16 AMERICA WAY U16-4 - BUILDING JACKET 16 America Way - Unit #4
. 0. CORY
CERTIFICATE OF OCCUPANCY
CITY OF SALEM Issued: -30SIZ6 Permit fr a0��5
f SALEM, MASSACHUSETTS 01970 City of Salem Building Dept
DATE MAY 1E 19 9, PERMIT NO. 202-1995
APPLICANT VINNIN CONSTRUCTION CO INC ADDRESSO WEATHERLY DRIVE 760
(NO.) (STREET) (CONTR'S LICENSE)
CITY SALEM STATE MA ZIPCODE 01970 TEL.NO.
PERMITTO NEW BUILDING ( ) STORY TWO OR MORE FAMILY NUMBEROF
(TYPE OF IMPROVEMENT) NO. (PROPOSED USE) DWELLING UNITS
0000 WEATHERLY DRIVE ZONING R_3
AT(LOCATION) DISTRICT
(NO.) (STREET)
BETWEEN FREEDOM HOLLOW AND WEATHERLY DRIVE
(CROSS STREET) (CROSS STREET)
SUBDIVISION MAF, 21 LOT 0235 BLOCK LSIZE
OT 17. 03 ACRES
BUILDING IS TO BE FT.WIDE BV FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION
TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION
(TYPE)
REMARKS: BUILD ONE SIXPLEX @ #16 AMERICA WAYJ L. E. T. Unit #4 of 6.
AREA OR@@ ,xPERMIT
VOLUME ESTIMATED COST$ 40 , OIZ10 FEE
9L�IQI. O00,(CUBIGSOUARE FEET)
OWNER VINNIN ASSOC REALTY TRUST BUILDING DEPT.
nnncvcc l7l WPLITHFRI Y nPTVF o.. 1 �7 T
JOB SITE-Py
CITY OF SALEM BILDING
�) SALEM, MASSACHUSETTS 01970 PERMIT
DATE MAY 16 19 95 PERMIT NO. 202-1995
APPLICANT VINNIN CONSTRUCTION CO INC ADDRESSQ WEATHERLY DRIVE 1) 780
(NO.) (STREET) (CONTR'S LICENSE)
CITY SALEM STATE MA ZIPCODE 0197Q TEL.NO.
PERMITTO NEW BUILDING (_) STORY TWO OR MORE FAMILY NUMBEROF 6
(IYPEOFIMPROVEMENT) NO (PROPOSEOUSE) DWELLING UNITS
QQQQ WEATHERLY DRIVE ZONING R_3
AT(LOCATION) DISTRICT
(NO.) (STREET)
BETWEEN FREEDOM HOLLOW INC WEATHERLY DRIVE
(CROSS STREET) (CROSS STREET)
LOT
SUBDIVISION MAG 21 LOT 0235 BLOCK SIZE 17. 03 ACRES
BUILDING IS TO BE FT.WIDE BV FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION
TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION
(TYPE)
REMARKS: BUILD ONE SIXGLEX Id #16 AMERICA WAY L. E. T. Unit #4 of 6.
AREA OR
VOLUME ,^ ESTIMATED COST ZFQJ, 000 FEE
TQ 2900. 00
(CUBICISOUARE FEET) ��PP
OWNER VINNIN ASSOC REALTY TRUST
BUILDING DEPT,
ADDRESSQ WEATHERLY DRIVE BY L. E. T
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS
ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL
AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENTOF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASETHE
APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE
REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HASBEEN MADE. WHERE A PERMITS ARE REQUIRED FOR
1.FOUNDATIONS OR FOOTINGS. CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL ELECTRICAL,PLUMBING AND
2.PRIOR TO COVERING STRUCTURAL MECHANICAL INSTALLATIONS.
MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE.
3.FINAL INSPECTION BEFORE OCCUPANCY.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDkG INSPECTION APPROV S PLUMBING INSPECTION APPROVAL ELECTRICAL INSPECTION APPROVALS
sjyso/�
BOARD F A H AS INSPECTION APPRO ALS FIRE DEPT.INSPECTING APPROVALS
OTHER CITY ENGINEER 2 2 Sr
3/ /�y J tee. Saroi7�Ara� � .
WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD
INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE
STAGES OF CONSTRUCTION. AS NOTED ABOVE. OR WRITTEN NOTIFICATION.
Mr. Leo Tremblay _
Building Inspector
One Salem Green
Salem, MA 01970
RE: PHASE III/THE VILLAGE AT VINNIN SQUARE
AMERICA WAY
SALEM, MA 01970
Dear Mr . Tremblay :
The framing of the following unit(s) and garage(s) at America Way,
Salem, MA 01970 has/have been inspected by the writer and found 'to
be completed in accordance with the applicable provisions of the
Commonwealth of Massachusetts Building Code currently in force:
Unit s /�o _ - Permit *.26 Z - /9 95
Unit 7#_/(g - Per®it s 2oa - f 99S
Architect:
Dougl e Haring
A . I .A. #3299
Vinnin Construction, Inc.
)508) 745.6264
FAX)508) 745-7992
Mr . Leo Tremblay
Building Inspector
One Salem Green
Salem, MA 01970
Hg: PHASE IIJ/THE VILLAGE AT VINNIN SOUARE
AMERICA WAY
SALEM, MA 01970
Dear Mr . Tremblay :
The framing of the following unit(s ) and garage(s ) at America Wato
y ,
Salem, MA 01970 has/have been inspected applicaby the ble provisions riter and oo? dthE
be, completed in accordance with the ap tly in force :
Commonwealth of Massachusetts BuildCode curren
ing .
Unit #- 4Ln2_ - Permit
Unit �1 _�_=T_. - Permit M .ZdZ___�99s
3 , 29a 9&
Builder:.j Lie ---_---
Gordon Thayer
Builders License #780
Zero Weatherly Drive, Salem, Massachusetts 01970
16 America Way
i
JOB SITECPY
BALDING
CITY SALEM
PERMIT
SALEMM,, MASSACHUSETTS 01970
i
DATE MAY 16 19 95 PERMIT NO. 202-1995
APPLICANT VINNIN CONSTRUCTION CO INC ADDRESSO WEATHERLY DRIVE 780
(NO.) (STREET) (CONTR'S LICENSE)
CITY SALEM STATE MA ZIP CODE 01970 TEL,NO.
PERMIT TO NEW BUILDING ( ) STORY TWO OR MORE FAMILY NUMBEROF
(TYPE OF IMPROVEMENT) NO. (PROPOSED USE) DWELLING UNITS—
AT(LOCATION)
NITSAT(LOCATION) E'
0000 WEATHERLY DRIVE ZONING
DISTRICT R_3
(N0.) (STREET)
BETWEEN FREEDOM HOLLOW AND WEATHERLY DRIVE
(CROSS STREET) (CROSS STREET)
SUBDIVISION MAP 21 LOT 0:'35 BLOCK s�e 17. 03 ACRES
BUILDING IS TO BE - FT.WIDE BV FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION
TOTYPE - USEGROUP BASEMENT WALLS OR FOUNDATION
(TYPE)
REMARKS: BUILD ONE SIXPLEX @ #r6—AMERICA WAY L. E. T. Unit S6 of 6.
cr
AREA OR PERMIT
(CUSICISOUARE FEET)
VOLUME ESTIMATED COST 405. 000 FEE $ 2900. 00
OWNER VINNIN ASSOC REALTY TRUST BUILDING DEPT.
ADDRESS 0 WEATHERLY DRIVE BY L. E. T
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS
ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL
AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE
APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE
REQUIRED FOR ALL CONSTRUCTION WORK POSTEDUNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR
1.FOUNDATIONS OR FOOTINGS. ELECTRICAL,PLUMBING AND
2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS.
MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE.
3.FINAL INSPECTION BEFORE OCCUPANCY.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTION APPROVALS PLUMBING INSPECTIONAgPROVALS ELECTRICAL INSPECTION APPROVALS
71
LM
RDOFIHEArrH GAS INSPECTION APPROVA FIRE DEPT. NSPECCTTI:NG APPROVALS)
OTHER CITY ENGINEER 2 x 2
CERTIFlip'Xf OF OCCUPANCY
Issued: rmit It a 45 X�7
o a em m n
WORILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD
INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE
STAGES OF CONSTRUCTION. AS NOTED ABOVE. OR WRITTEN NOTIFICATION.