Loading...
GEOTECHNIC REVIEW FOUNDATION UNDERPINNING - PROPOSED SILO KEVIN M. MARTIN, P.E.,. KMM GEOTECHNICAL CONSUL'TAN'T, LLC' 7 Marshall Rodd c Y 1 1 4: !t 3 Hamp5tead, NH 0384'x` 603-489-5556 (p)/ 603-489-5558 (0/781-718-4084(m) kevi n m a rt i n peOa o l.co m MEMORANDUM TO: Robert P Dandreo Dandreo Brothers , 106 Oakville Street ,,; Lynn, MA 01905 CNL FROM: Kevin M. Martin, P.E. Geotechnical Engineer DATE: May 11, 2018 RE: GEOTECHNICAL REVIEW FOUNDATION UNDERPINNING JACQUELINES GOURMET BAKERY PROPOSED SILO FOUNDATION SALEM,MASSACHUSETTS This memorandum serves to address foundation underpinning at the referenced project. The contents of this review are subject to the attached Limitations. BACKGROUND The site includes an existing commercial food processing facility. The project includes new exterior silos. The area in question is located adjacent to the building and existing silos. There is an approximate =13 ft wide strip of land between the building and associated access drive. The strip of land (which the new silo is to be located) is ramped up about =3 ft to the building. Further complicating the project are an existing water line and nearby drain line that parallel the building. The water line also laterals below the proposed pad to connect with the building. We understand that the water line can be re-located but the lateral can not be re-located. It is intended to support the silo on a new reinforced concrete pad foundation. The new foundation will be impacted by loading,subgrade conditions,grading,the existing building foundation and the intersecting utilities. Given the site constraints, a mat foundation that extends below grade to develop proper base and lateral support has been designed by BAI. Such a foundation will undermine the existing foundation (which is shallow). The adjacent silo foundations may also become undermined during construction. These should require further review as they become Jacqueline's Bakery May 11,2018 Salem, Massachusetts Page 2 of 3 exposed and verified. The existing foundation will need be underpinned for temporary and permanent support. Sequential concrete pit underpinning has been selected in this regard. Concrete pit underpinning involves localized undermining(z 3-4 ft wide)of the footing with approach pits that are filled with consolidated concrete to lower the BOF. The BOF will need to be lowered about =4 ft to accommodate the proposed construction. it (E) WI COURIN (E) 150)(17AL l (P) SILO LFr. CL (P) SILA LEG CL • 4 FLOOR 11EV = 101.87' L I FINISHED GRADE = 99.9A' a (E) Fwmc av = 101.11' ( } UNDERPINNNG FConffG I� ELEY - 1DJ.11' (b OTH DtS) r. 'a AUVI WR CEMER SOF GOI.M N INTERIOR FQE OF (E) F DAION WALL WHICCHM FURTHER FROV ExiERIN FACE OF (E) FOADATI13N WALL SUBGRADE CONDITIONS Apparent Rock Fill was encountered to depths of 9-10 ft below grade. It is difficult to distinguish rock fill (especially large boulders, cobbles, etc) from small diameter test bores. Nonetheless, apparent rock fill with embedded sand was vacuumed,sampled and penetrated to z 10 ft. It would appear that the rock fill may have been generated on-site with bedrock excavation but there is no verification in this regard. Further review of the subgrade should be completed during construction. Groundwater was not encountered and should not impact the underpinning. Jacqueline's Bakery May 11, 2018 Salem, Massachusetts Page 3 of 3 ENGINEERING EVALUATION Given necessary protection of the existing building, it is intended to underpin the foundation prior to the new silo foundation construction. Concrete pit underpinning will be employed to transfer foundation load to proper subgrade and provide necessary shoring. Concrete pit underpinning is a staggered undermining with subsequent concrete pitting of the existing foundation to transfer the foundation to proper depth. We have provided the attached Sketches, Profiles & Technical Specifications for Concrete Pit Underpinning. We trust the contents of this report are responsive to your needs at this time. Should you have any questions or require additional assistance,please do not hesitate to contact our office. SalemJacquelinesBakeryUnderpin.wpd Lo (F-Q�J1TM,—tjT �A'PS SHA�-u �7TS( �Q �Al) 3—9�•t 34_9• —Sj-�S' �"j'rcJD� y_y�•t 3'-3�• 8'-5 ' 6�• PROPOSED SILO FOUNDATION ---------------- 1 100, N -- LEG a - -- PROPOSED SILO S 1 � I 3 f11NRE SILO- Eg EXISTING PAD j ,' S1 \ EXISTING Pf TOP ELEV = 101.64 SILO CLTOP ELEV = 1 i JOTTOM ELEV = 99.64 1 --(E) BUILDING S3 / OWUOUS FOOTING - ------ - -- (APPROXIMATE) LEG CL '--(E) BUILDING CONCRETE (E) BUILDING COLUMN, TYP FOUNDATION WALL SILO FOUNDATION PLAN SCALE: 1/4" = 1'-0" PROPOSED SILO FOUNDATION PROPOSED SILO I FUTURE SILO y EXISTING PAD � 'i EXISTING P, TOP ELEV = 101.64' TOP ELEV = 1 IOTTOM ELEV = 99.64' � L ----—— `--(E) EknLw coNCRETE i \ ` FOUNDATION WALL 1 1\ I�--(El FOOTINGS BUILDING COLUMN. TYP i 2 SILO FOUNDATION PLAN C2-) SE f?✓(=��1 C.[= Z SCALE: 1/4* = 1'-0" / 0 5 3� Wtbi� STs rr SE G?vE(4c v ryle c loo PAvEP C' fi---VVCC L��IE Vouk,C6bles, g1dr5 SAMA, GRAVEL 31 13 oc.,K UL Ibo+ 1 F\ock �IKA�alk 0 2 REFZAL 0q Al p4K S1-toR Ac cuP-D 1(v 60 134 CL IZ +,kip U J 4 J/h Cl::'Cop Al <;ANP, 6RAv F> /D i�? Al IVI IV& I-r )' " I 1<5 .DE Tlj 10 F P M 1 A/s,pe FA � or, wd ext RMA l— TECHNICAL SPECIFICATIONS CONCRETE PIT UNDERPINNING JACQUELINE'S BAKERY SALEM, MASSACHUSETTS PURPOSE: Concrete pit underpinning is to be used to shore and protect the existing foundation prior to new constriction. • The underpinning pits shall be no greater than z3 ft wide. The underpinning pits should extend to the inside face of the existing foundation. The pits should also extend no less than z 5 inches beyond the front edge of the footing. • Approach pits shall be used for each underpinning. The approach pits shall be no greater than z 5 ft wide. The approach pits shall be shored per OSHA Regulations. Trench boxes may be used for the approach pits by others. • This design is for the existing building foundation. Critical attention shall be given at the column footings to mitigate extended exposure (no more than 40%). The adjacent silo foundations shall also be reviewed during construction and shored, underpinned and/or protected accordingly. • The underpinning pits shall be hand excavated below the foundation. Jack hammers or other power tools may be used to facilitate the excavation. • The bottom of the existing footings shall be cleaned or all loose soil, rock and debris to provide a clean,rough surface. • The bottom and side limits of the underpinning pits shall be manually hand trimmed. Shoring shall be used within the pits as necessary to maintain safe and stable conditions. Rock Fill is expected to be present below BOF. KMM shall be notified if differing subgrade conditions. • The underpinning should be completed in a sequential manner. No more than '/s(third)of the continuous foundation shall be undermined at one time. The attached Sketch shows a proposed staggered layout for the pits. The lateral extent of the underpinning shall be dictated by the proposed excavations. Excavations slopes no steeper than 2H:1 V shall be excavated below the existing BOF. • The bearing subgrade shall ultimately be dry, stable, free of frost and compact throughout construction. Soils which become weakened or disturbed shall be rendered unsuitable for structural bearing support. Field conditions shall dictate the use of a protective base. • Set forms then place and consolidate concrete (minimum 4 ksi high early strength) at a maximum 5 inch slump. Leave a z 3-4 inch space(gap)between the top of the underpinning pit and the bottom of the existing footing. Allow concrete to set for at least 36 hours(or until 3 ksi strength). Refer to the attached Detail. • Force dry-pak between the footing and underpinning pit. Dry-Pak shall consist of a 1:1 mix of Type I/H Portland Cement and concrete sand damped with enough water to hydrate. The amount of water should be enough to allow the mix to retain the shape of a 4 inch ball. The dry-pak shall be rammed with a wood post (2x4) and 10 pound sledge hammer to provide tight contact. A low shrink grout may also be used in lieu of Portland Cement. • Allow the Dry-Pak to set for no less than 24 hours. • Excavate additional pits as the underpinning continues. • KMM should be scheduled to review the pits and subgrade conditions to observe compliance with these Specifications. • Survey control of the existing foundations shall be monitored during construction. Movement greater than '/4 inch shall be reported to the Engineers. END OF SECTION r LIMITATIONS Explorations 1. The analyses,recommendations and designs submitted in this report are based in part upon the data obtained from preliminary subsurface explorations. The nature and extent of variations between these explorations may not become evident until construction. If variations then appear evident,it will be necessary to re-evaluate the recommendations of this report. 2. The generalized soil profile described in the text is intended to convey trends in subsurface conditions. The boundaries between strata are approximate and idealized and have been developed by interpretation of widely spaced explorations and samples; actual soil transitions are probably more gradual. For specific information,refer to the individual test pit and/or boring logs. 3. Water level readings have been made in the test pits and/or test borings under conditions stated on the logs. These data have been reviewed and interpretations have been made in the text of this report. However,it must be noted that fluctuations in the level of the groundwater may occur due to variations in rainfall, temperature, and other factors differing from the time the measurements were made. Review 4. It is recommended that this firm be given the opportunity to review final design drawings and specifications to evaluate the appropriate implementation of the recommendations provided herein. 5. In the event that any changes in the nature,design,or location of the proposed areas are planned,the conclusions and recommendations contained in this report shall not be considered valid unless the changes are reviewed and conclusions of the report modified or verified in writing by KMM Geotechnical Consultants,LLC. Construction 6. It is recommended that this firm be retained to provide geotechnical engineering services during the earthwork phases of the work. This is to observe compliance with the design concepts, specifications, and recommendations and to allow design changes in the event that subsurface conditions differ from those anticipated prior to the start of construction. Use of Report 7. This report has been prepared for the exclusive use of Dandreo Brothers in accordance with generally accepted soil and foundation engineering practices. No other warranty, expressed or implied,is made. 8. This report has been prepared for this project by KMM Geotechnical Consultants,LLC. This report was completed for preliminary design purposes and may be limited in its scope to complete an accurate bid. Contractors wishing a copy of the report may secure it with the understanding that its scope is limited to preliminary geotechnical design considerations only. � t t d °y J,-77 . abs • �*� tit �yz� { t ,�;. � O i ` I i `. r. ..�a.is � l;a ��;+v. #` a 7 4 wt d*, d u t J",r .yam X r.y�' Y _.. +. ye J ,;.� _w 4 yy A s l ,>' !k �. ,L�'�. a�� O t k ' ' '� ',. h', l�'v alit ��._.. _-.. IfiY ��4' v - .;. opo _� f, �°e`` ,w®�+4$� a ,� � ��a�y�:. �, P,. ,.�,,3y<