Loading...
ENGINEERING FINAL AFFIDAVIT • . . . . . . ole • 15 Commerce Way, Suite B Norton, MA 02766 ENGINEERING FINAL AFFIDAVIT 4BSM001A SALEM HEIGHTS SECTOR ADD Address: 12 Pope Street Salem, MA 01970 Date: FEBRUARY 26, 2017 CHAPPELL ceiASSOC IATC-S.:_t i �.ia;c�tc;=rtr-_-'.rrdSurv��vrnc; CaCHAPPELL lm:= ENGINEERINGi ASSOCIATES„ LLc C lol-Structural-t_ac1ci Sou v-yn-jcl February 27, 2017 T-Mobile Northeast LLC 15 Commerce Way, Suite B Norton, MA 02766 (508)286-2700 Reference: Engineering Completion Affidavit Site:4BSM001A—Salem Heights 12 Pope Street, Salem, MA 01970 CEA Job Number 1620.020 Site Description: The site is located on an existing rooftop in Salem, MA. The existing wireless communications facility includes the equipment mounted to the existing steel platform within the existing lease area as well as antennas mounted to the existing penthouse facade&within the faux flue. One(1) new panel antennas was facade mounted to the existing penthouse on a new pipe mount adjacent to the two(2)existing antennas. One(1) new 6x12 HCS cable was run along the existing cable path from the equipment to the new Delta sector antenna.A new Purcell Cabinet was wall mounted within the existing equipment area. The new equipment was tied into the existing grounding system on site. Engineering Field Visit: On February 26, 2018, Chappell Engineering Associates performed a field inspection of the previously installed T-Mobile equipment to verify general conformance with the Engineering Construction Documents dated 05/05/17. The following site photos document our field visit, and the enclosed Final Construction Control Document is attached as requested. Very truly yours, Chappell Engineering Associates, LLC q� DAVID G CHAPP ',k 4706 MAL David Chappell, P.E. Final Construction Control Document uf* D7 To be submitted at completion of construction by a Registered Design Professional for work per the 8a`edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title:4BSMOOIA—Salem Heights Date: 02/08/17 Permit No. Property Address: 12 Pope Street, Salem,MA 01970 Project: Check(x)one or both as applicable: X New construction X Existing Construction Project description: Installation of(1)new panel antennas facade mounted to the existing penthouse on a new pipe mount adjacent to the(2) existing antennas.(1)New 6x12 HCS cable run along the existing cable path from the equipment to the new Delta sector antenna.A new Purcell Cabinet wall mounted within the existing equipment area. The new equipment was tied into the existing grounding system on site. I David Chappell MA Registration Number: 34706 Expiration date: 06/30/2018 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural Structural Mechanical Fire Protection Electrical X Other: Describe Entire Project for the above named project. 1,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 78 107. �� onvin Enter in the space to the right a"wet"or CKW electronic signature and seal: c3 1 47CS Phone number: (508)481-7400 Email: dchappell@chappellengineering.co •-K�'JAIF��` Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 . <q\ ^�/ Existing Equipment Area on acted an Existing Screen W&!on an Existing SelPlatform 2» \\\ « W7 yy %�� Existing Equipment Cabin&S Mount dinhe Exisng Equipment Area 7_. iW�FI1INC ■ �.-. Existing PPC t New Purcell Cabinet Wall Mounted Within the Existing Equipment Area .=.mow..-.-,....,,,,,,,�,1 ��� • ?� �A•,�♦1~ �.,6.���!� ..�aJ� "°` ,;;ter°�ma.�>-':,�` .4 6 4 ,,..� 119. a.Y�"`♦":"`T ..+�� �.m (1)New 6x12 HCS Cable Run Within the Existing Vertical Cable Tray 3 4 e — <5 Existing Facade Mounted Alpha Sector Antennas i WAS J., Existing Facade Mounted Beta Sector Antennas Existing Beta Sector Antennas Mounted Within the Existing Faux Flue { \ \ Existing Facade Mounted Gammas do Antennas with the New Delta Sector Antnna �� > < � 2 � New OdG Sector Antenna Mounted mthe£xistng Building Facade on a New Pipe Mout