Loading...
12-16 BARCELONA AVENUE - BUILDING JACKET O'Esselte 74520 40%@P4 P4 4b APa 5 3 03 rr9 'B f�Tt J Qf 211Pm, tI88ttt TTSPftB FtUi , F Potllb of AvFV 1 CITY CLE;?ri. � Rernmr.� DECISION ON THE PETITION CHARLES J. SIDERSKI FOR A VARIANCE AT 16 BARCELONA AVE. (R-T) A hearing on this petition was held October 26, 1988 with the following Board Members present: James Fleming, Chairman; Messrs. , Bencal, Nutting, Luzinski and Associate Member LaBrecque. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. The petitioner, owner of the property, is seeking a Variance from setback requirements to allow for the construction of a garage 31 feet from the southerly boundary line of the property. The property is located in an R-1 district. The Variance which has been requested may be granted upon a finding of the Board that: a. special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structures in the same district; b. literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioner; c. desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district of the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented and after viewing the plans, amkes the following findings of fact: 1 . There was no opposition. 2. Several neighbors and Councillor O'Leary spoke in favor of the petitioner. On the basis of the above findings of fact, and on the evidence presented at the hearing, the Board of Appeal concludes as follows: 1 . Special conditions exist which especially affect the subject property but not the district generally; 2. Literal enforcement of the provisions of the ordinance would work a substantial hardship on the petitioner; 3. The relief requested can be granted without subtantial detriment to the public good and without nullifying or substantially derogating from the intent of the district or the purposes of the Ordinance. DECISION ON THE PETITION OF CHARLES J. SIDERSKI FOR A VARIANCE AT 16 BARCELONA AVE. , SALEM page two Therefore, the Zoning Board of Appeal voted unanimously, 5-0, to grant the relief requested, subject to the following conditions: 1 . All requirements of the Salem Fire Dept. relative to smoke and fire safety are strictly adhered to; 2. The petitioner obtain a building permit from the City of Salem Building Inspector; 3. The garage be built as per the plans and dimensions submitted to the Board of appeal; 4. The exterior finishes of the garage be in conformity with the exterior finished of the existing dwelling. VARIANCE GRANTED / ames M. Fleming, Esq j Chairman, Board of Ap al A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK APPEAL FRITS THIS DECISION, IF ANY. SHALL BE MADE PURSUANT TO SECTION 11 OF THE IIA4S. GENERAL IA'@S, CHAPTER 805, AND SHALL BE FILED WITHIN 20 DAYS AFTER THE DATE OF FILING OF THIS BCLISION IN THE OFFICE OF THE CITY CLERK. PORSW '" "*ASS. GENERA! LAW'S. CHAPTER 808, SECTION 11. THE VARIANCE OR SPECIAL PER-IT GRANTED MIEREIN, SHALL MI-I ".A E EFFECT UNTIL A COPY OF THED:CISIT:. BE°.,^,:NO THE ;T FICATIaCJF THE L.',! LLERX f;i Al 2J DA7S h,' C LLAFSED ^AJ NO APPEAL HAS SEEN FILED. OR TFIAiT. IF SSLri I'd! APPEAL :4AS 0E_1 FILE. THAT IT HA5 BEEPi DI1`5ISSED OR =TIED IS REC0MED I:{ Tip SCC,H ESSEX REUISi'RY ,^,-F DEEDS ,AND INDEXED UNDER THE NAME OF THE OSL'PiE' OF EM:R0 OR. IS RECURDED AND NG-ta ON TH'E UWNER'S CERTIFICATE OF TITLE. BOARD OF APPEAL 4�o APR 5 3 os N '8 (fitu of p'551Pm, ttSSMthuSPftB FILEr 3� s 19ottra of appeal CITYCLr1x. kFr,UTF DECISION ON THE PETITION CHARLES J. SIDERSKI FOR A VARIANCE AT 16 BARCELONA AVE. (R-1 ) A hearing on this petition was held October 26, 1988 with the following Board Members present: James Fleming, Chairman; Messrs. , Bencal, Nutting, Luzinski and Associate Member LaBrecque. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. The petitioner, owner of the property, is seeking a Variance from setback requirements to allow for the construction of a garage 3f' feet from the southerly boundary line of the property. The property is located in an R-1 district. The Variance which has been requested may be granted upon a finding of the Board that: a. special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structures in the same district; b. literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioner; c. desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district of the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented and after viewing the plans, amkes the following findings of fact: 1 . There was no opposition. 2. Several neighbors and Councillor O'Leary spoke in favor of the petitioner. On the basis of the above findings of fact, and on the evidence presented at the hearing, the Board of Appeal concludes as follows: 1 . Special conditions exist which especially affect the subject property but not the district generally; 2. Literal enforcement of the provisions of the ordinance would work a substantial hardship on the petitioner; 3. The relief requested can be granted without subtantial detriment to the public good and without nullifying or substantially derogating from the intent of the district or the purposes of the Ordinance. DECISION ON THE PETITION OF CHARLES J. SIDERSKI FOR A VARIANCE AT 16 BARCELONA AVE. , SALEM page two Therefore, the Zoning Board of Appeal voted unanimously, 5-0, to grant the relief requested, subject to the following conditions: 1 . All requirements of the Salem Fire Dept. relative to smoke and fire safety are strictly adhered to; 2. The petitioner obtain a building permit from the City of Salem Building Inspector; 3. The garage be built as per the plans and dimensions submitted to the Board of appeal; 4. The exterior finishes of the garage be in conformity with the exterior finished of the existing dwelling. VARIANCE GRANTED / �y r./llit//l T Ii�f. ie' / aures M. Fleming, Esqj Chairman, Board of Ap al A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK APPEAL FRW THIS DECISION, IF ANY, SHALL BE L",ADE PURSUANT TO SECTION 17 OF THE nA4S. GENERAL L..'FIS. CHAPTER 308, AND SHALL BE FILED WITHIN 20 DAYS AFTER THE DATE OF FILING OF THIS CEISION IN THE OFFICE OF THE CITY CLERK. GURS"T ' ":A3S. GEt:ER.AL LAWS, CI1A?TER EO3, SECTION 11, THE VARIANCE OR SPEC!A.L PFH'!IT RANTEW n.'EREI^!. SMALL N'U7 TARE EFFECT UNTIL A COPY OF THE DECISIJ.J. BE°,^','W THE -:,;T- FICA71a[ OF THE ".( .LER' '!V,; Z'J DC.'r'S H. 7E CLQ?FSED 1','J ANO APPEAL HAS DEEM F:=, OR TRA', i( S7:.h AN APPE-L i IS 0"% i-iLE THAT IT +?D SEEN D° SSED R C__�'!!ED IS RECD;M9D I% T; > - -H ESSEX' R° la'RY ^,F LEEDS AND INDEXED UNDER THE NAME OF THE O'dNE, OF&EiaRD OR. IS RECORDED AND NUiED ON Tilt UWNER'S CERTIFICATE OF TITLE. BOARD OF APPEAL . PLAN OF LAND r 1N R.W. REID R.L.S. LYNNFIELD, MA. 3 ' SCALE 1 "= z0' T.4 Ai. S-, 1487 I L 3 � q i� S1 , .LOt Co6Z I � 8562 SF- of G83 I QecK � VF. Or• S`/ /r RALPH J - J Wn.' O J F'' G G.JO Gc1 J \'�tioe'�A4 I I I Lot 300 i I i I 1 t I certify that the dwellings located as shown and con- formed to the zoning laws I of the f - Sai�Y when constructed. 75% o0 l3/4/R C .EZ O NA hereby, cer`ify to the best of my knowledge that the premises -hc:+n on this plan are not located within a 'food hazard area as delineated on the mao of Cemrunity 4Q5. 2 S01024 prepared by the Department of Housing and 'Jrban nevelopment or its successors dat2a3-/5• » fur-her certify that this rnsoection .v,as performed in accordance with the "Technical tandards for Mortgage Loan inspections" as adopted by the Massachusetts .association of Lana surveyors and Civil Engineers, Inc. dote : This plan Yas prepared from a taoe survey and is intended for mortgage purposes only. Offsets shown on , or scaled from this plan aro aooroximate only, and should not ae used to ^etermine rooerty '. roes . (Look ?age :2rt ficate ` urcer 5'372r t. j -. ----------�-----57-�PS —f_TCcn� --�Aa2_�EC,e--Z�----G2A_ D_E-- — --- -- ------ �----5_T�I—F_/ZDn7_--F�D,vT _C�172_Y -- - ----- - ----- --- __.____.--_�3_- ___13sft[v�i'z-�s__o_.v_ Dce/�_,P�t[�,u�_-__�i>�_c'rz.�sE_ S�i_lCiti�-- -- --�--- --./F`-�.r-'r6_/_c�m5._�1��3E-c�mP_[6rE�-_4,ud�EA�YFo_�P _ —_-- `_/.f15?Et_'Tia,upv o�_P__._B_E_r_'�2E /��1Y_—/_s�-�98.7_�—b�,cAG_-17.�"P�� - , T�YI��P _,Gf�l[L_�E .y_aT/F>Ed__��'�7Y/S LYJIE._ � �: P `- --- ------------- -- ----- ' --- li _ -- :., i _-__ OFFICE OF THE INSPECTOR OF BUILDINGS DATE.............................................. �• � •�`' Certificate of Approval for Building Occupancy Eric Manson THIS SHALL CERTIFY THAT ....................................� ..... ..... ... .................................................,................... has permission to occupy Premises at............. 2,BarS;gj .P.na...V -,.............................................................. --. — - for .................Single„Famil,y,,,}Wg],Uag.................................... purposes, in accordance with the City of Salem Zoning Ordinance and Building Code, providing that this use shall conform to the terms of the application on file in this office, and to the provisions of the Statutes, and to the City Zoning Ordinance and City Building Code. Any violation of any of the terms above noted is an immediate revocation of this certificate. CITY ENGINEER WIRING INSPECTOR PLUMBING INSPECTOR GAS INSPECTOR FIRE DEPT. VNISPECTOR Rough Inspection Rough Inspection �Rough IIIn sp-ection Rough Inspection nq4h in i Ck Final Inspection Final Inspection ns tion Final Inspection Fin nspecti INSPECTOR OF BUILDINGS ppn r.�' _ yt itV f `may � No..................................:............... OFFICE OF THE INSPECTOR OF BUILDINGS V 4Y. DATE.............................................. .,n p Certificate of Approval for Building Occupancy THIS SHALL CERTIFY THAT ...................................Bric ........................................................................... ........................................................................... haspermission to occupy premises at................... Ai ................................................................... for ................. ...............I.................... purposes, in accordance with the City of Salem Zoning Ordinance and Building Code, providing that this use shall conform to the terms of the application on file in this office,and to the provisions of the Statutes, and to the City Zoning Ordinance and City Building Code. Any violation of any of the terms above noted is an immediate revocation of this certificate. CITY ENGINEER WIRING INSPECTOR PLUMBING INSPECTOR GAS INSPECTOR FIRE DEPT. INSPIECTOR Rough Inspection Rough Inspection Rough Inspection Rough Inspection Rough ectlo .-.2vyV 6 Z Final Inspection Final Inspection action Final Inspection Final 1papecticyf fSv INSPECTOR OF BUILDINGS Chi#� of1ent, sttcllue## Aire 11cpartinent �Heravt)Z'rvrB 31 pm 48 Pfgette �` }�� rr-EI ED 7Jun�es �j. ramuu lGdit' lCF SALEN,'kiA'S"i. C14ief p a"T' An- 11197D March 24 , 1983 Salem Planning Department Re : Preliminary Plans One Salem Green Country Club Estates Salem, Mass - 01970 Bargejona Ave,= A St . , "B St . , 8 C St . Sirs : Preliminary subdivision plans have been received from Carter 6 Towers Engineering Corp . , on March 21 , 1983 , for our review. These plans• are dated Sept . 27 , 1982 . As a result of my review of said plans the following items shall be noted : I . It shall be noted that hydrant locations as shown on the plan , dated Sept . 27 , 1982 ; have not been approved by the Salem Fire Department . 2 . This plan was apparently drawn without any prior consultation with this office . Hydrant locations are to be placed on the plan as per the following listed locations . Ref : Mass . State Bldg . Code Section 1200 . 1 . 1 ('1 ) b (2) . 3 . It shall also be noted that hydrants located at ends of water mains , on cul -de-sacs ; while ideal for use as blow offs , are not considered of value for fire fighting purposes. These hydrants , while useable , are beyond the structures to be protected , and are not considered for normal use under normal firefighting tactics . This does not preclude the use of hydrants at these locations for compliance with the engineering requirements for blow off purposes . 4 . Approval of hydrants will require installation at locations as follows : a . Barcelona Ave . at Lot lines of lots #27 and #28 . (This location has been used because of the long distance from the last existing hydrant on Barcelona Ave . b . On Barcelona Ave . at B Street , on curb line of Lot #38 and no more than ten feet from the corner point . c . On Barcelona Ave . at C Street , on curb line of Lot #44 , and no more than ten feet from corner po'int . d . Hydrant at Barcelona Ave . and A Street , at curb line of of Lot # 63 , is satisfactory . Page #2-Report dated March 24 , 1983 (Country Club Estates- Barcelona Ave . Salem, Ma . ) e . Barcelona Ave . at Lot lines of Lots # 59 and #60 . ( Placement at lot lines eleminates any possible problems with driveway construction . ) f . On A Street at Barcelona Ave . at curb line on Lot #56 , not more than ten feet Southwesterly from cornor point . 5 . Additional gate valves are recommended on the water mains at the following points : (Subject to approval of Dir . of Pub . Services) a . On Barcelona Ave . near Lot #27 , where connection is made to existing water main . b . On A Street , from Barcelona Ave . , adjacent to Lot #46 . 6 . It is also recommended that the use of letter designations for . street names be eleminated . These designations are usually unacceptri able to residents and a request for a name changeils usually presented by the residents shortly after purchase of real estate . These names should be presented for approval now , as prior street designations have been submitted which were duplicates , and this creates havoc for the public safety forces . 7 . Two locations should be determined for City connected street fire alarm boxes . These locations shall be stipulated and shown on the plan prior to our approval . Locations for these fire alarm boxes , shall be obtained from the Salem City Electrician Mr . John Condon . Plans as submitted are therefore DIS-APPROVED.. , as of this date , by the Salem Fire Department,! Respectfully submitted Capt . David J . Goggin Salem Fire Marshal cc : Carter S Towers Eng . Corp.: 6 Fairview Ave . Swampscott , Ma . Salem Building Inspector Salem Electical Dept . Mr . Condon Salem Director of Public Services Fletcher file v5 � � �� , �y.LOWNT.�� Tittq of *alrm. Mmottr4usetts 7W Asaroanra' (®&re. Tug ?Hail 5 +��OIMINL W�'Y August 6, 1980 Mrs. Josephine R. Fusco City Clerk City of Salem City Hall Salem, MA 01970 Dear Mrs. Fusco: The Salem Board of Assessors wish to inform you of the following: ASSESSED OWNER STREET DESIGNATION Eric W. Manson 12 Barcelona Ave Janet A. Manson This is a new home. Very truly yours, BOARD OF ASSESSORS Henry E. Corbin Assessor HEC:mjg cc: Kenneth B. Cahill Postmaster Chief James Brennan, Fire Department Margaret R. Hagerty, Principal Clerk, Water Dept. /Robert E. Gauthier, Insp. of Bldgs. Engineering Dept., City of Salem Eric W. & Janet A. Manson THIS PLOT PLAN WAS NOT MADE NQ FROM AN INSTRUMENT SURVEY AND IS FOR THE USE OF THE BANK ONLY. UNDER NO CIRCUMSTANCES ARE OFF SETS TO BE USED FOR ESTABLISH- MENT OF FENCES,WALLS,HEDGES,etc. r- cS / r a� '7sov S4 P_ 0O; J)°} AIe ,PEFE�2ENCE=- DEED PLOT RZ,4AI OF44AIA0 PLAN: /,, P.ef°�uE > Zonoreo IAA I CE,PT/FY TH.9T THE BU/LO/NCjS DIY HE�PEON S q L. ��'�J it�ffa,f ARE LOCATED ON T//E e;,WUAW AS .51V,9WN ANO THAT i THEY CONFO,PiY/ TO T//E ZOV/N4� BYLAWS OF r//E e )7 y Or S c,L ^ ` i AT wF T/ME OF CONST,PUCT/ON, P/PPaI�PC� �O/ I ALSO CE,PT/FS' T.S'AT THE PRec1W/5E5 S,vaolw APE L oq/} ? r-J'4' AJwr 1 NOT GOCIJTEO W/rH/N A FLODO/ ZONE AS DEG/.vEATEO ON T//E /Y/AP OF UdY/MUN/TY #Z ZG/O /4 Se-Ae.' f 410' „ ��? • � '”� � /Y1A55, EFFECT/l�E . 3�1�'J77 BY THE 0E,-4,er1w.ENT OF D Z/ A/ �4 DEliELOPMENT FEDE NS s fE fIOM/N- ROBERT N ESSEX SU.PUEY SE,PU/fE, �iVL. /sreArioN. �^ 4 7 FQde.1 /71 .Salem, A?. o.q rE.-- RKY/s E /STEL $U THIS PLOT PLAN WAS NOT MADE FROM AN INSTRUMENT SURVEY AND NQ IS FOR THE USE OF THE BANK ONLY. UNDER NO CIRCUMSTANCES ARE OFF SETS TO BE USED FOR ESTABLISH- MENT OF FENCES,WALLS,HEDGES,etc. -.e z Peo A rs y 3T CU ' ` flll' 00 4 !,,6 ,PEFErPEiI/CE=— oEEo: .Pee PLOT Rz.-4A/ Of-404 to LOCATED IAA 1 CEPT/FY TH,9T Tf/E 6U/LD/NCjS �Yi9WrV HEPEON S l ,4R6 LOCATED ON rf/E !;AMIIAIP AS .5NOWAI ANO 71147 , THEY CONFORM TO ;r//Z7 ZON/AA!j BYLAWS OF TL/E ( ,I y OF .d q L rfr ; AT THE TIME OF CONST)PUCT/ON. P/PPa/�PC> >COf I 9L 50 CEPT/Ff THfJT THE FeEM/SES SNOWiV A.PE NOT LOCt/TED {Y/TH/N A FLOOD 1/9Z 9 PO ZOA/E AS DEL/NEATEO ON THE /YIAP OF COMMUN/TY ''�f'!Oa4 sLdle. 1 MASS., EFF /VE 3�i i r�> By F THE O!FR4RT4f.ENr OF / @f D L/,'B/an/ ° 4 DElYELOPMEA/T FEOE E fIOM/N- /.57RArlOA/. g° a. ESSEX 5LI011EY 54elllCE, 1AX 4 7 Aeder l StrPef.Salem, /YTa. Xqui mUlk ii Ur J Fee Due $10. 00 Recd by: Ck# te'7 Cash C tv of "-5� aIem, AassttehuUtts 9 o Aire Pepartuterd PraDyuarters C Robert J. Crowley 48 ?�dge#te �Rmt A/Ch i of tt1em, c tt_ 111870 FIRE DEPARTMENT CERTIFICATE OF APPROVAL-FOR BUILDING PERMIT To: Head of Fire Department Dates. 71,2,6103-L Application for plan approval and Certificate In accordance with the provisions of the Nass. State Building Code and Salem Fire Code, application is hereby made for approval of plans and issuance of a certificate of approval for a building permit, by the Salem Fire Department. (Ref. Section 113. 5, Nass. State Bldg. Code. ) Job Location: /6 a19eezza,uA Ave, Owner or _. Occupant: ivi'411A0! Alkeyesls General Contractor: AUr ,�O8E2T /�vu�9eecy Address: 3 ZA.rr- _S�• 1Fezz'Fr'e'4 Electrical Contractors Address: Fire Supression Contractors Address: Notice: Prior to starting work, sub-contractor shall file required form. ; Final inspection is required, prior to issuance of Certificate of Occupancy. Inspections are by appointment only. Signature of Applicant: '� � � Phone # 734� -86,29 Address of ''// City or Applicant: // HEe7 17. 46e �P. SALEM Towns 9,41-EM Approval Dates Certificate of Approval is hereby granted, on approved plans or sub- mittal of project details, by the Salem Fire Department. All plans are approved solely for identification of type and location of fire protection devices and equipment. All plans are subject to approval of any other authority having jurisdiction. Upon completion the applicant or installers shall request a test or inspection, and the installer shall file a Certificate of Completion, if required. Owner or Occupant: /tel//LLiAn1 �YA,P.sJ�/ s Project / Locations Sign u e of Fire Official This Certificate will hk�& �t expire on 11;W@4 TitIe Applicants� submit this Certificate of Approval, to Bldg. Insp. Form #81 (Rev. 7/82) Salim, fflassachusietts QlitV of ) vRce�� ire �eparfinexct �eu3�uuc#ers Robert. J. -Crowley 48 ?ir gette §treet A/Ch i of '2qttlem, 4{a_ 01970 FIRE DEPARTMENT CERTFICATE OF APPROVAL FOR BUILDING PERMIT In compliance with provisions of Section 113.5 of the Mass. State Building Code; and under guidelines agreed upon by the Salem Bldg. Inspector and the Salem Fire Chief; the applicant for a building permit, shall obtain the Certificate of Approval (see reverse side) and stamped plan approval from the Salem Fire Prevention Bureau. Said application and approval is required before a building permit may be issued. The Mass. State Building Code requires compliance approval of the Salem Fire Department, with reference to provisions of Article #4 and Article #12 of the Building Code, the Salem Fire Code, Mass. General Laws and Mass. Fire Prevention Regulations. The applicant shall submit this application with three (3 ) sets of plans, drawn in sufficient clarity and detail, to obtain stamped approval of the Salem Fire Department. This applies for all new construction; substantial alterations; change of use and/or occupancy; j and any other approvals required by the Mass. General Laws and the Fire Codes. Exception: Plans will not be required for structural work, when the proposed work to be performed under the building permit, will not; in the opinion of the Building Inspector, require a plan to show the nature and character of the work to be performed. NOTICE: Plans are normally required for fire supression systems; fire alarm systems; tank installations; and fire code requirements. NOTICE: Under provisions of Article #22, of the Mass. State Bldg. Code; certain proposed projects may not require submission of plans, nor complete compliance with new construction requirements. In these cases, provisions of Article #22, Appendix T, and Tables applicable shall apply. This section shall not however, super- sede the provisions outlined in Salem Fire Prevention Bureau Regulations; Chapter 148, M.G.L. ; or the Mass. Fire Prevention Regulations. i.e. all permits for fire code use and/or occupancy shall apply for the entire structure; fire alarm and/or smoke detector installation, shall apply to the entire structure, based on new A .C . (hardwired) units for all new construction, but the existing structure may comply with regulations applicable for existing structures. C1 NOTICE: Sub-contractors may also be required to file individual appli- cations for a fire department certificate of approval, covering their area of work. Said sub-contractors shall file for Fire Department application to install, prior to commencing any work. S.F.P.R. # 15B CTitu of �$s Mlem, al.55achutts A y u 4' Xiire Bepartment Peabquarters 1jnnces g. 3irtnnan - 48 cGafgette *r££t (Chief �a&nll Hitt. 01970 RULES AND GUIDELINES FOR INSTALLATION OF AUTOMATIC FIRE WARNING DEVICES, FOR USE IN RESIDENTIAL STRUCTURES: APPLICABLE FOR NEW CONSTRUCTION, FOR SUBSTANTIALLY ALTERED STRUCTURES, ( INCLUDING CREATION OF ADDITIONAL LIVING UNITS) , AND CONDOMINIUM CONVERSIONS. Under authority granted by the General Laws of the Commonwealth of Massachusetts, Chapter 148, Section 28, and the Mass. State Building Code, the following rules and guidelines are established for the installation of automatic fire warning devices, acceptable to the Head of the Salem Fire Department, which shall be enforced by the Salem Fire Prevention Bureau. 1 . Definitions: A. Use Groups R-1 , R-2, R-3 and R-4: As defined in Mass . State Bldg. Code Sec.209.0 B. Approved Smoke Detector: An approved automatic device which detects visible or invisible products of combustion. Approved smoke detectors must be activated .by a permanently wired source of alternating current electric power, or by a direct current source of electric power from an approved panel . C. Heat Detector: An approved device which detects abnormally high temperatures or increased rate of temperature rise or a combination of both. D. Common Hallway: A common corridor or space separately enclosed, which provides common access to the required exitways of the structure. E. Separate Sleeping Area: Shall mean the area or areas of a dwelling unit, in which the bedrooms or sleeping rooms are located. Bedrooms or sleeping rooms, separated by other use areas, such as kitchens, or living rooms, but not bathrooms; shall be considered as separate sleeping areas. F. Other Common Space: Any area which contains over one hundred square feet in area, and because of its character and use, would require fire detection devices to to adequately provide an early warning of fire, within said area. G. Occupancy Classification: T. Classification #1 : All occupancies which contain one or two dwelling units. 2. Classification #2: All occupancies which contain three to six dwelling units. 3. Classification #3: All occupancies which contain seven to twelve dwelling units. 4. Classification #4: All occupancies which contain thirteen to twenty-four dwelling units. 5• Classification #5: All occupancies which contain twenty-five or more dwelling units 2. Intent of Rules and Guidelines: A. It is the intent of this rule to provide basic protection from products of combustion or excessive heat build-up, in redidential occupancies, which may occur at any time _ and would become a probable threat to life safety. B. It is the intent of these rules to provide guidelines , under provisions of Article #12 of the Mass . State Building Code, for installation of approved auto- matic fire alarm devices and/or related equipment, consistant with recognized good practice, for the safeguarding, to a reasonable degree, of life and property from the hazards of fire, in the early stages. (2) S.F.P.R. # 15B (continued)- 3. Levels of Protection and Location of Devices: A. Classification #1 : One and Two Family Dwelling Units and Condominium Units. 1 . Refer to Mass. State Building Code, Sections 1216.3.2.2 and 1216.3.2.3(3). B. Classification #2. Three to Six Dwelling Units. 1 . Refer to Mass. State Building Code, Table 1216, Sections]216.3.2. 1 ; 1216.3.2.1 .3(2) 1216.3.2.8 and 1217.0 C . Classification #3= Seven to Twelve Dwelling Units. 1 . Refer to Mass. State Building Code, Table 1216, Sections 1216.3.2.1 ; 1216.3.2.3(2) ; 1216.3.2.4; 1216.3.2.5; 1216.3.2.8 and 1217.0 D. Classification #4: Thirteen to Twenty-four Units . 1 . Refer to Mass. State Building Code, Table 1216; Sections 1216.3.2.1 ; 1216.3.2.3(1) ; 1216.3.2.4; 1216.3.2.5; 1216.3.2.7; 1216.3.2.8; and 1217.0 E. Classification #5: Twenty-five or more Dwelling Units. 1 . Refer to Mass. State Building Code, Table 1216; Sections 1216.3.2.1; 1216.3.2.3(1) ; 1216.3.2.4; 1216.3.2.5; 1216.3.2.6; 1216.3.2.7; 1216.3.2.8 and 1217.0 4. Requirements: A. Refer to Mass. State Building Code, Sections 1216.9; 1216.9.1; 1216.9.2; and 1216.9.3 B. All fire alarm systems and devices shall require an electrical permitkto be obtained from the Salem City Elctrical Dept, and a Fire Department Permit to Install . C. The type of wiring and all connections shall be approved by the City Electrician. D. A Master Fire Alarm Box where required, shall be installed on the exterior of the structure or as directed by the Salem City Electrician. A blank door may be specified for use in most occupancies, and shall be determined before writing specifications. The coded box designation will be provided by the Salem City Electrician and should be obtained when filing plans. E. A Square D #9001KSIIK3 silence alarm switch shall be required and shall be located at the remote annunciator, which shall be located in the front entry at a location approved by the fire official . A trouble buzzer shall be located at the annunciator in the front entry, which shall sound when the silence alarm switch is activated. F. No Battery- type detection units are permitted in new construction, substantially altered structures, condominium conversions, and/or change of use group occupancies. 5. Application and Permit: A. An application shall be made by the licensed electrician or installer, on Fire Department Form #81F, prior .to starting any work on fire alarm systems or fire protection devices. B. A fee of $10.00 shall be submitted with each application. C. Sufficient sets of plans, preferably three sets, shall be submitted for review of the Fire Official , in such clarity and detail so as to enable the fire official to properly analize the intended installation. D. The Fire Official shall have up to ten (10) working days to review any plans, which are submitted for approval , per Section 113.5 of the Mass. State Bldg. Code. E. When plans are stamped approved, the applicant shall arrange to. pick up two sets, with a permit to install the devices as approved. In the event the plans are not approved, a letter will be sent to the applicant, explaining any deficiencies. 6. Zoning: A. All zoning shall be customized by floor of protection, based also on additional zones being provided for distinct building separations, over two-hundred feet of travel on any floor, -sprinkler and standpipe layouts and *any use of other fire alarm devices, such as manual local fire alarm pull stations. :All Zones must be approved prior to installation and plan approval . ,B. The Zone plates on the annunciator shall be attached with rivits or one way screws-, to prevent tampering with same. (3) S.F.P.R. #15B (continued) 7. Final Approval and Inspection: A. Upon completion of the installation, the licensed electrician/installer, shall request a final inspection and test. B. The Salem City Electrician shall be notified also to inspect all electrical portions of the system. C . The installer shall have tested the entire installation, prior to requesting the final test for approval and acceptance. D. The installation shall have been installed according to the stamped approved plans. E. The final inspection will be done by appointment only. Make all appointments at least 72 hours in advance. The licensed electrician/installer must be present for the test and inspection. The installer is also responsible for providing any other needed employees, for re-seting of systems and testing of devices. All appointments are subject to cancellation due to a fire emergency. F. Upon completion of a satisfactory testing of the fire alarm devices and systems, the installer shall sign a Certificate of Completion (Form #82) provided by the Salem Fire Official . The Fire Official will then issue the Certificate of Compliance and will sign the Certificate of Occupancy, if all other required work meets with his approval . 8. Maintenance: A. A maintenance program shall be established by the owner of record. B. A written maintenance report shall be filed with the Salem City Electrician, on a form provided by that office, for assurance that the system is in sound operating condition. Said report shall be filed at least annually. C . Failure to provide the reports of condition of a fire alarm system as required, shall constitute a violation of the fire code and such furthur action as the law permits, shall be taken. 9. The owner of record is required under provisions of the Mass . State Building Code to obtain a Certificate of Occupancy, prior to Use and Occupancy of any part of any structure. The Certificate of Occupancy shall be obtained from the Salem Building Inspector. Per Order: Capt. David J. Goggin Salem Fire Marshal Approved by: ) JJ m� Brennan, Chief Salem Fire Department (Rev. 6/1/83) e a JUL 15 12 13 PPf '1��J CITY ertr�rv�a MICHAEL E. O'BRIEN CITY OF SALEM OF SAL EPI, 8g� CITY SOLICITOR MASSACHUSETTS MARY P.4RRINGTON 93 WASHINGTON STREET ASSISTANT CITY SOLICITOR and 93 WASHINGTON STREET 187 FEDERAL STREET and SALEM,MA 01970 59 FEDERAL STREET 7464311 SALEM, MA 01970 7443363 7440350 Please Reply to 187 Federal Street Please Reply to 59 Federal Street July 24, 1984 Richard T. McIntosh. Zoning Enforcement Officer Building Department One Salem Green Salem, Massachusetts 019-70. Re: Lot 148,�Map=#8 a/k/a 16 Barc.ellona--Avenue) 8862 square feet Dear Mr. McIntosh:. You have requested City Solicitor Michael E. O'Brien for an opinion relating to the validity of a variance granted on June 6 , 1979.:: by the Salem Board of Appeal for the above referenced lot. City Solicitor Michael E . O'Brien has asked me to respond to your request. The variance granted provided for the combining of three under- sized lots into two undersized buildable lots. It is my understand- ing that a house has been erected already on one lot and this opinion is directed to the remaining lot. It is further my understanding within a year of the granting of the variance , the original petitioners petitioned the Planning Board for an endorsement of a plan of the two (2) lots as not constituting a subdivision within the meaning of the Subdivision Control Law. The plan was so endorsed and the lot in question was conveyed out by the original petitioners all within one year of the granting of the ori- ginal variance. Said deed out was subsequently registered by the Trial Court of the Commonwealth of Massachusetts, Land Court Department (Case No. 11802), as evidenced by Certificate of Title 49105 of the Essex County Registry of Deeds. Richard T. McIntosh - 2 July 24 , 1984 in view of theabove, it is my opinion that the rights authorized by the Variance have been exercised in accordance withMassachusettsGeneral Laws Chapter 40A, Section 10 and the Variance is valid. Very truly yours, Mar p. Harrington Assistant City Solicitor TIOTlr,l; OF VIOLSTinN FIRE PROT-ECTION Ff)UIFT,11T TEST BIJiLllNf; Dk.i"T Ctv of J%Ipm, '�fflztsstttljusetts 'o dire Department Ile0quartera s 48 Enfagettr btrrrt JflN 7 ..1 PI4 UO �amsa �. �f3crnnan RECEIVED �h °r CITY OF SALM MASS. Date January 7, 1980 To: Mr, Eric Manson, Owner Re- New -Occupancy 16 Barcelona Ave. Salem, Mass. 01970 Sir: Records at this office indicate that you have failed to file Form ll82, Certificate of Completion; and/or arranged for a test of fire protection equipment, installed under provisions of the General Laws of the Commonwealth of Massachusetts, at the above location. Application to install was made July 10, 1979 It appears that sufficient time has elapsed since the application date and/or occupancy has been established. Before occupanpy a test was to be conducted by appointment. Also Mr. Mitchell has not notified this office of the name of the electrician, which was required. You are therefor in violation of the General Laws of the Commonwealth. You shall make an appointment for the required test, by calling the Salem Fire Prevention Bureau, 744-1235; within seven days of this notice. Electrician should be present for the test. Failure to comply shall be cause for such furthur action to be taken as the law ,provides. Per order: � l Y" Lt. David J. oggin cc: Building Inspector Salem Fire Marshal Electrical Inspector Owner of Real Estate Installer file Form 82A (8/79) r L ^ ;.n r +• � JII 91:�d 4L� yl.r Ll�.'Y.�1 3 .'�l.l .-'�f r'���rJ�.wb:� � jun CITY C t lrad fi Ar"ad 744-6900 = JUNE 6, 1975 DECISION ON PETITION SUBMITTED BY ANEREW J.._I MARRY C. 'IIT(TCELL, OI, AGR OF PROPERTY LOCATED AT 1214 anclrlb BaRCEI,O i,YNUE A hearing; on this petition was held on Tuesday, June 6, 1975, with the following members of the Board present: Jane Lundregan, Donald Eames, Douglas Hopper and James Boulger. Notices were sent to abutters and others in accordance with Mass. General Laws, Chapter SOS. The notice of hearing was duly published in the Salem Evening News advising the public of said hearing. The Petitioner represented himself before the Board. They presently own three lots each with a 50 ft. frontage and they wish to combine the three lots into two lots; each having a 75 ft. frontage. - The lots were purchased a number of years ago and at that time the lots were con- sidered buildable lots. They are not now buildable lots and therefore it is desired to combine the three lots into two lots making them larger than they previously were. The Board voted unanimously to grant the petition requested. The Board found that by combining the three lots into two lots would be within the intent of the Salem Zoning ordinance. Most of the lots in that area are undersized and it would be a hard- ship to the . Petitioner to deny the use of the two lots. VARIANCE GRANTED ON T[IE .TW) LOTS x*rx 'YFrx APPEAL FROM THIS DECISIOiN, IF ANY, SHALL BE MADE PURSUANT TO SECTION 17 OF THE MLASS.. GEN. LA'S, CHAPTER SOS, .AND SHALL BE FILED WITHIN 20 DAYS AFTER HE DATE OF FILIiNG OF THIS DECISION IN THE OFFICE OF THE CITY CLERK. - PURSUANT TO MASS. GSI. LAWS, CHAPTER SOS, SECTION 11, -ME V_ARIANrCE OR SPECLAL PERMIT GRANTED HERF,IN, SHALL NOT TAKE EFFECT UNTIL A COPY OF THE DECISION, BEARING CERTIFICA- TION OF THE CITY CLERK THAT 20 DAYS HAVE ELAPSED AND NO APPEAL IIAS BEEN FILED OR THAT, IF SUCH AN APPEAL HAS BEEN FILED, THAT IT HAS BEEN DISNUSSED OR DENIED IS RECORDED AND NOTED ON '17IE OWNER'S CERTIFICATE OF TITLE. A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND ITIE CITY CLERK. BOARD OF APPEAL Alane T. Lunaregan � G Secretary _