Loading...
28 AMERICA WAY U28-1 - BUILDING INSPECTION 28 America Way - Unit 1 f No. �� t r-bJ City of Salem Ward 93 OCT 22 i^1 1: 20 ASI)HS5 R, CITY r)17 CM APPLICATION FOR PERMIT TO BUILD ADDITION, MAKE ALTERATIONS OR NEW CONSTRUCTION IMPORTANT-Applicant to complete all items in sections:1, ll, /it, IV,and/X. I. A7(LOCATION) ZS /CMEIZDISTRICT LOCATION OF BETWEEN 1Af -rb1E7Z I y 7�u 11/E" AND (CROSS STREET) (CROSS STREET) BUILDING LOT SUBDIVISION 11.1 SE LOT F BLOCK SIZE 7z, r5� cb II. TYPE AND COST OF BUILDING -All applicants complete Parts A -D A. TYPE OF IMPROVEMENT D. PROPOSED USE-FOR"DEMOLITION"USE MOST RECENT USE 1 NOW building Residential Nonresidential 2 ❑ Addition(If residential,enter number of new 12 ❑ One family 18 ❑ Amusement,recreational housing units added,it any,in part D,13) 19 ❑ Chruch,other religious 13 TWO or more family-Enter number 3 ❑ Alteration(See 2 above) of units....................................................... 20 ❑ Industrial 4 ❑ Repair replacement 14 E] Transient hotel,motel,or dormitory- 21 [:] Parking garage Enter number of units ........................... 22 E] Service station,repair garage 5 ❑ Wrecking(If muPo'famfly residential,enter number 23 ❑ Hospital,institutional of units in building in Part D, 13) 15 ❑ Garage 24 ❑ Office,bank,professional 6 ❑ Moving(relocation) 16 ❑ Carport 25 ❑ Public utility 26 ❑ School,library,other educational 7 ❑ Foundation only 17 ❑ Other-Specify 27 ❑ Stores,mercantile B.OWNERSHIP 28 ❑ Tanks,towers 8 Private(individual,cerporetion,nonprofit - ,.. - institution,etc.) 29 Other-Specify 9 ❑ Public(Federal,State,or local government C.COST (Omit cents) Nonresidential-Describe in detail proposed use of buildings,e.g.,food processing plant, machine shop,laundry building at hospital,elementary school,secondary school,college, parochial school,parking garage for department store,rental office building,office building 10. Cost of improvement ......................................................... $ at industrial plant.If use of existing building is being changed,enter proposed use. To be installed but not included in the above cost t a. Electrical........................................................................... b. Plumbing.......................................................................... c. Heating,air conditioning............................................. d. Other(elevator,etc.)..•................................................ r - 11. TOTAL COST OF IMPROVEMENT $.3 7 49cI r III; SELECTED CHARACTERISTICS OF,BUILDING -For new'buildings and additions, complete.Parts E-L;demolition, complete only Parts J&M, all others skip to IV E. PRINCIPAL TYPE OF FRAME F. PRINCIPAL TYPE OF HEATING FUEL' G. TYPE OF SEWAGE DISPOSAL I. TYPE OF MECHANICAL 30 ❑ Masonry(wall bearing) 35 ❑ Gas 40 Public or private company Will the,be central air 31 CKWood frame' - 36 ❑ Oil, ' qt Private(septic tank,etc.) conditioning? 32 ❑ Structural steel 37 ® Electricity 44 1& Yes 45 ❑ No 33 ❑ Reinforced concrete 38 ❑ Coal H. TYPE OF WATER SUPPLY Will there by an elevator? 34 ❑ Other-Specify 39 ❑ Other-Specify 42 ®,Public or private company 46 ❑ Yes 47 No 43 ❑ Private(well,cistern) ,` J.DIMENSIONS M. DEMOLITION OF STRUCTURES: 48. Number of Stories .._....................................................... 49. Total square feet of floor area, Has Approval from Historical Commission been received all floors,based on exterior PP dimensions ........................... ....................._......}�,... for any structure over fifty(50)years? Yes_ No so. Total land area,sq.ft....7..�..�....L .(a.....'!. .... Dig Safe Number K.NUMBER OF OFF-STREET PARKING SPACES Pest Control: 51. Enclosed ..................................&.................................. HAVE THE FOLLOWING UTILITIES BEEN DISCONNECTED? 52. outdoors..................................1 Yes No L RESIDENTIAL BUILDINGS ONLY Water: 53. Enclosed . ....................... Electric: l Gas: 54. Number of Full................./.2.............. Sewer: bathrooms DOCUMENTATION FOR THE ABOVE MUST BE ATTACHED Partial-----....................... BEFORE A PERMIT CAN'BE ISSUED. IV. COMPLETE THE FOLLOWING: Historic District? Yes_ Nom (If yes, please enclose documentation from Hist.'Com.) Conservation Area? Yes_ Nom (If yes, please enclose Order of Conditions) Has Fire Prevention approved and stamped plans or applications? Yeses No_ Is property located in the S.R.A.district? Yes_ No-& Comply with Zoning? Yes-X No (If no,enclose Board of Appeal decision) Is lot grandfathered? Yes-X No (If yes,submit documentation/if no,submit Board of Appeal decision) If new construction, has the proper Routing Slip been enclosed? Yeses No_ Is Architectural Access Board approval required? Yes_ Nox- (If yes, submit documentation) Massachusetts State Contractor License # 05'&83c Salem License # 78a Home Improvement Contractor # Homeowners Exempt form (if applicable) Yes_ No_ CONSTRUCTION TO BE COMMENCED WITHIN SIX(6) MONTHS OF ISSUANCE OF BUILDING PERMIT If an extension is necessary, please submit CONSTRUCTION IS TO BE COMPLETED BY: 7, if , 94 in writing to the Inspector of Buildings. V. IDENTIFICATION - To be completed by all applicants Name Mailing address-Number,street,city,and state ZIP Code Tel.No. 1. � Owner or AgawG 19 fG C Lessee 2. 7 Contractor Builder's Zewi License No. 3. 1320,3rlAs JL/Ag A.I,A, 92 Architect or Engineer 3z 99 I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his authorized agent and we agree to conform to all applicable laws of this jurisdiction. Signature of licant Address Application date 75 4nrrRos4 vt o ,2Z c/88o DO NOT WRITE BELOW THIS LINE VI. VALIDATION Building ,l/(��— CjJ FOR DEPARTMENT USE ONLY Permit number Building �J Use Group Permit issued ( C/U` 19 9,:5 Fire Grading Building t7 O Permit Fee $ C► � D l/ Live Loading Certificate of Occupancy $ Approved by: Occupancy Load Drain Tile $ —+ Plan Review Fee $ TITLE NOTES AND Data • (For department use) PERMIT TO BE MAILED TO: DATE MAILED: Construction to be started by: Completed by: VI ZONING PLAN EXAMINERS NOTES DISTRICT USE FRONT YARD ' SIDE YARD SIDE YARD REAR YARD NOTES SITE OR PLOT PLAN -For Applicant Use O N � �' �;; lLtf�1 II� �ttlEnt� ��ii5$?Zt�iLtsE�fS y � 9 ALL DF.m=PERs OF SIX (6) OR MORE RESIDEWIP.L DQ17ML.ING UNI'.CS OR 10,000 SQUARE: = OF CCMMN32C?AL SPP_CE ROUTING SLIP- REVIEW AND PASS ON AS INDICATED LOCATION: Z$ AMER,]gA WAY DATE 21 mc-- 1993 APPLICANT: Vi JNinI QsSaC. R,5A1-r mmosr INSERT DATE WHEN PASSING ON ASSESSORS Date CONTACT PES • PETER CARON (D -Ac9 573 R CPM PLANNER Salem !': ^T",c De t. 2 1 Saiem i Peen STEVE WEIMFRT �� U leirt, MA. 01970 3 nFPARTMFNT- FIRE DFPAJM FW IAISPFC'COR LAPO-mr 7 4 DEPARTMENT: DEPARTMnTr OF PUALIC SERVICES CONTACT PERSON: DIR`'c7COR 5 SQA'!FR D PAR74ENr /D Az N,ARCAREI' FUNGE tTY OR 64,1(1 CONTACT EFRSnNi EiFfRN JIAIWZ J 6 DEPARTMENT- ELECTRICAL NTACT PERSON: , PAUL TUTTLE 7 DEPARTMENT: D PARTMENT- CONTACT PERSON: RETURN TO BUrX1NC DEPARnl—wNR' . CITY OF SALEM, MASSACHUSETTS PLANNING DEPARTMENT �4 P.;SO KAVANAUGH �. � 4\ ONE SALEM GREEN GE j" I 01970 CITY PLANNER ��. 1�. �p•c ,p •� (617) 744•I580 TO: All developers of six (6) or more residential dwelling units or 10,000 square feet of commercial space FROM: Salem Planing Department/Building Department RE: Salem Area Residents Construction Employment Ordinance ---------------------------------------------------------------------- The Salem City Council recently passed the attached ordinance which requires that all developers of six (6) or more residential dwelling units or 10,000 square feet of commercial space hire specif,i-C percentages of Salem and Salem area employees for their construction work. e The purpose of the ordinance is to ensure that Salem and Salem Area residents receive the maximum benefits from the growing construction ecomcny of the City of Salem. A preconstruction conference will be scheduled by the Planning Department to discuss and explain the developer's requirements as outlined in the City of Salem Ordinance. The following information shall be furnished by the developer to ensure compliance with this ordinance: Upon issuance of a Building Permit, the developer shall submit to the ; alE:^.f Planning Department the following requested information: a. scope of construction; b. construction time schedule; c. projected number of employees and man-hours; d. types of trades to be hired; and e. names, addresses, and principals of contractors and sub-contractors being hired. Upon initiation of construction, all developers shall submit weekly workforce reports listing the-following: . .. ... _ . . . . a. names of employees; b. ' residential address of each employee; C. craft of each employee; d. job category of each employee; e. hours worked of each employee; f. hourly wage of each employee; and g. company which each employee is employed by. ;L?iL145) CERTIFICATE ISSUED DATE September 22, 1994 CITY OF SALEM s SALEM, MASSACHUSETTS 01970 BUILDING PERMIT - coax,a4CERTIFICATE OF OCCUPANCY DATE -.;U^Z' 19 PERMIT NO. APPLICANT tl i I'' ❑ [" Of i[,j Ir ADDRESS ^.Pr i•• 1:-t .w _ /�(� IN0.1 (STREET) (COMP'S LICENIU NUMBER OF PERMIT TO P?r1j STORY T^r.i 121E DWELLING UNITS (TYPE OF IUPROYEMENTI IVROPOSEO USE) `.�aZONING AL:erican Way t rE' l DISTRICT AT (LOCATION) ISiP INO.I BETWEEN 64eatfter1_y Drive AND (CROSS STREET) ICROSS STREET) ' LOT SUBDIVISION LOT BLOCK SIZE BUILDING IS -0 BE FT. WIOE P, FT. LONG BY FT. 111 HE!GHT AND SMALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION ITTPEI :arm_.c =,, . casc:ucc ueiL tuna D_L REMARKS! LEI K-Ellatc-pil AREA OR ��,^^ ��Npy9 VOLUME �ITyA[�' EAMAMAM�EY���EE�YY�T1���EYjjYjYjYEY���j�1�,1 '$Qi�l L:BIP SOOA9E Ff ETI veilOfN�A)•rFlenIoeTovIv�'P1vvlbO BE POSTED ON REMIyellsrFVEnv iiWNER 11 ':iaC>, ' TO BE POSTE60. PREMISES SEE„�?E NR,R S,E SIDETF,QQ'�QQ(IQIIT IONS OF CERTIFICATE ADDRESS DEPARTMENTAL APPROVAL FOR CERTIFICATE Of OCCUPANCY and COMPLIANCE k To be filled in by each division indicated hereon upon completion; of its final inspection. BUILDINGS Permit No. 485-93 Unit #1 Approved by John J. Jennings Date 9/22/94 Remarks PLUMBING Permit No. Approved by Dennis Ross Date 9/21/94 Remarks ELECTRICAL Peirmit No. Approved by-John Giardi Date 9/21/94 Remarks OTHER _Permit No. Approved by- i Date r ; Remarks OTHER -----_Permit No. Approved by Date Remarks BLILDING PERMIT JOB WEATHER CARD DATE 19 PERMIT NO. `"�" APPLICANT f. ?rt ..':C.. ADDRESS_., INO.) (STREET) (CONTR'S LICENSEI PERMIT TO '[!S . %ai c'-F'.i::L l(_If':1-STORY 1 1-0 NUMBEROF —DWELLING UNITS (TYPE OF IMPROVEMENTI NO. (PROPOSED USE) . i, d"-'ler`zatl 1riUV u... . 'rdw':; ZONING AT (LOCATION) DISTRICT (NO.) (STREET) BETWEEN .Aft r[ie7 iy lh".'o.: AND (CROStl STREET) ICROSS STREET) LOT SUBDIVISION LOT BLOCK S1ZE 1 BUILDING IS TO BE FT, WIDE BY FT. LONG BY FT. IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: AREA ORpp PERMIT $ VOLUME ESTIMATED COST - FEE S ',C'IBIC%SQUARE FEET) OWNER ADDRESS ^c.a L. . . BUILDINGCEPT'.BY _ _.... . .. THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY 09 SIDEWALK OR ANY PART THEREOF. EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY. NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE AP- PROVED BY THE JURISDICTION, STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF:PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF TNREE CALL APPROVED PLANS MUST BE RETAINED ON JOB AND THIS WHERE APPLICABLE SEPARATE INSPECTIONS I DUIRED FOR CARO KEPT POSTED UNTIL FINAL INSPECTION HAS BEEN PFRMITS ARE REQUIRED FOR ALL CONSTRUCTION WORK: ELECTRICAL, PLUMBING AND I. FOUNDATIONS OR FOOTINGS. MADE. WHERE A CERTIFICATE OF OCCUPANCY IS RE. MECHANICAL INSTALLATIONS. 2. PRIOR TO COVERING STRUCTURAL QUIRED,SUCH BUILDING SHALLNOT BE OCCUPIED UNTIL MEMBERS(RE AOY TO LATHI. FINAL INSPECTION HAS BEEN MADE. 3. FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 2 /7 29y ok 2L2 BOARD O EALTH GAS INSPECTION APPROVALS FIRE DEPT. INSPECTING APPROVALS Q OTHER CITY ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS WORK IS NOT STARTED WITHIN SIX MONTHS OF DATE THE CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. PERMIT IS ISSUED AS NOTED ABOVE. OR WRITTEN NOTIFICATION. Vinnin Construction, Inc. (508) 745-6264 FAX(508) 745-7992 Mr. Leo Tremblay Building Inspector One Salem Green Salem, MA 01970 RE: PHASE IIIB/THE VILLAGE AT VINNIN SQUARE AMERICA WAY SALEM, MASSACHUSETTS Dear Mr . Tremblay : The finish of the following unit(s) and garage(s ) at America Way, Salem, Massachusetts 01970, have been inspected by the writer and found to be completed in accordance with the applicable provisions of the Commonwealth of Massachusetts Building Code currently in force: Unit # Z8 - Permit # Unit # 28 - Z - Permit # 4.85- 93 X1"2 Builder :.. Gordon Thayer Date Builder's License #780 Zero Weatherly Drive, Salem, Massachusetts 01970