Loading...
8 AMERICA WAY - BUILDIING JACKET Y bd %OV OZSVL I&PUGdC s ' IMGIIVNS. >T BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR FANCY IS REQUIRED,SUCH BUILDING SHALL ELECTRICAL,PLUMBING AND MECHANICAL INSTALLATIONS. TIL FINAL INSPECTION HAS BEEN MADE. T IS VISIBLE FROM STREET INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS r� 1 2 3PECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 2 AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD ONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE OR WRITTEN NOTIFICATION. SULK SII . `.)L'Y B16 1LDING CITY OF SALEM a ! - SALEM, MASSACHUSETTS 01970 0 PERMIT DATE MAY IE 19 55 PERMIT NO. APPLICANT VINNIN CONSTRUCTIDN Cr' IN ADDRESS4!' WEATHERLY DR ?Hi? (ND.) (STREET) (CONTRS LICENSE) CITY SALEM STATE M[:' ZIP CODE I`i'i r)7I=I TEL.NO. - PERMITTO NEW DUILDING ( ) STORY ONE FAMILY' NUMBERGOUNITS (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) - AT(LOCATION) 000(2) WEATHERLY DRIVE ZONING DISTRICT (NO.) (STREET) BETWEEN rREEDOP', HOLLOW AND WEA HERL'( Dr:!.%'__ (CROSS STREET) (CROSS STREET) SUBDIVISION c'_1 LOT 5 BLOCK SIZE r`f 7—'- i BUILDING IS TO BE FT.WIDE BV FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: BUILD SINrL'c FAMILY TuWNtiuWSE f o A AMERiC A WAY L. E. .'. AREAOR n�,rr y�.n ri .f- ,nrt PERMITz'VOLUME - TIMAT90 CO51 ap` P�1 'L:" -`.''oyi FEE $ -:=:4'.I. It VI (CUBICISQUARE FEET) "' • -- W �'O'aC 6.y OWNER VINNIN ASSOC REALTY TRUST BUILDING DEPT. ADDRESS CA WEATHERL..Y DRIVE BY L. E. THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET.ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ► ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. ELECTRICAL,PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDIN`G- INSPECTION APPROVALS / PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS Z S-4 IG BOAR OF HEAA/LTTHy-�H// GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 74? OTHER CITY ENGINEER % 2 2 C r WORKSHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. AS NOTED ABOVE. OR WRITTEN NOTIFICATION. City of Salem Ward q22 -9q J� s o ST cn U` y26,-q11' APPLICATION m i FOR i PERMIT TO BUILD ADDITION, MAKE ALTERATIONS OR NEW CONSTRUCTION IMPORTANT-Applicant to complete all items in sections:1, It, 111, IV, andIX. ZONING 1. AT(LOCATION) /7-19-Zd--z-24•rea AhdE14d4A hIAY DISTRICT ZL3_ LOCATION (NO.) 1 (STREET) OF BETWEENLylwwrwaf:(.Y -XmIvir AND (CROSS STREET) (CROSS STREET) BUILDINGLOT /r y SUBDIVISION �PblpsE Air LOT aBLOCK SIZE 11. TYPE AND COST OF BUILDING -All applicants complete Parts A -D A. TYPE OF IMPROVEMENT D. PROPOSED USE-FOR"DEMOLITION"USE MOST RECENT USE 1 Ig New building Residential - Nonresidential 2 ❑ Addition(if residential,enter number of new 12 ❑ One family 18 ❑ Amusement,recreational housing units added,it any,in part D,13) -, 19 ❑ Chruch,other religious 13 Two or more family-Enter number 3 ❑ Alteration(See 2 above) of units......................................................._ �L 20 ❑ Industrial I 21 ❑ Parking garage 4 ❑ Repair replacement 14 ❑ Transient hotel,motel,or dormitory- 22 ❑ Service station,repair garage Enter number of units ........................... 5 EJ Wracking(it multifamily residential,enter number 23 ❑ HospNal,institutional of units in building in Part D,13) 15 ❑ Garage 24 ❑ Office,bank,professional 6 ❑ Moving(relocation) 16 ❑ Carpbrt 25 ❑ Public utility 7 ❑ Foundation only 26 E] School,library,other educational 17 ❑ Other-Specify 27 ❑ Stores,mercantile B.OWNERSHIP 28 ❑ Tanks,towers 8 Private(individual,coriporatiog,nonprofit pg E] Other-Specify institution,etc.) - 9 ❑ Public(Federal,State,or local government C.COST (Omit cents) Nonresidential-Describe in detail proposed use of buildings,e.g.,food processing plant, machine shop,laundry building at hospital,elementary school,secondary school,college, parochial school,parking garage for department store,rental office building,office building 10. Cost of improvement ......................................................... $ at industrial plad.,,if use pf existing building is being changed,enter proposed use. To be installed but not included t�I in the above cost L/ a. Electrical............. . b. Plumbing.......................................................................... .C. Heating,air conditioning............................................. ti v , ♦. 1 1 .. .. .- •`rl:Other(elevator,etc.),._................................................... el 11..TOTAL,COST OF IMPROVEMENT $= 777c 111. SELECTED CHARACTERISTICS OF BUILDING-For new buildings,and-additions, complete`Parts:E::L;demolition, complete only Parts J&M, all others skip to IV E. PRINCIPAL TYPE OF FRAME F. PRINCIPAL TYPE OF HEATING FUEL` G:TYPE OF SEWAGE DISPOSAL I. TYPE OF MECHANICAL 30,❑,Masomyr(wall bearing) 35 ❑ Gas s:a. 40 �•Publio or private wmparry =+ �:�•Will there be central air condr ioning? 31 Wood frame '4: - ., ,`41 Private se tic tank,etc. �1 32 ❑ Structural steel 37 ® Electricity, 44 K Yes 45 ❑ No 33 ❑ Reinforced concrete 38 ❑ Coal H. TYPE OF WATER SUPPLY Will there by an elevator? 34 ❑ Other-Specify 39 ❑ Other-Specify 42 ® Public or private company 46 ❑ Yes 47 ® No 43 ❑ Private(well,cistern) .. 11� J.DIMENSIONS 48. Number of stories ...............4................................... M. DEMOLITION OF STRUCTURES: 49. Total squors,re based of exteloorrior area, Has Approval from Historical Commission been received all floors,based on exterior dimensions ....................................... for any structure over fifty(50)years? Yes__No 50. Total land area,sq.it....................................................... Dig Safe Number K.NUMBER OF OFF-STREET PARKING SPACES Pest Control: 51. Enclosed.......................1.,............................................ HAVE THE FOLLOWING UTILITIES BEEN DISCONNECTED? 5ZOutdoors........................_� Yes No L RESIDENTIAL BUILDINGS ONLY Water: 53. Enclosed ......................................... Electric: �j Gas: 54. Number of Full.........Z4.................... Sewer: bathrooms DOCUMTATION FOR THE ABOVE MUST BE ATTACHED Partial.....-5.._.._...........- BEFORE AENPERMIT CAN BE ISSUED. ` IV. COMPLETE THE FOLLOWING: Hisioric'District? Yes_ Nom (If yes, please enclose documentation from Hist. Corn.) t Conservation Area? Yes_ Nom (If yes, please enclose Order of Conditions) Has Fire Prevention approved and stamped plans or applications? Yeses No_ Is property located in the S.R.A.district? Yes_ NO X Comply with Zoning? Yes-X- No (If no,enclose Board of Appeal decision) Is lot grandfathered? Yes-X- No (If yes,submit documentation/if no,submit Board of Appeal decision) If new construction,has the proper Routing Slip been enclosed? Yes No Is Architectural Access Board approval required? Yes_ NoX (If yes, submit documentation) Massachusetts State Contractor License # 05&99 SC Salem License# 71ENG Home Improvement Contractor# Homeowners Exempt form (if applicable) Yes_ No CONSTRUCTION TO BE COMMENCED WITHIN SIX (6)MONTHS OF ISSUANCE OF BUILDING PERMIT 9.S If an extension is necessary, please submit 7' CONSTRUCTION IS TO BE COMPLETED BY: in writing to the Inspector of Buildings. V. IDENTIFICATION - To be completed by all applicants Name Mailing address-Number,street,city,and state ZIP Code Tel.No. 1. Owner or ot970 yamw s Lessee z. p vA!EC Z contractor T Builder's Q ei. C I A'rm , mA, License No. 3. A.I,A, 9 7 Architect or Engineer As 1.Ar 3Z 99 I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his authorized agent and we agree to conform to all a pli0able laws of this jurisdiction. Signat I ure&pplicyt Address Application date 4Sp, ZZ 1 94 ot68c -i .�;T, DO NOT WRITE BELOW THIS LINE VI. VALIDATION Building — ' FOR DEPARTMENT USE ONLY Permit number Building Use Group Permit issued 19 Fire Grading Building P Permit Fee $ �7 rCf�O. Live Loading Certificate of Occupancy / $ Approved boccupancy Load y' Drain Tile $ Plan Review Fee $ TITLF NOTES AND Data-(For department use) PERMIT TO BE MAILED TO: DATE MAILED: Construction to be started by: Completed by: VI ZONING PLAN EXAMINERS NOTES DISTRICT USE FRONT YARD SIDE YARD SIDE YARD REAR YARD NOTES SITE OR PLOT PLAN •For Applicant Use oN 4 • lya.� Chi# of Salem, 9 ALL DF,%=PERS OF SIX (6) OR MARTS RESIDENTIAL DW.E'M.D)G UNITS OR 10,000 SQUARE FEET OF CGM�2C?AL SPACE . ROUTING SUP REVIEW AND PASS ON AS INDICATED LOCATION: 1749-20-21-24-2& AMERICA WAY DATE zz AvG . X994 APPLICANT: ViNNinl AsCx. ►'2- EAITY TfZu37' INSERT DATE WHEN PASSING ON nFPARTMFNT. ASSESSORS (, t@ CONTACT PE PEPFlt CARON �✓ 2 DEPARTMENT, CITY PIANNER -?c' STEVE WEIMYRT 3 FmrDrPAJMTW =PAFT.-—Xujtmq�Ib1SPT°T'.C'.RTOR LAPOINI'.5 F 4 DEPARTMENT: DEPARTM 77 OF PUBLIC SERVICES CONTACT PERSON: OIREC!OR 5 WATER D}PARTMEM.P MARFARET FIAGERTY OR MZN JIADOsz 6 DEPARTMENT- ELECTRICAL CONTACT PERSON: PAUL TUTTLE 7 DEPARTMENT: DEPARTMENT: k: x CONTACT PERSON: RETURN TO J - d HARING AND ASSOCIATES, INC. k 41 Hart Street Beverly Farms, Ma. 01915 August 7, 1995 Job Site Visit Village At Vinnin Square Gordon Thayer Temperature 85 D.F. Sunny/dry Douglas Haring 1. #6 & 8 Weatherly Dr. The framing of the second floor exterior walls is in progress. 2. #16 America Way: Interior structural walls are installed. Footings are poured. Backfilling is in progress, including compaction to get to the grade for the underside of the basement slab. Perforated piping is on the site for Radon venting. 3. #17 - 19 America Way (3) Town houses (type T-3) #18 Mechanical rough-in is completed. Drywall is in progress on the upper levels. Insulation is completed including foaming around the windows and floor sills. #19 is the Model unit. Furniture placement is in progress. Hot top bidder course is in place to Weatherly Drive. 4. #20 America Way: Completed. 5. #22,24 & 26 America Way: Completed. vv87.95 HARING AND ASSOCIATES, INC. 0 41 Hart Street Beverly Farms, Ma. 01915 July 21, 1995 Job Site Visit Village At Vinnin Square Gordon Thayer Temperature 85 D.F. Sunny/humid Douglas Haring 1. #6 & 8 Weatherly Dr. Basement slab is poured. Structural steel is in place Framing is to commence on Monday. July 24th. 1995 2. #16 America Way: Foundation wall is 90% complete. Partial backfilled has been done. Twenty feet of the front foundation wall has been left open so that the bearing footings for the walls and structural steel can be poured. 3. #17 - 19 America Way (3) Town houses (type T-3) Interior finishes are done. Floor finishes have not been laid in #17: the unit is not yet sold. Furniture is to be installed in the model (#19). #18 has interior partitions, HVAC, plumbing and electrical work is done. Insulation is to begin Monday. Brick and stone work for the front steps is done. Rough grading is starting. Secondary hook-up to transformer is completed. This was the last shut down for this phase. 4. #20 America Way: Landscaping is completed in the front and rear. All units have closed and are occupied. 5. #22,24 & 26 America Way: 100% complete and occupied. vv721.95 HARING AND ASSOCIATES, INC. p� 41 Hart Street U � Beverly Farms, Ma. 01915 October 23, 1995 Job Site Visit Village At Vinnin Square Gordon Thayer Temperature 70 D.F. Sunny Douglas Haring 1. #6 & 8 Weatherly Dr. The walls are completely insulated. The drywall is stocked in the units. Installation of drywall is in process. 2. 8,10,12 and 14 America Way (4 townhouses) The foundations are poured and the forms are striped. Interior backfilling will begin tomorrow. The exterior waterproofing and perimeter drains will proceed tomorrow. 3. #16 America Way: The roof is shingled. The E.P.D.M. flat roof is being installed today. The roof should be tight by this evening. There was no apparent damage from the heavy rains over the week-end. The interior partitions and rough plumbing and electrical work are complete. The Main trunk lines in the H.V.A.C. system are installed. The rough grading in the of #16 is including adding loam is being completed with the contractor's large equipment. When the garages are completed, the finish work will be done with hand tools. 3. #18 America Way Certificates of Occupancy and Smoke detector certificates are in hand for the 4 units which will close this week. The landscaping is completed in the front. The flagpole base is installed, including the grading up to it. 4. #17,19 America Way. Landscaping is complete in the front and rear including the shrubs next to the garage 18-6. vvl023.95 Haring and Associates, Inc. 41 Hart Street Beverly Farms, Mass. 01915 October 5, 1995 Job Site Visit: Village At Vinnin Square Cloudy- 55 Deg. F. 1.#6-8 Weather) Drive. The rough plumbing and wiring is complete. Anderson Insulation is installing the batt insulation and separate vapor barrier. Corners and edges are tapped. Joints are foam sealed. Drywall will start next week. 2. #12-14 America Way: Excavating and footings are installed. 3. #10 &8 America Way: Excavation is complete for footings. Soil is compacted. 4. #16 America Way: Roof Framing is in progress. 5. #18 America Way. Four units are sold. They are finished except for carpeting and finish hardware. Papers to pass at the end of October. C HARING AND ASSOCIATES, INC. 41 Hart Street Beverly Farms, Ma. 01915 May 19, 1995 Job Site Visit Village At Vinnin Square Gordon Thayer Temperature 65 D.F. Sunny Douglas Haring 1. #24 America Way - sold. #22 & #26 America Way are occupied. #19 America Way (new model unit) Ceramic tile bath room is installed as well as cabinets in kitchen and vanity in bath. 2. #20 America Way: (6-plex) Four units passed papers. The two remaining units will be done next week. commence next week. 3. #17 & #19 America Way: Interior finishes are installed. Stairs are competed. 4. #18 Weatherly Drive: Underground utilities are in place and have passed inspection. Slab to be poured May 4th. Framing to start next week.(5/10/95) 5. Hot top binder is down from #26 America way to 17 - 19 America way. 6. Phase H #18 America Way. Slab is poured. Basement partition is done. Wood in contact with cement is pressure treated. 7. #6 and #8 Weatherly Drive (Townhouses) Sewer pipe is in place Footings will start next week. 8. All permits for the remainder of phase II are in hand. vv519.95 \\ HARING AND ASSOCIATES, INC. �) 41 Hart Street Beverly Farms, Ma. 01915 June 1, 1995 Job Site Visit Village At Vinnin Square Gordon Thayer Temperature 75 D.F. Sunny Douglas Haring 1. #6 & 8 Weatherly Dr. Excavated, formed and poured footings. Points are being set for foundation walls. 2. #17 - 19 America Way Town houses T-3 Interior finishes are done. Carpet will be installed in the model (#19) next week. 3. #20 America Way: Landscaping is in process. There is one remaining unit to pass papers (#20-3). There were 8 closing in May. 4. #24 America Way: Interior finishes are installed including finish electrical and plumbing work. Carpet is to be installed next week. 5. #16 America Way: Footings are excavated and the batter boards are in place. 6. Phase H #18 America Way. (6 plex) Electrical switch gear is in place including the secondary wiring from the transformer to the switch gear. Roof framing is in progress. vv61.95