ENGINEERING FINAL AFFIDAVIT (002) •
. . . . . . ole •
15 Commerce Way, Suite B
Norton, MA 02766
ENGINEERING FINAL AFFIDAVIT
4BSM001A
SALEM HEIGHTS
SECTOR ADD
Address:
12 Pope Street
Salem, MA 01970
Date:
FEBRUARY 26, 2017
CHAPPELL
ceiASSOC IATC-S.:_t
i �.ia;c�tc;=rtr-_-'.rrdSurv��vrnc;
CaCHAPPELL
lm:= ENGINEERINGi
ASSOCIATES„ LLc
C lol-Structural-t_ac1ci Sou v-yn-jcl
February 27, 2017
T-Mobile Northeast LLC
15 Commerce Way, Suite B
Norton, MA 02766
(508)286-2700
Reference: Engineering Completion Affidavit
Site:4BSM001A—Salem Heights
12 Pope Street, Salem, MA 01970
CEA Job Number 1620.020
Site Description:
The site is located on an existing rooftop in Salem, MA. The existing wireless communications facility includes the
equipment mounted to the existing steel platform within the existing lease area as well as antennas mounted to the
existing penthouse facade&within the faux flue. One(1) new panel antennas was facade mounted to the existing
penthouse on a new pipe mount adjacent to the two(2)existing antennas. One(1) new 6x12 HCS cable was run along
the existing cable path from the equipment to the new Delta sector antenna.A new Purcell Cabinet was wall mounted
within the existing equipment area. The new equipment was tied into the existing grounding system on site.
Engineering Field Visit:
On February 26, 2018, Chappell Engineering Associates performed a field inspection of the previously installed T-Mobile
equipment to verify general conformance with the Engineering Construction Documents dated 05/05/17. The following site
photos document our field visit, and the enclosed Final Construction Control Document is attached as requested.
Very truly yours,
Chappell Engineering Associates, LLC
q� DAVID G
CHAPP ',k
4706
MAL
David Chappell, P.E.
Final Construction Control Document
uf* D7 To be submitted at completion of construction by a
Registered Design Professional
for work per the 8a`edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title:4BSMOOIA—Salem Heights Date: 02/08/17 Permit No.
Property Address: 12 Pope Street, Salem,MA 01970
Project: Check(x)one or both as applicable: X New construction X Existing Construction
Project description:
Installation of(1)new panel antennas facade mounted to the existing penthouse on a new pipe mount adjacent to the(2)
existing antennas.(1)New 6x12 HCS cable run along the existing cable path from the equipment to the new Delta sector
antenna.A new Purcell Cabinet wall mounted within the existing equipment area. The new equipment was tied into the
existing grounding system on site.
I David Chappell MA Registration Number: 34706 Expiration date: 06/30/2018 ,am a registered design
professional, and I have prepared or directly supervised the preparation of all design plans,computations and
specifications concerning:
Architectural Structural Mechanical
Fire Protection Electrical X Other: Describe Entire Project
for the above named project. 1,or my designee,have performed the necessary professional services and was present at the
construction site on a regular and periodic basis. To the best of my knowledge,information,and belief the work
proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building
permit and that I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 78 107.
�� onvin
Enter in the space to the right a"wet"or CKW
electronic signature and seal: c3 1
47CS
Phone number: (508)481-7400 Email: dchappell@chappellengineering.co
•-K�'JAIF��`
Building Official Use Only
Building Official Name: Permit No.: Date:
Version 06 11 2013
. <q\
^�/
Existing Equipment Area on acted an Existing Screen W&!on an Existing SelPlatform
2» \\\ «
W7 yy
%��
Existing Equipment Cabin&S Mount dinhe Exisng Equipment Area
7_. iW�FI1INC ■ �.-.
Existing PPC
t
New Purcell Cabinet Wall Mounted Within the Existing Equipment Area
.=.mow..-.-,....,,,,,,,�,1 ��� • ?� �A•,�♦1~ �.,6.���!� ..�aJ� "°` ,;;ter°�ma.�>-':,�` .4
6 4
,,..� 119. a.Y�"`♦":"`T ..+��
�.m
(1)New 6x12 HCS Cable Run Within the Existing Vertical Cable Tray
3
4
e
— <5
Existing Facade Mounted Alpha Sector Antennas
i
WAS
J.,
Existing Facade Mounted Beta Sector Antennas
Existing Beta Sector Antennas Mounted Within the Existing Faux Flue
{ \ \
Existing Facade Mounted Gammas do Antennas with the New Delta Sector Antnna
�� >
< � 2 �
New OdG Sector Antenna Mounted mthe£xistng Building Facade on a New Pipe Mout