Loading...
38 BOARDMAN STREET - BUILDING JACKET 3 0 1�o�exj M A 1�1 5! s rsperTab® Oversized-Tab Folders 90%Larger Label Area SM9EA® KEEPING YOU ORGANIZED No. 10301 PATENTPENDING FORESTRY SUSTAINABLE MIN.RECYCLED l INITIATIVE CONTENTIOY1 ceels.ampsw0r. POSTCONSUMER m C,pmarsrrara iP011iJ MADE IN USA GET ORGANIZED AT SMEAD.COM 38 Boardman Street Salem, Massachusetts PERMIT DRAWINGS/SMOKE DETECTOR SET �NPROVED 7 S 712 SubjecE to`a�iprovr�l.by any otiber authority'.hiy jty-is diction. Cimbf sFME .arr . By- PLA ERPPROVEDSOLELYFORIDMlf-,CAT3NCF TY ATIq LOCATION OF""pt PSMJLcGTt4.W ''ViM. R MIJ.'fROTECTION.DEVICES.".PE•LU Z'CT f( A FINALT STANDIHSPECTION,FORCOMFL:TECOkIOU- MCE WITH THE FIRE CODE. Sara Castle del Rio, AIA w Ly 2(C, ZOOS DRAWING LIST SUPPLEMENT TO PERMIT DWGS EC-B BASEMENT PLAN A-1 FIRST FLOOR PLAN (DESIGN DRAWINGS) A-2 SECOND FLOOR PLAN A-3 THIRD FLOOR PLAN A-8 SECTION @ THIRD FLOOR A-9 DETAILS JULY 26 FIRE DETECTOR PLANS E-B BASEMENT ELECTRICAL RC PLAN E-1 FIRST FLOOR ELECTRICAL RC PLAN E-2 SECOND FLOOR ELECTRICAL RC PLAN E-3 THIRD FLOOR ELECTRICAL RC PLAN Supplement to Permit Drawings 38 Boardman Street,Salem 131uly 05 General Notes to Contractors 1. Codes: Comply with applicable codes and regulations. Present copies of inspection reports 2. Dimensions: Verify existing conditions and dimensions indicated on drawings with field dimensions before fabrication or ordering of materials. Do not scale drawings. 3. Permits, Fees, And Notices: Please include in the estimate and pay for the building permit, governmental fees, and any other fees anticipated in the project. 4. Clean up: Keep premises and surrounding area free from accumulation of debris and rubbish. At the end of the project, remove all project waste materials and rubbish and extra materials from the site. 5. Other Interior Work: A. Insulate third floor walls and any walls that have been gutted B. Provide 5/8 GWB for ceilings separating units but decision as to the necessity of this is made by the Building Inspector. C. Kitchen Cabinet drawings will be provided by Home Depot 6. Exterior Work: A. Bolt rear decks into house and fill in behind brick steps B. Paint all exterior word work and shutters C. Provide new black storms and screens for all windows, new and old D. Repair existing windows as needed E. Provide for all new wood Brosco triple track windows on the third floor 7. Schedule: Our goal is to get the units on the market in September so please Keep the work progressing in a timely fashion. 38 Boardman Street, Salem Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005 PERMIT SET/FIRE DECTECTOR PLANS EXISTING COLUMNS 31/2"Lolly Columns with 20"Square X 12"deep footing 15'-0" 12'-61/4 -_ -' �-- ------ I---- -- -- - -------------— {T ------------ j ---------- I 6-111/2" 8'-51/2" 9'-31/2" 7-31/2" EXISITNG STAIR (NTS) —— UP i [ —! �sementP1ancale4 =1 -0"DRAWN BYSCdR Walls Exisitng To Remain 38 Boardman Street, Salem — New Walls Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005 PERMIT SET/FIRE DECTECTOR PLANS TBDI ALL DIMENSIONS ARE FINISHED DIMENSIONS Fridge 36"Wide Dw— ------- Ven Space DEC Install New 15'-6"VIF o q Gas -7 lattice U I CL..—- i, . Slide in Firepla e LIVING ROOM 102 30"Space O I DINING AREA 101 KITCHEN 100 (See Home Depot Plan) �.ow wAI, IJ New Floor Existing Floor I 4'-2 I/4"VIF 2'-6" 6" 13'-31/4"Outside of Structure New PNL xew PNt YI New cased opening WD New PNL WD New Jack Studs to support 2nd Floor opening 4 Door � Cabinet Door Cabinet I I New PNL I New PNL WD 11 DWODor Door I New PNL Install �r HALL 108 IBUI EXISITNG STAIR N ATH 104 or new metal ro Clgset New 1 10 (NITS) 104 1 SIM and shelving 17A � A9 SIM HW Floor A9 Refinish Exist.Tr. UP L Tub MASTER BEDROOM 106 _—-i Ljp B�EQ �tDN EQ BEDROOM 107 EQ EQ New PNL WD Clo$et r A Install EXISITNG STAIR Fill crack between 106 new metal rod stair and wall LL and shelving (NTS) New Wood Window � A-1 First Floor Plan Scale 1 4"=1'-0"DRAWN BY SCdR —Walls Exisitng To Remain 38 Boardman Street, Salem — New Walls Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005 PERMIT SET/FIRE DECTECTOR PLANS TBDI ALL DIMENSIONS ARE FINISHED DIMENSIONS Ca Fridge _ I_ _ Ven )ECK Spaceide DW Install lattice New is II 15'-6"VIF U ° SITTING AREA 201 CL — -\' — g Slide in Firepla e - LIVING ROOM 202 O y I 30"Space 0 KITCHEN 200 II 1I.OW WAL O r � II New Floor Existing Floor New cased opening 13'-31/4"Outside of Structure New rNti New Jack Studs to support 1 SIM N.rNc — (2)14"LVL's above -4 Cabinet mO Cabinet ¢ ( A9 D�� —— _ ........ EXISITNG STA Base and — HALL 208 eihead Cab.- 203 Formica To 3/ " 11'-6" Sand and finish (NTS) BATH 204 g1-0" treads HD Floor 8 DN Refinish Ex.Tread Fur out around 1 New Railin New WD PNL B existing pipes D"ur STUD /GUESTROOM 207 DN and ducts A9 UP LAUN RY New Wood/Glass 205 French Doors DINING ROOM 206 5'-0" WD EXISITNG STAIR VIF VIF (NTS) LI 15'-7'— New Wood Window A-2 Second Floor Plan Scale 1 4"=I' 0"DRAWN EY SCdR ellitngTDRemain N — NewwWalls 38 Boardman Street Salem ALL DIMENSIONS ARE FINISHED DIMENSIONS Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005 ALL THIRD FLOOR WINDOWS TO BE REPLACED New Roof Below PERMIT SET/FIRE DECTECTOR PLANS WITH BROSCO WOOD TRIPLE TRACK CL0 :. ::.: :.....::: . ::::::•. T-l" I —Existing Dormer . Above Roof �.�., Wrap chimney Below w/BB&Plaster WD if d q q L———— MASTER) EDROOM 302 BEDROOM 300 Door d — New BEDROOM 301 Roof Below E4 EQ C I New PNL [.y R R WD Bi(old W Door �GUNNew PNL 2'JlWD —_ EXISITNG STAIR HALL 306 wo PNL (NTS)New WD Railing ASE WALL 1'-2"' 2'-6" 3'-T' �p DRESSINV AREA 303 M ..... New PNL New WD 7 Door :.. ... Ne PNL 2'-6e 2y_6" TYPICAL CLOSET Roof ;........ •:....... •.. Door ••••••••••• r Floor: Exisiting Refin. Below C1 Ceiling:BB and Plaster DN •::o::, ••.•o••'••• New O erable Walls:BB and Plaster w/ \\��%� oc f° STER BATH 304 •••• New PNL New PNL WD Base U ?; _ D euom Skyllgh Above wn W.1d stall new MTL Rod and R BATH 305 p� n j Dom Shelving New Opera§le —— �: Skylight Abpve.........::::. .:::.�: :::.:�� 'i 1 I I 1 I I I I I I IIS L'� ;t:.:�..••I•. �: •JI.�:::.•:. .::•• ��I'� �:. > nWDSheV q Open Wood Shelv' CLOSET 303A N Exisitng Sewer Vent ET 303B ....; a� : CLOS PLENUM FOR PLU BING,ELECTRICAL AND HVAC :•^"'''' r'•'•^^^^T`N �. :.:............... 15-7 I 11' 91/4" o I A-3 Third Floor Plan Scale 1/4"=1'-0"DRAWN BY SUR 38 Boardman Street, Salem Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005 PERMIT SET/FIRE DECTECTOR PLANS RIDGE VENT HVAC PLENUM Insulate Ceffing.:�7 Pull Down Stair New Operable Skylight MASTER BATH 304 n � STAIR HALL BEDROOM 301 \ F + 306 w Wood c Shelving Third Floor N A-8 Section (cry Third Floor Scale 1 4"=1'-0"DRAWN BY SCdR EXISTING 2X3 STUDS 38 Boardman Street, Salem Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005 PERMIT SET/FIRE DECTECTOR PLANS NEW 2X4 JACK STUDS — WOOD BASE NEW CASING EXISITING FLOOR JOISTS Plan at Jack Studs OWN MLDG TBD Scale: 1 1/2"= 1'-0" NE w 14°tv[ CASING HEIGHT TO MATCH THAT OF EXISTING WINDOWS Section at LVL Scale: 11/2'1= it-Oil A-9 Details Match Existing Windows Scalel. 1/2' = 1'-0"DRAWN BY SCdR HARDWIRED HEAT DETECTORS 38 Boardman Street Salem Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005 HARD WIRED SMOKE DECTECTORS PERMIT SET/FIRE DECTECTOR PLANS WASHER DRYER BELOW I r' NEW FURNACE BELOW i .. _... r I — i ..... (STAIR (NTS) i I ii i WASHER DRYER BELOW E-B ;Basement Electrical RC an Scale 1/4"=P-0"DRAWN BYSCdR HARD WIRED HEAT DETECTORS 38 Boardman Street Salem I Lyn Ann Gehnas Sara Castle del Rio 26JULY 2005 HARD WIRED SMOKE DECTECTORS { PERMIT SET/FIRE DECTECTOR PLANS i DJ LIVING ROOM 102 DINING AREA 101 KITCHEN 100 (See Home Denot Plan) i 1 i .......... \i r- i......i 1 i IFLLJ STIBULE EXISI STAIR U BATH 104 NEW HALL 1 / ,\ i S to � i r7 1 1 1 1 MASTER BEDROQ 106 BEDROOM 107 i I L i1 I E-1 First Floor Electrical RC Plait Scale 1/4"=P-0" DRAWN BY SUR HARD WIRED HEAT DETECTORS 38 Boardman Street, Salem Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005 HARD WID SMOKE DECI'ECTORS PERMIT SET/FIRE DECTECTOR PLANS RE - _ .. : I SITTING AREA 201 LIVING ROOM 202 KITCHEN 200 it ! , EXISITNG STA -, ! HALL 20 203 (NTS) S -11204 ....._ \ S TH 204 1 1 STUDY/GUESTROOM 207 ........ ........... i ._ f _..... LAUN RY y, :. 205 ..�. - .. DINING ROOM 206 .. ..... .... ... ...._'. � o I E-2 Second Floor Electrical RC Pt Scale 1/41"=P-0" DRAWN BYSCdR ........... 38 Boardman Street, Salem HARD WIRED HEAT DETECTORS Lyn Ann Gelinas/Sara Castle del Rio 26JULY 2005 HARD WIRED SMOKE DECTECTORS PERMIT SET/FIRE DECTECTOR PLANS I it ! ! i I MASTER BEDROOM 302 BEDROOM 300 BEDROOM 301 itSis i 1 r � i ! I EXISITNG STAIR HALL 306 (NTS)New WD Railing S DRESSINQ AREA 303 05; r-r' I MASTER BATH 304! 11 1 1 7 1 BATH 305 ..... I ! .. ! .- i 1 E-3 Third Floor Electrical RC Plan Scale 1/4"=1'-0" DRAWN BY SUR j 38 Boardman Street Salem, Massachusetts Demolition Set 28 June 05 Lyn Ann Gelinas Sara Castle del Rio • , I Supplement to Demolition Drawings 38 Boardman Street,Salem 28June 05 General Notes b 1.. Demo: Kitchen and Baths to studs. Refer to DWGS for wall info. 2. Remove: All existing cabinetry, shelving, plumbing fixtures, appliances, flat panel hollow doors and any exterior debris along side of house. 14" Fj-IA;A7 t^ awihw/P*Y 3. Preserve all original moldings,trim, casings, hardware, and doors. If there is a question, contact owner. 4. Codes: Comply with applicable codes and regulations. Present copies of inspection reports. 5. Dimensions: Verify existing conditions. Do not scale drawings. 6. Permits,Fees,And Notices: Please include in the estimate and pay for the permits, governmental fees, and any other fees anticipated in the project. 7. Clean up: Keep premises and surrounding area free from accumulation of debris and rubbish. At the end of the project, remove all project waste materials and rubbish and extra materials from the site. 8. Schedule: Our goal is to get the units on the market in September so please Keep the work progressing in a timely fashion. REMOVE SOAPSTONE SINK 38 Boardman Street, Salem REMOVE RAISED FLOOR PLATFORM Lyn Ann Gelinas/Sara Castle del Rio 28 June 2005 o � s1vt.Ll/r^3 AT 11H�INEY TO RE ❑ AT THIS LEVEL REMOVE WORK BENCH Beam Above - ----------------- L ------ --------- �r^*r ----------_-�r^-�F-_----_----- - ----- ---- -� l u ----_--_---- {�.J ---- -------- ***Verify column locations**** EXISITNG STAIR TO REMAIN (NTS) A-- UP D-0 Basement Demolition Plan Scale -0"DRAWN BYSCdR i' Walls Exisitng To Remain 38 Boardman Street, Salem Lyn Ann Gelinas/Sara Castle del Rio 28 June 2005 —Walls to be Removed DEMOLITION PLANS -———————— Remove Cabinets and Soffit above Remove Chimney KITCHEN O DINING ROOM Save Mantel Save mantel LIVING ROOM lU Floor: LINOLEUM OUT Floor:RUG OUTNONO Floor:RUG OUT A Ceiling: TO STUCTURE )O g' Ceiling:NO Walls: TO STUDS Walls:AS NOTED Walls:NO Doors: REMOVE ALL FLAT PANEL1p HOLLOW CORE DOORS FRIDG FVPANTRY Floor:LINOLEUM OUT TIBULE EXISTING STAIR Ceiling:NO (NTS) Walls: NO Floor:Out Walls: Stair treads:N BATH MASTER BEDROOM Floor: Walls:NO BEDROOM 1= �1 E DN UP Floor:RUG OUT Floor:RUG OUT Ceiling:NO Ceiling:loor:REMOVE TILE Walls: NO Walls: O NN fling:TO STRUC. Walls:T0 STUDS EXISTING STAIR (NTS) D-1 First Floor Plan Scale 1/4"=l'-O"DRAWN BYSCdR —WalleExisitngToRemain 38 Boardman Street, Salem Lyn Ann Gelinas/Sara Castle del Rio 28 June 2005 —Walls to be Removed DEMOLITION PLAN —Remove to studs only — oo Gut to Remove Cabinets and studs Soffit above Remove Chimney Save Mantel DINING ROOM � KITCHEN OO Save Mantel LIVING ROOM W Floor: LINOLEUM OUT Floor:RUG OUT Floor:RUG OUT A Ceiling: TO SfUCTURE 00 Ceiling: NO Ceiling:NO Walls: TO STUDS 0 Walls:AS NOTED Walls:NO Doors: REMOVE ALL FLAT PANEL HOLLOW CORE DOORS FRIDG XISTTNG STAIR PANTRY Floor:LINOLEUM O TS) Ceiling:NO Floor:OUT Walls: NO DN Stair Treads:NO 0 Walls:NO MASTER BEDROOM DN � BATH rBEDRM Floor:RUG OUT OUT Ceiling:NO loor:REMOVE TILE Walls: NO ailing:TO STRUC. alls:TO STUDS OEXI S IR e � D-2 Second Floor Plan Scale 1 4"=1'-0"DRAWN BY SCdR 38 Boardman Street, Salem — Walls Exisitng To Remain Lyn Ann Gelinas/Sara Castle del Rio 28 June 2005 —Walls to be Removed Roof Below DEMOLITION PLANS —Remove to studs only I LFloor:Leave � Dormer Above Remove Chimney toFirst Floor L____J Chimney to Remain Roof Below Floor:LeaveCeiling:To Structure Walls:To Studs ling:To Structure lls:To Studs Floor:Leave Ceiling:To Structure Walls:To Studs Floor:Leave —Aj Ceiling:To Structure Walls:To Studs EXISITNG STAIR (NTS) Floor:Leave Ceiling:To Structure Walls:To Studs Q Exisitng Sewer Vent Floor:Leave a Remove Ceiling:To Structure � I Skylight Above Walls:To Studs I i D-3 Third Floor Plan Scale 1/4"=I'-O"DRAWN BY SUR