0 AMERICA WAY - BUILDING INSPECTION I§Pendaflmr
/3 Esselte
74520 40%W P4
HARING/ ROBERT CHARLES GROUP
41 Hart Street
Beverly Farms, Ma. 01915
April 29, 1996
Job Site Visit
Village At Vinnin Square
Gordon Thayer Temperature 60 D.F. Sunny
Douglas Haring
1. #10,12,14 America Way: Masonry entry steps completed.
#12,14 America Way: Drywall complete. Ceiling has been sprayed. The
interior finish has been delivered. Installation to begin this week.
2. #18 America Way: Front stair foundation being poured.
18-2 Complete passing papers today.
3. #16 - 3,4 America Way: Occupied. Punch list in progress.
4. #8,10,12,14 America Way: Paving: grading driveways. Walks to front stairs
being formed. #8 & #10 - Insulation to start tomorrow.
5. Phase III: Common area punch list in progress.
6. Landscaping: When dry, loam will be screened for final grading.
vv430.95
etw
HARING AND ASSOCIATES, INC.
41 Hart Street
Beverly Farms, Ma. 01915
November 6, 1995
Job Site Visit
Village At Vinnin Square
Gordon Thayer Temperature 50 D.F. Sunny
Douglas Haring
1. #6 & 8 Weatherly Dr. The drywall is completed. Taping is in progress.
2. 8,10,12 and 14 America Way (4 townhouses) The underground utilities are
in place and the backfilling and compaction are in progress. No serious
frost is expected until after Thanksgiving.
3. #16 America Way: The PVC plumbing is in placed. The E.P.D.M. flat roof is
installed. The roof shingles are complete. 90 5 of the sprinkler work is
complete. The interior partitions, rough plumbing and electrical work are
complete. The exterior window trim, corner boards and clapboards are in
progress. The PVC Radon vent is in place.
4. #18 America Way Four units are occupied. Units 3 and 4 have punchlists
in progress.
vv116.95
r
HARING AND ASSOCIATES, INC.
(� 41 Hart Street
y\v Beverly Farms, Ma. 01915
November 20, 1995
Job Site Visit
Village At Vinnin Square
Gordon Thayer Temperature 40 D.F. Sunny
Douglas Haring
1. #6 & 8 Weatherly Dr. The tapping is completed. Finished carpentry is
finished. HVAC is in operation. Driveway area is compacted: ready for
hardtop.
2. 8,10 America Way. (townhouses) Backfill and compaction are complete.
12,14 America Way (townhouses) The underground utilities are in place and
the slabs are poured. No serious frost has occurred so far.
Steel erection is expected to start by Friday. Framing should start the
week of the 22nd. of November.
3. #16 America Way: The roof is done. 50% of the exterior clapboards are in
place, straight and tight. Sprinkler and HVAC work is complete. The rough
plumbing and electrical work are 95% complete. The exterior window trim
and corner boards are in progress. Three garages are still to be built.
4. #19 America Way Model town house has been sold. #17 America Way will
become the new townhouse.
vv1120.95
#?., ¢L,� �M r;•- r.✓ r' `i.s. AI lP :1 ' }a -'4a;xi :idE s, x':;
Ile
CE RTIFICAT 155 D-:
D/ET.E 1 �1P� g..:-
i" CITY OF.SAI.EM
SALE9. MA SS AC HUSETTS 01970 T- BUILDING PERMIT NN
CERTIFICATEOF 'OCCUPANCY
DATE
{ 9L9/ � 19194 19-94 5' i
O PERMIT'NO.
Af+PLICANF ;.;OoIdon.Thayer I ADDRESS' �Weat er y Or. &aem[ MA ; 7
A T�[�'��..L 1 j 4 4 j. ..EE.��� --(N0.) 5., lygCTI �. j ( (CONIR'S LICENSE'
r •• -zTOwnhous@ i i ... ' LLYe��.[�E� �:j t 1Q1 [i NUMBER OF; -
PERMIT:TO I_) STORY Q' DW ELL W6 UNII$.
'L^. L • (,vPE OF IMPROVEMENT/' MO. r�1 VRO105ED USE) 1� nn j 1 + -
'AT,(LOLiTI0N1 19 America Way Salem[ FIA i n� . I WBrdi V i 'L ON ING R3
DISTRICT
. - 'STREET'
Cz
BETWEEN ANO B V 1 !
!CROSS STREET'
(CROSS STREET)
SUGDIVIS IDN LOT
1 - LOT ' BLOCK SIZE
BUILDING IS _D BE Fi, WIDE P.. FT. LONG BY 'FT. IN HEIGHT AND SHALLSCONF.ORM:IN CONSTRUCTOON
TO TYPE C USE GROUP BASEMENT WALLS OR FOUNDATiON^_ 1 a
"' CJ 'TYPE: t
r Co$strnf' t one unit townhouse.
REMARKS:
AV LUNE REA ORtMRE 'EJ[LM�� �
Oiie4`ww�__wElll' AYYOIAAAO[[[[1WWWB�[[1��1111
L:B16 SOV/RE iEETI
Pinniu Assoc. er lsi lvens�yr vvlvw venb�lv cfLv'r veTlvrrmvmensewo
OWNER TO BE P�O$$TEp ON PREMISES
A
CORES S Weutheri Dr. SEE REiBBSE`y°meDRp$a;BNDITIONS OF CERTIFICATE
DEPARTMENTAL APPROVAL FOR CERTIFICATE
of*OCCUPANCY and COMPLIANCE
Toy�e frllgd in b each division indicated hereon
35 •;upon completion o[ its final inspection. j
419-94'
`�ZBUIL'DINGS ; i Permit No.
Approved b 4. npinBa Date 12/8/95
4 Remarks
a M •C `L I t i `I I� I j
PLVMBING Perm t No.
i i I
Approved by�� RRss i i Date 6/1./95
» j
r ' • �"•��: � i i I I � j i 1
Remarks j I
ELECTRICAL ! Permit No. qq[
9� Approved by 1 G#ar!di� Date ;'12/5/95
Remark[ i
�.
OTHER= Fire f Permit No.
" �A plov -Pj ezephkil I bUJ2/95
Q „
i
Remhrks�
LOVER `+ { � Perm:t No.
4 on!1
p proved bye i' ' I Date f,'
�• �lr k., a-,J jN^..-��.' f .. !. , �} � E '��
' =Remark' jI i - ' _ •+
4k.I '
BILDII4ur
f _
PERMIT
JOB WEATHER CARD
DATE / 1994 PERMIT NO. 429-94
APPLICANT riOrdau 22ayer ADDRESSit MtBsetisyts ,r, SaSam, !W 7E0
# IN0.1 (STREET) (CONTR•S LICENSE)
PERMIT TO eOy"houa¢ (_) STORY dwalling NUMBER OF
' (TYPE 01 IMPROVEMENT) N0. (PROPOSED USE) DWELLING UNITS
AT (LOCATION)
29 AmeriC,a WaY baled, MAA Ware J ZONING ItJ IM0.1 (STREET( DISTRICT
BETWEEN AND
ICROSA STREET) (CROSS STREET)
SUBOIV ISIONO LOT BLOCK SIZE
BUILDING IS TO BE FT. WIDE BV FT. LONG BY FT. IN HEIGHT AND SMALL CONFORM IN CONSTRUCTION
TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION
GanntTucc oE2a unit tcwaTYPE)
bousa.
REMARKS: J� //��
VREA OR OLUME Call for Permit Ill IT.r,�11T11�5 TIMATED COST p FEEMIT S
t OJBICISOUARE FEET( J
OWNER Virmin Acsoc.
ADDRESS wCG1C)lN3'd" ;i - BYILOINQDAPTTremh:a,.,
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY 04 SIDEWALK OR ANY PART THEREOF. EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY. NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE AP-
PR OVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED
FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS
OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM OF THREE CALL APPROVED PLANS MUST BE RETAINED ON JOB AND THIS WHERE APPLICABLE SEPARATE
INSPECTIONS REQUIRED FDR CARD KEPT POSTED UNTIL FINAL INSPECTION HAS BEEN PFRMITS ARE REQUIRED FOR
ALL CONSTRUCTION WORK: ELECTRICAL, PLUMBING AND
I. FOUNDATIONS OR FOOTINGS. MADE. WHERE A CERTIFICATE OF OCCUPANCY IS RE. MECHANICAL INSTALLATIONS.
2. PRIOR TO COVERING STRUCTURAL QUIRED,SUCH BUILDING SHALLNOT BE OCCUPIED UNTIL
MINAL INSPECTION
TI TO LATHE FINAL INSPECTION HAS BEEN MADE.
]. FINAL INSPECTION BEFORE
OCCUPANCY.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS
z �r 6 z fi ori 6-Iy-�� 21021
� a
BOARD OF HELTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS
OTHER CITY ENGINEER 2 2
C
`57)1
WORK SHALL NOT PgOCEEO UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION INSPECTIONS INDICATED ON THIS CARD
INSPECTOR HAS APPROVED THE VARIOUS WORK IS NOT STARTED WITHIN SIX MONTHS OF DATE THE CAN BE ARRANGED FOR BY TELEPHONE
STAGES OF CONSTRUCTION. PERMIT IS ISSUED AS NOTED ABOVE. OR WRITTEN NOTIFICATION.