ARCHITECT'S FIELD RPT 4/20/18 the architectural ARCHITECT'S FIELD REPORT tatteam PROJECT NAME: Pequot Highlands Interior Mod-Rehab PROJECT LOCATION: 12 First Street Salem, MA United States ARCHITECT'S PROJECT#: 16068.00 FIELD REPORT: 00022 DATE: 4/2/2018 WEATHER DESCRIPTION: TIME TEMP WIND SPEED HUMIDITY REMARKS 11:00 AM 30°F 3.5 mph 92% Light Snow EST.%COMPLETION&CONFORMANCE WITH SCHEDULE:68%Complete PRESENT ON-SITE: Chris Poulin Silver Street Development Carpenters,Plumbers,Electricians,Elevator Techs Cliff Ageloff Partner Engineering and Science, Inc. Eric Clory The Silver Street Group,LLC Mike Swiatek Port Harbor Construction,INC. TOTAL: 5 OBSERVATIONS: ITEM CATEGORY REMARKS PHOTOS 1 Work in Corridor painting is ongoing. Progress 2 Work in Corridor carpet installation is ongoing. Progress 3 Work in South Building roof replacement ongoing.98% Progress complete.Roof parapet installation is ongoing due to favorable temperatures. 4 Work in North Building roof replacement is ongoing.98% Progress complete.Cell phone equipment relocation is ongoing. 5 Work in Elevator#2&#3 scope of work is ongoing. Progress 6 Work in South building lobby work is ongoing. Progress 7 Work in Window and panel exterior trim installation is Progress ongoing The Architectural Team, Inc. 50 Commandants Way at Admiral s Hill Chelsea AIA 02150 T 617.889.44x)2 F 61 7.884.4329 xww.architecturaReam.com Page 1 of 4 ARCHITECT'S FIELD REPORT DATE: 4/212018 FR: 00022 ITEM CATEGORY REMARKS PHOTOS 8 Work in Pipe staging installation is ongoing for 12 story Progress building on western and eastern facade. 9 Work in Swingstage work on 12 story building is ongoing. Progress Brick demo is ongoing on the southern facade.Brick demo has begun on the eastern facade. 10 Work in Bridge panel installation is ongoing. Progress 11 Work in Storefront installation is ongoing throughout. Progress 12 Work in Office renovation is ongoing. Progress 13 Observations Unit punchlist work is complete 14 Items to Verify PHC must verify CoGen exhaust location complies with engineer's response to RFI#30. 15 Observations Photos X ,.h A The Architectural Team, Inc. 50 Commandants Way at Admiral's Hill Chelsea MA 02150 T 617.889.4402 F 617.884.4329 www-.architecturalteam.com Page 2 of 4 ARCHITECT'S FIELD REPORT DATE: 4/2/2018 FR: 00022 ITEM CATEGORY REMARKS PHOTOS a .,tea }: 4W ' e Citi a f ATTACHMENTS: Report By: The Architectural Team,Inc./Lamarr Rollins II The Architectural Team, Inc. 50 Commandant's Way at Admital s Hill Chelsea MA 02150 T 617.889.4402 F 61 7.884.4329 Ha.^.w,architecturalteam.com Page 3 of 4 M { ARCHITECT'S FIELD REPORT DATE: 4/212018 FR: 00022 Distribution: Phil Renzi The Architectural Team,Inc. prenzi@architecturalteam.com Chris Poulin Silver Street Development cpoulin@thesilverstreetgroup.com Eric Clory The Silver Street Group,LLC eclory@thesilverstreetgroup.com Mike Swiatek Port Harbor Construction,INC. mswiatek@portharborconstruction.co m The Architectural Team, Inc 50 Commandants Ways at Admirals Hill Chelsea MA 02150 T 0i7.889.=4402 F 6'17.884,4329 mw. vv.archdecturalteam,rom Page 4 of 4