardware, and doors. If there is
a question, contact owner.
4. Codes: Comply with applicable codes and regulations. Present copies of
inspection reports.
5. Dimensions: Verify existing conditions. Do not scale drawings.
6. Permits,Fees,And Notices: Please include in the estimate and pay for the
permits, governmental fees, and any other fees anticipated in the project.
7. Clean up: Keep premises and surrounding area free from accumulation of debris
and rubbish. At the end of the project, remove all project waste materials and
rubbish and extra materials from the site.
8. Schedule: Our goal is to get the units on the market in September so please
Keep the work progressing in a timely fashion.
REMOVE SOAPSTONE SINK 38 Boardman Street, Salem
REMOVE RAISED FLOOR PLATFORM Lyn Ann Gelinas/Sara Castle del Rio 28 June 2005
o � s1vt.Ll/r^3
AT 11H�INEY TO RE ❑
AT THIS LEVEL
REMOVE WORK BENCH Beam Above
- -----------------
L ------ --------- �r^*r ----------_-�r^-�F-_----_----- - ----- ---- -� l
u ----_--_---- {�.J ---- --------
***Verify column locations****
EXISITNG STAIR TO REMAIN
(NTS)
A-- UP
D-0 Basement Demolition Plan
Scale -0"DRAWN BYSCdR i'
Walls Exisitng To Remain 38 Boardman Street, Salem
Lyn Ann Gelinas/Sara Castle del Rio 28 June 2005
—Walls to be Removed DEMOLITION PLANS
-———————— Remove Cabinets and
Soffit above
Remove Chimney
KITCHEN O DINING ROOM Save Mantel
Save mantel LIVING ROOM
lU
Floor: LINOLEUM OUT Floor:RUG OUTNONO Floor:RUG OUT
A Ceiling: TO STUCTURE )O g' Ceiling:NO
Walls: TO STUDS Walls:AS NOTED Walls:NO
Doors: REMOVE ALL FLAT PANEL1p
HOLLOW CORE DOORS
FRIDG
FVPANTRY Floor:LINOLEUM OUT
TIBULE EXISTING STAIR Ceiling:NO
(NTS) Walls: NO
Floor:Out
Walls:
Stair treads:N BATH MASTER BEDROOM
Floor: Walls:NO BEDROOM
1= �1 E
DN UP Floor:RUG OUT Floor:RUG OUT
Ceiling:NO Ceiling:loor:REMOVE TILE Walls: NO Walls: O
NN
fling:TO STRUC.
Walls:T0 STUDS
EXISTING STAIR
(NTS)
D-1 First Floor Plan
Scale 1/4"=l'-O"DRAWN BYSCdR
—WalleExisitngToRemain 38 Boardman Street, Salem
Lyn Ann Gelinas/Sara Castle del Rio 28 June 2005
—Walls to be Removed DEMOLITION PLAN
—Remove to studs only
— oo
Gut to
Remove Cabinets and studs
Soffit above
Remove Chimney Save Mantel
DINING ROOM
�
KITCHEN OO Save Mantel LIVING ROOM
W Floor: LINOLEUM OUT Floor:RUG OUT Floor:RUG OUT
A Ceiling: TO SfUCTURE 00 Ceiling: NO Ceiling:NO
Walls: TO STUDS 0 Walls:AS NOTED Walls:NO
Doors: REMOVE ALL FLAT PANEL
HOLLOW CORE DOORS
FRIDG
XISTTNG STAIR PANTRY Floor:LINOLEUM O
TS) Ceiling:NO
Floor:OUT Walls: NO DN
Stair Treads:NO 0
Walls:NO MASTER BEDROOM
DN
� BATH
rBEDRM
Floor:RUG OUT OUT
Ceiling:NO loor:REMOVE TILE Walls: NO
ailing:TO STRUC.
alls:TO STUDS
OEXI S IR
e �
D-2 Second Floor Plan
Scale 1 4"=1'-0"DRAWN BY SCdR
38 Boardman Street, Salem
— Walls Exisitng To Remain Lyn Ann Gelinas/Sara Castle del Rio 28 June 2005
—Walls to be Removed Roof Below DEMOLITION PLANS
—Remove to studs only
I
LFloor:Leave � Dormer
Above
Remove Chimney toFirst Floor L____J
Chimney to Remain Roof Below
Floor:LeaveCeiling:To Structure
Walls:To Studs
ling:To Structure
lls:To Studs Floor:Leave
Ceiling:To Structure
Walls:To Studs
Floor:Leave —Aj
Ceiling:To Structure
Walls:To Studs
EXISITNG STAIR
(NTS)
Floor:Leave
Ceiling:To Structure
Walls:To Studs
Q Exisitng Sewer Vent Floor:Leave
a Remove Ceiling:To Structure
� I Skylight Above Walls:To Studs
I i
D-3 Third Floor Plan
Scale 1/4"=I'-O"DRAWN BY SUR