Loading...
20 ALBION STREET - BUILDING JACKET Certificate No: 701-11 Building Permit No.: 701-11 Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Permits This is to Certify that the SINGLE FAMILY DWELLING located at Dwelling Type 20 ALBION STREET in the CITY OF SALEM - -- - ---------- ....... - - -------- Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY 20 ALBION STREET This permit is granted ill conformity with the Statutes and ordinances relating thereto, and expires .- ___-------__-_ unless sooner suspended orrevoked. Expiration Date _ '- - .. ___ ------ - - --. Issued On: Fri Jan 4, 2013 - GeoTMS®2013 Des Launers Municipal Solutions,Inc. -.__ ----------______..----------- _______-_.__-_ F SALEM, MASSACHUSETTS PLAN SHOWING NEW FOUNDATION PREPARED FOR: JOSEPH SALAMONE STREET "1 CERTIFY THAT THE NEW FOUNDATION 20 ALBION PARCEL ID: STREET IS LOCATED ON THE GROUND AS SHOWN." Q AeD REID LAND SURVEYORS - " 365 CHATHAM ST., LYNN, MASS. RALPH W. REID P.L.S. (781) 592-2660 — plotplansOreidls.com JUNE 15, 2012 — SCALE 1" = 20" 1p of Y4 RALPH °yo NICHOLS STREET 0 WRQ" No. 29422 r' 75 Dpess STAKE � IRON RODNAILO (set)0 5425± S.F. 1 1 0 (assessed) I 1 m N/F I i C7 o 1N 1 CECILE T. ELWELL O I ° I� (n PARCEL ID: 15-0231-0 ZONE R1 0 1 > 22 ALBION STREET LOT AREA 15,000 SF rn N LOT FRONTAGE 100' I I FRONT YARD 15' SIDE YARD 10' REAR YARD 30' 121' I 13.8'µ 24.0' BULK ULK NEW cn FOUNDATION N/F D m ANN M. THIBEAULT rn ct PARCEL ID: 15-0229-0 18 ALBION STREET p22 10_5 13.1' i. 15_4'_ 5.Y to IR(se) D IRON set)0 a P it R12-014 20 ALBION STREET BLB/RWR 20 ALBION STREET 701-11 GIS#: 7506-,T _ COMMONWEALTH OF MASSACHUSETTS Map 153 a T _ FBlock- _ CITY OF SALEM Lot 0230{ Category:. , 101 New Smile family) Permit#, 701.11 BUILDING PERMIT Project-# a, " JS-2011-00 1191 ^�T) Est.Cost:,., VZ,50000t,..,j- s' Fee Charged S656.00 Balance Due $-.06' : PERMISSION IS HEREBY GRANTED TO: lConst.Llass. __ - Contractor: License: Expires Use Group:) Joseph Salamone CONSTRUCTIO SUPERVISOR-83299 Lot Slze(sq;ft) 5499.8856.' !!Zoning::'.,-.- �Owner- Joseph Salamone UnitsGained jApplieanl: Joseph Salamone Unity s Lost-," " n CITY OF SALEM ROUTING SLIP New ConstructionM Certificate of Occupancy ;I LOCATION do 41b,'on DATE SSORS DATE 93 Washington St. CIT DATE 93 s ington St. "LIC SERVICES DATE 120 Washington St. ATER 5EF, 'DeddA!Q DATE 120�Washington St.rl"kw& e_xk(Z;, CROS TION DATE 5 J on Ave PL DATE 14 shington St. CON N DATE 12 mgton St. ELECTRICAL DATE 48 Lafayette S . FIRE ON DATE Avenu HEALTH ^ f DATE ')'g "J] 120 Washington St. tBUILDING INSPECTOR DATE Z 120 Washington St. CNJPREScheck Software Version 4.4.1 Compliance Certificate Project Title: 24x36 Colonial Energy Code: 2007 IECC Location: Salem,Massachusetts ' Construction Type: Single Family - Conditioned Floor Area: 1664 ft2 Glazing Area Percentage: 100/9 Heating Degree Days: 6268 Climate Zone: 5 Construction Site: Owner/Agent Designer/Contractor. 20 Albion St Joe Salamone Salem,MA 01970 Top-Notch Custom Homes Compliance:0.4%Better Than Code Maximum UA:226 Your UA:225 T %ee.orwmae Tem Cade iM .11 G haw d.bmMi...fie house ie heeedon code 4atlaort Neo. 11 DOES NOT prontle an estimate of ereryy uae pr mat mta.In a minim.m .tmma. Gross Cavity Cont. Glazing UA Assembly Area or R-Value R-Value or Door Perimeter U-Factor Ceiling 1:Flat Calling or Scissor Truss 832 38.0 0.0 465- Wall 5Wall 1:Wood Frame,16"o.c. 1920 19.0 0.0 104 Window 1:Vinyl Frame:DoublePam 189 0.300 57 SHGC:0.21 Floor 1:All-Wood JolstlTnxss:Dver Unconditioned Space 832 19.0 0.0 39 Furnace 1:Forced Hot Air 78 AFUE Air Conditioner 1:Electric Central Air 13 SEER Compliance Statement: The proposed building design described here is mmistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2007 IECC requirements in REScheck Version 4.4.1 and to comply with the mandatory requirements listed In the REScheck Inspection Checklist. Name-Title Signature Date Project Title:24x36 Colonial Report date:04125/11 Data filename:C:1Documents and Settings wwNMy Documents\Top-NotcMChlef Desigri Albion St Salem\24x36 Colonial.rck Page 1 of 3 REScheck Software Version 4.4.1 Inspection Checklist Ceilings: U Ceiling 1:Flat Ceiling or Scissor Truss,R-38.0 cavity insulation Comments: Above-Grade Walls: U Wall 1:Wood Frame,16'o.c.,R-19.0 cavity insulation Comments: Windows: U Window 1:Vinyl Frame:Double Pane,U-factor:0.300 For windows without labeled U-factors,describe features: #Panes—Fours Type Thermal Break? Yes No Comments: Nate.,Up to 15 sq.it.of glazed fenestration per dwelling is exempt from U-factor and SHGC requirements. Floors: U Floor 1:All-Wood JolstlTmss:Over Unconditioned Space,R-19.0 cavity Insulation Comments: Floor insulation is installed In permanent contact with the underside of the subfloor decking. Heating and Cooling Equipment: U Furnace 1:Faced Hot Air:78 AFUE or higher Make and Model Number: U Air Conditioner 1:Electric Central Air:13 SEER or higher Make and Model Number: Air Leakage: U Joints,attic access openings,and all other such openings In the building envelope that are sources of air leakage are sealed. U Recessed lights in the building thermal envelope are 1)type IC rated and ASTM E283 labeled and 2)sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. U Access doors separating conditioned from unconditioned space are weather-stripped and insulated(without insulation compression a damage)to at least the level of insulation on the surrounding surfaces.Where loose fi0 Insulation exists,a baffle or retainer is installed to maintain insulation application. U Wood-buming fireplaces have gasketed doors and outdoor combustion air. Sunrooms: U Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 0.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Vapor Retarder: U A minimum of Class II(1.0 perm)vapor retarder is installed on the interior side of above-grade framed walls or it has been determined that moisture or its freezing will not damage the materials. Exceptions: Class III(10 perm or less)vapor retarder Is permitted forvented cladding over OSB,plywood,fiberboard,gypsum,or for sheathing over 2x4 framing having insulation of R5 or better,or for sheathing over 2x6 framing having insulation of R-7.5 or better. Materials Identification and Installation: U Materials and equipment are installed in accordance with the manufacturer's Installation Instructions. U Insulation Is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R-value. Project Title:2436 Colonial Report date:04125/11 Data filename:CADocuments and Setfings1,Juio9IJIy wsl-sr.„20 Alblon St Saler112406 Colonial.rck Page 2 of 3 J Materials and equipment ale identified so that compliance can be determined. U Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. LI Insulation R-values and glazing U-factors are clearly marked on the building plans or specifications. Duct Insulation: 0 Supply ducts in attics am insulated to a minimum of R-8.All other ducts in unconditioned spaces or outside the building envelope are insulated to at least RE. Duct Construction: Air handlers,fitter boxes,and duct connections to flanges of air distribution system equipment or sheet metal fittings are sealed and mechanically fastened. All joints,seams,and connections are made substantially airtight with tapes,gasketing,mastics(adhesives)or other approved closure systems.Tapes and mastics are rated UL 181A or UL 181 B- Building framing cavities are not used as supply ducts. Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. C1 Additional requirements for tape sealing and metal duct crimping are included by an inspection for compliance with the International Mechanical Code. Temperature Controls: LI Thermostats exist for each separate HVAC system.A manual or automatic means to partially resmcl or shut orf the heating and/or cooling Input to each zone or floor is provided. Heating and Cooling Equipment Sizing: LI Additional requirements for equipment suing are inckided by an inspection for compliance with the international Residential Code. O For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2006 IECC Commercial Building Mechanical and/or Service Water Heating(Sections 503 and 504). Circulating Service Hot Water Systems: LI Circulating service hot water pipes are insulated to R-2. 0 Circulating service hot water systems include an automatic or accessible manual switch to tum off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: 0 HVAC piping conveying fluids above 105 degrees F or chtited fluids below 55 degrees F are insulated to R-2. Certificate: l7 A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window 1.1-factors;type and efficiency of space-conditioning and water heating equipment The certificate does not cover or obstruct the visibility of the circuit directory label,service disconnect label or other required labels. NOTES TO FIELD:(Building Department Use Only) Project Title:2436 Colonial Report date:04125111 Data filename:CADocuments and SettingMJuiceWly Documents\Top-NaIU\Chief Designs120 Albion St Salem124x36 Colonial.rck Page 3 of 3 N0 2007 IECC Energy r . Efficiency Certificate Insulation Rating R-Value Ceiling!Roof 38.00 Wall 19.00 Floor f Foundation 19.00 Ductwork(unconditioned spaces): Door Rating U.Factor SHGC Window 0.30 0.21 Door Heating&Cooling Equipment Efficiency Forced Hot Air Furnace 78 AFUE Electric Central Air Conditioner 13 SEER Water Heater: Name: Date: Comments: